(see section 6.2) installation quick guide · 2015-04-28 · res 3.6kwh all in one installation...

2
RES 3.6kWh All in One Installation Quick Guide Manual Download (Refer to Installation Manual) • https://myess.samsungsdi.com/engineer/main.do • https://112.106.12.149/engineer/main.do CAUTION Included in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package. CAUTION • Do not operate with other components not approved by the ESS systems. (Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer. The Specifications of the product may be modified without prior notice to improve product quality. CAUTION This warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes; • have been incorrectly installed or commissioned; have been modified, altered or operated with other components not approved by Samsung SDI; • have been physically damaged (e.g. damage from falls or transportation); have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient conditions). Wiring Schematic of Single Phase System (for Australia) (See Section 5.1) Grid kWh (ESS Meter) L N L N L N PE kWh (Utility Meter) L N L N N L PE AC Grid Line PV1 PV2 Loads AC Circuit Breaker DC Disconnection Switch AC Circuit Breaker Samsung SDI ESS 3.6kWh All-in-One RS485 Communication Line PE PV2 Array PV1 Array Main Earth Bar Example for switchboard wiring on a TN-S network for on-grid. Energy Meter Wiring & Setting (EM24-RS485 Type) (See Section 6.2) Energy Meter Wiring & Setting (EDMI Mk7C D0 Type) (See Section 6.2) Load Grid(Mains) LAN RS485-A RS485-B SO+(FDIN) SO-(FDIN) SO+(PUSH) SO-(PUSH) DO-Purchase DO-BI/Feed-In PCS S/M Server ESS Meter RS485-B 41 RS485-A 42 FAN PV+ PV2 PV- PV+ PV2 PV- L N PE N L1 N L1 41 42 43 31 32 33 Load LAN RS485-A RS485-B SO+(FDIN) SO-(FDIN) SO+(PUSH) SO-(PUSH) DO-Purchase DO-BI/Feed-In PCS S/M Server ESS Meter RS485-B 41 RS485-A 42 FAN PV+ PV2 PV- PV+ PV2 PV- L N PE N L Grid L RS-232C Direct Cable (Length : < 10m) N KMK 131 Australia (Eng.) 04/2015. Rev1.0 Meter (C2000M) Grid / All-in-One Connection (1) L1 Short Circuit L (Grid) (4) L2 - (11) N N (Grid) (3) L1 Load - L (All-in-One) (11) N N (All-in-One) (41) A - RS485-B (All-in-One) (42) B + RS485-A (All-in-One) Meter (C2000M) Grid / All-in-One Connection (TB1-1) L (Grid) (TB1-2) N (Grid) (TB1-3) N (All-in-One) (TB1-4) L (All-in-One) (IR Optical Interface) D0-Bi/Feed-In(All-in-One) * KMK131 Probe, RS232C Extension Cable (TB2) Do Not Use (TB3) Do Not Use (TB4) Do Not Use (EM24 Meter Setting) 1) Application: F 2) ModBus Address : 1 (default value) 3) Baudrate : 9600 (default value) 4) SYS: 1P 5) p int.ti: 1 (EDMI Mk7C Meter Setting) - It does not need to be changed (All-in-One Setting) Meter Type : D0 (Bi-Direction) D0-Bi/Feed-In : 9:Mk7C (EDMI) D0 (Bi-Direction) Meter Type : D0-Bi/Feed-In Smart Meter Selection D0 - Meter Model Selection 9:Mk7C (EDMI) D0 (Bi-Direction) Meter Type : D0-Bi/Feed-In Smart Meter Selection D0 - Meter Model Selection 5:EM24-DIN.AV9.3.X.IS.X(Gavazzi) See from Initial setup page SJ68-02069D R4636Z1 1 5420Q1 0EC (All-in-One Setting) 6) Meter Type : D0 (Bi-Direction) 7) D0-Bi Feed-In : 5:EM24-DIN.AV9.3.X.IS.X SDI_호주.indd 1 15. 4. 17. 오후 3:37

Upload: others

Post on 20-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (See Section 6.2) Installation Quick Guide · 2015-04-28 · RES 3.6kWh All in One Installation Quick Guide Manual Download (Refer to Installation Manual) •  •

RES 3.6kWh All in OneInstallation Quick Guide

Manual Download (Refer to Installation Manual)• https://myess.samsungsdi.com/engineer/main.do• https://112.106.12.149/engineer/main.do

CAUTIONIncluded in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package.

