Page 1: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

2010 Watershed Management Plan

Capitol Region Watershed District

September 1, 2010

Page 2: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

Cover Image

Upper right: dragonfly detail, image courtesy of Capitol Region Watershed District

Main image: Mississippi River - downtown St. Paul at night, photo by Dan Oldre, image courtesy of Dan Oldre

Page 3: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  i 

Table of Contents

Page #

Acknowledgements iii

Acronyms ix

Glossary of Terms xi

Executive Summary xv

Land and Water Resource Summary 1

Issues and Goals 16

Implementation Plan 35

Implementation Plan Table 113

Watershed District Administration 117

Appendix A Land and Water Resource Inventory

Appendix B Public Participation Process & Meeting Minutes

Appendix C Issues Matrix

Appendix D Historic Waters of the Capitol Region Watershed District

Appendix E Education and Outreach Plan

Appendix F Wetland Management Strategy

Appendix G 10 Year Maintenance, Repair, and improvement Plan for the Trout Brook Storm Sewer Interceptor

Page 4: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  ii 

Appendix H Stream Corridor Restoration Plan

Appendix I Stormwater Impact Fund Implementation Plan

Appendix J Program Evaluation

Page 5: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  iii 

Acknowledgments   The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people.     The Board of Managers wishes  to acknowledge  the  following groups and individuals for their involvement in the planning process.  Without their hard work and dedication this plan would not have been possible and the Managers thank them for their effort.   Capitol Region Watershed District Board Members

Robert Piram  Board President Joseph Collins  Vice President Michael Thienes  Treasurer      Seitu Jones  Secretary Marylyn Deneen  Education/Information 

Citizen Advisory Committee The District is proud to have one of the most active Citizen Advisory Committees in the Watershed District  Community.   Watershed  Districts  are  required  to  organize  and make  use  of  a  group  of citizens to provide input on its operations, watershed management plan and annual budget, among others.  The following are members of the District’s long‐standing Citizen Advisory Committee.     

David Arbeit  Ted McCaslin William Barton  Michael MacDonald   Jim Cotner   Judith Monson   Bill Downing  Ole Olmanson Steven Duerre  Shirley A. Reider, Co‐Chair Bruce Holdhusen  Michelle Ulrich, Secretary Jerry Kafka  Jerome Wagner Paul Kammueller, Co‐Chair  Brandon Wiarda   

Capitol Region Watershed District Staff

Mark Doneux  District Administrator Melissa Baker  Water Resource Technician Elizabeth Beckman  Education and Outreach Coordinator Anna Eleria  Water Resource Specialist Bob Fossum  Water Resource Project Manager Forrest Kelley  Permit Coordinator  Camille Logan   Administrative Assistant  Matt Loyas  Water Resource Technician Dawn Nelson  Office Manager Carrie Robertson  Water Resource Technician 

Page 6: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  iv 

 Technical Advisory Committee The  District  has  assembled  a  Technical  Advisory  Committee  from which  they  solicit  input  on  a variety of technical issues.  The committee is made up of staff professionals from the Cities, County, regional  and  State  agencies  and  representatives  from  other  partners  such  as  the  University  of Minnesota, State Fair and various non‐profit entities.   The following are standing members of the Technical  Advisory  Committee,  many  of  whom  were  very  active  in  the  development  of  the Watershed Management Plan.  

Lynn Leibfried  BNSF Railway Company Melissa Lewis  BWSR Steve Woods  BWSR Justin Miller  City of Falcon Heights Heather Butkowski  City of Lauderdale Chuck Ahl  City of Maplewood DuWayne Konewko  City of Maplewood Steve Kummer  City of Maplewood Deb Bloom  City of Roseville Duane Schwartz  City of Roseville Thomas Paschke  City of Roseville Adam Robbins  City of St. Paul Anne Hunt  City of St. Paul Anne Weber  City of St. Paul Bob Kessler  City of St. Paul Brian Tourtelotte  City of St. Paul Bruce Beese  City of St. Paul Bruce Elder  City of St. Paul Cecile Bedor  City of St. Paul Cy Kosel  City of St. Paul Dan Haak  City of St. Paul Dave Nelson  City of St. Paul Don Ganje  City of St. Paul George Johnson  City of St. Paul Jodi Martinez  City of St. Paul Josh Williams  City of St. Paul Larry Zangs  City of St. Paul Phil Belfiori  City of St. Paul Tom Beach  City of St. Paul Yung Kang Lu  City of St. Paul Michael Hamm  City of St. Paul Judy Sventek  Metropolitan Council Brian Hudalla  Minnesota State Fair Craig Wills  MNDNR Beth Neuendorf  MnDOT Steve Johnson  MNRRA Bruce Henningsgaard  MPCA Denise Leezer  MPCA Mike Findorff  MPCA 

Page 7: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  v 

Tom Petersen  Ramsey Conservation District Julie Kleinschmidt  Ramsey County  Ken Haider  Ramsey County Public Works Terry Noonan  Ramsey County Public Works Joni Giese  SRF Consulting Chuck Derscheid   St. Paul Port Authority Kevin Umidon  St. Paul Public Schools Isd 625 Operations Dave Schuler   St. Paul Regional Water Services John Blackstone   St. Paul Regional Water Services Steve Schnieder   St. Paul Regional Water Services Deborah Swackhammer   University of Minnesota Les Potts    University of Minnesota Andy Phelan  University of Minnesota  

Community Advisory Group The  District  assembled  a  group  of  community  members  to  assist  in  the  development  of  the Watershed Management Plan.   The  following  individuals were  regularly apprised of  the planning process and given opportunities to give input.    

