California High-Speed Train Project 2012 Business Plan Capital Cost Estimate Page 22 APPENDIX C - SCC SUMMARY TABLES PER ICS/IOS STAGE (see Attachment)

Upload: others

Post on 30-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

California High-Speed Train Project 2012 Business Plan Capital Cost Estimate

Page 22

APPENDIX C - SCC SUMMARY TABLES PER ICS/IOS STAGE

(see Attachment)

Exhibit A
Page 2: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

California High-Speed Train Project 2012 Business Plan Update

Capital Cost Summary Tables02/28/2012

Prepared by: V. Kanevskiy Printed on: 5/31/2012

Checked by: R. Smith

Reviewed by:

Approved by:

FRA STANDARD COST CATEGORIES BASE YEAR FY 2011 DOLLARS (Thousands) LOW COST OPTION HIGH COST OPTION

10 TRACK STRUCTURES & TRACK 2,347,000$ Civil (10.04-10.06, 10.08, 10.18) 731,000$

Structures (10.01-10.03, 10.07) 1,146,000$

Track (10.09, 10.10, 10.14) 473,000$

20 STATIONS, TERMINALS, INTERMODAL -$

30 SUPPORT FACILITIES: YARDS, SHOPS, ADMIN. BLDGS -$

40 SITEWORK, RIGHT OF WAY, LAND, EXISTING IMPROVEMENTS 2,092,000$ Purchase or lease of real estate (40.07) 431,000$

50 COMMUNICATIONS & SIGNALING -$

60 ELECTRIC TRACTION -$

70 VEHICLES -$

80 PROFESSIONAL SERVICES (applies to Cats. 10-60) 673,000$

90 UNALLOCATED CONTINGENCY 233,000$

100 FINANCE CHARGES -$

TOTAL: 5,345,000$

ICS

N/A

1

Page 3: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Cooperative Agreement FR-HSR-0009-10-01-00, as amended, Exhibit 3: Funding Contribution Plan

Period Start 1-Jul-12 1-Jul-13 1-Jul-14 1-Jul-15 1-Jul-16 1-Jul-17 1-Jul-18Period End 30-Jun-13 30-Jun-14 30-Jun-15 30-Jun-16 30-Jun-17 30-Jun-18 30-Jun-19

UsesPhase 1 Planning, PE & Environmental 186,000,000 92,691,617 37,161,942 26,937,680 23,669,782 5,538,980 - -

Real Property AcquisitionCP1 ROW Acquisition 441,000,000 225,964,411 215,035,589 - - - - -

CP2 ROW Acquisition 179,000,000 6,105,322 131,253,009 41,641,669 - - - -

CP3 ROW Acquisition 108,000,000 3,683,658 79,191,760 25,124,582 - - - -

CP4 ROW Acquisition 45,670,021 1,557,711 33,487,864 10,624,446 - - - -

This Exhibit 3 is the Funding Contribution Plan required by Cooperative Agreement FR-HSR-0009-10-01-00, as amended. Nothing in this Funding Contribution Plan shall be interpreted to modify, supersede, or amend the terms of Cooperative Agreement FR-HSR-0009-10-01-00 including but not limited to the Scope, Schedule and Approved Project Budget contained therein.

FY S&UDOCUMENT-483240.xlsx

CP4 ROW Acquisition 45,670,021 1,557,711 33,487,864 10,624,446 - - - -

D-B, Program Management, Contract Work & ContingencyProgram Management 266,422,656 38,997,826 44,683,740 44,683,740 44,854,942 44,683,740 44,512,538 4,006,128

SR-99 225,900,000 28,600,000 29,100,000 47,900,000 61,600,000 52,900,000 5,800,000 -

CP1 1,450,823,148 - 103,125,689 616,885,196 477,108,209 214,642,875 38,469,733 591,447

CP2 900,704,098 - 13,471,860 35,362,457 437,310,400 367,161,387 47,397,994 -

CP3 1,163,348,616 - 15,408,362 43,412,826 27,902,926 600,398,243 474,227,285 1,998,973

CP4 466,547,844 - 5,348,379 16,632,000 8,073,736 249,837,366 186,210,053 446,309

CP5 512,336,079 - - 16,826,719 51,784,732 179,626,665 198,397,588 65,700,374

Project Reserve 108,000,000 - - - - - 108,000,000 -

Total Uses 6,053,752,462 397,600,544 707,268,194 926,031,316 1,132,304,727 1,714,789,256 1,103,015,193 72,743,232

SourcesARRA Funds 2,414,056,231 397,600,544.47 527,662,898 103,021,460 573,308,299 812,463,029 - -

FY10 Funds 928,620,000 - - - - 103,028,444 794,987,654 30,603,902

Prop 1A Funds 2,711,076,231 - 179,605,296 823,009,856 558,996,428 799,297,783 308,027,539 42,139,330

Total Sources 6,053,752,462 397,600,544 707,268,194 926,031,316 1,132,304,727 1,714,789,256 1,103,015,193 72,743,232 Total Sources 6,053,752,462 397,600,544 707,268,194 926,031,316 1,132,304,727 1,714,789,256 1,103,015,193 72,743,232

Notes:Estimates based on input from Authority staff and consultants as of November 2012 .

1 Phase I Planning PE & Environmental costs include costs for oversight and management of the regional contractors

2 CP1-5 D-B costs include the cost of construction management and other support costsEstimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction timeline SR-99 Realignment costs are based on the draft agreement between the Authority and Caltrans as of July 19th, 2012.

3 CP1-5 ROW acquisition costs include the cost of ROW support and mitigation.4 Program Management costs after March FY 12/13 are spread in a level manner.5 Portions of Phase 1 will need additional funding for Planning, Preliminary Engineering and Environmental6 PE/NEPA/CEQA Dollars spent between 2010 and 2012 in the amount of $202,000,000 are not reflected in the above numbers7 Amendment #1 in amount of $91,000,0008 Reference is made to the Grant Agreement dated September 22, 2010 and to Amendment No. 59 Advance payment is requested for all ARRA eligible elements through spring 2014, or earlier.

10 Grantee's ability to issue NTP for any design or construction contract is subject to the limitations in Attachment 3A, Task 5 of Cooperative Agreement FR-HSR-0009-10-01-00, as amended. Red text designates scope activities that are authorized to be paid with Federal funds , using advance payment method, until Prop 1A bond sale or

Monthly cost estimates for Phase 1 PE/NEPA/CEQA are based on estimated annual expenditures spread uniformly over 12 months .

11

12

131415 Preconstrcution funding availability estimated mid-June 2012. Does not reflect invoicing lag to the FRA.

Red text designates scope activities that are authorized to be paid with Federal funds , using advance payment method, until Prop 1A bond sale or April 2014, whichever is earlier.

Blue text designates scope activities that are authoritzed to be paid with Federal funds, using advance payment method, until Prop 1A bond sale or April 2014, whichever is earlier; however, these activities require FRA approval prior to issuing NTP for any design and construction activities, consistent with Attachment 3A, Task 5 of Cooperative Agreement FR-HSR-0009-10-01-00, as amended.Project contingency is allocated across CP 1-5.Project reserve will be allocated in future grant amendments

FY S&UDOCUMENT-483240.xlsx

Exhibit B - FRA Funding Agreement - Ammendment #5 DEC 5 2012
Exhibit B Funding Contribution Amendment 5 December 2012
Page 4: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

FCP Report Dec 2013 v2.4 7 of 22

SUMMARY CONSTRUCTION 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total RC Teams PMT Design-Build TotalTask 5 D-B Program Management - - 31,131,707 51,925,380 58,118,004 85,858,259 110,456,117 77,698,379 7,119,832 190,903 422,498,581 - 263,488,821 159,009,760 422,498,581

Task 5.1 Program ManagementTask 5.1.1 PMT (Tasks 6 - 16, except 15) - - 30,655,354 44,516,060 42,987,742 46,577,055 47,371,588 41,091,461 - - 253,199,261 - 253,199,261 - 253,199,261 Task 5.1.2 Network Integration (Task 15) - - 420,605 1,693,124 1,799,313 1,543,599 2,399,853 2,433,067 - - 10,289,560 - 10,289,560 - 10,289,560 Task 5.1.3 Program Construction Management 1 - - 55,748 5,716,197 8,949,960 8,949,960 8,949,960 2,278,176 - - 34,900,000 - - 34,900,000 34,900,000 Task 5.1.4 Program Construction Management 2 - - - - 1,582,413 8,992,308 15,199,336 8,046,364 1,325,490 - 35,145,909 - - 35,145,909 35,145,909 Task 5.1.5 Program Construction Management 3 - - - - 2,043,843 11,614,457 19,631,448 10,392,676 1,712,001 - 45,394,425 - - 45,394,425 45,394,425 Task 5.1.6 Program Construction Management 4 - - - - 182,024 4,594,994 9,776,016 7,107,811 1,917,910 - 23,578,755 - - 23,578,755 23,578,755 Task 5.1.7 Program Construction Management 5 - - - - 572,710 3,585,886 7,127,916 6,348,825 2,164,431 190,903 19,990,671 - - 19,990,671 19,990,671

Task 6 Real Property Acquisition - - 11,600,700 149,597,010 266,642,394 221,789,167 119,099,978 13,899,602 3,023,846 - 785,652,696 32,427,114 - 753,225,582 785,652,696

Task 6.1 Real Property - Preliminary R.O.W - - 10,898,056 10,942,269 10,586,789 - - - - - 32,427,114 32,427,114 - - 32,427,114

Task 6.2 Real Property - Regular R.O.W - - 702,644 138,654,741 256,055,605 221,789,167 119,099,978 13,899,602 3,023,846 - 753,225,582 - - 753,225,582 753,225,582 Task 6.2.1 CP1 ROW Acquisition - - 702,644 98,632,400 140,726,415 132,785,330 47,708,772 - - - 420,555,561 - - 420,555,561 420,555,561 Task 6.2.2 CP2 ROW Acquisition - - - 24,961,669 71,930,052 46,553,113 35,555,166 - - - 179,000,000 - - 179,000,000 179,000,000 Task 6.2.3 CP3 ROW Acquisition - - - 15,060,672 43,399,138 28,087,912 21,452,279 - - - 108,000,000 - - 108,000,000 108,000,000 Task 6.2.4 CP4 ROW Acquisition - - - - - 14,362,813 14,383,761 13,899,602 3,023,846 - 45,670,021 - - 45,670,021 45,670,021

Task 7 Early Work Program - N/A - - - - - - - - - - - - - - -

Task 8 D-B Contract Work - - - 187,539,793 442,952,374 1,031,909,769 1,499,169,879 833,363,999 148,207,596 4,581,679 4,147,725,090 5,137,387 - 4,142,587,703 4,147,725,090

Task 8.1 SR-99 - - - 15,400,000 28,000,000 54,000,000 71,000,000 46,000,000 11,500,000 - 225,900,000 - - 225,900,000 225,900,000 - - - -

Task 8.2 CP1 - - - 170,327,335 330,058,826 364,862,210 308,918,923 119,137,849 - - 1,293,305,143 - - 1,293,305,143 1,293,305,143 Task 8.2.1 D-B CP1 - - - 167,827,335 297,149,736 327,316,756 204,706,802 25,804,515 - - 1,022,805,143 - - 1,022,805,143 1,022,805,143 Task 8.2.2 CP1 Contingency - - - - - - 66,666,667 93,333,333 - - 160,000,000 - - 160,000,000 160,000,000 Task 8.2.3 Third Parties CP1 - - - 2,500,000 32,909,091 37,545,455 37,545,455 - - - 110,500,000 - - 110,500,000 110,500,000

Task 8.3 CP2 - - - 1,812,458 40,430,390 210,857,602 356,404,116 188,676,478 31,080,958 - 829,262,003 5,137,387 - 824,124,616 829,262,003 Task 8.3.1 D-B CP2 - - - - 37,105,461 210,857,602 356,404,116 188,676,478 31,080,958 - 824,124,616 - - 824,124,616 824,124,616 Task 8.3.2 PE4P - - - 1,812,458 3,324,929 - - - - - 5,137,387 5,137,387 - - 5,137,387 Task 8.3.3 Third Parties / Support Costs CP2 - - - - - - - - - - - - - - -

Task 8.4 CP3 - - - - 27,793,652 242,303,692 434,711,496 212,980,960 22,866,392 - 940,656,191 - - 940,656,191 940,656,191 Task 8.4.1 D-B CP3 - - - - 27,793,652 242,303,692 434,711,496 212,980,960 22,866,392 - 940,656,191 - - 940,656,191 940,656,191 Task 8.4.2 Third Parties / Support Costs CP3 - - - - - - - - - - - - - - -

Task 8.5 CP4 - - - - 2,924,468 73,824,994 157,065,349 114,196,922 30,813,910 - 378,825,643 - - 378,825,643 378,825,643 Task 8.5.1 D-B CP4 - - - - 2,924,468 73,824,994 157,065,349 114,196,922 30,813,910 - 378,825,643 - - 378,825,643 378,825,643 Task 8.5.2 Third Parties / Support Costs CP4 - - - - - - - - - - - - - - -

Task 8.6 CP5 - - - - 13,745,038 86,061,272 171,069,995 152,371,791 51,946,336 4,581,679 479,776,110 - - 479,776,110 479,776,110 Task 8.6.1 D-B CP5 - - - - 13,745,038 86,061,272 171,069,995 152,371,791 51,946,336 4,581,679 479,776,110 - - 479,776,110 479,776,110 Task 8.6.2 Third Parties / Support Costs CP5 - - - - - - - - - - - - - - -

Task 9 Project Reserves - - - - - 3,855,592 15,422,370 123,445,623 11,566,777 - 154,290,362 - - 154,290,362 154,290,362 Task 9.1 Project Reserves - - - - - 3,855,592 15,422,370 15,422,370 11,566,777 - 46,267,109 - - 46,267,109 46,267,109 Task 9.2 Interim Use Reserve - - - - - - - 108,023,253 - - 108,023,253 - - 108,023,253 108,023,253

Task 10 Unallocated Contengency - - - - - 17,715,478 70,861,911 70,861,911 53,146,433 - 212,585,733 - - 212,585,733 212,585,733 Task 10.1 Unallocated Contengency - - - - - 17,715,478 70,861,911 70,861,911 53,146,433 - 212,585,733 - - 212,585,733 212,585,733

Construction Subtotal - - 42,732,407 389,062,183 767,712,771 1,361,128,266 1,815,010,255 1,119,269,514 223,064,484 4,772,583 5,722,752,462 37,564,501 263,488,821 5,421,699,141 5,722,752,462

Total 131,807,879 126,648,474 126,650,389 454,105,117 915,898,771 1,396,586,720 1,833,325,392 1,133,892,653 223,064,484 4,772,583 6,346,752,462 369,711,568 417,995,668 5,559,045,226 6,346,752,462

FCP Expenditures and Forecast

Exhibit C Quarterly Funding Contribution Update Dec 2013
Page 5: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

California High-Speed Rail Authority Funding Contribution Plan (FCP) September 30, 2015 Revised

Table of Contents Table of Contents 1

Footnotes 2

FCP Expenditures and Forecast 3

Cost Summary Tables 8

Planning Cost Summary by Segment 9

Annual Expenditures Plan by FRA Task 10

Annual Expenditure Plan by Environmental/Construction 11

Annual Expenditure Plan by Funding Source 12

Monthly Expenditure Plan by Funding Source 13

Report date September 30, 2015

Exhibit A
Exhibit D Funding Contribution Plan Sept 2015 (currently most recent)
Page 6: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 2 of 22

Footnotes Cooperative Agreement FR-HSR-0009-10-01-00, Exhibit 3: Funding Contribution Plan

The following Funding Contribution Plan is submitted for the quarter ended September 30, 2015.