CAUTION• Do not operate with other components not approved by the ESS systems.

(Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer.• The Specifications of the product may be modified without prior notice to improve product quality.

CAUTIONThis warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes;• have been incorrectly installed or commissioned;• have been modified, altered or operated with other components not approved by Samsung SDI;• have been physically damaged (e.g. damage from falls or transportation);• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient

conditions).

Wiring Schematic of Single Phase System (for Australia)(See Section 5.1)

Grid

kWh(ESS Meter)

L

N

L

N

L

N

PE

kWh(Utility Meter)

L N

L N

NL PE

AC Grid Line PV1

PV2

LoadsAC Circuit Breaker

DC Disconnection Switch

AC Circuit Breaker

Samsung SDI ESS3.6kWh All-in-One

RS485CommunicationLine

PE

PV2 ArrayPV1 Array

Main Earth Bar

Example for switchboard wiring on a TN-S network for on-grid.

Energy Meter Wiring & Setting (EM24-RS485 Type)(See Section 6.2)

Energy Meter Wiring & Setting (EDMI Mk7C D0 Type)(See Section 6.2)

Load

Grid(Mains)

LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)

DO-Purchase

DO-BI/Feed-In

PCSS/M

Server

ESS Meter

RS485-B 41

RS485-A 42

FANPV+

PV2

PV-

PV+

PV2

PV-

L

N

PE

N L1

N L1

41 42 43

31 32 33

Load

LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)

DO-Purchase

DO-BI/Feed-In

PCSS/M

Server

ESS Meter

RS485-B 41

RS485-A 42

FANPV+

PV2

PV-

PV+

PV2

PV-

L

N

PEN L

GridL

RS-232C Direct Cable(Length : < 10m)

N

KMK131

Australia (Eng.) 04/2015. Rev1.0

Meter (C2000M) Grid / All-in-One Connection(1) L1 Short

CircuitL (Grid)

(4) L2 -(11) N N (Grid)(3) L1 Load - L (All-in-One)(11) N N (All-in-One)

(41) A - RS485-B (All-in-One)(42) B + RS485-A (All-in-One)

Meter (C2000M) Grid / All-in-One Connection

(TB1-1) L (Grid)

(TB1-2) N (Grid)

(TB1-3) N (All-in-One)

(TB1-4) L (All-in-One)

(IR Optical Interface) D0-Bi/Feed-In(All-in-One) * KMK131 Probe, RS232C Extension Cable

(TB2) Do Not Use

(TB3) Do Not Use

(TB4) Do Not Use

(EM24 Meter Setting)1) Application: F

2) ModBus Address : 1 (default value)

3) Baudrate : 9600 (default value)

4) SYS: 1P

5) p int.ti: 1

(EDMI Mk7C Meter Setting)- It does not need to be changed

(All-in-One Setting) Meter Type : D0 (Bi-Direction) D0-Bi/Feed-In : 9:Mk7C (EDMI)

D0 (Bi-Direction)Meter Type :

D0-Bi/Feed-In

Smart Meter Selection

D0 - Meter Model Selection

9:Mk7C (EDMI)

D0 (Bi-Direction)Meter Type :

D0-Bi/Feed-In

Smart Meter Selection

D0 - Meter Model Selection

5:EM24-DIN.AV9.3.X.IS.X(Gavazzi)