Lavonne Lee  American Indian Family Center  Georgia Lickness  American Indians in Unity Ly Vang  Association for the Advancement of Hmong 

Women in MN Melvin Giles   Aurora St. Anthony CDC Tara Chadwick  Chilchiutlicue Environmental Project/Indigenous 

People’s Taskforce  Annie Levenson‐Falk  Citizens League of Minnesota Tamara Downs Schwei  Community Design Center of Minnesota Rhonda DeBough  District 10 Community Council Michael Jon Olson  District 11 Community Council Amy Sparks  District 12 Community Council Theresa Heiland  District 13 Community Council Melissa Martinez‐Sones  District 14 Community Council Kathy Carruth  District 15 Community Council Diane Hilden  District 16 Community Council Jeff Roy  District 16 Community Council Jill Hirons Maraist  District 17 Community Council Ed Lambert  District 4 Community Council Leslie McMurray  District 5 Planning Council Kerry  Antrim  District 6 Planning Council Tait Danielson Castillo  District 7 Community Council Irna Landrum  District 8 Community Council Ed Johnson  District 9 Community Council Janna Caywood  District Resident Angela Earl  District Resident Dan Edgerton  District Resident Sherri Knuth  District Resident Mike Kowski  District Resident 

Page 8: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  vi 

Barbara Leary  District Resident Beth Mercer‐Taylor  District Resident Tonya Micholie  District Resident Bob Milligan  District Resident Sarah Risser  District Resident Bill Shreiner  District Resident Elizabeth Ann Sletten  District Resident Shawn Tracy  District Resident Mari Bongiovanni  East Side Neighborhood Development Corporation Faith Krogstad  Eco Education Molly Johnston  Eco Education Deborah Torraine  Environmental Justice Advocates of MN (EJAM) Yonatan Assefaw  Eritrean Community Center of Minnesota Susan Hubbard  Eureka Recycling Peggy Lynch  Friends of Parks and Trails of St. Paul and Ramsey 

County Trevor Russell  Friends of the Mississippi Deborah Karasov  Great River Greening Jonathon Palmer  Hallie Q. Brown/Martin Luther King Center Val Vargas  Hispanic Chamber of Commerce  Anita Yang  Hmong Academy  Sarah Clark  Lower Phalen Creek Project Diane Hilden  McCarrons Lake Association Lori Fritts  Midway Chamber of Commerce Pamela J. Standing  Minnesota American Indian Chamber of Commerce Barbara Davis  Minnesota Black Chamber of Commerce  Mario Hernandez  Minnesota Department of Human Rights Bill Baker  Minnesota Hmong Chamber of Commerce Suzanne Koepplinger  Minnesota Indian Women's Resource Center Nick Khaliq  NAACP Mara O'Neill  Neighborhood Development Center  Armando Cacho  Neighborhood House Sirad Osman  New Americans Community Services Sarah Bellamy  Penumbra Theater Christine Podas‐Larson  Public Art ‐‐ St. Paul Sherry Howe  Rotary Club Annie Huidekoper  Saint Paul Saints Heather Cox  Science Museum of Minnesota Art Weddington  Selby Area CDC Gedaly Meerovich  Slavic Community Center  Jonathon Sage‐Martinsen  SPARC Kristopher Johnson   St. Paul Area Chamber of Commerce Matt Anfang  St. Paul Building Owners & Managers Assoc. Tim Griffin  St. Paul Riverfont Corporation Robert McClain   St. Paul Urban League Lee Pao Xiong  The Center for Hmong Studies Saeed Fahia  The Confederation of Somali Community in 

Minnesota 

Page 9: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  vii 

Susan Schmidt  Trust for Public Land, Minnesota Office Brian McMahon  University United Connie Cassela  Wellington Management Tene Wells  Women Venture 

Consulting Resource

Emmons & Olivier Resources   Patrick J. Conrad, Project Manager   Brett H. Emmons    Camilla Correll Jennifer Olson  Kent Brander 

Page 10: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  viii 

 

Page 11: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  ix 

Acronyms

BMPs    Best Management Practices BOD    Biochemical Oxygen Demand BWSR  Board of Water and Soil 

Resources CAC    Citizens Advisory Committee CERCLA  Comprehensive 

Environmental Response Compensation and Liability Information 

CIP    Capital Improvement Program COE    Corps of Engineers (U.S. Army) CRWD  Capitol Region Watershed 

