self-renewal: a prototype design for urban-village housing

81
SELF-RENEWAL A Prototype Design for Urban-Village Housing Chalmers University of Technology - Architecture - Master thesis 2016 Autumn Student: Xinmin Zhuang (MPDSD) Examiner: Dag Tvilde Supervisor: Joaquim Tarrasó

Upload: xinmin-zhuang-leed-ga

Post on 17-Jan-2017

171 views

Category:

Design


2 download

TRANSCRIPT

Page 1: Self-renewal: A Prototype Design for Urban-village Housing

SELF-RENEWALA Prototype Design for Urban-Village Housing

Chalmers University of Technology - Architecture - Master thesis 2016 AutumnStudent: Xinmin Zhuang (MPDSD) Examiner: Dag Tvilde Supervisor: Joaquim Tarrasó

Page 2: Self-renewal: A Prototype Design for Urban-village Housing

URBAN-VILLAGEvillage engulfed by city

‘RULES OF GAME‘URBAN-VILLAGE TRANSFORMATION IN GUANGZHOU CITY

SELF-RENEWALA PROTOTYPE DESIGN FOR URBAN-VILLAGE HOUSING

Page 3: Self-renewal: A Prototype Design for Urban-village Housing

URBAN- VILLAGEVillage engulfed by city

Page 4: Self-renewal: A Prototype Design for Urban-village Housing

LOCATIONLOCATION

Page 5: Self-renewal: A Prototype Design for Urban-village Housing

FromGothenburgSWEDEN

ToGuangzhou(Canton)CHINA

GuangdongProvince

GuangzhouCity (Canton)

City centre

Page 6: Self-renewal: A Prototype Design for Urban-village Housing

1979 1988 1995 2002

Figure 1. Remote sensing monitoring and driving force analysis of urban expansion in Guangzhou city, China. (MA,Y., & XU, R., 2010).

RAPID CITY EXPANSION

Page 7: Self-renewal: A Prototype Design for Urban-village Housing

DUAL-LAND RIGHT SYSTEM

LAND IN VILLAGE IS MANAGED BY VILLAGE COLLECTIVE

LAND IN CITYIS MANAGED BY MUNICIPALITY

Page 8: Self-renewal: A Prototype Design for Urban-village Housing

RURAL SETTLEMENT-Village rely on agricultural economy

VILLAGE ON THE URBAN-RURAL FRINGE-Urban & rural contact

URBANVILLAGE-Urban& ruralconflict

URBANSETTLEMENT-Completingurban & ruralintegration

DUA

L-LA

ND R

IGHT

SY

STEM

1

2

3

4

RAPID CITY EXPANSION

Page 9: Self-renewal: A Prototype Design for Urban-village Housing

1

2

3

4 URBANSETTLEMENT

VILLAGE ON THE URBAN-RURAL FRINGE

URBAN - VILLAGE

RURALSETTLEMENT

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

Page 10: Self-renewal: A Prototype Design for Urban-village Housing

1 RURALSETTLEMENT

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

Village as rural settlement

IN NORTHERN GUANGZHOU

Page 11: Self-renewal: A Prototype Design for Urban-village Housing
Page 12: Self-renewal: A Prototype Design for Urban-village Housing
Page 13: Self-renewal: A Prototype Design for Urban-village Housing

2VILLAGE ON THE URBAN-RURAL FRINGE

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

urban & rural CONTACT

NANCUNVILLAGE

Page 14: Self-renewal: A Prototype Design for Urban-village Housing
Page 15: Self-renewal: A Prototype Design for Urban-village Housing

Villagers start to rebuild / add floors,rent out rooms to migrant workers.

Page 16: Self-renewal: A Prototype Design for Urban-village Housing

3 URBAN - VILLAGE

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

urban & rural CONflict

YONGTAIVILLAGE

Page 17: Self-renewal: A Prototype Design for Urban-village Housing

City infrastructure mix with village features

Page 18: Self-renewal: A Prototype Design for Urban-village Housing

Villager keep enlarging their housing and adding floors till covering the whole plot they own

Page 19: Self-renewal: A Prototype Design for Urban-village Housing

Window is covered by user for privacy due to the limited distance in-between two buildings

Page 20: Self-renewal: A Prototype Design for Urban-village Housing

Waste is collected at outdoor without sorting

Page 21: Self-renewal: A Prototype Design for Urban-village Housing

Vehicle is controlled, electric club cars shuttle inbetween the subway station and the northest area