See from Initial setup page

SJ68-02069D

R4636Z1 1 5420Q 1 0EC

(All-in-One Setting)6) Meter Type : D0 (Bi-Direction)

7) D0-Bi Feed-In : 5:EM24-DIN.AV9.3.X.IS.X

SDI_호주.indd 1 15. 4. 17. 오후 3:37

Page 2: (See Section 6.2) Installation Quick Guide · 2015-04-28 · RES 3.6kWh All in One Installation Quick Guide Manual Download (Refer to Installation Manual) •  •

5. Installer Account (See Section 7.4) 1) Open your mobile browser.

2) Input the URL:

- https://myess.samsungsdi .com/engineer/main.do or

- https://112.106.12.149/engineer/main.do.

3) Input your ID and password. (A new account can be provided by the wholesaler.)

4) You can see the list of ESS's.

5) Click the icon on the right to add a new ESS.

6) Input AIO information, installation information, and owner information.

7) Click the “Submit” button.

8) If it is saved successfully, you can see the success message. It may take 5 to10 minutes.

Main Menu * is mandatory

[Figure 5-1] Engineer log in page [Figure 5-2] New ESS adding page

[Figure 3-3] Initial setup page

Install Setting MenuMENU LIST

Region:

[W] (Range:0 ~ 3300 W)

[W] (Range:0 ~ 3300 W)

Country:

installed PV-1 Power:

installed PV-2 Power:

Feed In Limit percentage

Server IP

Server Port

Output Max Power

Australia Melbourne

S/N : XXXXXXXXXXXXXXXXXXXXXXXXXX

3300

3300

60%

4.6kW

112.106.12.149

80

Product Information

Date/Time Setting

Year/Month/Day

Hour:Minute:Second

Install Setting

Operating Test

SAVE and ReSTART

2015 2/ 5/

1 14: 26:

D0 (Bi-Direction)Meter Type :

D0-Bi/Feed-In

Smart Meter Selection

D0 - Meter Model Selection

-None-

1) Click here

2) For the max power per string

3) Do NOT change!

5) Do NOT change! : D0

7) Set the current local time and date

8) Click “Operating Test.“

9) After clicking “SAVE and ReSTART” on the top of the window a message saying “Wait for 1 Minute and press F5” will appear → follow the message

10) Click here

4) Do NOT change!

6) Select an energy meter type : 5:EM24-DIN.AV9.3.X.IS.X 9:Mk7C(EDMI)

1. Battery Tray Assembly (See Chapter 3, Section 5.4) 1) Below is a simplified illustration for assembling the battery tray.

Short cable

Long cable

[Figure 1-1] Process for Battery Assembly [Figure 1-3] Cable Stuff Method

[Figure 1-2] Battery to BMS Connection [Figure 1-4] Battery Power Connection

2) Perform internal wiring.

➀ Connect the voltage and temperature measurement cables between BMS (on the top inside the enclosure) and Tray (4 connections).

➁ Connect the power cables between Inverter and Battery Tray.

2. Connect PV, AC grid, and Energy meter (See Chapter 6)

3. SIM (System Install Manager) Connection (See Chapter 7)1) Set on your laptop (shown in Figure 3-1).

Control panel → Network and Sharing Center → Change Adapter Settings → Local Area Connector → Properties → Internet Protocol Version 4 (TCP/IP)

[Figure 3-1] Setting Laptop IP

2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 3-2.)

3) Connect the LAN cable between AIO and Laptop.

4) Turn the power On (AC grid On).

5) Access to SIM (System Install Manager) http://17.91.23.196:8000

6) Install the settings (shown in Figure 3-3).

Insert Jumper Wire

[Figure 3-2] Location of Jumper

4. Operating test (See Chapter 8) 6. User Account (Refer to User Guide) - Input the URL https://myess.samsungsdi.com

Australia (Eng.) 04/2015. Rev1.0

SDI_호주.indd 2 15. 4. 17. 오후 3:37