District CSE    Confined Space Entry CWA    Clean Water Act CWI    County Well Index DNR  Department of Natural 

Resources EPA  Environmental Protection 

Agency (U.S.) FEMA  Flood Emergency 

Management Act HSG    Hydrologic soil group JPA    Joint Powers Agreement LEED  Leadership in Energy and 

Environmental Design LCCMR  Legislative and Citizen Council 

on Minnesota Resources MCES  Metropolitan Council 

Environmental Services MDH   Minnesota Department of 

Health MNDOT  Minnesota Department of 

Transportation MPCA  Minnesota Pollution Control 

Agency MS4  Municipal Separate Storm 

Sewer System NA    Not Applicable NCHF  North Central Hardwood 

Forest Ecoregion NPDES  National Pollutant Discharge 

Elimination System NSQD  National Stormwater Quality 

Database 

NURP  Nationwide Urban Runoff Program 

O&M    Operation and Maintenance PED  Planning and Economic 

Development (City of St. Paul) PRAP  Performance Review and 

Assistance Program of the  Board of Water and Soil Resources 

RCD    Ramsey Conservation District RR    Railroad RCD    Ramsey Conservation District RWMWD  Ramsey‐Washington Metro 

Watershed District SCS  Soil Conservation Service SPRWS  Saint Paul Regional Water 

Service TAC    Technical Advisory Committee TBI  Trout Brook Storm Sewer 

Interceptor TKN    Total Kjehldahl Nitrogen TMDLs    Total Maximum Daily Loads TP    Total Phosphorus TRI    Toxic Release Inventory TSS    Total Suspended Solids VIC  Voluntary Investigation and 

Clean‐up WMO  Water Management 

Organization 

Page 12: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  x 

Page 13: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xi 

Glossary of Terms    

Term  Definition  

Adaptive management strategies 

An iterative process of evaluating progress toward stated goals and revising and refining implementation actions to ensure that progress is being made toward the goal. 

Aeration The addition of air to a water body in order to increase the oxygen content of the water to benefit the health of the living organisms within the lake. 

Arlington Pascal Project 

 Major Capital Improvement Project undertaken by the District in conjunction with the City of St. Paul.  Project includes Como Golf Course Pond, Arlington Underground Storage, infiltration trenches and raingardens.   

Bacteria 

Microorganisms that can live in a variety of conditions, some types can cause illness in humans. The quantity of E. coli, a specific type of bacteria, is used as a metric to evaluate potential fecal contamination in surface water resources. 

Best Management Practices (BMPs) 

Methods used to control the speed and total amount of stormwater that flows off a site after a rainstorm and used to improve the quality of the runoff water.  Can also refer to practices for control of sediment and erosion. 

Chloride A chemical used as a water quality metric.  Chloride is a component of many common road salts used for de‐icing in the winter. 

Chlorophyll‐a A component of algae and other plants used to conduct photosynthesis.  Chlorophyll‐a is used as a water quality metric to evaluate the amount of algae present in a water body. 

Climate change A long‐term change in climate measures such as temperature and rainfall.  Changes in climate have a large impact on water quality as well as lake and wetland water levels and stream and river flows. 

Ecological integrity The quality of the plant community compared to a representative plant community for the local area.  Higher quality communities have a higher ecological integrity. 

Ecosystem The group of all living organisms in a certain area that are expected to interact within the same habitat. 

Floodplain The land adjacent to a water body that is expected to be inundated with water after a large rainfall event.   

Green infrastructure 

 A stormwater management approach that utilizes natural landscape features and hydrologic processes to treat stormwater by infiltration, evapotranspiration, and/or reuse of runoff.   Green infrastructure also achieves other environmental goals such as carbon sequestration, reductions in urban heat island effect, improved air quality, improved wildlife habitat and increased opportunities for outdoor recreation.  Adapted from US EPA 

Groundwater Water located below ground in the spaces present in soil and bedrock. 

Page 14: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xii 

Term  Definition  

Groundwater recharge Water moving through the soil surface and deeper underground to become groundwater. 

Hydrology The movement of water.  Often used in reference to water movement as runoff over the soil after a rainfall event as it contributes to surface water bodies. 

Illicit discharges Any contribution to the storm sewer system that isn't stormwater (i.e. illegal connections to the storm sewer, dumping of materials in the storm sewer). 

Impervious surfaces 

Surfaces that severely restrict the movement of water through the surface of the earth and into the soil below.  Impervious surface typically refers to manmade surfaces such as non‐porous asphalt or concrete roadways, buildings, and heavily compacted soils. 

Infiltration  The movement of water into the soil. 

Internal phosphorus loading 

The total amount of the nutrient phosphorus that is contributed to the water column of a lake, stream, river, or wetland from sources within the water body.  The sediment at the bottom of a water body is a common internal phosphorus source. 

Macroinvertebrates 

Aquatic insects used as a metric of water quality.  Different macroinvertebrates will live in water with poor water quality than live in water with high water quality, thus the different types of macroinvertebrates present are an indication of the quality of the water. 

