Seminar on “Hong Kong Electricity Market: Post-2008” Reliability, Security, Best Price : A Consumer’s View Presentation by KCRC 12 April 2005

Upload: others

Post on 20-Dec-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Seminar on“Hong Kong Electricity Market:

Post-2008”

Reliability, Security, Best Price : A Consumer’s View

Presentation by KCRC

12 April 2005

Page 2: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Content

KCRC Electricity Consumption Profile

KCRC Traction Supply Networks

Potential Energy Cost Saving Measures

Energy Demand for Future Extensions

View on Post 2008 Electricity Market

Q & A

Page 3: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

KCRC NetworkTotal length > 150 km

Annual electricity consumption HK$ 450 million in 2004

Page 4: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Daily Patronage

Average daily patronage 1.5 million

Page 5: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

KCRC Operating ExpensesElectricity and

fuel16%

Staff cost

Electricity and fuel

Repair and maintenance

Material cost

Store and spares consumed

Property ownership andmanagement expensesOthers

Cost of services acquired

Government rent and rates

Page 6: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Breakdown of Energy Cost

Depots andother KCRC

BuildingFacilities

5%

Traction Energy65%

StationOperations

30%

Page 7: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

KCRC Traction Supply Networks

System Voltage Infeed Points

East Rail AC 25kV Ho Man Tin, Tai Wai & Fanling CLP 132kV/25kV substation

West Rail AC 25kV Kwai Fong & Tin Shui Wai CLP 132kV/25kV substation

MOS Rail AC 25kV Tai Wai & Wu Kai Sha CLP 132kV/25kV substation

Light Rail DC 750V Tuen Mun, Yuen Long, Tin Shui Wai CLP 132kV/11kV substation

Page 8: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

FANTPK

YR

H1

YB

H2

BR

H3

TAW’A’

BR

YBBR

H2H3

YR

H1

YB

H2

RY

H1

HMT

LOW

ETS

EAST RAIL

WKN

CLPP FLK 132kV S/S

CIO

H1

WKS

MA ON SHAN RAIL

CLPP MOB 132kV S/S

CLPP TWK 132kV S/SCLPP TST 132kV S/S (2003)

TAW’B’

KWT / ATJ

AbbreviationsATJ – Au Tau JunctionCIO – City OneETS – East Tsim Sha TsuiFAN - FanlingHMT – Ho Man TinKWT – Kwu TungWKS – Wu Kai ShaLMC – Lok Ma ChauLOW – Lo WuTPK – Tai Po KauTAW’A’ – Tai Wai ‘A’TAW’B’ – Tai Wai ‘B’WKN – West Kowloon

LMC

East Rail Supply Networks

Page 9: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

West Rail Supply Networks

TUMTIS

BRRY

KWF HPWKN

ETS/HMT

CLPP KFW 132kV S/SYBBR

CLPP TIW 132kV S/S

H3H2H1H3H2H1

NAC

KWT / LMC

ATJ

WEST RAIL

AbbreviationsATJ – Au Tau JunctionETS – East Tsim Sha TsuiKWF – Kwai FongKWT – Kwu TungLMC – Lok Ma ChauNAC – Nam CheongHP – Ho PuiTIS – Tin Shui WaiTUM – Tuen MunWKN – West Kowloon

CLPP 132kV S/S

Page 10: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

CLP Tariff

• Traction energy -- Large Power Tariff Scheme

• Station energy -- Bulk Power Tariff Scheme

• Keep on negotiating for a better rate

Page 11: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Trend of Traction EnergyEast Rail Traction Energy

2.40

2.45

2.50

2.55

2.60

1999 2000 2001 2002 2003 2004

Year

kWh

/ car

-km

Page 12: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Energy ManagementIntroduction of Regenerative Braking

Phase III LRVSP-1900 / SP-1950 New EMU

Page 13: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Energy ManagementTraction Coasting Control

Hard Driving Profile Coasting Profile

Spee

d

DistanceStation

AStation

BSp

eed

DistanceStation

AStation

B

High Potential of Traction Energy SavingHigh Potential of Traction Energy Saving

motoringmotoring braking coasting braking

Page 14: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Energy ManagementReplacement of Motor Alternator with

Power Electronic Converter

Traditional Motor-Alternator Set

State-of-the-art Power Electronic Converter

On-going energy saving approx. HK$ 6 million annuallyOn-going energy saving approx. HK$ 6 million annually

Page 15: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

KCRC Network Extensionby 30% in future

Lok Ma ChauSpur Line

KowloonSouthern Link

Northern Link

ShatinCentral Link

RegionalExpress Line

Page 16: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Energy Demand Projection

500,000

600,000

700,000

800,000

2003 2005 2007 2009 2011 2013 2015 2017

Ener

gy (M

Whr

)

MOS

LMCKSL

NOL/SCL/REL

Page 17: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Potential connectivity for better security

• Linking with HEC due to SCL• Better assurance on the supply security

due to two sources of supply

Page 18: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Opening of electricity market will have impacts on

• Price structure• Security • Reliability• Choice of optimal supplier

Page 19: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Opinion

Being a mass transit service provider and probably one of the largest electricity consumer in HK, KCRC is closely observing the development of the electricity market reform with an open-minded.

Page 20: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

Bottom Lines

To obtain electricity power withGood security

High reliability

Best price

for enabling KCRC to provide good service to passenger

Page 21: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –

End of Presentation