General Assumptions: - This budget update for September 30, 2015 is submitted as required by Cooperative Agreement FR-HSR-0009-

10-01-05. Nothing in this quarterly update shall be interpreted to modify, supersede, or amend the terms of the Cooperative Agreement FR-HSR-0009-10-01-05.

- The schedule and forecast contained herein are unmitigated and subject to change. - The Authority is requesting a one-year extension to the period of performance as a contingency to allow for

potential use for testing and demonstration of high-speed service and/or integration with an Initial operating Segment.

- The proposed one-year extension does not reflect a change in any contractual delivery schedule. - Both CP 1 and CP 2-3 delivery schedules are being re-baselined. Upon completion, the FCP schedule will be

updated to reflect the changes. - State funding sources may include Prop 1A and Cap & Trade. - FY 10/11 costs reflect ARRA start date of August 17, 2010. - The San Francisco to San Jose and San Jose to Merced environmental sections are currently under

procurement and subject to change.

Page 7: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 3 of 22

From 8/17/2010 Total Estimated Resource SUMMARY - PROJECT DEVELOPMENT 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Cost RC Teams PMT Agencies Total

Task 1 Environmental Review 51,290,773 51,531,643 39,465,078 30,638,774 29,438,985 28,850,650 9,364,436 1,872,784 - - 242,453,124 190,497,780 51,955,344 - 242,453,124 Task 1.1 Regional Consultant Project Management 11,183,708 11,334,603 9,462,239 6,692,902 4,742,318 4,688,065 2,553,597 308,750 - - 50,966,182 50,966,182 - - 50,966,182 Task 1.2 Regional Consultant Public / Agency Participation 4,030,945 5,251,179 3,921,771 2,164,819 3,636,662 2,711,715 1,628,800 - - - 23,345,891 23,345,891 - - 23,345,891 Task 1.3 Alternatives Analysis 1,501,987 836,222 1,239,815 2,621,311 5,178,809 748,392 9,800 - - - 12,136,336 12,136,336 - - 12,136,336 Task 1.4 EIR / EIS Analysis 21,559,952 15,243,143 6,955,080 3,013,590 6,531,060 3,170,677 1,127,500 - - - 57,601,001 57,601,001 - - 57,601,001 Task 1.5 Draft and Final EIR / EIS 4,532,938 7,621,300 4,576,920 3,039,004 413,406 6,133,600 1,247,350 165,863 - - 27,730,381 27,730,381 - - 27,730,381 Task 1.6 Certification of EIR / EIS and ROD 317,850 1,660,521 5,691,406 4,564,133 830,193 5,323,898 329,989 - - - 18,717,989 18,717,989 - - 18,717,989 Task 1.7 Program Management 8,163,392 9,584,676 7,617,847 8,543,015 8,106,539 6,074,303 2,467,400 1,398,171 - - 51,955,344 - 51,955,344 - 51,955,344

Task 2 PE 15% and 30% Design 67,962,916 51,020,315 34,492,128 24,642,965 20,592,029 12,394,734 4,668,518 2,950,250 - - 218,723,856 140,951,481 77,772,375 - 218,723,856 Task 2.1 Regional Consultant PE 46,800,121 30,460,615 24,899,586 17,375,799 14,757,448 4,139,144 1,668,518 850,250 - - 140,951,481 140,951,481 - - 140,951,481 Task 2.2 Program Management 6,213,724 7,263,650 9,592,542 7,267,166 5,834,581 8,255,590 3,000,000 2,100,000 - - 49,527,253 - 49,527,253 - 49,527,253 Task 2.3 RDP Engineering 14,949,071 13,296,051 - - - - - - - - 28,245,122 - 28,245,122 - 28,245,122

Task 3 Other Related Work 11,123,576 23,062,760 8,859,651 7,902,906 10,231,702 43,242,300 54,785,802 2,818,802 - - 162,027,498 12,875,448 14,709,502 134,442,548 162,027,498 Task 3.1 Regional Consultant Station Area Planning 674,493 707,814 480,260 239,024 413,924 230,621 110,000 - - - 2,856,137 2,856,137 - - 2,856,137 Task 3.2 Regional Consultant ROW Work 2,267,839 7,030,227 961 - 125,395 537,889 57,000 - - - 10,019,311 10,019,311 - - 10,019,311 Task 3.3 RDP ROW Work 296,574 428,622 - - - - - - - - 725,196 - 725,196 - 725,196 Task 3.4 Ridership Forecasting 3,237,742 4,355,299 - - - - - - - - 7,593,041 - 7,593,041 - 7,593,041 Task 3.5 Construction Planning / Procurement Support 954,079 5,437,186 - - - - - - - - 6,391,265 - 6,391,265 - 6,391,265 Task 3.6 Station Area Planning - - - - - 6,900,000 3,950,000 150,000 - - 11,000,000 - - 11,000,000 11,000,000 Task 3.7 LAUS/So Cal Improvements - - - - - 32,000,000 48,000,000 - - - 80,000,000 - - 80,000,000 80,000,000 Task 3.8 Resource Agencies for Environmental Review 3,692,849 5,103,612 8,378,429 7,663,882 9,692,383 3,573,790 2,668,802 2,668,802 - - 43,442,548 - - 43,442,548 43,442,548

Task 4 Project Administration (SWCAP) 659,950 - - 17,920 - 117,652 - - - - 795,522 - - 795,522 795,522

Total SUMMARY - PROJECT DEVELOPMENT 131,037,215 125,614,718 82,816,857 63,202,565 60,262,717 84,605,335 68,818,756 7,641,836 - - 624,000,000 344,324,709 144,437,221 135,238,071 624,000,000

Phase I San Francisco - San Jose 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 7,364,960 2,728,386 1,105,301 908,322 810,654 3,928,903 4,183,578 270,395 - - 21,300,498 15,376,215 5,924,284 - 21,300,498

Task 1.1 Regional Consultant Project Management 2,444,353 714,426 134,829 7,986 - 1,122,320 1,211,056 - - - 5,634,970 5,634,970 - - 5,634,970 Task 1.2 Regional Consultant Public / Agency Participation 1,016,757 416,431 157,400 3,589 - 560,919 997,400 - - - 3,152,496 3,152,496 - - 3,152,496 Task 1.3 Alternatives Analysis 263,815 - - - - 31,447 9,800 - - - 305,062 305,062 - - 305,062 Task 1.4 EIR / EIS Analysis 2,427,912 639,062 51,287 42,446 - 831,728 811,800 - - - 4,804,234 4,804,234 - - 4,804,234 Task 1.5 Draft and Final EIR / EIS 395,783 - - - - 561,069 374,900 - - - 1,331,752 1,331,752 - - 1,331,752 Task 1.6 Certification of EIR / EIS and ROD - - - - - - 147,700 - - - 147,700 147,700 - - 147,700 Task 1.7 Program Management 816,339 958,468 761,785 854,302 810,654 821,420 630,922 270,395 - - 5,924,284 - 5,924,284 - 5,924,284 Task 1.8 Resource Agencies for Environmental Review 694,920 178,125 25,915 17,727 970,860 552,647 639,519 355,746 - - 3,435,459 - - 3,435,459 3,435,459

Task 2 PE 15% and 30% Design 12,839,892 3,644,554 969,677 726,717 583,458 825,559 300,000 210,000 - - 20,099,857 12,322,620 7,777,237 - 20,099,857 Task 2.1 Regional Consultant PE 10,723,612 1,588,584 10,423 - - - - - - - 12,322,620 12,322,620 - - 12,322,620 Task 2.2 Program Management 621,372 726,365 959,254 726,717 583,458 825,559 300,000 210,000 - - 4,952,725 - 4,952,725 - 4,952,725 Task 2.3 RDP Engineering 1,494,907 1,329,605 - - - - - - - - 2,824,512 - 2,824,512 - 2,824,512

Task 3 Other Related Work 1,558,753 1,238,450 63,939 86,420 3,517,835 1,491,050 2,309,879 1,211,490 - - 11,477,815 649,179 1,470,950 9,357,686 11,477,815 Task 3.1 Regional Consultant Station Area Planning 404,192 - - - - 56,107 75,000 - - - 535,299 535,299 - - 535,299 Task 3.2 Regional Consultant ROW Work 1,522 - - - - 55,359 57,000 - - - 113,880 113,880 - - 113,880 Task 3.3 RDP ROW Work 29,657 42,862 - - - - - - - - 72,520 - 72,520 - 72,520 Task 3.4 Ridership Forecasting 323,774 435,530 - - - - - - - - 759,304 - 759,304 - 759,304 Task 3.5 Construction Planning / Procurement Support 95,408 543,719 - - - - - - - - 639,126 - 639,126 - 639,126 Task 3.6 Station Area Planning - - - - - - - - - - - - - - - Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 704,201 216,339 63,939 86,420 3,517,835 1,379,584 2,177,879 1,211,490 - - 9,357,686 - - 9,357,686 9,357,686

Task 4 Project Administration (SWCAP) 33,541 - - 896 - 2,353 - - - - 36,790 - - 36,790 36,790 Task 4.1 SWCAP 33,541 - - 896 - 2,353 - - - - 36,790 - - 36,790 36,790 Task 4.2 Project Administration - - - - - - - - - - - - - - -

Total San Francisco - San Jose 21,797,146 7,611,390 2,138,917 1,722,355 4,911,947 6,247,864 6,793,457 1,691,885 - - 52,914,960 28,348,013 15,172,472 9,394,476 52,914,960

FCP Expenditures and Forecast

Page 8: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 4 of 22

Phase I San Jose - Merced 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 8,318,503 8,264,014 6,679,641 4,198,886 5,273,541 4,116,968 5,180,858 1,602,389 - - 43,634,800 32,214,969 11,419,831 - 43,634,800

Task 1.1 Regional Consultant Project Management 2,274,671 2,017,638 1,463,296 968,146 807,154 398,583 1,342,542 308,750 - - 9,580,780 9,580,780 - - 9,580,780 Task 1.2 Regional Consultant Public / Agency Participation 670,742 919,461 610,920 200,583 432,424 544,234 631,400 - - - 4,009,764 4,009,764 - - 4,009,764 Task 1.3 Alternatives Analysis 324,124 22,460 50,867 - (144) 2,974 - - - - 400,281 400,281 - - 400,281 Task 1.4 EIR / EIS Analysis 4,084,721 3,897,504 2,467,457 951,113 2,079,355 432,338 315,700 - - - 14,228,189 14,228,189 - - 14,228,189 Task 1.5 Draft and Final EIR / EIS 147,905 419,351 547,532 368,682 220,380 675,986 872,450 165,863 - - 3,418,150 3,418,150 - - 3,418,150 Task 1.6 Certification of EIR / EIS and ROD - 29,132 15,999 1,759 113,063 235,562 182,289 - - - 577,804 577,804 - - 577,804 Task 1.7 Program Management 816,339 958,468 1,523,569 1,708,603 1,621,308 1,827,290 1,836,478 1,127,776 - - 11,419,831 - 11,419,831 - 11,419,831

Task 2 PE 15% and 30% Design 11,868,231 5,131,762 7,790,861 4,659,669 3,777,970 2,019,256 4,368,518 2,740,250 - - 42,356,517 27,404,291 14,952,225 - 42,356,517 Task 2.1 Regional Consultant PE 9,751,952 3,075,792 5,872,353 3,206,236 2,611,053 368,138 1,668,518 850,250 - - 27,404,291 27,404,291 - - 27,404,291 Task 2.2 Program Management 621,372 726,365 1,918,508 1,453,433 1,166,916 1,651,118 2,700,000 1,890,000 - - 12,127,713 - 12,127,713 - 12,127,713 Task 2.3 RDP Engineering 1,494,907 1,329,605 - - - - - - - - 2,824,512 - 2,824,512 - 2,824,512

Task 3 Other Related Work 1,086,526 1,939,834 1,736,592 1,128,177 1,498,430 1,403,777 2,075,923 1,607,312 - - 12,476,572 276,132 1,470,950 10,729,490 12,476,572 Task 3.1 Regional Consultant Station Area Planning 1,641 234,393 4,606 - - - 35,000 - - - 275,640 275,640 - - 275,640 Task 3.2 Regional Consultant ROW Work 422 70 - - - - - - - - 492 492 - - 492 Task 3.3 RDP ROW Work 29,657 42,862 - - - - - - - - 72,520 - 72,520 - 72,520 Task 3.4 Ridership Forecasting 323,774 435,530 - - - - - - - - 759,304 - 759,304 - 759,304 Task 3.5 Construction Planning / Procurement Support 95,408 543,719 - - - - - - - - 639,126 - 639,126 - 639,126 Task 3.6 Station Area Planning - - - - - 700,000 1,550,000 150,000 - - 2,400,000 - - 2,400,000 2,400,000 Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 635,624 683,261 1,731,986 1,128,177 1,498,430 703,777 490,923 1,457,312 - - 8,329,490 - - 8,329,490 8,329,490

Task 4 Project Administration (SWCAP) 77,232 - - 4,480 - 29,410 - - - - 111,122 - - 111,122 111,122

Total San Jose - Merced 21,350,492 15,335,610 16,207,093 9,991,212 10,549,940 7,569,412 11,625,300 5,949,952 - - 98,579,010 59,895,392 27,843,007 10,840,612 98,579,010

Phase I Merced - Fresno 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 11,343,968 12,374,763 6,897,018 5,036,475 330,065 - - - - - 35,982,289 29,929,186 6,053,103 - 35,982,289

Task 1.1 Regional Consultant Project Management 910,665 1,194,052 1,174,151 806,743 51,840 - - - - - 4,137,450 4,137,450 - - 4,137,450 Task 1.2 Regional Consultant Public / Agency Participation 300,566 946,072 333,453 70,727 - - - - - - 1,650,817 1,650,817 - - 1,650,817 Task 1.3 Alternatives Analysis 41,733 - - - - - - - - - 41,733 41,733 - - 41,733 Task 1.4 EIR / EIS Analysis 7,091,348 3,512,502 - - - - - - - - 10,603,850 10,603,850 - - 10,603,850 Task 1.5 Draft and Final EIR / EIS 950,855 3,487,682 - - - - - - - - 4,438,537 4,438,537 - - 4,438,537 Task 1.6 Certification of EIR / EIS and ROD 7,954 838,286 4,627,629 3,304,705 278,225 - - - - - 9,056,799 9,056,799 - - 9,056,799 Task 1.7 Program Management 2,040,848 2,396,169 761,785 854,302 - - - - - - 6,053,103 - 6,053,103 - 6,053,103

Task 2 PE 15% and 30% Design 10,549,753 9,812,104 2,520,195 1,171,869 36,466 - - - - - 24,090,388 11,973,793 12,116,595 - 24,090,388 Task 2.1 Regional Consultant PE 5,259,054 4,672,179 1,560,941 445,153 36,466 - - - - - 11,973,793 11,973,793 - - 11,973,793 Task 2.2 Program Management 1,553,431 1,815,912 959,254 726,717 - - - - - - 5,055,314 - 5,055,314 - 5,055,314 Task 2.3 RDP Engineering 3,737,268 3,324,013 - - - - - - - - 7,061,280 - 7,061,280 - 7,061,280

- Task 3 Other Related Work 1,791,891 7,267,530 1,042,068 290,823 - 1,800,000 - - - - 12,192,312 3,825,408 3,677,376 4,689,529 12,192,312