Mercury 

A metal that recycles between land, air and water. The primary source of mercury in water bodies is air pollution.  Mercury accumulates in fish and often results in fish consumption advisories for lakes and rivers. Mercury can have toxic effects on the nervous system of animals, including humans, that eat large quantities of fish. 

Metals Metals dissolved in water.  Typical metals included in monitoring programs are cadmium, chromium, copper, lead, nickel, and zinc 

Nonpoint source pollution Pollution, such as nutrients and sediment, that are not from one distinct origin.  For example, soil can run off of land throughout the watershed, it does not come from just one point. 

Nutrients A group of chemicals that are needed for the growth of an organism.  Within surface water systems, nutrients such as phosphorus and nitrogen can lead to the excessive growth of algae. 

Organic contaminants Contaminants including synthetic pesticides and herbicides and volatile organic compounds such as the compounds found in solvents and plastics. 

Outwash plain A region of relatively flat to undulating topography covered by sediment deposited by the glacier meltwater.  Outwash is usually composed of sand, sand and gravel, or fine sand and silt.   

Perched water table An area that is underlain by a fine grained geologic unit or aquitard that restricts the downward movement of surface water.  Perched lakes and wetlands are less connected to groundwater systems. 

Page 15: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xiii 

Term  Definition  

Perfluorooctane sulphonate (PFOS) 

A synthetic compound used in some fire‐fighting foams and other products.  It is highly persistent in the environment and is suspected to be detrimental to human health. 

Page 16: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xiv 

Term  Definition  

Pesticides  A substance intended to prevent, repel, or destroy a pest (insects, mice, bacteria, etc.). 

Polychlorinated biphyenyls (PCBs) 

A compound historically used in coolants, transformers, and other uses.  They are highly persistent in the environment and are suspected to be detrimental to human health. 

Quaternary Quaternary period is geologic time beginning about 1.5 million years ago to present.  Term is often used with respect to geologic deposits: unconsolidated soils deposited during the Quaternary geologic period. 

Ramsey County Groundwater Commission 

Group formed for groundwater planning and management in Ramsey County.  The District is a member. 

Rotenone A pesticide used to facilitate lake restoration by killing unwanted fish populations. 

Speleologist  A person who studies caves. 

Storm drain stenciling The practice of marking the location of inlets to the storm sewer system with a notice to remind people that the storm sewer system drains to a local river, stream, lake, or wetland. 

Stormwater BMPs Methods used to control the speed and total amount of stormwater that flows off a site after a rainstorm and used to improve the quality of the runoff water. 

Stormwater infrastructure Methods used to control the speed and total amount of stormwater that flows off a site after a rainstorm and used to improve the quality of the runoff water. 

Stormwater management facilities 

Methods used to control the speed and total amount of stormwater that flows off a site after a rainstorm and used to improve the quality of the runoff water. 

Stormwater/Stormwater runoff  The water that flows off a site after a rainstorm. 

Subwatershed A smaller geographic section of a larger watershed unit with a drainage area of typically between 2 and 15 square miles and whose boundaries include all the land area draining to a specified point. 

Surficial groundwater  Groundwater present above bedrock units. 

Total Maximum Daily Loads (TMDLs) 

The total amount of a pollutant or nutrient that a water body can receive and still meet state water quality standards.  TMDL also refers to the process of allocating pollutant loadings among point and nonpoint sources.  

Total phosphorus The total amount of the nutrient phosphorus that is present in a water sample.  Increased phosphorus is a key factor leading to decreased water quality. 

Trophic State Index A measurement combining readings for total phosphorus, water clarity (secchi depth), and chlorophyll‐a into one value used as an indicator of water quality. 

Trout Brook storm sewer interceptor 

 Major storm sewer pipe carrying flows through the eastern portion of the District.  The District took over ownership from the Met Council which previously owned the pipe when it carried combined storm and sanitary flows. 

Page 17: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xv 

Term  Definition  

Turbidity 

A measure of particles in the water, such as sediment and algae. Related to the depth sunlight can penetrate into the water. Higher turbidities reduce the penetration of sunlight in the water and can affect species of aquatic life that survive in the waterbody.  

Water Quality 

Water quality is a term used to describe the chemical, physical, and biological characteristics of water, usually in respect to its suitability for a particular use.  In the case of surface waters, uses are typically swimming and fishing. 

Wetland Reestablishment 

The making of a wetland in an area that had previously been a wetland but had been lost due to draining, filling or other means.  The District refers to this process as wetland ‘reestablishment’ in an effort to distinguish it from the terms ‘restoration’ or ‘creation’ which have specific definitions is MN Rules 8420 Wetland Conservation Act.   

