LEED-NC 2.2 Submittal Template | Last Modified: March 2006 LEED-NC 2.2 Submittal Template SS Credit 5.1: Site Development: Protect or Restore Habitat I, , from verify that the information provided below is accurate, to the best of my knowledge. (Company Name) (Responsible Individual) SELECT OPTION Please select the appropriate compliance path Option 1: Undisturbed Greenfield Sites Option 2: Previously Developed or Graded Sites Option 1 - Undisturbed Greenfield Sites Prior to development of this project, the site was an undisturbed greenfield site. All site disturbance is limited to 40 feet beyond the building perimeter; 10 feet beyond surface walkways, patios, surface parking and utilities less than 12 inches in diameter; 15 feet beyond primary roadway curbs and main utility branch trenches; and 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities and playing fields) that require additional staging areas in order to limit compaction in the constructed area. Option 2 - Previously Developed OR Graded Sites Prior to development of this project, the site was previously developed or was graded. Enter the total site area (excluding building footprint): square feet Enter the total site area that has been restored using native and/or adaptive planting: square feet Percentage of site area that has been restored using native and/or adaptive planting: % 50% of the site area must be restored using native and/or adaptive planting to qualify for this credit.

Upload: lythuan

Post on 10-Feb-2017

229 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2

LEED-NC 2.2 Submittal Template | Last Modified: March 2006

LEED-NC 2.2 Submittal TemplateSS Credit 5.1: Site Development: Protect or Restore Habitat

I, , from

verify that the information provided below is accurate, to the best of my knowledge.

(Company Name)(Responsible Individual)

SELECT OPTION

Please select the appropriate compliance path

Option 1: Undisturbed Greenfield Sites

Option 2: Previously Developed or Graded Sites

Option 1 - Undisturbed Greenfield Sites

Prior to development of this project, the site was an undisturbed greenfield site.

All site disturbance is limited to 40 feet beyond the building perimeter; 10 feet beyond surface walkways,patios, surface parking and utilities less than 12 inches in diameter; 15 feet beyond primary roadway curbsand main utility branch trenches; and 25 feet beyond constructed areas with permeable surfaces (such aspervious paving areas, stormwater detention facilities and playing fields) that require additional staging areasin order to limit compaction in the constructed area.

Option 2 - Previously Developed OR Graded Sites

Prior to development of this project, the site was previously developed or was graded.

Enter the total site area (excluding building footprint): square feet

Enter the total site area that has been restored using native and/or adaptive planting: square feet

Percentage of site area that has been restored using native and/or adaptive planting: %

50% of the site area must be restored using native and/or adaptive planting to qualify for this credit.

Page 2: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2

LEED-NC 2.2 Submittal Template | Last Modified: March 2006

LEED-NC 2.2 Submittal TemplateSS Credit 5.1: Site Development: Protect or Restore Habitat

SUPPORTING DOCUMENTATION

Sheet Description LogPlease include sheet name, sheet number and file name for each uploaded, referenced drawing (e.g. A-101, Site Plan, siteplan.pdf)

I have provided the appropriate supporting documentation in the document upload section of LEEDOnline. Please refer to the above sheets.

NARRATIVE (Required)

Describe the project's approach to this credit. Please provide any additional comments or notes regarding specialcircumstances or considerations regarding the project's credit approach.

Page 3: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2

LEED-NC 2.2 Submittal Template | Last Modified: March 2006

LEED-NC 2.2 Submittal TemplateSS Credit 5.1: Site Development: Protect or Restore Habitat

NARRATIVE (Optional)

Please provide any additional comments or notes regarding special circumstances or considerations regarding theproject's credit approach.

The project is seeking point(s) for this credit using an alternate compliance approach. The compliance approach,including references to any applicable Credit Interpretation Rulings is fully documented in the narrative above. (Indicatethe number of points documented in the field below).

Alternative Compliance Points Documented

Credit: Points Documented:

Project Name:

First Name Last Name

READY TO SAVE THIS TEMPLATE TO LEED-ONLINE? Please enter your first name, last name and today's date below, followed by yourLEED-Online Username and Password associated with the Project listed above to confirm submission of this template.

Date Username (Email Address) Password

Letter Template Version .

Page 4: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2
Page 5: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2
Page 6: SELECT OPTION Option 1 - Undisturbed Greenfield Sites Option 2