Page 22: Self-renewal: A Prototype Design for Urban-village Housing

First floors are rent out for commerce, bringing main streets lively atmosphere at day and night

Page 23: Self-renewal: A Prototype Design for Urban-village Housing

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

4 URBANSETTLEMENT

Completing urban & rural integration

LIEDEVILLAGE

Page 24: Self-renewal: A Prototype Design for Urban-village Housing

CITY CENTRE

NEWERCITYAREA

NEW DEVELOPED

INDUSTRIAL/

RESIDENTIAL

AREA

4

Lie-de VILLAGEredevelopment project(started from 2007, completed in 2010)It is the first redevelopment project in Guangzhou CITY

Page 25: Self-renewal: A Prototype Design for Urban-village Housing

Figure 4. Lie-de village, Guangzhou (Google earth, 2000).

Lie-de VILLAGEredevelopment project(started from 2007, completed in 2010)It is the first redevelopment project in Guangzhou CITY

Page 26: Self-renewal: A Prototype Design for Urban-village Housing

Figure 2. Lie-de village before redevelopment, Guangzhou ( Sina news, 2007)

Page 27: Self-renewal: A Prototype Design for Urban-village Housing

Figure 5. Lie-de village, Guangzhou (Google earth, 2010).

Lie-de VILLAGEredevelopment project(started from 2007, completed in 2010)It is the first redevelopment project in Guangzhou CITY

Page 28: Self-renewal: A Prototype Design for Urban-village Housing

Figure 3. Lie-de village resettlement, Guangzhou ( Guangzhou Urban Renewal Bureau, 2011).

Page 29: Self-renewal: A Prototype Design for Urban-village Housing

‘RULES OF GAME’Urban-village Transformation in Guangzhou City

Page 30: Self-renewal: A Prototype Design for Urban-village Housing

‘Top-down’ mode= Give villagers an acceptable answer

Pearl River

New ci

ty ax

is

-Village-collective owned-Leasing for businss-Earning will be distributed to villager

-New built community -For villager resettlement

-Ownership transfer Village → State-Sold to land market for investment in construction

Original border

‘TOP-DOWN‘ MODELie-de VILLAGE redevelopment project

Page 31: Self-renewal: A Prototype Design for Urban-village Housing

big demolishment & reconstructionin short-term (2007-2010)

Figure 6. A holdout case in Lie-de redevelopment project. (Sohu news, 2007).

Page 32: Self-renewal: A Prototype Design for Urban-village Housing

Conflict x 138 ?

Figure 6. A holdout case in Lie-de redevelopment project. (Sohu news, 2007).

There are 138 urban-villages in the list of transformation, the previous mode will cause big social cost...

Page 33: Self-renewal: A Prototype Design for Urban-village Housing

Conflict x 138 ?

+ Alternative transformation mode:

Micro-transformation

Page 34: Self-renewal: A Prototype Design for Urban-village Housing

Conflict x 138 ?

+ alternative transformation mode:

micro-transformation

SELF-RENEWAL

Page 35: Self-renewal: A Prototype Design for Urban-village Housing

YONG-TAI3 URBAN - VILLAGE

Housing(1990s)

Housing(2000s)

Old factory site

A

B

C

Parking building

Electric club car

Metro station

1

2

3

+

+

Urban villagermulti-story housing-built in 1990s

Urban villagermulti-story housing-built in 2000s

Village collective ownedIndustrial/Commercial area

High way/ Main road

Station/ Shuttle route of electric club car

+Metro station

Bus station

200m

N

1A

B

C

2

3

Page 36: Self-renewal: A Prototype Design for Urban-village Housing

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Page 37: Self-renewal: A Prototype Design for Urban-village Housing

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Page 38: Self-renewal: A Prototype Design for Urban-village Housing

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent Ownershippreserved

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Page 39: Self-renewal: A Prototype Design for Urban-village Housing

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent Ownershippreserved

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent Ownershippreserved

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = Rent

Tenants

Old factories site

Infrastructureimprovement

New commercialcomplex

Developer

Villagecollective

Villagers

Ownership of land stay as beforeInvestment = RentSELF-RENEWAL

BY VILLAGE COLLECTIVE

INFRASTRUCTURE & PUBLIC SPACE

Page 40: Self-renewal: A Prototype Design for Urban-village Housing

SELF-RENEWALBY URBAN VILLAGERS?