Page 18: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xvi 

Executive Summary  The Capitol Region Watershed District  (District)  is  a  special purpose  local  unit  of  government  created  to manage  and protect  part  of  the Mississippi  River  Basin,  along with  the lakes, wetlands, and creeks that comprise the watershed and drain  to  the  river.  The  District  was  established  by  the Minnesota  Board  of  Water  and  Soil  Resources  (BWSR)  in 1998. The District is governed by five Board Members, while the  Districts  programs,  activities  and  initiatives  are  carried out  by  staff  members,  consultants  and  citizen  volunteers.  The mission  of  the  District  is  to  “To  protect, manage  and improve the water resources of the Capitol Region Watershed District.”    The first watershed management plan for the District was adopted in 2000. Since then, the District has worked towards accomplishing the goals and objectives set forth in the 2000 plan.   The District has  developed  programs,  projects  and  capital  improvement  projects  to manage  and  restore  its resources.     With the experiences of the last 10 years, the input of stakeholders, and a vision for the future, the District  set out  to  establish  new  goals  for  its  next  10  years  of  operation.    This  2010 Watershed Management Plan meets the requirements specified in Minnesota Statutes Chapter 103B and 103D and will be valid through 2020.  Land & Water Resource Inventory The District encompasses 40.6 square miles of fully urbanized and developed  land within portions of Falcon Heights, Lauderdale, St. Paul, Maplewood, and Roseville.  The Mississippi River forms the western  and  southern  borders  of  the District. Within  the  boundaries  of  the District  there  are  a number of valuable water resources  including Como Lake, Lake McCarrons, Loeb Lake and Crosby Lake, as well as several significant wetlands.  A summary of the land and water resource inventory section is included within the body of the Plan and the traditional inventory is included as Appendix A.    Issues & Goals The process for developing this watershed management plan began with the identification of issues and documenting the concerns of stakeholders, residents, District staff, board members, and other interested  parties  in  a  thorough  public  involvement  process.    The  public  involvement  process brought to  light two guiding principles of the plan; the value  in cooperating with District partners and the critical role that residents play in effective watershed management.  A detailed description of the public participation process as well as meeting minutes can be found in Appendix B. 

Page 19: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xvii 

The District places great value on working with partners  in order  to explore new  ideas,  increase efficiency,  prevent  duplication  of  effort  and  save  money  when  promoting  best  management practices across the watershed.  This District also recognizes the importance of involving residents in watershed protection.  In order for the District to achieve its mission of protecting, managing and improving water  resources,  it  is essential  that  residents adopt preferred water quality protection behaviors in their own home landscape, and support large scale watershed management projects.  Issue statements were crafted to encompass all comments received during the public involvement process  and  identify  what  needs  are  to  be  addressed  within  the  timeframe  of  the  watershed management plan.  The issue statements were then used to formulate Goals for the District in order to guide activities for the next 10 years. During this process, an Issues Matrix was developed which can  be  found  as Appendix  C.    The  issues  and  goals  crafted  fall  under  the  following  seven  Issue Topics. 

Education and Outreach The purpose of education and outreach is to inform residents of the issues related to water quality and stormwater management, the role of the District, and to encourage change  in people’s  behaviors  related  to water.    Through  education  and  outreach,  the  District  can disseminate information about the state of the local resources while delivering the message that  residents  are  key part of  the  solution. With  the Bringing Water Back  campaign,  the District’s goal  is  to  reconnect people who  live, work and  recreate  in  the District with  the water resources and to create a sense of ownership.  The District is unique in that it has the most diverse population of residents within the state of Minnesota. Such diversity requires watershed education to be delivered  in a way that meets the needs of each of the varying populations.  

Urban Stormwater Management The  watershed  is  fully  developed,  resulting  in  a  landscape  dominated  by  impervious surfaces.   Urban stormwater management  is necessary to reverse the  impact of  increased stormwater  runoff  and  pollutant  loading  to  District water  bodies  caused  by  impervious surfaces.    The District’s  urban  stormwater management will  be  primarily  focused on  the protection of  the water quality of  the District’s water  resources.   Additional effort will be focused  on  investigating  new  stormwater  management  techniques,  promoting  green infrastructure  and  addressing  storm  sewer  infrastructure  capacity  and  corresponding flooding problems.        

Monitoring and Data Assessment The data collected through the District’s monitoring program provide valuable  information on the state of water resources and the effectiveness of stormwater management BMPs.  In addition  the  data  provide  guidance  for  making  decisions  on  stormwater  management projects and is used in education and outreach programs to convey messages to the public about  stormwater.  The  District’s monitoring  efforts  will  continue  to  be  focused  on  the subwatersheds  draining  to  the Mississippi  River  and  specific water  resources  and  BMPs throughout the District while exploring additional monitoring opportunities with wetlands, groundwater,  soils,  and  additional  BMPs.  The  District  will  also  focus  on  ensuring  that collected data and assessments are in a format that is understandable and available to the public.    

Page 20: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xviii 

Future Trends Changes in watershed management and emerging issues such as climate change impact the District’s management decisions.   The District  recognizes  the  importance of  staying up  to date  on  new  and  innovative  stormwater  management  approaches  given  the  highly developed nature of the watershed and the  limits of traditional practices.  In addition, the District will need  to have a  role  in addressing  changes  in watershed management due  to climate change.    