Task 3.1 Regional Consultant Station Area Planning 78,438 - - - - - - - - - 78,438 78,438 - - 78,438 Task 3.2 Regional Consultant ROW Work 10,598 3,736,372 - - - - - - - - 3,746,970 3,746,970 - - 3,746,970 Task 3.3 RDP ROW Work 74,144 107,155 - - - - - - - - 181,299 - 181,299 - 181,299 Task 3.4 Ridership Forecasting 809,436 1,088,825 - - - - - - - - 1,898,260 - 1,898,260 - 1,898,260 Task 3.5 Construction Planning / Procurement Support 238,520 1,359,296 - - - - - - - - 1,597,816 - 1,597,816 - 1,597,816 Task 3.6 Station Area Planning - - - - - 1,800,000 - - - - 1,800,000 - - 1,800,000 1,800,000 Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 580,757 975,881 1,042,068 290,823 - - - - - - 2,889,529 - - 2,889,529 2,889,529

Task 4 Project Administration (SWCAP) 116,099 - - 2,688 - 17,650 - - - - 136,437 - - 136,437 136,437

Total Merced- Fresno 23,801,711 29,454,397 10,459,281 6,501,856 366,531 1,817,650 - - - - 72,401,426 45,728,386 21,847,074 4,825,966 72,401,426

FCP Expenditures and Forecast

Page 9: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 5 of 22

Phase I Fresno - Bakersfield 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 11,951,478 14,453,679 9,728,991 8,090,890 1,218,063 306,475 - - - - 45,749,575 39,770,890 5,978,686 - 45,749,575

Task 1.1 Regional Consultant Project Management 2,519,975 4,226,205 3,324,563 2,716,612 531,127 - - - - - 13,318,483 13,318,483 - - 13,318,483 Task 1.2 Regional Consultant Public / Agency Participation 1,220,980 1,775,490 1,283,527 631,032 122,254 - - - - - 5,033,282 5,033,282 - - 5,033,282 Task 1.3 Alternatives Analysis - - - - 4,312 - - - - - 4,312 4,312 - - 4,312 Task 1.4 EIR / EIS Analysis 3,114,822 1,604,933 - - 8,664 - - - - - 4,728,420 4,728,420 - - 4,728,420 Task 1.5 Draft and Final EIR / EIS 2,753,544 3,657,779 3,705,227 2,641,129 116,461 - - - - - 12,874,139 12,874,139 - - 12,874,139 Task 1.6 Certification of EIR / EIS and ROD 301,309 793,103 1,034,781 1,247,815 435,246 - - - - - 3,812,254 3,812,254 - - 3,812,254 Task 1.7 Program Management 2,040,848 2,396,169 380,892 854,302 - 306,475 - - - - 5,978,686 - 5,978,686 - 5,978,686

Task 2 PE 15% and 30% Design 15,902,078 16,920,367 7,566,914 11,773,887 3,750,436 - - - - - 55,913,682 44,276,714 11,636,968 - 55,913,682 Task 2.1 Regional Consultant PE 10,611,379 11,780,442 7,087,287 11,047,170 3,750,436 - - - - - 44,276,714 44,276,714 - - 44,276,714 Task 2.2 Program Management 1,553,431 1,815,912 479,627 726,717 - - - - - - 4,575,687 - 4,575,687 - 4,575,687 Task 2.3 RDP Engineering 3,737,268 3,324,013 - - - - - - - - 7,061,280 - 7,061,280 - 7,061,280

- Task 3 Other Related Work 4,133,335 7,629,814 2,782,937 1,463,985 - 2,400,000 2,400,000 - - - 20,810,071 6,041,967 3,677,376 11,090,729 20,810,071

Task 3.1 Regional Consultant Station Area Planning - 321,157 215,985 94,713 - - - - - - 631,855 631,855 - - 631,855 Task 3.2 Regional Consultant ROW Work 2,115,364 3,293,785 961 - - - - - - - 5,410,111 5,410,111 - - 5,410,111 Task 3.3 RDP ROW Work 74,144 107,155 - - - - - - - - 181,299 - 181,299 - 181,299 Task 3.4 Ridership Forecasting 809,436 1,088,825 - - - - - - - - 1,898,260 - 1,898,260 - 1,898,260 Task 3.5 Construction Planning / Procurement Support 238,520 1,359,296 - - - - - - - - 1,597,816 - 1,597,816 - 1,597,816 Task 3.6 Station Area Planning - - - - - 2,400,000 2,400,000 - - - 4,800,000 - - 4,800,000 4,800,000 Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 895,872 1,459,595 2,565,990 1,369,272 - - - - - - 6,290,729 - - 6,290,729 6,290,729

Task 4 Project Administration (SWCAP) 202,403 - - 4,480 - 11,766 - - - - 218,650 - - 218,650 218,650

Total Fresno - Bakersfield 32,189,295 39,003,859 20,078,843 21,333,241 4,968,499 2,718,241 2,400,000 - - - 122,691,978 90,089,571 21,293,029 11,309,378 122,691,978

Phase I Bakersfield - Palmdale 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 2,679,979 5,402,800 5,953,688 4,886,674 9,417,634 8,813,613 - - - - 37,154,388 26,957,279 10,197,109 - 37,154,388

Task 1.1 Regional Consultant Project Management 256,628 846,620 1,249,689 913,161 1,036,727 700,669 - - - - 5,003,494 5,003,494 - - 5,003,494 Task 1.2 Regional Consultant Public / Agency Participation 123,650 305,641 379,984 233,422 717,749 489,333 - - - - 2,249,779 2,249,779 - - 2,249,779 Task 1.3 Alternatives Analysis 238,257 236,650 144,544 627,634 2,915,839 556,282 - - - - 4,719,206 4,719,206 - - 4,719,206 Task 1.4 EIR / EIS Analysis 1,245,104 3,055,422 2,264,560 976,703 1,906,373 683,870 - - - - 10,132,032 10,132,032 - - 10,132,032 Task 1.5 Draft and Final EIR / EIS - - 10,449 - - 450,169 - - - - 460,618 460,618 - - 460,618 Task 1.6 Certification of EIR / EIS and ROD - - - - 3,658 4,388,491 - - - - 4,392,149 4,392,149 - - 4,392,149 Task 1.7 Program Management 816,339 958,468 1,904,462 2,135,754 2,837,289 1,544,798 - - - - 10,197,109 - 10,197,109 - 10,197,109

Task 2 PE 15% and 30% Design 2,545,232 4,511,635 9,236,769 2,250,981 2,597,006 3,538,334 - - - - 24,679,957 11,361,221 13,318,736 - 24,679,957 Task 2.1 Regional Consultant PE 428,953 2,455,665 6,838,634 434,190 554,902 648,877 - - - - 11,361,221 11,361,221 - - 11,361,221 Task 2.2 Program Management 621,372 726,365 2,398,135 1,816,791 2,042,104 2,889,456 - - - - 10,494,224 - 10,494,224 - 10,494,224 Task 2.3 RDP Engineering 1,494,907 1,329,605 - - - - - - - - 2,824,512 - 2,824,512 - 2,824,512

Task 3 Other Related Work 534,894 1,466,576 1,371,338 2,354,078 1,754,636 393,763 - - - - 7,875,286 7,481 1,470,950 6,396,855 7,875,286 Task 3.1 Regional Consultant Station Area Planning - - - - - - - - - - - - - - - Task 3.2 Regional Consultant ROW Work - - - - - 7,481 - - - - 7,481 7,481 - - 7,481 Task 3.3 RDP ROW Work 29,657 42,862 - - - - - - - - 72,520 - 72,520 - 72,520 Task 3.4 Ridership Forecasting 323,774 435,530 - - - - - - - - 759,304 - 759,304 - 759,304 Task 3.5 Construction Planning / Procurement Support 95,408 543,719 - - - - - - - - 639,126 - 639,126 - 639,126 Task 3.6 Station Area Planning - - - - - - - - - - - - - - - Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 86,054 444,466 1,371,338 2,354,078 1,754,636 386,282 - - - - 6,396,855 - - 6,396,855 6,396,855

Task 4 Project Administration (SWCAP) 63,369 - - 1,792 - 22,354 - - - - 87,515 - - 87,515 87,515

Total Bakersfield - Palmdale 5,823,474 11,381,011 16,561,796 9,493,525 13,769,276 12,768,064 - - - - 69,797,146 38,325,981 24,986,796 6,484,369 69,797,146

FCP Expenditures and Forecast

Page 10: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 6 of 22

Phase I Palmdale - Los Angeles 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 5,821,176 6,037,157 7,053,636 6,376,361 9,972,443 8,121,794 - - - - 43,382,567 34,349,816 9,032,751 - 43,382,567

Task 1.1 Regional Consultant Project Management 2,078,325 1,675,901 1,679,340 821,107 1,841,588 1,895,497 - - - - 9,991,759 9,991,759 - - 9,991,759 Task 1.2 Regional Consultant Public / Agency Participation 332,317 600,221 782,272 921,064 1,909,387 592,261 - - - - 5,137,522 5,137,522 - - 5,137,522 Task 1.3 Alternatives Analysis 578,652 458,204 571,183 1,901,065 1,452,302 92,001 - - - - 5,053,407 5,053,407 - - 5,053,407 Task 1.4 EIR / EIS Analysis 1,967,100 2,290,750 1,998,160 995,329 2,260,640 765,268 - - - - 10,277,247 10,277,247 - - 10,277,247 Task 1.5 Draft and Final EIR / EIS 48,443 53,613 118,219 29,193 76,565 3,208,125 - - - - 3,534,159 3,534,159 - - 3,534,159 Task 1.6 Certification of EIR / EIS and ROD - - - - - 355,723 - - - - 355,723 355,723 - - 355,723 Task 1.7 Program Management 816,339 958,468 1,904,462 1,708,603 2,431,962 1,212,918 - - - - 9,032,751 - 9,032,751 - 9,032,751

Task 2 PE 15% and 30% Design 9,528,276 7,242,195 5,540,659 2,640,641 9,221,532 4,752,738 - - - - 38,926,041 26,675,172 12,250,870 - 38,926,041 Task 2.1 Regional Consultant PE 7,411,997 5,186,225 3,142,524 1,187,207 7,471,158 2,276,061 - - - - 26,675,172 26,675,172 - - 26,675,172 Task 2.2 Program Management 621,372 726,365 2,398,135 1,453,433 1,750,374 2,476,677 - - - - 9,426,357 - 9,426,357 - 9,426,357 Task 2.3 RDP Engineering 1,494,907 1,329,605 - - - - - - - - 2,824,512 - 2,824,512 - 2,824,512

- Task 3 Other Related Work 1,163,288 2,222,557 1,328,049 1,232,683 1,952,952 3,160,565 - - - - 11,060,094 1,094,688 1,470,950 8,494,456 11,060,094

Task 3.1 Regional Consultant Station Area Planning 173,710 73,178 45,210 8,804 206,388 138,440 - - - - 645,729 645,729 - - 645,729 Task 3.2 Regional Consultant ROW Work - - - - - 448,958 - - - - 448,958 448,958 - - 448,958 Task 3.3 RDP ROW Work 29,657 42,862 - - - - - - - - 72,520 - 72,520 - 72,520 Task 3.4 Ridership Forecasting 323,774 435,530 - - - - - - - - 759,304 - 759,304 - 759,304 Task 3.5 Construction Planning / Procurement Support 95,408 543,719 - - - - - - - - 639,126 - 639,126 - 639,126 Task 3.6 Station Area Planning - - - - - 2,000,000 - - - - 2,000,000 - - 2,000,000 2,000,000 Task 3.7 LAUS/So Cal Improvements - - - - - - - - - - - - - - Task 3.8 Resource Agencies for Environmental Review 540,739 1,127,269 1,282,838 1,223,878 1,746,565 573,167 - - - - 6,494,456 - - 6,494,456 6,494,456

Task 4 Project Administration (SWCAP) 136,516 - - 1,792 - 28,236 - - - - 166,544 - - 166,544 166,544

Total Palmdale - Los Angeles 16,649,255 15,501,910 13,922,344 10,251,477 21,146,927 16,063,333 - - - - 93,535,247 62,119,676 22,754,571 8,661,000 93,535,247

Phase I Los Angeles - Anaheim 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total Est Cost RC Teams PMT Agencies TotalTask 1 Environmental Review 3,810,709 2,270,845 2,046,803 1,141,165 2,416,586 3,562,897 - - - - 15,249,006 11,899,426 3,349,579 - 15,249,006

Task 1.1 Regional Consultant Project Management 699,091 659,762 436,369 459,146 473,881 570,996 - - - - 3,299,246 3,299,246 - - 3,299,246 Task 1.2 Regional Consultant Public / Agency Participation 365,933 287,863 374,215 104,403 454,849 524,967 - - - - 2,112,230 2,112,230 - - 2,112,230 Task 1.3 Alternatives Analysis 55,406 118,908 473,221 92,612 806,501 65,687 - - - - 1,612,335 1,612,335 - - 1,612,335 Task 1.4 EIR / EIS Analysis 1,628,945 242,970 173,616 47,999 276,027 457,472 - - - - 2,827,029 2,827,029 - - 2,827,029 Task 1.5 Draft and Final EIR / EIS 236,409 2,875 195,492 - - 1,238,251 - - - - 1,673,026 1,673,026 - - 1,673,026 Task 1.6 Certification of EIR / EIS and ROD 8,587 - 12,997 9,854 - 344,122 - - - - 375,561 375,561 - - 375,561 Task 1.7 Program Management 816,339 958,468 380,892 427,151 405,327 361,402 - - - - 3,349,579 - 3,349,579 - 3,349,579

Task 2 PE 15% and 30% Design 4,729,453 3,757,698 867,052 1,419,201 625,162 1,258,847 - - - - 12,657,414 6,937,670 5,719,744 - 12,657,414 Task 2.1 Regional Consultant PE 2,613,173 1,701,728 387,425 1,055,843 333,433 846,067 - - - - 6,937,670 6,937,670 - - 6,937,670 Task 2.2 Program Management 621,372 726,365 479,627 363,358 291,729 412,779 - - - - 2,895,231 - 2,895,231 - 2,895,231 Task 2.3 RDP Engineering 1,494,907 1,329,605 - - - - - - - - 2,824,512 - 2,824,512 - 2,824,512

- Task 3 Other Related Work 854,888 1,297,998 534,728 1,346,741 1,507,849 32,593,144 48,000,000 - - - 86,135,349 980,595 1,470,950 83,683,804 86,135,349

Task 3.1 Regional Consultant Station Area Planning 16,513 79,086 214,459 135,507 207,537 36,075 - - - - 689,176 689,176 - - 689,176 Task 3.2 Regional Consultant ROW Work 139,933 - - - 125,395 26,091 - - - - 291,418 291,418 - - 291,418 Task 3.3 RDP ROW Work 29,657 42,862 - - - - - - - - 72,520 - 72,520 - 72,520 Task 3.4 Ridership Forecasting 323,774 435,530 - - - - - - - - 759,304 - 759,304 - 759,304 Task 3.5 Construction Planning / Procurement Support 95,408 543,719 - - - - - - - - 639,126 - 639,126 - 639,126 Task 3.6 Station Area Planning - - - - - - - - - - - - - - - Task 3.7 LAUS/So Cal Improvements - - - - - 32,000,000 48,000,000 - - - 80,000,000 - - 80,000,000 80,000,000 Task 3.8 Resource Agencies for Environmental Review 249,603 196,801 320,270 1,211,234 1,174,917 530,979 - - - - 3,683,804 - - 3,683,804 3,683,804