URBAN VILLAGE HOUSINGS

Page 41: Self-renewal: A Prototype Design for Urban-village Housing

VILLAGERS HAVE ABILITY TO REBUILD THEIR HOUSING PROPERTY

Page 42: Self-renewal: A Prototype Design for Urban-village Housing

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

THE BUILDING PROCESS OF VILLAGE HOUSING

Page 43: Self-renewal: A Prototype Design for Urban-village Housing

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

PREREQUISITE

Page 44: Self-renewal: A Prototype Design for Urban-village Housing

< 80 M 2

< 11 M

Building area

Buildingheight

Each family can own one property

Page 45: Self-renewal: A Prototype Design for Urban-village Housing

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

THE GAP IN MANAGEMENT SYSTEM

Page 46: Self-renewal: A Prototype Design for Urban-village Housing

Villagers

Tenants

Architect Structural engineer

Municipality

Villagecollective

NewTenants

VillagersVillager = owner = developer = manager

Building permit application

Prerequisite/(Building code)

The gap [ Who manages a village within city ? ]

Builder

VILLAGER HOUSING AS A MAIN ELEMENT IS STILL LACKING OF DESIGN GUIDANCE

Page 47: Self-renewal: A Prototype Design for Urban-village Housing

SELF-RENEWALA Prototype Design for Urban-village Housing

Page 48: Self-renewal: A Prototype Design for Urban-village Housing

AIM & OBJECTIVES

Page 49: Self-renewal: A Prototype Design for Urban-village Housing

Easier to copy,economical to build

Beneficial for both indoor and outdoor

Providing Yong-tai urban-villagers a prototype for their rebuilt housing

Page 50: Self-renewal: A Prototype Design for Urban-village Housing

DELIMITATIONS

Page 51: Self-renewal: A Prototype Design for Urban-village Housing

Strategies

Prototype

Indicators

Background

Boundary of housing site

Ref.

