Page 1: Senior Capstone Presentation

Redesign of Dewitt Field Airport Terminal

The Simmons Team: Amber Simmons PM, Sarah Hunnewell,

Carmen Forzetting, Brendan Amy, Jason Stetson

Page 2: Senior Capstone Presentation

Acknowledgements• Margaret Daigle, City of Old Town Manager• Bill Mayo, Assistant City Manager• David Wight, Public Works Director• John McCormack, PE; CES Inc.• Jennifer Richard, CID, LEED AP; WBRC Architects/Engineers• Dr. Thomas Sandford, Capstone Professor• Shaleen Jain, Capstone Advisor• Judith Hakola, Technical Writing Professor• Phil Dunn, CIE/CMT Professor• Edwin Nagy, CIE Professor

Page 3: Senior Capstone Presentation

Project Background

Located in Old Town off Route 43 on Gilman Falls Avenue

Built in 1970 Attached to J.W. Sewall

Company hangar No renovations since

construction

Page 4: Senior Capstone Presentation

Existing Terminal Conditions

• Outdated architecture and design• Thin walls

• High energy costs

Page 5: Senior Capstone Presentation

Project Scope

• Conceptual airport terminal design• Aesthetically pleasing

• Modern architecture• LEED certification

http://www.old-town.org/index.asp?Type=B_BASIC&SEC={13010F93-E257-44D2-8E10-3FD834ECE4BA}

Page 6: Senior Capstone Presentation

Project Scope cont’d

• Attract companies to proposed business park• Floor plan design• Structural framing• Concrete slab design• Estimated final cost

Page 7: Senior Capstone Presentation

Constraints

• LEED Certification• Material selection

• Fuel tank regulations• Single story• Surrounding buildings

remain untouched

Page 8: Senior Capstone Presentation

Site Inspection and Evaluation

• Outer appearance• Siding• No indication this is the

Dewitt Field Airport• Low ceilings

• 8ft high

Page 9: Senior Capstone Presentation

Site Inspection and Evaluation

• Poor lighting• Fluorescent

• Thin walls• Minimal insulation

• Inner appearance• Improvements needed

Page 10: Senior Capstone Presentation

Site Inspection and Evaluation

• Inefficient use of space• Half of building not in

use• Available rooms are

small

Page 11: Senior Capstone Presentation

Leadership in Energy and Environmental Design (LEED)

• Green rating system designed by U.S. Green Building Council (USGBC)

• Goal to optimize energy use during and post-construction to decrease carbon footprint

http://towsonfamiliesunited.com/blog/wpcontent/uploads/2008/11/leed_550x550.jpg

Page 12: Senior Capstone Presentation

LEED Certification

Points Level of Certification

26-32 Certified

33-38 Silver

39-51 Gold

52-69 Platinum

http://www.azcommerce.com/doclib/energy/ppt/Emissions%20Workshop%20Introduction_JWg_files/slide0041_image025.jpg

Page 13: Senior Capstone Presentation

LEED for New Construction Version 2.2

• Terminal design based on version 2.2

• April 27, 2009: LEED version 3 released

• Project design will need to be reviewed to meet version 3 requirements

http://www.usgbc.org/Docs/Archive/Embedded_Images/Docs5542.jpg

Page 14: Senior Capstone Presentation

LEED Certification Categories

Sustainable sites

(14 points)

Water Efficiency (5 points)

Energy and Atmospher

e (17 points)

Materials and

Resources (13 points)

Indoor Environment

al Quality (15 points)

Innovation and Design

Process (5 points)