Task 4 Project Administration (SWCAP) 30,791 - - 1,792 - 5,883 - - - - 38,466 - - 38,466 38,466

Total Los Angeles - Anaheim 9,425,842 7,326,541 3,448,583 3,908,900 4,549,597 37,420,771 48,000,000 - - - 114,080,234 19,817,691 10,540,273 83,722,270 114,080,234

FCP Expenditures and Forecast

Page 11: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 7 of 22

SUMMARY CONSTRUCTION 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 Total RC PMT Agencies TotalTask 5 D-B Program Management - - 31,136,331 45,926,766 53,876,703 65,418,807 104,112,666 91,784,936 16,878,972 4,275,762 413,410,943 - 257,832,263 155,578,680 413,410,943

Task 5.1 Program ManagementTask 5.1.1 RDP - - 30,657,544 39,857,425 42,480,342 46,377,509 54,080,944 40,301,955 - - 253,755,718 - 248,491,154 5,264,564 253,755,718 Task 5.1.2 Network Integration (Task 15) - - 423,039 1,356,016 1,886,859 2,193,510 3,481,684 - - - 9,341,109 - 9,341,109 - 9,341,109

Task 5.2 Project Construction ManagementTask 5.2.1 Project Construction Management 1 - - 55,748 4,713,325 6,673,262 5,968,366 4,996,943 4,996,943 4,996,943 2,498,471 34,900,000 - - 34,900,000 34,900,000 Task 5.2.2 Project Construction Management 2-3 - - - - 2,836,240 6,503,983 26,033,367 27,859,868 8,104,689 506,543 71,844,690 - - 71,844,690 71,844,690 Task 5.2.3 Project Construction Management 4 - - - - - 4,375,439 8,750,878 8,021,638 1,701,560 729,240 23,578,755 - - 23,578,755 23,578,755 Task 5.2.4 Project Construction Management 5 - - - - - - 6,768,850 10,604,532 2,075,781 541,508 19,990,671 - - 19,990,671 19,990,671

Task 6 Real Property Acquisition - - 16,669,946 88,829,420 145,992,592 223,210,763 293,478,048 34,529,567 - - 802,710,337 24,327,386 - 778,382,951 802,710,337

Task 6.1 Real Property - Preliminary R.O.W - - 10,898,056 9,374,743 4,054,588 - - - - - 24,327,386 24,327,386 - - 24,327,386

Task 6.2 Real Property - R.O.W Services & Relocation - - 771,891 79,454,678 141,938,004 223,210,763 293,478,048 34,529,567 - - 773,382,951 - - 773,382,951 773,382,951 Task 6.2.1 CP1 ROW Services & Relocation - - 771,891 77,411,657 111,009,376 92,868,429 50,404,706 4,009,300 - - 336,475,359 - - 336,475,359 336,475,359 Task 6.2.2 CP2-3 ROW Services & Relocation - - - 2,043,021 28,039,219 118,137,446 104,498,859 - - - 252,718,545 - - 252,718,545 252,718,545 Task 6.2.3 CP4 ROW Services & Relocation - - - - 2,889,409 12,204,888 138,574,483 30,520,267 - - 184,189,047 - - 184,189,047 184,189,047

Task 6.3 Real Property -Environmental Mitigation - - 5,000,000 - - - - - - - 5,000,000 - - 5,000,000 5,000,000 Task 6.3.1 CP1 ROW Mitigation - - 5,000,000 - - - - - - - 5,000,000 - - 5,000,000 5,000,000 Task 6.3.2 CP2-3 ROW Mitigation - - - - - - - - - - - - - - - Task 6.3.3 CP4 ROW Mitigation - - - - - - - - - - - - - - -

Task 7 Early Work Program - N/A - - - - -

Task 8 D-B Contract Work - - - 84,767,382 117,009,828 626,016,459 1,392,126,797 1,069,512,821 661,353,664 203,259,574 4,154,046,525 - - 4,154,046,525 4,154,046,525

Task 8.1 SR-99 - - - 14,900,000 6,582,821 56,588,145 76,741,947 53,116,947 17,970,140 - 225,900,000 - - 225,900,000 225,900,000

Task 8.2 CP1 - - - 69,867,382 73,237,538 250,095,448 290,934,941 294,648,985 227,498,865 87,204,842 1,293,488,000 - - 1,293,488,000 1,293,488,000 Task 8.2.1 D-B CP1 - - - 67,367,382 62,229,962 230,321,276 227,475,903 207,465,206 175,929,135 62,336,644 1,033,125,509 - - 1,033,125,509 1,033,125,509 Task 8.2.2 CP1 Contingency - - - - - - 26,011,654 49,736,396 49,736,396 24,868,198 150,352,643 - - 150,352,643 150,352,643 Task 8.2.3 Third Parties CP1 - - - 2,500,000 11,007,576 19,774,172 37,447,384 37,447,384 1,833,334 - 110,009,848 - - 110,009,848 110,009,848

Task 8.3 CP2-3 - - - - 37,189,469 248,491,163 812,002,858 423,470,490 204,198,244 70,415,666 1,795,767,890 - - 1,795,767,890 1,795,767,890 Task 8.3.1 D-B CP2-3 - - - - 37,189,469 220,265,356 722,521,826 279,993,329 91,366,244 13,999,666 1,365,335,890 - - 1,365,335,890 1,365,335,890

Task 8.3.1.1 D-B CP2-3 Haz Material Prov. Sum - - - - - - 8,352,000 8,352,000 8,352,000 4,176,000 29,232,000 - - 29,232,000 29,232,000 Task 8.3.2 CP2-3 Contingency - - - - - - - 104,480,000 104,480,000 52,240,000 261,200,000 - - 261,200,000 261,200,000 Task 8.3.3 Third Parties / Support Costs CP2-3 - - - - - 28,225,806 81,129,032 30,645,161 - - 140,000,000 - - 140,000,000 140,000,000

Task 8.4 CP4 - - - - - 70,841,703 136,407,960 90,436,217 79,885,325 15,223,430 392,794,635 - - 392,794,635 392,794,635 Task 8.4.1 D-B CP4 - - - - - 70,841,703 136,407,960 90,436,217 79,885,325 15,223,430 392,794,635 - - 392,794,635 392,794,635 Task 8.4.2 CP4 Contingency - - - - - - - - - - - - - - - Task 8.4.3 Third Parties / Support Costs CP4 - - - - - - - - - - - - - - -

Task 8.5 CP5 - - - - - - 76,039,091 207,840,182 131,801,091 30,415,636 446,096,000 - - 446,096,000 446,096,000 Task 8.5.1 D-B CP5 - - - - - - 76,039,091 207,840,182 131,801,091 30,415,636 446,096,000 - - 446,096,000 446,096,000 Task 8.5.2 CP5 Contingency - - - - - - - - - - -

Task 9 Project Reserves - - - - - - - 61,716,145 61,716,145 30,858,072 154,290,362 - - 154,290,362 154,290,362 Task 9.1 Project Reserves - - - - - - - 18,506,844 18,506,844 9,253,422 46,267,109 - - 46,267,109 46,267,109 Task 9.2 Interim Use Reserve - - - - - - - 43,209,301 43,209,301 21,604,651 108,023,253 - - 108,023,253 108,023,253

Task 10 Unallocated Contingency - - - - - - - 79,317,718 79,317,718 39,658,859 198,294,295 - - 198,294,295 198,294,295 Task 10.1 Unallocated Contingency - - - - - - - 79,317,718 79,317,718 39,658,859 198,294,295 - - 198,294,295 198,294,295

Construction Subtotal - - 47,806,277 219,523,568 316,879,123 914,646,029 1,789,717,511 1,336,861,187 819,266,499 278,052,268 5,722,752,463 24,327,386 257,832,263 5,440,592,813 5,722,752,463

Total 131,037,215 125,614,718 130,623,135 282,726,133 377,141,840 999,251,364 1,858,536,267 1,344,503,023 819,266,499 278,052,268 6,346,752,462 368,652,095 402,269,484 5,575,830,883 6,346,752,462

FCP Expenditures and Forecast

Page 12: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 8 of 22

Cost Summary Table FY10 Grant ARRA Grant

Federal Federal

Task 1: Environmental Review -$ 129,242,071$ 113,211,053$ -$ 242,453,124$

Task 2:Preliminary Engineering -$ 116,592,947$ 102,130,909$ -$ 218,723,856$

Task 3:Other Related Work Need -$ 75,361,921$ 34,565,578$ 52,100,000$ 162,027,498$

Task 4: Project Administration and Indirect Costs -$ 424,061$ 371,461$ -$ 795,522$

$ - $ 321,620,999 $ 250,279,000 $ 52,100,000 $ 624,000,000

FIRST CONSTRUCTION SECTIONTask 5: Design/Build Program Management

$ 38,014,790 186,216,762$ 189,179,392$ -$ 413,410,943$

Task 6: Real Property Acquisition $ 8,984,784 426,400,364$ 367,325,190$ -$ 802,710,337$

Task7: Early Works -$ -$ -$ -$ -$

Task 8: Design/Build Contract Work $ 634,811,166 1,618,318,107$ 1,900,917,253$ -$ 4,154,046,525$

Task 9: Project Reserves $ 108,023,253 -$ 46,267,109$ -$ 154,290,362$

Task 10: Unallocated Contingency $ 138,786,007 -$ 59,508,288$ -$ 198,294,295$

$ 928,620,000 $ 2,230,935,232 $ 2,563,197,231 $ - $ 5,722,752,463

TOTAL $ 928,620,000 $ 2,552,556,231 $ 2,813,476,232 $ 52,100,000 $ 6,346,752,463

Task Description State Local Total

PHASE 1 PROJECT DEVELOPMENT

PHASE 1 SUBTOTAL

SUBTOTAL

Source: Funding Contribution Plan April 2013; CF-YR-FRA Source: Funding Contribution Plan April 2013; CF-YR-FRA

Page 13: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 9 of 22

Planning Cost Summary by Segment

Task Description FY10 GrantFederal

ARRA Grant Federal State Local Total

RDP Phase 1 -$ 76,993,710$ 67,443,510$ -$ 144,437,221$ Resource Agencies/Legal Costs Phase 1 -$ 23,157,486$ 20,285,062$ -$ 43,442,548$ San Francisco - San Jose -$ 15,111,193$ 13,236,820$ -$ 28,348,013$ San Jose – Merced -$ 31,927,840$ 27,967,552$ -$ 59,895,392$ Merced - Fresno -$ 24,375,975$ 21,352,411$ -$ 45,728,386$ Fresno – Bakersfield -$ 48,023,150$ 42,066,421$ -$ 90,089,571$ Bakersfield – Palmdale -$ 20,430,049$ 17,895,932$ -$ 38,325,981$ Palmdale - Los Angeles -$ 33,113,517$ 29,006,159$ -$ 62,119,676$ Los Angeles - Anaheim -$ 10,564,019$ 9,253,672$ -$ 19,817,691$

Other Planning CostsProject Administration and Indirect Costs -$ 424,061$ 371,461$ -$ 795,522$ Station Area Planning -$ 5,500,000$ 1,400,000$ 4,100,000$ 11,000,000$ LAUS/Southern CA Improvements -$ 32,000,000$ -$ 48,000,000$ 80,000,000$

-$ 321,620,999$ 250,279,000$ 52,100,000$ 624,000,000$

PHASE 1 PROJECT DEVELOPMENT

PROJECT DEVELOPMENT

SUBTOTAL

Page 14: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 10 of 22

EXPENDITURES ($ 000's)Period Start 7/1/2010 7/1/2011 7/1/2012 7/1/2013 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019Period End 6/30/2011 6/30/2012 6/30/2013 6/30/2014 6/30/2015 6/30/2016 6/30/2017 6/30/2018 6/30/2019 6/30/2020

Task No. Task Description FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20 TotalTask 1 A Environmental Review 244,229$ 242,453$ 51,291$ 51,532$ 39,465$ 30,639$ 29,439$ 28,851$ 9,364$ 1,873$ -$ -$ 242,453$ Task 2 A PE 15% and 30% Design 214,377 218,724 67,963 51,020 34,492 24,643 20,592 12,395 4,669 2,950 - - 218,724$ Task 3 A Other Related Work 164,598 162,027 11,124 23,063 8,860 7,903 10,232 42,534 55,494 2,819 - - 162,027$ Task 4 A Project Administration Work (SWCAP) 796 796 660 - - 18 - 118 - - - - 796$ Task 5 B D/B Program Management 411,960 413,411 - - 31,136 45,927 53,877 65,419 104,113 91,785 16,879 4,276 413,411$ Task 6 B Real Property Acquisition 804,161 802,710 - - 16,670 88,829 145,993 223,211 293,478 34,530 - - 802,710$ Task 7 B Early Work Program - N/A - - - - - - - - - - - - -$ Task 8 B D/B Contract Work 4,154,047 4,154,047 - - - 84,767 117,010 626,016 1,392,127 1,069,513 661,354 203,260 4,154,047$ Task 9 B Project Reserve 154,290 154,290 - - - - - - - 61,716 61,716 30,858 154,290$ Task 10 B Unallocated Contingency 198,294 198,294 - - - - - - - 79,318 79,318 39,659 198,294$ TBD TBD - - - - - - - - - - -$ Project Development Expenditures (A) 624,000$ 624,000$ 131,037$ 125,615$ 82,817$ 63,203$ 60,263$ 83,897$ 69,527$ 7,642$ -$ -$ 624,000$ Construction Expenditures (B) 5,722,752$ 5,722,752$ -$ -$ 47,806$ 219,524$ 316,879$ 914,646$ 1,789,718$ 1,336,861$ 819,266$ 278,052$ 5,722,752$ Total Expenditures (A) + (B) 6,346,752$ 6,346,752$ 131,037$ 125,615$ 130,623$ 282,726$ 377,142$ 998,543$ 1,859,245$ 1,344,503$ 819,266$ 278,052$ 6,346,752$

Notes:1 Third party /Support costs for CP4 & 5 are embedded in the respective D-B contract amounts.2 State funding sources may include Prop 1A and Cap & Trade.3 FY 10/11 costs reflect ARRA start date of August 17, 2010.

Expenditures / Proposed

BudgetCurrent Grant

Budget

Annual Expenditures by FRA Task

Page 15: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 11 of 22

Annual Expenditure Plan by Environmental/Construction

FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20 Expenditures

Project Development Source 624,000$ 492,963$ 367,348$ 284,531$ 221,329$ 161,066$ 77,169$ 7,642$ 0$ 0$ 624,000$ Project Development Use 131,037 125,615 82,817 63,203 60,263 83,897 69,527 7,642 - - 624,000 Environmental Balance 492,963$ 367,348$ 284,531$ 221,329$ 161,066$ 77,169$ 7,642$ 0$ 0$ 0$ (0)$

Construction Source 5,722,752$ 5,722,752$ 5,722,752$ 5,674,946$ 5,455,423$ 5,138,543$ 4,223,897$ 2,434,180$ 1,097,319$ 278,052$ 5,722,752$ Construction Use - - 47,806 219,524 316,879 914,646 1,789,718 1,336,861 819,266 278,052 5,722,752 Construction Balance 5,722,752$ 5,722,752$ 5,674,946$ 5,455,423$ 5,138,543$ 4,223,897$ 2,434,180$ 1,097,319$ 278,052$ 0$ (0)$

Balance 6,215,715$ 6,090,101$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,067$ 2,441,822$ 1,097,319$ 278,052$ 0$ (0)$

Total Sources 6,346,752$ 6,215,715$ 6,090,101$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,067$ 2,441,822$ 1,097,319$ 278,052$ 6,346,752$ Total Uses 131,037 125,615 130,623 282,726 377,142 998,543 1,859,245 1,344,503 819,266 278,052 6,346,752 Balance 6,215,715$ 6,090,101$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,067$ 2,441,822$ 1,097,319$ 278,052$ 0$ (0)$

Notes:1 Third party /Support costs for CP4 & 5 are embedded in the respective D-B contract amounts.2 State funding sources may include Prop 1A and Cap & Trade.3 FY 10/11 costs reflect ARRA start date of August 17, 2010.