Ref.Environmental Economic

Social

Bearable

Viable

Equitable

Sustainable

Design

Strategies

Prototype

Indicators

Background

Boundary of housing site

Page 52: Self-renewal: A Prototype Design for Urban-village Housing

FOCUS AREA

Page 53: Self-renewal: A Prototype Design for Urban-village Housing

23°14’N113°18’E

23°13’N113°18’E

23°13’N113°17’E

++

+

R=200m

N

0 30

Built in~2000sPlot in similar dimension~9m x 12m

Built in~1990sPlot in variousdimension

FAR3.91

Land area47,891m2

Building coverage61.87%

Building area29,628m2

Floor area187,030m2

252Buildings

Page 54: Self-renewal: A Prototype Design for Urban-village Housing

INDICATORS SELECTION

Page 55: Self-renewal: A Prototype Design for Urban-village Housing

OBJECTIVES

selectedINDICATORS

EFFECTIVE RANGE:Building --- Surrounding --- Neighborhood

POSSIBILITY: Short term ----- Long term

INVESTIGATION

- LIMITED SITUATION FOR REGULATORY COMPLIANCE

- ADAPTABLE LAYOUT

- BALANCE OF THE RENT AND TENANT REQUESTS

- ECONOMIC FEASIBILITY

- PUBLIC INFRASTRUCTURES

- POTENTIAL SECURITY RISKS

- RAINWATER MANAGEMENT

- WASTE MANAGEMENT

- VENTILATION

- PRIVACY AND SIGHTLINE DESIGN

- DAYLIGHT

EFFECTIVE RANGE: Building - Surrounding - Neighborhood-

AD

APT

ABL

E LA

YOU

T

- EC

ON

OM

IC F

EASI

BILI

TY - R

AIN

WAT

ER M

AN

AG

EMEN

T

- W

AST

E M

AN

AG

EMEN

T

- V

ENTI

LATI

ON

- PR

IVA

CY

AN

D S

IGH

TLIN

E D

ESIG

N

- D

AYLI

GH

T

IMPLE

MEN

TATI

ON TIM

ELIN

E: Sh

ort-te

rm -

Long-te

rm

- LI

MIT

ED S

ITU

ATIO

N F

OR

REG

ULA

TORY

CO

MPL

IAN

CE

- BA

LAN

CE

OF

THE

REN

T A

ND

TEN

AN

T R

EQU

ESTS

- PO

TEN

TIA

L SE

CU

RIT

Y R

ISKS

- PU

BLIC

INFR

AST

RU

CTU

RES

- ADAPTABLE LAYOUT

- ECONOMIC FEASIBILITY

- RAINWATER MANAGEMENT

- WASTE MANAGEMENT

- VENTILATION

- PRIVACY AND SIGHTLINE DESIGN

- DAYLIGHT

EFFECTIVE RANGE: Building - Surrounding - Neighborhood-

AD

APT

ABL

E LA

YOU

T

- EC

ON

OM

IC F

EASI

BILI

TY - R

AIN

WAT

ER M

AN

AG

EMEN

T

- W

AST

E M

AN

AG

EMEN

T

- V

ENTI

LATI

ON

- PR

IVA

CY

AN

D S

IGH

TLIN

E D

ESIG

N

- D

AYLI

GH

T

IMPLE

MEN

TATI

ON TIM

ELIN

E: Sh

ort-te

rm -

Long-te

rm

Page 56: Self-renewal: A Prototype Design for Urban-village Housing

RAINWATERMANAGEMENT ECONOMICAL

DESIGN

PRIVACY(SIGHTLINE)

WASTEMANAGEMENT

DAYLIGHT

VENTILATION

ADAPTABLE LAYOUT

Page 57: Self-renewal: A Prototype Design for Urban-village Housing

>PLOT (SETBACK)DAYLIGHT> Set back building for better daylight

Page 58: Self-renewal: A Prototype Design for Urban-village Housing

~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m

~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m

A1 Lowest apartmentB0 Groundfloor +1.1m*B1 Basement*1.1m=window height from floor

DEC 2112.00

S

N

DEC 2112.00

S

N

Page 59: Self-renewal: A Prototype Design for Urban-village Housing

~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m

~1100

° ° ° °8.80 0.00 0.00 0.00 0.00 7.35 1.48 1.33 1.08 0.77 5.90 2.96 2.65 2.17 1.53 4.45 4.43 3.98 3.25 2.30

A1 3.00 6.12 Groundfloor B0 1.40 7.54 6.77

Basement

15.00 30.00 45.00 60.00 0.00 1.53 3.06 4.59

5.91 5.30 4.33 3.06 7.81 5.52 3.91

1.10 °0.00

0.60

Lowest studio apartment

A0 8.36 7.508.66 6.12 4.33

these are the changed required Ddaylight The gap has changed inbetween Ddaylight & limited width of lane+set=back

Lowest Highest(Upper floor - thickness of floor ) Change→ 0.00 D with angle ° ° ° °Prototype A3 8.80 0.00 0.00 0.00 0.00

B2 7.35 1.48 1.33 1.08 0.77 A2 5.90 2.96 2.65 2.17 1.53 B1 4.45 4.43 3.98 3.25 2.30 A1 3.00 6.12

Groundfloor B0 1.40 7.54 6.77

Basement A0 0.60 8.36 7.50

0.97 0.87 0.71 0.50

0.87 15.00 30.00 45.00 60.00 7.70 7.70 9.41 0.00 6.25 6.25 7.91 1.53 4.80 4.80 6.73 3.06 3.35 3.35 5.28 4.59 1.90 1.90 3.83 5.91 5.30 4.33 3.06 0.30 0.30 2.93 7.81 5.52 3.91

-0.50 -0.50 1.33 8.66 6.12 4.33

cosB

1.10 10.28 8.78 7.60 6.15 4.70

+Set back 3mWidth of existing lane

2.5~3mDistancebetweenbuildings5.5~6m

5.5~6m5.5~6m5.5~6m5.5~6m

A1B0 +1.1m*B1*1.1m=window height from floor

R=200m

N

0 30

Page 60: Self-renewal: A Prototype Design for Urban-village Housing

PRIVACY (SIGHTLINE) >VOLUME> Modify volume to redirect sightline

Page 61: Self-renewal: A Prototype Design for Urban-village Housing

~1.5m

Page 62: Self-renewal: A Prototype Design for Urban-village Housing
Page 63: Self-renewal: A Prototype Design for Urban-village Housing