Page 15: Senior Capstone Presentation

LEED Prerequisites

• Construct Activity Pollution Prevention

• Fundamental Commissioning of the Building Energy Systems

• Minimum Energy Performance

• Fundamental Refrigerant Management

• Storage and Collection of Recyclables

• Minimum IAQ Performance

• Environmental Tobacco Smoke (ETS) Control

• Optimize Energy Performance • Two points mandatory

Page 16: Senior Capstone Presentation

Feasible Points

• LEED Certification achievable for new terminal design

• Additional points can be achieved to client’s discretion and with budget allowance

http://j436.files.wordpress.com/2009/02/docs1961.jpg

Page 17: Senior Capstone Presentation

Inspiration: Foster Innovation Center

• LEED – Silver• Modern Design• Design by Oak Point

Associates

http://www.oakpoint.com/portfolio06-A.html and http://i34.tinypic.com/fyg385.jpg

Page 18: Senior Capstone Presentation

Floor Plan Design

• Design Criteria:• Larger building footprint of 50’ x 120’• 8-9 Offices• 20-30 person Conference Room• Pilot’s Area

o Pilot’s Loungeo Full Private Bathroomo Overnight Bunking Room

• Room for expansion (e.g. Coffee Shop with Kitchen)

Page 19: Senior Capstone Presentation

Floor Plan DesignTo Runway

To Parking Lot

Page 20: Senior Capstone Presentation

Design Considerations

• Usage of Facility• Airport personnel, pilots, business employees, and

general public• Separation of Airport and Rented Space

• Offices on one side with terminal opposite• Efficient Usage of Space

• Create inviting space for business, reduce unused area• Open, Wide Entry Hallway

• Easy access to entire terminal with inviting seating for occupants

Page 21: Senior Capstone Presentation

Site Design: Current Condition

Page 22: Senior Capstone Presentation

Site Design: Future Condition

Page 23: Senior Capstone Presentation

3D Rendering

Front of the Building

Page 24: Senior Capstone Presentation

3D Rendering

Back of the Building

Page 25: Senior Capstone Presentation

Engineering Design

• Design based on• Client’s concerns• LEED constraints• Loading factors

• ASCE 7 Minimum Design Loads for Building• 2006 Building Code Handbook• AISC Steel Construction Manual 13 Edition• ACI 318 Building Code

http://gosteelit.com/_wizardimages/AISC_logo.jpghttp://www.aquaterraeng.com/news/wp-content/uploads/2008/10/asce.jpg

Page 26: Senior Capstone Presentation

Loads

• Wind Load• ASCE 7 Section 6.0• Class C exposure at 17

ft ave. roof height – 14.7 psf

• Dead Loads• Live Loads

• ASCE 7 Section 4.0• Office Use – 100 psf

• Snow Load• ASCE 7 Section 8.0• Old Town, ME – 60 psf

Page 27: Senior Capstone Presentation

Steel Frame Design

• Light gauge steel roof trusses• Large 50 ft span• Recycled steel for LEED point• “Modern” feel

• W18x57 beams, 25’ spans• Type 5 Standard Pipe columns

spaced at 25’• Flexible floor layout• Again keeping in mind the “modern” feel

Page 28: Senior Capstone Presentation

Concrete Slab Design• Reinforced Concrete Slab

• F’c = 3000 psi• 6” slab, #4 bars at 10”, temperature and shrinkage

reinforcement #3 bars at 12”• Reinforced Concrete Footings

• F’c = 3000 psi• Loads from column• Loads from concrete slab• 4’-4” square footing, 13” high, 8 - #4 bars evenly

spaced

Page 29: Senior Capstone Presentation

Material Considerations

• Material selection based on LEED guidelines• Rapidly renewable• Low VOC substitutes for conventional products

• Paints, adhesives• Recycled materials

• Aluminum roofing• Carpet tiles

• Sustainable materials

Page 30: Senior Capstone Presentation

Cost

• Exterior cost• Approximately $115,000

• Interior cost• Approximately $86,000

http://www.buildersbooksource.com/booksite/images/items/9780876298268.jpg

Page 31: Senior Capstone Presentation

Total Terminal Cost

• Approximately $1.2 Million • Includes the following:

• Site work• Masonry• Equipment• Plumbing• HVAC system• Electrical• Engineering/Architectural Fees

• RSMeans Building Construction Cost Data - 2008http://i43.tower.com/images/mm109005024/rsmeans-building-construction-cost-data-2008-phillip-r-waier-paperback-cover-art.jpg

Page 32: Senior Capstone Presentation

Thank you for your time.