($ 000's)

Page 16: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 12 of 22

FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20Period Begin 7/1/2010 7/1/2011 7/1/2012 7/1/2013 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019Period End 6/30/2011 6/30/2012 6/30/2013 6/30/2014 6/30/2015 6/30/2016 6/30/2017 6/30/2018 6/30/2019 6/30/2020 Expenditures

Sources:ARRA 321,621$ 256,102$ 193,295$ 110,478$ 47,276$ 37,500$ 21,604$ 0$ 0$ 0$ 321,621$ FY10 - - - - - - - - - - - State 250,279 184,760 121,953 121,953 121,953 71,466 24,973 7,492 0 0 250,279 Local 52,100 52,100 52,100 52,100 52,100 52,100 30,592 150 (0) (0) 52,100

Project Development Subtotal 624,000$ 492,963$ 367,348$ 284,531$ 221,329$ 161,066$ 77,169$ 7,642$ 0 0 624,000$

ARRA 2,230,935$ 2,230,935$ 2,230,935$ 2,183,129$ 1,963,605$ 1,838,140$ 923,494$ -$ -$ -$ 2,230,935$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 338,780 - - 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,371,783 2,371,783 2,095,400 1,097,319 278,052 2,563,197 Local - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,722,752$ 5,674,946$ 5,455,422$ 5,138,543$ 4,223,897$ 2,434,180$ 1,097,319$ 278,052$ 5,722,752$

Uses:ARRA 65,519$ 62,807$ 82,817$ 63,203$ 9,776$ 15,896$ 21,604$ -$ -$ -$ 321,621$ FY10 - - - - - - - - - - - State 65,519 62,807 - - 50,487 46,493 17,481 7,492 - - 250,279 Local - - - - - 21,508 30,442 150 - - 52,100

Project Development Subtotal 131,037$ 125,615$ 82,817$ 63,203$ 60,263$ 83,897$ 69,527$ 7,642$ -$ -$ 624,000$

ARRA -$ -$ 47,806$ 219,524$ 125,465$ 914,646$ 923,494$ -$ -$ -$ 2,230,935$ FY10 - - - - - - 589,840 338,780 - - 928,620 State - - - - 191,414 - 276,383 998,081 819,266 278,052 2,563,197 Local - - - - - - - - - - -

Construction Subtotal -$ -$ 47,806$ 219,524$ 316,879$ 914,646$ 1,789,718$ 1,336,861$ 819,266$ 278,052$ 5,722,752$

Balance:ARRA 256,102$ 193,295$ 110,478$ 47,276$ 37,500$ 21,604$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - State 184,760 121,953 121,953 121,953 71,466 24,973 7,492 0 0 0 0 Local 52,100 52,100 52,100 52,100 52,100 30,592 150 (0) (0) (0) (0)

Project Development Subtotal 492,963$ 367,348$ 284,531$ 221,329$ 161,066$ 77,169$ 7,642$ 0 0$ 0$ (0)$

ARRA 2,230,935$ 2,230,935$ 2,183,129$ 1,963,605$ 1,838,140$ 923,494$ (0)$ -$ -$ -$ 0$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 338,780 (0) - - - State 2,563,197 2,563,197 2,563,197 2,563,197 2,371,783 2,371,783 2,095,400 1,097,319 278,053 (0) (0) Local - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,674,946$ 5,455,422$ 5,138,543$ 4,223,897$ 2,434,179$ 1,097,319$ 278,053$ (0)$ (0)$

Balance 6,215,715$ 6,090,100$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,066$ 2,441,821$ 1,097,319$ 278,053$ (0)$ (0)$

Total Sources 6,346,752$ 6,215,715$ 6,090,100$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,066$ 2,441,822$ 1,097,319$ 278,052$ 6,346,752$ Total Uses 131,037 125,615 130,623 282,726 377,142 998,543 1,859,245 1,344,503 819,266 278,052 6,346,752 Balance 6,215,715$ 6,090,100$ 5,959,477$ 5,676,751$ 5,299,609$ 4,301,066$ 2,441,821$ 1,097,319$ 278,053$ (0)$ (0)$

Notes:1 Please refer to the notes on page 2

($ 000's)

Annual Expenditure Plan by Funding Source

Page 17: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 13 of 22

Monthly Expenditure Plan by Funding Source FY 10/11

Period Begin 7/1/2010 8/1/2010 9/1/2010 10/1/2010 11/1/2010 12/1/2010 1/1/2011 2/1/2011 3/1/2011 4/1/2011 5/1/2011 6/1/2011Period End 7/31/2010 8/31/2010 9/30/2010 10/31/2010 11/30/2010 12/31/2010 1/31/2011 2/28/2011 3/31/2011 4/30/2011 5/31/2011 6/30/2011

Sources:ARRA 321,621$ 321,621$ 318,884$ 312,762$ 306,225$ 300,550$ 294,950$ 289,031$ 282,849$ 276,443$ 269,613$ 263,648$ FY10 - - - - - - - - - - - - State 250,279 250,279 247,542 241,420 234,883 229,208 223,608 217,689 211,507 205,101 198,271 192,306 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 624,000$ 624,000$ 618,527$ 606,282$ 593,207$ 581,859$ 570,659$ 558,819$ 546,456$ 533,644$ 519,983$ 508,054$

ARRA 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$

Uses:ARRA -$ 2,737$ 6,122$ 6,537$ 5,674$ 5,600$ 5,920$ 6,182$ 6,406$ 6,830$ 5,965$ 7,546$ FY10 - - - - - - - - - - - - State - 2,737 6,122 6,537 5,674 5,600 5,920 6,182 6,406 6,830 5,965 7,546 Local - - - - - - - - - - - -

Project Development Subtotal -$ 5,473$ 12,245$ 13,075$ 11,349$ 11,200$ 11,839$ 12,363$ 12,812$ 13,661$ 11,929$ 15,091$

ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Construction Subtotal -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Balance:ARRA 321,621$ 318,884$ 312,762$ 306,225$ 300,550$ 294,950$ 289,031$ 282,849$ 276,443$ 269,613$ 263,648$ 256,102$ FY10 - - - - - - - - - - - - State 250,279 247,542 241,420 234,883 229,208 223,608 217,689 211,507 205,101 198,271 192,306 184,760 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 624,000$ 618,527$ 606,282$ 593,207$ 581,859$ 570,659$ 558,819$ 546,456$ 533,644$ 519,983$ 508,054$ 492,963$

ARRA 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$

Balance 6,346,752$ 6,341,279$ 6,329,034$ 6,315,960$ 6,304,611$ 6,293,411$ 6,281,572$ 6,269,209$ 6,256,396$ 6,242,736$ 6,230,806$ 6,215,715$

Total Sources 6,346,752$ 6,346,752$ 6,341,279$ 6,329,034$ 6,315,960$ 6,304,611$ 6,293,411$ 6,281,572$ 6,269,209$ 6,256,396$ 6,242,736$ 6,230,806$ Total Uses - 5,473 12,245 13,075 11,349 11,200 11,839 12,363 12,812 13,661 11,929 15,091 Balance 6,346,752$ 6,341,279$ 6,329,034$ 6,315,960$ 6,304,611$ 6,293,411$ 6,281,572$ 6,269,209$ 6,256,396$ 6,242,736$ 6,230,806$ 6,215,715$

Notes: Please refer to the notes on page 2

($ 000's)

Page 18: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 14 of 22

Monthly Expenditure Plan by Funding Source

FY 11/12Period Begin 7/1/2011 8/1/2011 9/1/2011 10/1/2011 11/1/2011 12/1/2011 1/1/2012 2/1/2012 3/1/2012 4/1/2012 5/1/2012 6/1/2012Period End 7/31/2011 8/31/2011 9/30/2011 10/31/2011 11/30/2011 12/31/2011 1/31/2012 2/29/2012 3/31/2012 4/30/2012 5/31/2012 6/30/2012

Sources:ARRA 256,102$ 251,493$ 245,999$ 241,042$ 236,368$ 232,181$ 227,346$ 222,550$ 217,363$ 211,494$ 205,949$ 200,457$ FY10 - - - - - - - - - - - - State 184,760 180,151 174,657 169,700 165,026 160,839 156,004 151,208 146,021 140,152 134,607 129,115 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 492,963$ 483,743$ 472,757$ 462,842$ 453,495$ 445,120$ 435,450$ 425,859$ 415,484$ 403,746$ 392,656$ 381,672$

ARRA 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$

Uses:ARRA 4,610$ 5,493$ 4,957$ 4,674$ 4,187$ 4,835$ 4,796$ 5,188$ 5,869$ 5,545$ 5,492$ 7,162$ FY10 - - - - - - - - - - - - State 4,610 5,493 4,957 4,674 4,187 4,835 4,796 5,188 5,869 5,545 5,492 7,162 Local - - - - - - - - - - - -

Project Development Subtotal 9,219$ 10,987$ 9,915$ 9,347$ 8,375$ 9,670$ 9,591$ 10,375$ 11,737$ 11,090$ 10,984$ 14,324$

ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Construction Subtotal -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Balance:ARRA 251,493$ 245,999$ 241,042$ 236,368$ 232,181$ 227,346$ 222,550$ 217,363$ 211,494$ 205,949$ 200,457$ 193,295$ FY10 - - - - - - - - - - - - State 180,151 174,657 169,700 165,026 160,839 156,004 151,208 146,021 140,152 134,607 129,115 121,953 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 483,743$ 472,757$ 462,842$ 453,495$ 445,120$ 435,450$ 425,859$ 415,484$ 403,746$ 392,656$ 381,672$ 367,348$

ARRA 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ 2,230,935$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$ 5,722,752$

Balance 6,206,496$ 6,195,509$ 6,185,594$ 6,176,247$ 6,167,872$ 6,158,202$ 6,148,611$ 6,138,236$ 6,126,499$ 6,115,408$ 6,104,424$ 6,090,101$

Total Sources 6,215,715$ 6,206,496$ 6,195,509$ 6,185,594$ 6,176,247$ 6,167,872$ 6,158,202$ 6,148,611$ 6,138,236$ 6,126,499$ 6,115,408$ 6,104,424$ Total Uses 9,219 10,987 9,915 9,347 8,375 9,670 9,591 10,375 11,737 11,090 10,984 14,324 Balance 6,206,496$ 6,195,509$ 6,185,594$ 6,176,247$ 6,167,872$ 6,158,202$ 6,148,611$ 6,138,236$ 6,126,499$ 6,115,408$ 6,104,424$ 6,090,101$

Notes: Please refer to the notes on page 2

($ 000's)

Page 19: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 15 of 22

Monthly Expenditure Plan by Funding Source

FY 12/13Period Begin 7/1/2012 8/1/2012 9/1/2012 10/1/2012 11/1/2012 12/1/2012 1/1/2013 2/1/2013 3/1/2013 4/1/2013 5/1/2013 6/1/2013Period End 7/31/2012 8/31/2012 9/30/2012 10/31/2012 11/30/2012 12/31/2012 1/31/2013 2/28/2013 3/31/2013 4/30/2013 5/31/2013 6/30/2013

Sources:ARRA 193,295$ 187,118$ 179,887$ 172,746$ 165,179$ 158,636$ 152,711$ 146,438$ 140,050$ 132,455$ 125,861$ 118,489$ FY10 - - - - - - - - - - - - State 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 367,348$ 361,171$ 353,940$ 346,799$ 339,232$ 332,689$ 326,764$ 320,491$ 314,103$ 306,508$ 299,914$ 292,542$

ARRA 2,230,935$ 2,228,530$ 2,225,302$ 2,222,324$ 2,218,816$ 2,215,614$ 2,212,273$ 2,208,852$ 2,205,301$ 2,201,680$ 2,197,530$ 2,188,078$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,722,752$ 5,720,347$ 5,717,119$ 5,714,142$ 5,710,633$ 5,707,431$ 5,704,090$ 5,700,669$ 5,697,118$ 5,693,497$ 5,689,348$ 5,679,895$

Uses:ARRA 6,178$ 7,231$ 7,141$ 7,566$ 6,543$ 5,925$ 6,273$ 6,388$ 7,595$ 6,594$ 7,372$ 8,010$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Project Development Subtotal 6,178$ 7,231$ 7,141$ 7,566$ 6,543$ 5,925$ 6,273$ 6,388$ 7,595$ 6,594$ 7,372$ 8,010$

ARRA 2,405$ 3,228$ 2,978$ 3,508$ 3,202$ 3,341$ 3,421$ 3,550$ 3,622$ 4,149$ 9,452$ 4,949$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Construction Subtotal 2,405$ 3,228$ 2,978$ 3,508$ 3,202$ 3,341$ 3,421$ 3,550$ 3,622$ 4,149$ 9,452$ 4,949$

Balance:ARRA 187,118$ 179,887$ 172,746$ 165,179$ 158,636$ 152,711$ 146,438$ 140,050$ 132,455$ 125,861$ 118,489$ 110,478$ FY10 - - - - - - - - - - - - State 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 361,171$ 353,940$ 346,799$ 339,232$ 332,689$ 326,764$ 320,491$ 314,103$ 306,508$ 299,914$ 292,542$ 284,531$

ARRA 2,228,530$ 2,225,302$ 2,222,324$ 2,218,816$ 2,215,614$ 2,212,273$ 2,208,852$ 2,205,301$ 2,201,680$ 2,197,530$ 2,188,078$ 2,183,129$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,720,347$ 5,717,119$ 5,714,142$ 5,710,633$ 5,707,431$ 5,704,090$ 5,700,669$ 5,697,118$ 5,693,497$ 5,689,348$ 5,679,895$ 5,674,946$

Balance 6,081,518$ 6,071,059$ 6,060,940$ 6,049,865$ 6,040,121$ 6,030,854$ 6,021,160$ 6,011,221$ 6,000,004$ 5,989,261$ 5,972,437$ 5,959,477$

Total Sources 6,090,101$ 6,081,518$ 6,071,059$ 6,060,940$ 6,049,865$ 6,040,121$ 6,030,854$ 6,021,160$ 6,011,221$ 6,000,004$ 5,989,261$ 5,972,437$ Total Uses 8,582 10,459 10,119 11,075 9,745 9,267 9,695 9,938 11,217 10,743 16,824 12,959 Balance 6,081,518$ 6,071,059$ 6,060,940$ 6,049,865$ 6,040,121$ 6,030,854$ 6,021,160$ 6,011,221$ 6,000,004$ 5,989,261$ 5,972,437$ 5,959,477$

Notes: Please refer to the notes on page 2

($ 000's)

Page 20: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 16 of 22

Monthly Expenditure Plan by Funding Source

Source: Funding Contribution Plan April 2013; Monthly

FY 13/14Period Begin 7/1/2013 8/1/2013 9/1/2013 10/1/2013 11/1/2013 12/1/2013 1/1/2014 2/1/2014 3/1/2014 4/1/2014 5/1/2014 6/1/2014Period End 7/31/2013 8/31/2013 9/30/2013 10/31/2013 11/30/2013 12/31/2013 1/31/2014 2/28/2014 3/31/2014 4/30/2014 5/31/2014 6/30/2014