ADAPTABLE LAYOUT >FLOOR PLAN> Design floor plan for variation

Page 64: Self-renewal: A Prototype Design for Urban-village Housing

+Elevator/Balcony

W

E

Minimize

E

W

Combination

Staircase

+Elevator

+Balcony

~ Studio apartment

Kitchen Toilet

1:100

TYPICAL FLOOR PLAN

Page 65: Self-renewal: A Prototype Design for Urban-village Housing

+Elevator/Balcony

W

E

Minimize

E

W

CombinationMINIMIZE DIMENSION~34m2

+Elevator/Balcony

W

E

Minimize

E

W

Combination+ ELEVATOR /BALCONY~43m2

+Elevator/Balcony

W

E

Minimize

E

W

CombinationCOMBINATION (*Buidling area

<80m2)

Page 66: Self-renewal: A Prototype Design for Urban-village Housing

RAINWATER & WASTEMANAGEMENT >SYSTEM

> Consider rainwater and waste management in building scale

Page 67: Self-renewal: A Prototype Design for Urban-village Housing

Catchment area

Distribution

Treatment

Storage Overflow

Page 68: Self-renewal: A Prototype Design for Urban-village Housing

Managed byUrban-villager(Housing owner)

Sorting bytenants

Page 69: Self-renewal: A Prototype Design for Urban-village Housing

VENTILATION & ECONOMICAL DESIGN >FACADE

> Facade designed for better ventilation with economical materials

Page 70: Self-renewal: A Prototype Design for Urban-village Housing

Hollow blocks

Concrete screen

Vertical green

Page 71: Self-renewal: A Prototype Design for Urban-village Housing

RAINWATERMANAGEMENT ECONOMICAL

DESIGN

PRIVACY(SIGHTLINE)

WASTEMANAGEMENT

DAYLIGHT

VENTILATION

ADAPTABLE LAYOUT

Page 72: Self-renewal: A Prototype Design for Urban-village Housing

Rooftop terrace

Green roof

A3 : Studio apartment

B2 : Studio apartment

B1 : Studio apartment

A2 : Studio apartment

A1 : Studio apartment

Common laundry room

Gabage room

Indoor bicycle parking

Storage

Small-scalecommercial facility

Private owned green space

Elevator

Ramp

Staircase

B1+B2 : Family apartment

ROOFTOP TERRACE

Page 73: Self-renewal: A Prototype Design for Urban-village Housing
Page 74: Self-renewal: A Prototype Design for Urban-village Housing

Rooftop terrace

Green roof

A3 : Studio apartment

B2 : Studio apartment

B1 : Studio apartment

A2 : Studio apartment

A1 : Studio apartment

Common laundry room

Gabage room

Indoor bicycle parking

Storage

Small-scalecommercial facility

Private owned green space

Elevator

Ramp

Staircase

B1+B2 : Family apartment

STUDIO/FAMILYAPARTMENT

Rooftop terrace

Green roof

A3 : Studio apartment

B2 : Studio apartment

B1 : Studio apartment

A2 : Studio apartment

A1 : Studio apartment

Common laundry room

Gabage room

Indoor bicycle parking

Storage

Small-scalecommercial facility

Private owned green space

Elevator

Ramp

Staircase

B1+B2 : Family apartment

Page 75: Self-renewal: A Prototype Design for Urban-village Housing
Page 76: Self-renewal: A Prototype Design for Urban-village Housing

Rooftop terrace

Green roof

A3 : Studio apartment

B2 : Studio apartment

B1 : Studio apartment

A2 : Studio apartment

A1 : Studio apartment

Common laundry room

Gabage room

Indoor bicycle parking

Storage

Small-scalecommercial facility

Private owned green space

Elevator

Ramp

Staircase

B1+B2 : Family apartment

BASEMENT

GROUNDFLOOR

Page 77: Self-renewal: A Prototype Design for Urban-village Housing
Page 78: Self-renewal: A Prototype Design for Urban-village Housing

FROM BUILDING

TO SURROUNDING

Page 79: Self-renewal: A Prototype Design for Urban-village Housing

When the prototype has been implemented morein larger scale

WHAT IF...

Page 80: Self-renewal: A Prototype Design for Urban-village Housing

146/252 housings can provide more space for green.(146 / 252 housings > 80m2 permitted building area )

~22.19% of land can be transformed as private green space, and it will be an advantage for green infrastruture in this context. (10,627m2 / 47,891m2)

Page 81: Self-renewal: A Prototype Design for Urban-village Housing

SELF-RENEWALA Prototype Design for Urban-Village Housing

Student: Xinmin Zhuang (MPDSD) Examiner: Dag Tvilde Supervisor: Joaquim Tarrasó

THANK YOU