Secure gas supply for Europe >Henning Kothe, Project Director, Nord Stream AG –
Berlin, May 21, 2010
![Page 2: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/2.jpg)
Energy infrastructure for Europe >
Nord Stream:
> TWO PARALLEL OFFSHORE PIPELINES of 1,224 km (transport capacity 55 bcm/p.a.)
> A DIRECT LINK to Russia’s vast proven gas reserves
> AN ADDITIONAL route complementing existing network and other planned pipelines
Gas transported by Nord Stream can:
> COVER 25% of the extra gas imports needed in the EU by 2030
> PROVIDE 26 million European households with electricity and heating fuel
> MAKE a substantial contribution to EU climate protection goals
2
![Page 3: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/3.jpg)
Project overview – right on track >
Nord Stream already:
> UNDERTOOK the most comprehensive survey of the Baltic Sea environment
> IDENTIFIED the optimal route, minimising impact on the Baltic Sea environment
> COMPLETED technical design of the pipeline, ensuring safe transport of natural gas
> CONCLUDED the Environmental Impact Assessment and largest international consultation process (Espoo) to date
> OBTAINED all permits for construction
> SECURED financing for phase I
> STARTED construction of the first line
3
![Page 4: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/4.jpg)
Permits granted – construction started in April >
4
200915.06. 30.06.
Water Permit received
20.10.
EEZ Permit granted
05.11.
EEZ Permits granted
18.12.
Construction Permit granted
Munitions clearance
Permit obtained
02.10.
First and second Construction Permit
granted
21./28.12. 12.02.
Water Permit granted
2010
Final Espoo Meeting – Closure of
Espoo Process
![Page 5: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/5.jpg)
Committed to preserving the environment >
Nord Stream ALREADY:
> INVESTED more than 100 million euros into environmental studies, planning and route design
> SURVEYED 40,000 line kilometres of the Baltic Sea in comprehensive geophysical, gradiometric investigations
> CONCLUDED comprehensive EIA and environmental studies that found:
• Environmental impacts are temporary and of minor significance
• Fishing can be impacted during construction, but fish stock are not affected
> ESTABLISHED a Data and Information Fund
> SET UP environmental monitoring system
5
![Page 6: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/6.jpg)
Project players – a true European endeavour >
6
2
Nord Stream and ShareholdersNord Stream AGOAO GazpromN.V. Nederlandse GasunieBASF SE/Wintershall Holding GmbHE.ON Ruhrgas AG
1
3
4
5
Port of Sassnitz-Mukran Port of KotkaPort of HankoPort of SlitePort of Karlskrona
Nord Stream’s Logistical Hubs (weight coating, marshalling yards, stock yards)
3
1
2
Gazprom Marketing and Trading Ltd, UKDONG Energy A/SGaz de France S. A. WINGAS GmbH & Co. KGE.ON Ruhrgas AG
Nord Stream Gas Purchasers
3
1
2
5
4
Nord Stream‘s Contractors(Surveys, EIA, design, production, logistics, pipe laying)
Marin Mätteknik ABRambøllSaipem Services S.p.A. EUPEC GmbH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PetroValves S.R.L.DNVERM
PeterGazZAO OMKEUROPIPE GmbHDoF ASA
IfAÖGlobal Maritime IVL
4
5
3 2
1
1
2
3
4
56
7
8
9
10
11
12
13
14
1
2
3
5 4
1
2
3
Italy
France
UK Denmark
Germany
Russia
Sweden
Finland
Netherlands
Switzerland
Norway
5 45
4
![Page 7: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/7.jpg)
Time schedule >
7
2011-20122011 20122010-20111997-1999 20092006-20082005 - 2006
Feasibility Study
Conceptual Design
Detailed Design
Laying Line 1
CommissioningLine 1
Laying Line 2
Applications & PermittingEIA
Commissioning Line 2
![Page 8: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/8.jpg)
Three vessels guarantee a timely construction >
> Castoro 6 • Saipem Services S.p.A.
• Anchor positioned (deep waters)
• Lay rate: appr. 2.6 km/day
• Installations: Offshore installation; construction of Russian landfall and offshore construction towards German landfall
8
> Castoro 10• Saipem Services S.p.A.
• Anchor positioned (shallow waters)
• Slow installation in Greifwalder Bodden area, near the German landfall
> Solitaire• Allseas Group S.A.
• Dynamically positioned (no anchoring)
• Lay rate: appr. 2.4 km/day
• Installations: Offshore construction in the Gulf of Finland
![Page 9: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/9.jpg)
Laying the first line 2010/2011 – construction schedule >
9
2010 April
May
June
July
Aug.
Sep.
Oct.
Nov.
Dec.
2011 Jan.
Feb.
March
Casto
ro S
ei (C
6)
Solita
ire
Casto
ro D
ieci (C
10
)
* KP = Kilometre Point
![Page 10: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/10.jpg)
Pipe-laying process >
10
![Page 11: Secure gas supply for Europe > Henning Kothe, Project Director, Nord Stream AG – Berlin, May 21, 2010](https://reader036.vdocuments.net/reader036/viewer/2022062511/55165ad8550346a2698b4f79/html5/thumbnails/11.jpg)
Contact >
Nord Stream AG
> Grafenauweg 26304 Zug / SwitzerlandPhone: +41 41 766 91 [email protected]
11
Henning Kothe> Project Director