Sources:ARRA 110,478$ 105,327$ 99,234$ 93,481$ 87,258$ 81,698$ 77,050$ 72,131$ 67,631$ 62,789$ 58,010$ 52,594$ FY10 - - - - - - - - - - - - State 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 284,531$ 279,380$ 273,287$ 267,534$ 261,311$ 255,751$ 251,103$ 246,184$ 241,684$ 236,842$ 232,063$ 226,647$

ARRA 2,183,129$ 2,178,935$ 2,145,219$ 2,131,242$ 2,117,615$ 2,102,335$ 2,088,662$ 2,077,979$ 2,058,856$ 2,033,825$ 1,997,870$ 1,986,352$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,674,946$ 5,670,753$ 5,637,037$ 5,623,059$ 5,609,432$ 5,594,153$ 5,580,479$ 5,569,797$ 5,550,673$ 5,525,643$ 5,489,688$ 5,478,169$

Uses:ARRA 5,151$ 6,094$ 5,753$ 6,223$ 5,560$ 4,648$ 4,919$ 4,501$ 4,841$ 4,780$ 5,416$ 5,318$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Project Development Subtotal 5,151$ 6,094$ 5,753$ 6,223$ 5,560$ 4,648$ 4,919$ 4,501$ 4,841$ 4,780$ 5,416$ 5,318$

ARRA 4,194$ 33,716$ 13,977$ 13,627$ 15,279$ 13,674$ 10,682$ 19,124$ 25,031$ 35,955$ 11,519$ 22,746$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Construction Subtotal 4,194$ 33,716$ 13,977$ 13,627$ 15,279$ 13,674$ 10,682$ 19,124$ 25,031$ 35,955$ 11,519$ 22,746$

Balance:ARRA 105,327$ 99,234$ 93,481$ 87,258$ 81,698$ 77,050$ 72,131$ 67,631$ 62,789$ 58,010$ 52,594$ 47,276$ FY10 - - - - - - - - - - - - State 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 121,953 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 279,380$ 273,287$ 267,534$ 261,311$ 255,751$ 251,103$ 246,184$ 241,684$ 236,842$ 232,063$ 226,647$ 221,329$

ARRA 2,178,935$ 2,145,219$ 2,131,242$ 2,117,615$ 2,102,335$ 2,088,662$ 2,077,979$ 2,058,856$ 2,033,825$ 1,997,870$ 1,986,352$ 1,963,605$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 2,563,197 Local - - - - - - - - - - - -

Construction Subtotal 5,670,753$ 5,637,037$ 5,623,059$ 5,609,432$ 5,594,153$ 5,580,479$ 5,569,797$ 5,550,673$ 5,525,643$ 5,489,688$ 5,478,169$ 5,455,423$

Balance 5,950,133$ 5,910,323$ 5,890,593$ 5,870,743$ 5,849,904$ 5,831,582$ 5,815,981$ 5,792,357$ 5,762,485$ 5,721,750$ 5,704,816$ 5,676,751$

Total Sources 5,959,477$ 5,950,133$ 5,910,323$ 5,890,593$ 5,870,743$ 5,849,904$ 5,831,582$ 5,815,981$ 5,792,357$ 5,762,485$ 5,721,750$ 5,704,816$ Total Uses 9,344 39,810 19,730 19,850 20,839 18,322 15,601 23,624 29,872 40,735 16,934 28,065 Balance 5,950,133$ 5,910,323$ 5,890,593$ 5,870,743$ 5,849,904$ 5,831,582$ 5,815,981$ 5,792,357$ 5,762,485$ 5,721,750$ 5,704,816$ 5,676,751$

Notes: Please refer to the notes on page 2

($ 000's)

Page 21: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 17 of 22

Monthly Expenditure Plan by Funding Source

Source: Funding Contribution Plan April 2013; Monthly

FY 14/15Period Begin 7/1/2014 8/1/2014 9/1/2014 10/1/2014 11/1/2014 12/1/2014 1/1/2015 2/1/2015 3/1/2015 4/1/2015 5/1/2015 6/1/2015Period End 7/31/2014 8/31/2014 9/30/2014 10/31/2014 11/30/2014 12/31/2014 1/31/2015 2/28/2015 3/31/2015 4/30/2015 5/31/2015 6/30/2015

Sources:ARRA 47,276$ 45,560$ 40,840$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ FY10 - - - - - - - - - - - - State 121,953 120,202 120,168 118,892 113,788 109,240 104,980 100,577 95,675 91,903 87,708 82,542 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 221,329$ 217,862$ 213,108$ 208,492$ 203,388$ 198,840$ 194,580$ 190,177$ 185,275$ 181,503$ 177,308$ 172,142$

ARRA 1,963,605$ 1,945,311$ 1,934,243$ 1,928,673$ 1,915,374$ 1,905,571$ 1,905,571$ 1,905,542$ 1,905,523$ 1,905,262$ 1,905,262$ 1,905,262$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,563,197 2,560,552 2,546,559 2,535,454 2,527,227 2,506,110 2,484,827 2,471,077 2,461,378 2,433,896 2,402,529 2,386,466 Local - - - - - - - - - - - -

Construction Subtotal 5,455,423$ 5,434,483$ 5,409,421$ 5,392,747$ 5,371,221$ 5,340,301$ 5,319,018$ 5,305,239$ 5,295,521$ 5,267,778$ 5,236,411$ 5,220,349$

Uses:ARRA 1,716$ 4,720$ 3,340$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State 1,751 33 1,277 5,104 4,548 4,260 4,403 4,901 3,772 4,195 5,166 11,076 Local - - - - - - - - - - - -

Project Development Subtotal 3,467$ 4,754$ 4,616$ 5,104$ 4,548$ 4,260$ 4,403$ 4,901$ 3,772$ 4,195$ 5,166$ 11,076$

ARRA 18,294$ 11,068$ 5,570$ 13,300$ 9,802$ 0$ 30$ 19$ 260$ 0$ 0$ 67,122$ FY10 - - - - - - - - - - - - State 2,645 13,993 11,104 8,227 21,118 21,283 13,750 9,699 27,482 31,367 16,062 14,683 Local - - - - - - - - - - - -

Construction Subtotal 20,940$ 25,061$ 16,674$ 21,527$ 30,920$ 21,283$ 13,779$ 9,718$ 27,742$ 31,367$ 16,062$ 81,805$

Balance:ARRA 45,560$ 40,840$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ 37,500$ FY10 - - - - - - - - - - - - State 120,202 120,168 118,892 113,788 109,240 104,980 100,577 95,675 91,903 87,708 82,542 71,466 Local 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100 52,100

Project Development Subtotal 217,862$ 213,108$ 208,492$ 203,388$ 198,840$ 194,580$ 190,177$ 185,275$ 181,503$ 177,308$ 172,142$ 161,066$

ARRA 1,945,311$ 1,934,243$ 1,928,673$ 1,915,374$ 1,905,571$ 1,905,571$ 1,905,542$ 1,905,523$ 1,905,262$ 1,905,262$ 1,905,262$ 1,838,140$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,560,552 2,546,559 2,535,454 2,527,227 2,506,110 2,484,827 2,471,077 2,461,378 2,433,896 2,402,529 2,386,466 2,371,783 Local - - - - - - - - - - - -

Construction Subtotal 5,434,483$ 5,409,421$ 5,392,747$ 5,371,221$ 5,340,301$ 5,319,018$ 5,305,239$ 5,295,521$ 5,267,778$ 5,236,411$ 5,220,349$ 5,138,543$

Balance 5,652,344$ 5,622,529$ 5,601,239$ 5,574,609$ 5,539,141$ 5,513,598$ 5,495,415$ 5,480,796$ 5,449,281$ 5,413,719$ 5,392,490$ 5,299,609$

Total Sources 5,676,751$ 5,652,344$ 5,622,529$ 5,601,239$ 5,574,609$ 5,539,141$ 5,513,598$ 5,495,415$ 5,480,796$ 5,449,281$ 5,413,719$ 5,392,490$ Total Uses 24,407 29,815 21,290 26,631 35,467 25,543 18,183 14,620 31,514 35,562 21,229 92,881 Balance 5,652,344$ 5,622,529$ 5,601,239$ 5,574,609$ 5,539,141$ 5,513,598$ 5,495,415$ 5,480,796$ 5,449,281$ 5,413,719$ 5,392,490$ 5,299,609$

Notes: Please refer to the notes on page 2

($ 000's)

Page 22: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 18 of 22

Monthly Expenditure Plan by Funding Source

FY 15/16Period Begin 7/1/2015 8/1/2015 9/1/2015 10/1/2015 11/1/2015 12/1/2015 1/1/2016 2/1/2016 3/1/2016 4/1/2016 5/1/2016 6/1/2016Period End 7/31/2015 8/31/2015 9/30/2015 10/31/2015 11/30/2015 12/31/2015 1/31/2016 2/29/2016 3/31/2016 4/30/2016 5/31/2016 6/30/2016

Sources:ARRA 37,500$ 37,500$ 37,192$ 36,913$ 36,635$ 34,756$ 32,877$ 30,998$ 29,119$ 27,241$ 25,362$ 23,483$ FY10 - - - - - - - - - - - - State 71,466 66,589 62,549 56,923 53,340 49,906 46,173 42,739 39,305 35,573 32,139 28,556 Local 52,100 52,100 51,870 51,663 51,455 48,847 46,239 43,631 41,024 38,416 35,808 33,200

Project Development Subtotal 161,066$ 156,189$ 151,611$ 145,499$ 141,429$ 133,508$ 125,290$ 117,369$ 109,448$ 101,229$ 93,309$ 85,239$

ARRA 1,838,140$ 1,761,470$ 1,718,864$ 1,685,063$ 1,627,660$ 1,565,635$ 1,464,689$ 1,395,172$ 1,300,658$ 1,214,390$ 1,112,680$ 1,017,315$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 Local - - - - - - - - - - - -

Construction Subtotal 5,138,543$ 5,061,873$ 5,019,267$ 4,985,466$ 4,928,063$ 4,866,038$ 4,765,092$ 4,695,575$ 4,601,061$ 4,514,793$ 4,413,083$ 4,317,718$

Uses:ARRA -$ 308$ 279$ 279$ 1,879$ 1,879$ 1,879$ 1,879$ 1,879$ 1,879$ 1,879$ 1,879$ FY10 - - - - - - - - - - - - State 4,877 4,040 5,626 3,583 3,434 3,732 3,434 3,434 3,732 3,434 3,583 3,583 Local - 230 208 208 2,608 2,608 2,608 2,608 2,608 2,608 2,608 2,608

Project Development Subtotal 4,877$ 4,578$ 6,112$ 4,070$ 7,921$ 8,219$ 7,921$ 7,921$ 8,219$ 7,921$ 8,070$ 8,070$

ARRA 76,671$ 42,606$ 33,801$ 57,403$ 62,026$ 100,945$ 69,517$ 94,514$ 86,269$ 101,710$ 95,364$ 93,821$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Construction Subtotal 76,671$ 42,606$ 33,801$ 57,403$ 62,026$ 100,945$ 69,517$ 94,514$ 86,269$ 101,710$ 95,364$ 93,821$

Balance:ARRA 37,500$ 37,192$ 36,913$ 36,635$ 34,756$ 32,877$ 30,998$ 29,119$ 27,241$ 25,362$ 23,483$ 21,604$ FY10 - - - - - - - - - - - - State 66,589 62,549 56,923 53,340 49,906 46,173 42,739 39,305 35,573 32,139 28,556 24,973 Local 52,100 51,870 51,663 51,455 48,847 46,239 43,631 41,024 38,416 35,808 33,200 30,592

Project Development Subtotal 156,189$ 151,611$ 145,499$ 141,429$ 133,508$ 125,290$ 117,369$ 109,448$ 101,229$ 93,309$ 85,239$ 77,169$

ARRA 1,761,470$ 1,718,864$ 1,685,063$ 1,627,660$ 1,565,635$ 1,464,689$ 1,395,172$ 1,300,658$ 1,214,390$ 1,112,680$ 1,017,315$ 923,494$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 928,620 State 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 Local - - - - - - - - - - - -

Construction Subtotal 5,061,873$ 5,019,267$ 4,985,466$ 4,928,063$ 4,866,038$ 4,765,092$ 4,695,575$ 4,601,061$ 4,514,793$ 4,413,083$ 4,317,718$ 4,223,897$

Balance 5,218,062$ 5,170,878$ 5,130,964$ 5,069,492$ 4,999,546$ 4,890,382$ 4,812,944$ 4,710,509$ 4,616,022$ 4,506,392$ 4,402,957$ 4,301,067$

Total Sources 5,299,609$ 5,218,062$ 5,170,878$ 5,130,964$ 5,069,492$ 4,999,546$ 4,890,382$ 4,812,944$ 4,710,509$ 4,616,022$ 4,506,392$ 4,402,957$ Total Uses 81,548 47,184 39,914 61,472 69,946 109,164 77,437 102,435 94,487 109,631 103,434 101,891 Balance 5,218,062$ 5,170,878$ 5,130,964$ 5,069,492$ 4,999,546$ 4,890,382$ 4,812,944$ 4,710,509$ 4,616,022$ 4,506,392$ 4,402,957$ 4,301,067$

Notes: Please refer to the notes on page 2

($ 000's)

Page 23: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 19 of 22

Monthly Expenditure Plan by Funding Source

Source: Funding Contribution Plan April 2013; Monthly

FY 16/17Period Begin 7/1/2016 8/1/2016 9/1/2016 10/1/2016 11/1/2016 12/1/2016 1/1/2017 2/1/2017 3/1/2017 4/1/2017 5/1/2017 6/1/2017Period End 7/31/2016 8/31/2016 9/30/2016 10/31/2016 11/30/2016 12/31/2016 1/31/2017 2/28/2017 3/31/2017 4/30/2017 5/31/2017 6/30/2017

Sources:ARRA 21,604$ 19,810$ 18,016$ 16,222$ 14,428$ 11,034$ 7,640$ 4,246$ 851$ 657$ 463$ 269$ FY10 - - - - - - - - - - - - State 24,973 23,548 22,042 20,577 19,152 17,687 16,222 14,756 13,372 11,866 10,482 8,976 Local 30,592 28,048 25,503 22,958 20,414 19,469 18,524 17,579 16,635 12,490 8,345 4,201

Project Development Subtotal 77,169$ 71,406$ 65,561$ 59,757$ 53,993$ 48,189$ 42,385$ 36,581$ 30,858$ 25,014$ 19,290$ 13,446$

ARRA 923,494$ 776,070$ 635,875$ 503,522$ 338,262$ 178,539$ 27,358$ 0$ 0$ 0$ 0$ 0$ FY10 928,620 928,620 928,620 928,620 928,620 928,620 891,695 795,031 684,976 591,366 501,226 417,666 State 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,355,958 2,314,531 2,267,364 2,203,651 2,165,019 2,129,208 Local - - - - - - - - - - - -

Construction Subtotal 4,223,897$ 4,076,473$ 3,936,278$ 3,803,925$ 3,638,665$ 3,478,942$ 3,275,011$ 3,109,561$ 2,952,340$ 2,795,016$ 2,666,246$ 2,546,874$

Uses:ARRA 1,794$ 1,794$ 1,794$ 1,794$ 3,394$ 3,394$ 3,394$ 3,394$ 194$ 194$ 194$ 269$ FY10 - - - - - - - - - - - - State 1,425 1,506 1,465 1,425 1,465 1,465 1,465 1,385 1,506 1,385 1,506 1,484 Local 2,545 2,545 2,545 2,545 945 945 945 945 4,145 4,145 4,145 4,051

