(see section 6.2) installation quick guide · 2015-04-28 · res 3.6kwh all in one installation...
TRANSCRIPT
RES 3.6kWh All in OneInstallation Quick Guide
Manual Download (Refer to Installation Manual)• https://myess.samsungsdi.com/engineer/main.do• https://112.106.12.149/engineer/main.do
CAUTIONIncluded in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package.
CAUTION• Do not operate with other components not approved by the ESS systems.
(Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer.• The Specifications of the product may be modified without prior notice to improve product quality.
CAUTIONThis warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes;• have been incorrectly installed or commissioned;• have been modified, altered or operated with other components not approved by Samsung SDI;• have been physically damaged (e.g. damage from falls or transportation);• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient
conditions).
Wiring Schematic of Single Phase System (for Australia)(See Section 5.1)
Grid
kWh(ESS Meter)
L
N
L
N
L
N
PE
kWh(Utility Meter)
L N
L N
NL PE
AC Grid Line PV1
PV2
LoadsAC Circuit Breaker
DC Disconnection Switch
AC Circuit Breaker
Samsung SDI ESS3.6kWh All-in-One
RS485CommunicationLine
PE
PV2 ArrayPV1 Array
Main Earth Bar
Example for switchboard wiring on a TN-S network for on-grid.
Energy Meter Wiring & Setting (EM24-RS485 Type)(See Section 6.2)
Energy Meter Wiring & Setting (EDMI Mk7C D0 Type)(See Section 6.2)
Load
Grid(Mains)
LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)
DO-Purchase
DO-BI/Feed-In
PCSS/M
Server
ESS Meter
RS485-B 41
RS485-A 42
FANPV+
PV2
PV-
PV+
PV2
PV-
L
N
PE
N L1
N L1
41 42 43
31 32 33
Load
LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)
DO-Purchase
DO-BI/Feed-In
PCSS/M
Server
ESS Meter
RS485-B 41
RS485-A 42
FANPV+
PV2
PV-
PV+
PV2
PV-
L
N
PEN L
GridL
RS-232C Direct Cable(Length : < 10m)
N
KMK131
Australia (Eng.) 04/2015. Rev1.0
Meter (C2000M) Grid / All-in-One Connection(1) L1 Short
CircuitL (Grid)
(4) L2 -(11) N N (Grid)(3) L1 Load - L (All-in-One)(11) N N (All-in-One)
(41) A - RS485-B (All-in-One)(42) B + RS485-A (All-in-One)
Meter (C2000M) Grid / All-in-One Connection
(TB1-1) L (Grid)
(TB1-2) N (Grid)
(TB1-3) N (All-in-One)
(TB1-4) L (All-in-One)
(IR Optical Interface) D0-Bi/Feed-In(All-in-One) * KMK131 Probe, RS232C Extension Cable
(TB2) Do Not Use
(TB3) Do Not Use
(TB4) Do Not Use
(EM24 Meter Setting)1) Application: F
2) ModBus Address : 1 (default value)
3) Baudrate : 9600 (default value)
4) SYS: 1P
5) p int.ti: 1
(EDMI Mk7C Meter Setting)- It does not need to be changed
(All-in-One Setting) Meter Type : D0 (Bi-Direction) D0-Bi/Feed-In : 9:Mk7C (EDMI)
D0 (Bi-Direction)Meter Type :
D0-Bi/Feed-In
Smart Meter Selection
D0 - Meter Model Selection
9:Mk7C (EDMI)
D0 (Bi-Direction)Meter Type :
D0-Bi/Feed-In
Smart Meter Selection
D0 - Meter Model Selection
5:EM24-DIN.AV9.3.X.IS.X(Gavazzi)
See from Initial setup page
SJ68-02069D
R4636Z1 1 5420Q 1 0EC
(All-in-One Setting)6) Meter Type : D0 (Bi-Direction)
7) D0-Bi Feed-In : 5:EM24-DIN.AV9.3.X.IS.X
SDI_호주.indd 1 15. 4. 17. 오후 3:37
5. Installer Account (See Section 7.4) 1) Open your mobile browser.
2) Input the URL:
- https://myess.samsungsdi .com/engineer/main.do or
- https://112.106.12.149/engineer/main.do.
3) Input your ID and password. (A new account can be provided by the wholesaler.)
4) You can see the list of ESS's.
5) Click the icon on the right to add a new ESS.
6) Input AIO information, installation information, and owner information.
7) Click the “Submit” button.
8) If it is saved successfully, you can see the success message. It may take 5 to10 minutes.
Main Menu * is mandatory
[Figure 5-1] Engineer log in page [Figure 5-2] New ESS adding page
[Figure 3-3] Initial setup page
Install Setting MenuMENU LIST
Region:
[W] (Range:0 ~ 3300 W)
[W] (Range:0 ~ 3300 W)
Country:
installed PV-1 Power:
installed PV-2 Power:
Feed In Limit percentage
Server IP
Server Port
Output Max Power
Australia Melbourne
S/N : XXXXXXXXXXXXXXXXXXXXXXXXXX
3300
3300
60%
4.6kW
112.106.12.149
80
Product Information
Date/Time Setting
Year/Month/Day
Hour:Minute:Second
Install Setting
Operating Test
SAVE and ReSTART
2015 2/ 5/
1 14: 26:
D0 (Bi-Direction)Meter Type :
D0-Bi/Feed-In
Smart Meter Selection
D0 - Meter Model Selection
-None-
1) Click here
2) For the max power per string
3) Do NOT change!
5) Do NOT change! : D0
7) Set the current local time and date
8) Click “Operating Test.“
9) After clicking “SAVE and ReSTART” on the top of the window a message saying “Wait for 1 Minute and press F5” will appear → follow the message
10) Click here
4) Do NOT change!
6) Select an energy meter type : 5:EM24-DIN.AV9.3.X.IS.X 9:Mk7C(EDMI)
1. Battery Tray Assembly (See Chapter 3, Section 5.4) 1) Below is a simplified illustration for assembling the battery tray.
Short cable
Long cable
[Figure 1-1] Process for Battery Assembly [Figure 1-3] Cable Stuff Method
[Figure 1-2] Battery to BMS Connection [Figure 1-4] Battery Power Connection
2) Perform internal wiring.
➀ Connect the voltage and temperature measurement cables between BMS (on the top inside the enclosure) and Tray (4 connections).
➁ Connect the power cables between Inverter and Battery Tray.
2. Connect PV, AC grid, and Energy meter (See Chapter 6)
3. SIM (System Install Manager) Connection (See Chapter 7)1) Set on your laptop (shown in Figure 3-1).
Control panel → Network and Sharing Center → Change Adapter Settings → Local Area Connector → Properties → Internet Protocol Version 4 (TCP/IP)
[Figure 3-1] Setting Laptop IP
2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 3-2.)
3) Connect the LAN cable between AIO and Laptop.
4) Turn the power On (AC grid On).
5) Access to SIM (System Install Manager) http://17.91.23.196:8000
6) Install the settings (shown in Figure 3-3).
Insert Jumper Wire
[Figure 3-2] Location of Jumper
4. Operating test (See Chapter 8) 6. User Account (Refer to User Guide) - Input the URL https://myess.samsungsdi.com
Australia (Eng.) 04/2015. Rev1.0
SDI_호주.indd 2 15. 4. 17. 오후 3:37