Funding and Organization The  District  funds  programs,  projects  and  capital  improvements  through  levied  taxes, grants,  bonds  and  other  outside  sources  of  funding.    Partnering  with  the  county, municipalities,  and  other  governmental  entities  to  implement  watershed  management projects results in cost savings for the District and in turn, the residents.  The District plans to continue to encourage and coordinate such partnerships and  facilitate  joint projects as well as continuing to offer grant programs for projects benefiting the water resources.      

Regulations and Enforcement The District  currently  implements  rules  that  address water  quality  and  quantity,  erosion control,  wetland  protection,  Trout  Brook  Storm  Sewer  Interceptor  and  floodplain management.    The  District will  focus  on  keeping  these  rules  clear  and  up  to  date with revisions as needed,  improving compliance and  inspections, and coordinating District rules with other local and state and federal regulatory requirements.  

Ecosystem Health In addition to protecting and improving water quality, the District is dedicated to promoting healthy and viable ecosystems throughout the watershed.   The District  is highly developed and most  natural  areas  no  longer  exist.    The  Bringing Water  Back  campaign  focuses  on restoring historic wetlands, streams and other natural areas as well as completing ecological restoration of degraded natural areas.    

  Implementation Plan The District developed a series of goals to address various aspects of these fundamental issues.  The goals  formed  the  basis  for  developing  an  implementation  plan.    The  District’s  10  year implementation  plan  consists  of  programs,  projects  and  capital  improvements  geared  towards meeting  the  goals  identified  in  the  planning  process.    The  following  table  with  cost  estimates summarizes the implementation plan. 

Page 21: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xix 

 

 

Page 22: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xx 

Capitol Region Watershed District 2011 – 2020 Watershed Management Plan Implementation Plan Summary 

Year   2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  Total 

TOTAL COST  $4,526  $4,128  $4,136  $5,421  $5,582  $5,786  $4,519  $4,642  $4,519  $4,586  $47,846                          Code  ADMINISTRATION  $392  $404  $416  $428  $441  $454  $494  $509  $524  $540  $4,602 101  Administration  $392  $404  $416  $428  $441  $454  $494  $509  $524  $540  $4,602                          Code  PROGRAMS  $1,246  $1,286  $1,313  $1,395  $1,439  $1,479  $1,435  $1,478  $1,525  $1,567  $14,163 201  Groundwater 

Protection $45  $47  $48  $78  $80  $83  $85  $88  $90  $93  $737 

207  Rulemaking/Rule Revisions 

$33  $34  $35  $14  $14  $14  $15  $15  $16  $16  $206 

208  Permitting  $151  $156  $160  $155  $160  $164  $169  $174  $180  $185  $1,655 210  Stewardship Grants  $113  $116  $119  $121  $125  $129  $133  $137  $141  $145  $1,278 211  Monitoring and Data 

Assessment $300  $308  $309  $360  $370  $381  $368  $379  $390  $401  $3,566 

220  Education and Outreach  $216  $223  $229  $194  $200  $206  $210  $217  $223  $230  $2,149 225  Technical Resources and 

Information Sharing $167  $172  $177  $141  $145  $150  $156  $161  $166  $171  $1,605 

228  Future Trends: Research and Positioning 

$113  $117  $120  $225  $232  $239  $184  $190  $196  $202  $1,818 

230  GIS  $90  $93  $96  $87  $90  $93  $94  $96  $99  $102  $941 240  Safety Program  $17  $21  $18  $19  $23  $20  $21  $21  $25  $23  $209                          Amounts expressed in thousands of dollars.        

Page 23: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xxi 

Capitol Region Watershed District 2011 – 2020 Watershed Management Plan Implementation Plan Summary Continued  

Year   2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  Total 

Code  PROJECTS  $826  $875  $764  $615  $643  $649  $671  $677  $605  $622  $6,948 301  Shoreline & Streambank 

Assessment and Maintenance 

$38  $40  $41  $33  $34  $35  $15  $16  $16  $17  $283 

305  Como Lake Subwatershed 

$120  $123  $127  $138  $142  $147  $150  $155  $160  $164  $1,426 

313  Lake McCarrons Subwatershed 

$32  $33  $34  $35  $36  $37  $39  $40  $41  $42  $370 

315  Loeb Lake Subwatershed  $21  $21  $22  0  0  0  0  0  0  0  $64 317  Crosby Lake 

Subwatershed $50  0  $50  0  0  0  0  $50  0  0  $150 

320  Trout Brook Subwatershed 

$206  $292  $218  $156  $160  $165  $238  $144  $149  $153  $1,881 

325  Wetland, Stream and Ecosystem Restoration – Planning 

$129  $133  $137  $116  $120  $123  0  0  0  0  $757 

330  Mississippi River Subwatersheds 

$212  $214  $116  $128  $130  $133  $127  $129  $132  $134  $1,454 

370  Watershed Management Planning 

0  0  0  0  $12  0  $92  $133  $98  $101  $435 

390  Special Projects and Grants 

$19  $19  $20  $9  $9  $10  $10  $10  $11  $11  $127 

                         Amounts expressed in thousands of dollars.      