Project Development Subtotal 5,764$ 5,844$ 5,804$ 5,764$ 5,804$ 5,804$ 5,804$ 5,723$ 5,844$ 5,723$ 5,844$ 5,804$

ARRA 147,425$ 140,195$ 132,353$ 165,260$ 159,723$ 151,181$ 27,358$ -$ -$ -$ -$ -$ FY10 - - - - - 36,925 96,665 110,055 93,610 90,140 83,560 78,886 State - - - - - 15,825 41,428 47,166 63,714 38,631 35,812 33,808 Local - - - - - - - - - - - -

Construction Subtotal 147,425$ 140,195$ 132,353$ 165,260$ 159,723$ 203,931$ 165,450$ 157,221$ 157,324$ 128,771$ 119,372$ 112,694$

Balance:ARRA 19,810$ 18,016$ 16,222$ 14,428$ 11,034$ 7,640$ 4,246$ 851$ 657$ 463$ 269$ 0$ FY10 - - - - - - - - - - - - State 23,548 22,042 20,577 19,152 17,687 16,222 14,756 13,372 11,866 10,482 8,976 7,492 Local 28,048 25,503 22,958 20,414 19,469 18,524 17,579 16,635 12,490 8,345 4,201 150

Project Development Subtotal 71,406$ 65,561$ 59,757$ 53,993$ 48,189$ 42,385$ 36,581$ 30,858$ 25,014$ 19,290$ 13,446$ 7,642$

ARRA 776,070$ 635,875$ 503,522$ 338,262$ 178,539$ 27,358$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 928,620 928,620 928,620 928,620 928,620 891,695 795,031 684,976 591,366 501,226 417,666 338,780 State 2,371,783 2,371,783 2,371,783 2,371,783 2,371,783 2,355,958 2,314,531 2,267,364 2,203,651 2,165,019 2,129,208 2,095,400 Local - - - - - - - - - - - -

Construction Subtotal 4,076,473$ 3,936,278$ 3,803,925$ 3,638,665$ 3,478,942$ 3,275,011$ 3,109,561$ 2,952,340$ 2,795,016$ 2,666,246$ 2,546,874$ 2,434,180$

Balance 4,147,878$ 4,001,839$ 3,863,683$ 3,692,659$ 3,527,132$ 3,317,397$ 3,146,143$ 2,983,198$ 2,820,030$ 2,685,536$ 2,560,319$ 2,441,822$

Total Sources 4,301,067$ 4,147,878$ 4,001,839$ 3,863,683$ 3,692,659$ 3,527,132$ 3,317,397$ 3,146,143$ 2,983,198$ 2,820,030$ 2,685,536$ 2,560,319$ Total Uses 153,188 146,039 138,157 171,024 165,527 209,735 171,254 162,944 163,168 134,494 125,216 118,498 Balance 4,147,878$ 4,001,839$ 3,863,683$ 3,692,659$ 3,527,132$ 3,317,397$ 3,146,143$ 2,983,198$ 2,820,030$ 2,685,536$ 2,560,319$ 2,441,822$

Notes: Please refer to the notes on page 2

($ 000's)

Page 24: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 20 of 22

Monthly Expenditure Plan by Funding Source

FY 17/18Period Begin 7/1/2017 8/1/2017 9/1/2017 10/1/2017 11/1/2017 12/1/2017 1/1/2018 2/1/2018 3/1/2018 4/1/2018 5/1/2018 6/1/2018Period End 7/31/2017 8/31/2017 9/30/2017 10/31/2017 11/30/2017 12/31/2017 1/31/2018 2/28/2018 3/31/2018 4/30/2018 5/31/2018 6/30/2018

Sources:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 7,492 6,880 6,231 5,619 4,988 4,358 3,746 3,097 2,503 1,873 1,261 612 Local 150 137 125 112 100 87 75 62 50 37 25 12

Project Development Subtotal 7,642$ 7,017$ 6,356$ 5,731$ 5,088$ 4,445$ 3,821$ 3,159$ 2,553$ 1,910$ 1,286$ 624$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 338,780 218,327 126,929 97,221 0 0 0 0 0 0 0 0 State 2,095,400 2,061,584 2,038,093 1,953,163 1,940,098 1,832,470 1,718,793 1,605,117 1,499,294 1,397,064 1,293,528 1,191,848 Local - - - - - - - - - - - -

Construction Subtotal 2,434,180$ 2,279,911$ 2,165,022$ 2,050,384$ 1,940,098$ 1,832,470$ 1,718,793$ 1,605,117$ 1,499,294$ 1,397,064$ 1,293,528$ 1,191,848$

Uses:ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State 612 649 612 631 631 612 649 593 631 612 649 612 Local 13 13 13 13 13 13 13 13 13 13 13 13

Project Development Subtotal 624$ 662$ 624$ 643$ 643$ 624$ 662$ 606$ 643$ 624$ 662$ 624$

ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 120,454 91,397 29,708 97,221 - - - - - - - - State 33,816 23,491 84,930 13,065 107,629 113,676 113,676 105,823 102,230 103,536 101,680 94,529 Local - - - - - - - - - - - -

Construction Subtotal 154,269$ 114,889$ 114,638$ 110,286$ 107,629$ 113,676$ 113,676$ 105,823$ 102,230$ 103,536$ 101,680$ 94,529$

Balance:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 6,880 6,231 5,619 4,988 4,358 3,746 3,097 2,503 1,873 1,261 612 0 Local 137 125 112 100 87 75 62 50 37 25 12 (0)

Project Development Subtotal 7,017$ 6,356$ 5,731$ 5,088$ 4,445$ 3,821$ 3,159$ 2,553$ 1,910$ 1,286$ 624$ 0$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 218,327 126,929 97,221 0 0 0 0 0 0 0 0 0 State 2,061,584 2,038,093 1,953,163 1,940,098 1,832,470 1,718,793 1,605,117 1,499,294 1,397,064 1,293,528 1,191,848 1,097,319 Local - - - - - - - - - - - -

Construction Subtotal 2,279,911$ 2,165,022$ 2,050,384$ 1,940,098$ 1,832,470$ 1,718,793$ 1,605,117$ 1,499,294$ 1,397,064$ 1,293,528$ 1,191,848$ 1,097,319$

Balance 2,286,928$ 2,171,378$ 2,056,115$ 1,945,187$ 1,836,915$ 1,722,614$ 1,608,276$ 1,501,847$ 1,398,974$ 1,294,814$ 1,192,472$ 1,097,319$

Total Sources 2,441,822$ 2,286,928$ 2,171,378$ 2,056,115$ 1,945,187$ 1,836,915$ 1,722,614$ 1,608,276$ 1,501,847$ 1,398,974$ 1,294,814$ 1,192,472$ Total Uses 154,894 115,550 115,262 110,929 108,272 114,301 114,338 106,429 102,873 104,161 102,341 95,154 Balance 2,286,928$ 2,171,378$ 2,056,115$ 1,945,187$ 1,836,915$ 1,722,614$ 1,608,276$ 1,501,847$ 1,398,974$ 1,294,814$ 1,192,472$ 1,097,319$

Notes: Please refer to the notes on page 2

($ 000's)

Page 25: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 21 of 22

Monthly Expenditure Plan by Funding Source

FY 18/19Period Begin 7/1/2018 8/1/2018 9/1/2018 10/1/2018 11/1/2018 12/1/2018 1/1/2019 2/1/2019 3/1/2019 4/1/2019 5/1/2019 6/1/2019Period End 7/31/2018 8/31/2018 9/30/2018 10/31/2018 11/30/2018 12/31/2018 1/31/2019 2/28/2019 3/31/2019 4/30/2019 5/31/2019 6/30/2019

Sources:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 0 0 0 0 0 0 0 0 0 0 0 0 Local (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0)

Project Development Subtotal 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 0 0 0 0 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ State 1,097,319 1,003,083 907,490 824,736 748,897 681,922 614,894 548,973 489,917 432,964 379,569 327,544 Local - - - - - - - - - - - -

Construction Subtotal 1,097,319$ 1,003,083$ 907,490$ 824,736$ 748,897$ 681,922$ 614,894$ 548,973$ 489,917$ 432,964$ 379,569$ 327,544$

Uses:ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Project Development Subtotal -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State 94,236 95,592 82,754 75,840 66,974 67,028 65,921 59,056 56,953 53,395 52,026 49,491 Local - - - - - - - - - - - -

Construction Subtotal 94,236$ 95,592$ 82,754$ 75,840$ 66,974$ 67,028$ 65,921$ 59,056$ 56,953$ 53,395$ 52,026$ 49,491$

Balance:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 0 0 0 0 0 0 0 0 0 0 0 0 Local (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0)

Project Development Subtotal 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 0 0 0 0 0 0 0 0 0 0 0 0 State 1,003,083 907,490 824,736 748,897 681,922 614,894 548,973 489,917 432,964 379,569 327,544 278,052 Local - - - - - - - - - - - -

Construction Subtotal 1,003,083$ 907,490$ 824,736$ 748,897$ 681,922$ 614,894$ 548,973$ 489,917$ 432,964$ 379,569$ 327,544$ 278,052$

Balance 1,003,083$ 907,490$ 824,736$ 748,897$ 681,922$ 614,894$ 548,973$ 489,917$ 432,964$ 379,569$ 327,544$ 278,052$

Total Sources 1,097,319$ 1,003,083$ 907,490$ 824,736$ 748,897$ 681,922$ 614,894$ 548,973$ 489,917$ 432,964$ 379,569$ 327,544$ Total Uses 94,236 95,592 82,754 75,840 66,974 67,028 65,921 59,056 56,953 53,395 52,026 49,491 Balance 1,003,083$ 907,490$ 824,736$ 748,897$ 681,922$ 614,894$ 548,973$ 489,917$ 432,964$ 379,569$ 327,544$ 278,052$

Notes: Please refer to the notes on page 2

($ 000's)

Page 26: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Draft FCP Report Sept 2015 v1.5 22 of 22

Monthly Expenditure Plan by Funding Source

FY 19/20

Period Begin 7/1/2019 8/1/2019 9/1/2019 10/1/2019 11/1/2019 12/1/2019 1/1/2020 2/1/2020 3/1/2020 4/1/2020 5/1/2020 6/1/2020Period End 7/31/2019 8/31/2019 9/30/2019 10/31/2019 11/30/2019 12/31/2019 1/31/2020 2/29/2020 3/31/2020 4/30/2020 5/31/2020 6/30/2020

Sources:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 0 0 0 0 0 0 0 0 0 0 0 0 Local (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0)

Project Development Subtotal 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0 0 0 0 0 State 278,052 227,537 182,708 134,734 89,437 41,468 0 0 0 0 0 0 Local - - - - - - - - - - - -

Construction Subtotal 278,052$ 227,537$ 182,708$ 134,734$ 89,437$ 41,468$ 0$ 0$ 0$ 0$ 0$ 0$

Uses:ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State - - - - - - - - - - - - Local - - - - - - - - - - - -

Project Development Subtotal -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

ARRA -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY10 - - - - - - - - - - - - State 50,516 44,829 47,973 45,297 47,969 41,468 - - - - - - Local - - - - - - - - - - - -

Construction Subtotal 50,516$ 44,829$ 47,973$ 45,297$ 47,969$ 41,468$ -$ -$ -$ -$ -$ -$

Balance:ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 - - - - - - - - - - - - State 0 0 0 0 0 0 0 0 0 0 0 0 Local (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0)

Project Development Subtotal 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

ARRA 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$ FY10 0 0 0 0 0 0 0 0 0 0 0 0 State 227,537 182,708 134,734 89,437 41,468 0 0 0 0 0 0 0 Local - - - - - - - - - - - -

Construction Subtotal 227,537$ 182,708$ 134,734$ 89,437$ 41,468$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

Balance 227,537$ 182,708$ 134,734$ 89,437$ 41,468$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

Total Sources 278,052$ 227,537$ 182,708$ 134,734$ 89,437$ 41,468$ 0$ 0$ 0$ 0$ 0$ 0$ Total Uses 50,516 44,829 47,973 45,297 47,969 41,468 - - - - - - Balance 227,537$ 182,708$ 134,734$ 89,437$ 41,468$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

Notes: Please refer to the notes on page 2

($ 000's)

Page 27: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

California High-Speed Rail: Operations Report

FY14-15, FY15-16 and Program Metrics

January 2016

Finance & Audit Committee Meeting

Exhibit E - CAHSR Operations Report with contingency breakdowns January 2016
Exhibit E Detailed information about project contingencies Excerpt from Operations Report January 2016
Page 28: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Projected Available Contingency Level at Future Milestones

66

Contract Milestones Projected Available

Contingency ($M)Potential Risks Expected to Occur at Contract Milestones

Mean Rem. Risk Exposure

($M)

As of Apr 01, 2015 151.7

90% Design 144.8 • Scope changes as per environmental requirements modifications 6.9

100% RFC Design 122.0• Madera County Design roadway revisions (Avenues 9, 12, 13, 15 and 15.5)• Other Known scope changes incl. McKinley, GSB, etc.• City of Fresno Tier 2 requirements

22.9

10% Construction 86.2

• Delays in agreement with RR agencies (50% impact)• ROW acquisition delays (50% impact)• Delays in obtaining permits (50% impact)• SJVRR Spurs - Scope considers one spur in the vicinity of Dry Creek Canal

35.8

20% Construction 78.7• Utility Provisional Sum• Construction contract work Prov. Sums

7.5

50% Construction 48.2• Changed/Differing Site Conditions• Class I & II Hazmat

30.5

75% Construction 40.3• Change or mis-representation of environmental requirements• SR99 & SR180 Interface Coordination

7.9

90% Construction 22.4 • Direct costs associated with intrusion protection 17.9

Substantial Complete 10.4• ROW acquisition delays (50% impact)• Delays in obtaining permits (50% impact)• Delays in acquiring compensatory mitigation sites

24.1

Risk – CP1

Note: Content as of 01-Apr-2015. The projections for remaining contingency available will be reviewed and adjusted at major project milestones. This will take into account actual known impact of risks that are realized and free-up the mean impact of the risks that are avoided.

F&A Committee Meeting – January 2016

Page 29: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

70

Projected Available Contingency Level at Future Milestones

Contract Milestones

Projected Available

Contingency ($M)Potential Risks Expected to Occur at Contract Milestones

P90 Risk Exposure

($M)

CP2-3 NTP 261

60% Design 253.6 • Scope changes as per Environmental requirement modifications 15.3

90% Design 233.6 • Kings County Roadway Modifications• Notice of approval of restricted drawings

20.0

100% RFC Design 202.8 • Fresno & Tulare County Roadway Modifications• SBE/DBE participation, community benefits agreement and NTHI

30.8

10% Construction 186.8

• Delays in agreement with RR agencies (20% impact)• ROW acquisition delays (20% impact); Delays in obtaining permits (20% impact)• Uncooperative Kings County delaying HSR work (20% impact)• CPUC delays (20% impact)

16.0

20% Construction 147.3 • Uncertainty in utility relocation costs; Uncertainty in canal relocation costs• Construction Water hard to find

39.5

50% Construction 125.3 • Changed/Differing Site Conditions• Class I & II Hazmat

22.0

75% Construction 79.7 • BNSF railroad intrusion protection measures (50%) 45.6

90% Construction 67.2 • Agricultural crossings at Hanford and Cross Creek necessitated by embankments. 12.5

Substantial Complete

47.2• ROW acquisition delays (50% impact)• Delays in obtaining permits (50% impact)• Delays in acquiring compensatory mitigation sites (50% impact)

40.1

Risk – CP2-3

Note: Content as of 11-Jun-2015. The projections for remaining contingency available will be reviewed and adjusted at major project milestones. This will take into account actual known impact of risks that are realized and free-up the P90 impact of the risks that are avoided.

F&A Committee Meeting – January 2016

Page 30: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

~tJ!S'TA CALIFORNIA STATE TRANSPORTATION AGENCY

Edmund G. Brown Jr. Governor

Brian P. Kelly Secretary

July 10, 2013

The Honorable Mark DeSaulnier, Chair Senate Transportation and Housing Committee State Capitol, Room 2209 Sacramento, CA 95814

The Honorable Mark Leno, Chair Senate Committee on Budget and Fiscai .Review State Capitol, Room 5019 Sacramento, CA 95814

915 Capitol Mall, Suite 350B Sacramento, CA 95814

916-323-5400 www.calsta.ca.gov

The Honorable Bonnie Lowenthal, Chair Assembly Transportation Committee 1 020 N Street, Room 112 Sacramento, CA 95814

The Honorable Nancy Skinner, Chair Assembly Committee on the Budget State Capitol, Room 6026 Sacramento, CA 95814

Dear Senator DeSaulnier, Senator Leno, Assembly Member Lowenthal, and Assembly Member Skinner:

This letter is to indicate that I have reviewed and approve the California High-Speed Rail Authority's (Authority) Risk Management Report as consistent with Provision 8 of Item 2665-306-6043 of the Budget Act of 2012 (SB 1029, Chapter 152, Statutes of 2012).

Attachment

cc list: See next page

California Transportation Commission • Board of Pilot Commissioners • California Highway Patrol • Department of Motor Vehicles Department of Transportation • High Speed Rail Authority • Office of Traffic Safety • New Motor Vehicle Board

Exhibit F - Excerpt from HSRA Risk Management Report
Page 31: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

July 10, 2013 Page 2

cc: The Honorable Darrell Steinberg, President pro Tern, California Senate The Honorable John Perez, Speaker, California Assembly The Honorable Ted Gaines, Vice Chair, Senate Transportation and Housing Committee The Honorable Bill Emmerson, Vice Chair, Senate Budget and Fiscal Review Committee The Honorable Eric Linder, Vice Chair, Assembly Transportation Committee The Honorable Jeff Gorell, Vice Chair, Assembly Budget Committee Ms. Carrie Cornwell, Chief Consultant, Senate Transportation and Housing Committee Ms. Janet Dawson, Chief Consultant, Assembly Transportation Committee Ms. Keely Bosler, Staff Director, Senate Budget and Fiscal Review Committee Mr. Christian Griffith, Chief Consultant, Assembly Committee on the Budget Ms. Diane Boyer-Vine, Legislative Counsel, State Capitol Mr. Gregory Schmidt, Secretary of the Senate, State Capitol Mr. E. Dotson Wilson, Chief Clerk of the Assembly, State Capitol

Page 32: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

BOARD MEMBERS

Dan Richard CHAIR

Thomas Richards VICE CHAIR

Jim Hartnett VICE CHAIR

Patrick W. Henning, Sr.

Katherine Perez-Estolano

Michael Rossi

Lynn Schenk

Thomas J. Umberg

Jeff Morales CHIEF EXECUTIVE OFFICER

(()~IINO <l. 8ROt\'N JA

GllVfP.NOR

~CALIFORNIA 'ql High-Speed Rail Authority

July 31,2013

The Honorable Mark DeSaulnier, Chair Senate Transportation and Housing Committee State Capitol, Room 2209 Sacramento, CA 95814

The Honorable Bonnie Lowenthal, Chair Assembly Transportation Committee I 020 N Street, Room 112 Sacramento, CA 95814

The Honorable Mark Leno, Chair Senate Budget and Fiscal Review Committee State Capitol, Room 5019 Sacramento, CA 95814

The Honorable Nancy Skinner, Chair Assembly Budget Committee State Capitol, Room 6026 Sacramento, CA 95814

Dear Senator DeSaulnier, Senator Leno, Assembly Member Lowenthal, and Assembly Member Skinner:

The California High-Speed Rail Authority (Authority) is committed to transparency in the identification, assessment and management of project risks. To that end, the Authority has had in place a process for risk management since 2010. In September 2012, the Authority hired a risk manager and subsequently began to refine its strategy of identifying potential risks to the project and the steps necessary to mitigate those risks.

Provision 8 ofltem 2665-306-6043 of the Budget Act of2012 (SB 1029, Chapter 152, Statutes of 2012) requires the Authority to prepare and submit to the Legislature a report, approved by the Secretary of Business, Transportation and Housing, that details the elements of risk in the high­speed rail project.

Central to this reporting requirement is a comprehensive Risk Management Plan that "defines the roles and responsibilities for risk management and addresses the process by which the Authority will identify and quantify project risks, implement and track risk response activities, and monitor and control risks" throughout the duration of the high-speed rail project.

In addition to the development of a Risk Management Plan, SB l 029 requires the Authority to quantify the effect of identified risks in financial terms, maintain documents to track identified risks, establish mitigation steps, provide a plan for regularly reassessing its estimates of capital and support costs, provide a plan for reassessing risks and reserves, and provide a plan for integrating the estimates for capital, support costs and contingency reserves in required reports.

Attached is the Authority's Risk Management Plan, dated June 5, 2013, which contains all of the elements required by SB 1029.

If you have any questions or comments, please contact Matt Robinson, Deputy Director of Legislation, at (916) 324-1541 or matthew.robinson(a:hsr.ca.gov.

____ _,) 770 L Street, Suite 800 Sacramento. CA 95814 • T: (916) 324-1541 • F: (916) 322-0827 • www.hsr.ca.gov

Page 33: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

DeSaulnier, Leno, Lowenthal, Skinner July 31,2013 Page 2

SiJ:;-~ Jeff Morales Chief Executive Officer

Attachment

cc: The Honorable Darrell Steinberg, President pro Tern, California Senate The Honorable John Perez, Speaker, California Assembly The Honorable Ted Gaines, Vice Chair, Senate Transportation and Housing Committee The Honorable Bill Emmerson, Vice Chair, Senate Budget and Fiscal Review Committee The Honorable Eric Linder, Vice Chair, Assembly Transportation Committee The Honorable Jeff Gorell, Vice Chair, Assembly Budget Committee Ms. Carrie Cornwell, Chief Consultant, Senate Transportation and Housing Committee Ms. Janet Dawson, Chief Consultant, Assembly Transportation Committee Ms. Keely Bosler, Staff Director, Senate Budget and Fiscal Review Committee Mr. Christian Griffith, Chief Consultant, Assembly Committee on the Budget Ms. Diane Boyer-Vine, Legislative Counsel, State Capitol Mr. Gregory Schmidt, Secretary of the Senate, State Capitol Mr. E. Dotson Wilson, Chief Clerk of the Assembly, State Capitol

Page 34: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Project Risk Management Plan June 5, 2013

www.hsr.ca.gov

Page 35: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

i ' ue: Cate> · o r::June 013 P<r:e;

Page 36: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Program Risk Management Plan

• Alert the project team to potential cost risks and opportunities

Facilitate the review and validation of the cost estimate and schedule

Establish the initial baseline for scope, quantities and cost for use in cost trending throughout

the project

Provide a record of all documents used to prepare the estimate

Provide a record of key communications made during estimate preparation.

• Act as a source of support during dispute resolutions

Provide the historical relationships between estimates throughout the project lifecycle

Reduce the number of addenda

The completed Basis of Estimate document will:

Be factually complete, but concise

• Be able to support facts and findings

Describe the tools, techniques, estimating methodology, and data used to develop the cost

estimate

Identify other projects that were referenced or benchmarked during estimate preparation

Establish the context of the cost estimate and schedule and support estimate and schedule

review and validation

Identify estimating team members and their roles

These efforts will be led by Authority staff with support from Project Controls and Risk Management

personnel.

4.1.1 Updating Capital and Support Cost Estimates

The Program-wide estimate is an estimate of all capital costs associated with implementation the

California High-Speed Rail Program. It is expected that as the CHSRP progresses, more detailed

information will be developed requiring periodic updates of the estimate. Program-wide estimates will

be re-estimated every two years as part of the updates to the Business Plan. The revised estimate will be

established as the current baseline estimate for the program. Prior to adoption of the revised business

plan estimate, the estimate will be reconciled to the previous business plan estimate.

Subsequent to the adoption of the baseline estimate all revisions to the baseline estimate as a result of

configuration changes resulting from changes to alignment, development of more detailed plans, or

actual bid costs will be tracked and approved through the Authority's change management procedure.

The current baseline estimate together with all approved changes will be the basis by which the revised

business plan estimate is reconciled .

In addition to the above requirement, as each segment of the overall alignment of the program evolves

in development the segment or construction package will be estimated at the 15 percent design level

and again following completion of the engineering for procurement design level. These detailed cost

estimates will be the basis for integrating estimates for overall capital costs, support costs, and

contingency reserves in reports.

f.', If' 1(

Page 37: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Questions? Email [email protected] / CARRD www.calhsr.com V1.1 January 20, 2016

What is the status of environmental mitigation projects in the Central Valley?

The California High Speed Rail Authority committed to offsetting impacts of the initial construction. We’ve counted 7 different initiatives beyond strict requirements in construction contracts that total about $105 million. The latest Authority budget shows a $5 million commitment.

Program Cost Vendors Status Details

Agricultural conservation easements to offset all land taken out of production

$20 million (for 2,500 acres)

California Department of Conservation

None purchased so far. No update on total acreage – may be 5,000 acres.

Program FAQ Contract CHSRA web link

Mitigation of impacts to endangered species for CP 2-4. Route cuts through key areas for many endangered species

$50 million Westervelt Not clear if contract executed

Staff memo Jan 2015 RFP June 2015 Board memo 268 page mitigation plan

Mitigation of impacts for CP1 via Lazy K project (restoration of vernal pools and land preservation)

$10 million Vollmar Natural Lands Consulting, Inc.

Nearing approval for permits

Nov 2013 board approval

Reduction in emissions in the San Joaquin valley from certain construction impacts - air quality very poor in region

$12 million (estimate based on $35 million for SJ section )

San Joaquin Valley Air Pollution Control District

$2 million for CP 1A/B appear spent/ no information on rest of ICS

Fresno Bee article 2014 staff memo

Tree planting to offset construction GHG emissions (does not include GHG from materials)

$5 - $10 million based on number and urban vs rural mix

TBD As of Dec 2015, none planted 5,000 tree goal for first 29 miles 20,000 for whole project?

Agricultural mitigation fund (part of legal settlement)

$ 5 million Paid out in 2013

Traffic mitigation ? ? Some elements in D-B contracts

Exhibit G - CARRD summary on Environmental mitigation in Central Valley
Page 38: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

February 10, 2011

Calif. Gauges Private­Sector Interest in

High­Speed Rail as Critics Question

Cost, RidershipBy COLIN SULLIVAN of 

California went fishing for private contractors and investors yesterday with the state's firstopen invitation to outside parties looking to participate in construction of an 800­mile high­speed rail line.

The agency in charge of the project, the California High­Speed Rail Authority, gave interestedparties a five­week window, until March 16, to express interest in design, construction,financing, operations and maintenance of the north­to­south line.

The first step in the authority's open­tent approach is meant to gauge interest before a moreformalized request for proposals is issued later this year. Authority officials said they areseeking all manner of private interest, in either the first, 120­mile leg of the project in theCentral Valley or any future phase, to include financing and core systems work inelectrification and signaling.

The first phase of the project will cost about $5.5 billion with more than half of that to comefrom federal sources (and most of it already obligated). Jeffrey Barker, the authority's deputyexecutive director, told reporters yesterday "it's time to turn to the private sector" followingpublic­sector financial commitments and voters having approved the project in a 2008 ballotmeasure.

"This is opening the door to that process," Barker said during a press call.

The pitch comes as Washington continues to heighten its scrutiny of the California blueprint,especially in light of well­publicized rail retreats in Ohio and Wisconsin. Just this week, VicePresident Joe Biden announced plans to spend $53 billion over the next six years on high­speed trains and rail improvements, with an $8 billion down payment on the sector to beincluded in the White House budget next week (Greenwire, Feb. 8).

But with Republicans now in charge of the House, there is some question as to whetherappropriators will agree with President Obama on high­speed rail. In Washington yesterday,according to a report from McClatchy Newspapers, House Transportation and Infrastructure

MORE IN ENERGY & ENVIRONMENT 

ARTICLES)

Shell Shareholders Approve

Acquisition of BG Group

Read More »

Exhibit H - CARRD in NYT with updated costs on HSRA Project
Page 39: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

Chairman John Mica (R­Fla.) indicated he would prefer spending cash on rail improvements inthe busy Northeast rather than California.

The story quoted Mica saying he is not impressed with California's plan to build the firstsegment of its rail line in the Central Valley. Mica questioned if ridership in a state, where thecar is king, would ever meet expectations.

$65B price tag?

Adding to the pushback were new cost estimates released yesterday by a watchdog group calledCalifornians Advocating Responsible Rail Design that pegs the entire project's cost at $65billion. That is up from a $43 billion estimate the authority released in 2009.

Nadia Naik, co­founder of the Palo Alto­based group, explained her organization had beenhoping to see updated numbers from the authority, but when she lost confidence that thosenumbers would appear anytime soon, the group decided to release its own estimate.

"Our figures are based on the authority's documents and [American Recovery andReinvestment Act] applications and were calculated over two months ago," she said. "The 2009$43 billion figure was outdated the day it was released, because it [priced] the project as itexisted circa 2005."

Naik also called on the authority to release its own updated cost estimate as soon as possible,noting that a business plan for the project was due to the state Senate by Feb. 1 but thatdeadline has slipped until later this year because the authority's relationship with its financialconsultant, PricewaterhouseCoopers, apparently fell through.

Elizabeth Alexis, an economist and another co­founder of the group, said the organizationprepared the new estimate by filling in the gaps of a 2009 spreadsheet from the authority. Forinstance, the 2009 estimate did not assume reconstruction of Caltrain stations along the high­speed rail's route south of San Francisco, which Alexis said would add significant costs. Nor didthe 2009 estimate include figures on what it would cost to build extensive aerial platforms inBakersfield and Fresno, she said.

"They know these numbers, they just don't share them," Alexis said. "It shouldn't just be thesmall club of high­speed railed obsessives that are in on the joke. The public should see thesenumbers."

Alexis said her group wants to work with people on both sides of the rail debate.

"We're just a group of normal people who kept running into each other at the same meetings,"

Nadia Naik
Page 40: (see Attachment) Exhibit Acalhsr.com/wp-content/uploads/2016/01/Exhibits-for...Estimated CP1-5 D-B constrcution costs are estimated following an S-curve for the corresponding construction

she said.

A spokeswoman for the rail authority, Rachel Wall, defended the California project, saying itrepresents the first mega high­speed rail project attempted in the United States.

"California is building a true high­speed rail system connecting major metropolitan cities,"Wall said. "It will generate revenue and be a cheaper, faster transportation alternative forCalifornians. We are building a system that is analogous to the systems in Asia and Europe."

Sullivan reported from San Francisco.

Copyright 2011 E&E Publishing. All Rights Reserved.

For more news on energy and the environment, visit www.greenwire.com.

Greenwire is published by Environment & Energy Publishing. Read More »

Nadia Naik