Page 24: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xxii 

Capitol Region Watershed District 2011 – 2020 Watershed Management Plan Implementation Plan Summary Continued  

Year   2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  Total 

Code CAPITAL IMPROVEMENT PROJECTS 

$2,062  $1,563  $1,643  $2,983  $3,058  $3,203  $1,919  $1,979  $1,865  $1,857  $22,133 

401  Shoreline and Streambank Restoration 

$89  $95  $95  $23  $23  $24  $25  $25  $26  $27  $448 

405  Como Lake Subwatershed BMPs 

$503  $518  $533  $370  $381  $392  $188  $193  $199  $205  $3,481 

413  Lake McCarrons Subwatershed BMPs 

$525  $26  $226  $3  $3  $3  $211  $12  $12  $12  $1,034 

415  Loeb Lake Subwatershed BMPs 

$39  $41  $42  $28  $29  $30  $31  $32  $33  $34  $338 

417  Crosby Lake Subwatershed BMPs 

0  0  0  $38  $39  $40  0  0  0  0  $116 

420  Trout Brook Subwatershed BMPs 

$365  $200  $150  $75  $77  $80  0  $150  0  0  $1,097 

425  Wetland, Stream and Ecosystem Restoration – Implementation 

$31  $32  $33  $697  $714  $733  $684  $702  $720  $638  $4,983 

430  Mississippi River Subwatersheds BMPs 

100  200  100  $175  $177  $80  0  0  0  0  $832 

435  Stormwater Impact Fund Implementation 

0  0  0  $53  $54  $56  0  0  0  0  $162 

440  Special Projects and Grants 

$285  $294  $302  $281  $290  $299  $307  $317  $326  $336  $3,037 

450  Future Trends: Implementation 

0  0  0  $949  $978  $1,007  $12  $13  $13  $13  $2,985 

490  Debt Service  $125  $162  $162  $293  $293  $461  $461  $536  $536  $592  $3,619                          Amounts expressed in thousands of dollars.   

Page 25: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xxiii 

Page 26: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  xxiv

Administration The administration section of the Plan contains useful information on the operation of the District as well as a discussion on the interaction of the District and its partners.  The financial implication of the Plan on local government is discussed and the requirements for local water management plans are established.  The District defines two alternatives for local plan development; one for cities that wish to adopt the Districts Rules and another approach for those Cities that do not intend to adopt the Rules.    The District will fund its implementation program using four primary sources of revenue:  

1. Property tax levy 2. Grant funds 3. Local partner cost‐sharing funding 4. Bonds and Loans 

 The District’s financing approach for operations (administration, programs, and projects) will be to fund  the  costs primarily  through  the annual  levy, however,  typically 5%  is  raised  through grants, fees,  interest  income,  and  local  cost‐share  funding.    The  financing  approach  for  capital improvement projects is planned to be 25% through the annual levy and 75% through grants, loans, and  bond  proceeds.    Small  capital  improvement  projects  (less  than  $250,000) will  be  financed through  the annual  levy.    Larger projects will have  the  costs  spread  to  the  long‐term benefitting parties  through  financing  via  bonds  and  loans.    The  District  will  seek  local  partner  cost‐share funding for capital improvement projects of all sizes to off‐set the District’s contributions.  Current and  past  bond  issues,  loans  and  grants  and  their  original  amounts  are  listed  below.

Page 27: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

 

Page 28: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

 

LAND & WATER RESOURCE SUMMARY

Page 29: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

 

Page 30: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  1

Land & Water Resource Summary  Introduction and History of the Area The Capitol Region Watershed District (District) is 40.6 square miles  in  size  and  includes  portions  of  Falcon  Heights, Lauderdale, St. Paul, Maplewood, and Roseville.   Within  the municipal  boundary  of  Falcon  Heights  are  the  State Fairgrounds  and  the  St.  Paul  Campus  of  the  University  of Minnesota.  (Figure 1 and Figure 2).   The District  is bounded to  the  east  by  the  Ramsey‐Washington  Metro  Watershed District,  to  the west by Mississippi Watershed Management Organization and  to  the north by  the Rice Creek Watershed District  and  the  Grass  Lake  Watershed  Management Organization.  The Mississippi River forms the south and west boundaries of the District.    The District is hydrologically situated at the confluence of the Mississippi and Minnesota Rivers, in a fully urbanized  setting.   The  reach of  the Mississippi River bordering  the District has cultural and historically significance for groups.   The River provides for power generation, regional recreational opportunities, major fly‐way for migratory birds, and barge traffic.    The Mississippi  River  Valley has  been  a  focal  point  for  settlement since  the  time  of  the  earliest inhabitants of  the  area,  the Hopewell  culture, built burial mounds on  the bluffs overlooking  the river.   In addition  to  the Hopewell  culture,  the Dakota  Indians  lived  in  the area and used similiar mounds to bury their dead from about 1600 to 1837.  The Dakota also revered Carver’s Cave, which they referred to ask “Wakân Teepee”, or dwelling of the Great Spirit.  European settlement of  the area began  in  the mid‐1800s and development became very  rapid  in the late 1800s.  To accommodate the growth and development, natural areas were paved over and built upon,  streams were  filled or buried  in pipes, and wetlands were drained and  filled.   These actions  resulted  in  significant  changes  to  the natural  landscape and hydrology of  the District.   A further description of the historic water resources of the District can be found in Appendix D.   Many of  the remaining natural areas  in  the District have significantly degraded over  time.   These areas consist primarily of non‐native, invasive species and lack ecological diversity. This degradation has  reduced  the effectiveness of  the  remaining natural areas  to protect and buffer  the District’s water resources.  Due to the District’s highly urbanized nature and impervious land cover, the water resources are greatly  impacted by stormwater  runoff.   The District  is  faced with  the challenge of managing  its  water  resources  while  balancing  the  land  use  needs  of  a  growing  and  diverse population.   

Page 31: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  2

Figure 1. District General Setting 

 

Page 32: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  3

Figure 2. District Boundary and Cities  

Page 33: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  4

Current Water Resources The  Minnesota  Department  of  Natural  Resources  (MN  DNR)  Public  Waters  Inventory  (PWI) identifies 10 basins within the District, including Como Lake, Crosby Lake, Lake McCarrons, and Loeb Lake  as  protected  waters.    The  PWI  also  lists  six  public  waters  wetlands  and  one  protected watercourse,  the Mississippi River.     Como  Lake and  the Mississippi River are  listed on  the 2008 303(d)  list  of  impaired waters.    Como  Lake  is  impaired  for  aquatic  recreation  due  to  excessive nutrients.    The  Mississippi  River  is  impaired  for  aquatic  consumption  due  to  mercury, perfluorooctane sulphonate (PFOS), and polychlorinated biphenyls (PCBs), impaired for aquatic life due to turbidity, and impaired for aquatic recreation due to fecal coliform.   In addition to the DNR Inventory, other water bodies in the District include Woodview Marsh, Willow Reserve, Burlington Pond, Town and Country Club Spring, and others.   (See Figure 3)  Many  historical  surface  waters  have  been  altered  or  filled  to make  way  for  development.  An extensive  series  of  pipes  and  tunnels  were  constructed  to  collect  and  convey  stormwater downstream, replacing creeks and streams that once conveyed water within the area. Trunk storm sewers collect runoff and transport it to the Mississippi River, the eventual receiving waterbody for all runoff within the District. A total of 55 outlet pipes discharge to the River.   Smaller storm sewer systems and ponds service the remaining portions of the District.  For example, the following five ponds serve as surge basins for the Trout Brook Stormsewer Interceptor System: Sims‐Agate  Storm  Pond,  Arlington‐Jackson  Pond,  Westminster‐Mississippi  Pond,  Arlington‐Arkwright Pond, and Willow Reserve. 

Page 34: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  5

Figure 3.  Surface Water Resources  

Page 35: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  6

Historic Water Resources Prior  to  European  settlement,  the  District  contained  a  number  of  significant  natural  and water resources.   These  resources  included  lakes, wetlands, streams, and springs,  in addition  to habitat communities adjacent to these resources.   As the District was developed, most of these resources were either lost or highly altered.   Figure 4 shows a number of lakes, wetlands, streams and springs that historically existed within the District.  For the most part, the larger historic lakes and ponds still exist today (i.e. McCarrons Lake, Como  Lake,  Loeb  Lake,  Burlington  Pond  and  Crosby  Lake), while  a  number  of  the  smaller  lake systems throughout the District no longer exist. Cozy Lake which once existed near Como Lake, has since been filled  in and established as parkland.   Sandy Lake was used by St. Paul Regional Water Services to store lime slurry and has since been covered with soil and developed into a prairie.  Lake Sarita  located on the University of Minnesota campus, was filled to develop campus housing.   The Sarita wetland currently on  the campus grounds  is all  that remains of Lake Sarita.   Similarly,  four large wetland  complexes  located  in  the  center  of  the District  and  a  number  of  smaller wetland systems have been  filled  in due  to development.   Some of  the  lost wetlands connected  to other water resources that can still be found today such as Woodview Marsh, Willow Reserve, and Trout Brook.      The stream and spring systems that existed  in the District ultimately discharged to the Mississippi River.    Some  of  these  systems  no  longer  exist,  while  others  drain  through  storm  sewers underground.   For example, Trout Brook and Phalen Creek originally  flowed  through  the eastern part of the District to the Mississippi River. Trout Brook roughly followed what today  is  Interstate 35E  south  to  the Mississippi River. Phalen Creek  flowed  south  to  the Mississippi River  from Lake Phalen,  through a deep  ravine along Dayton’s Bluff. Both  streams were partially  filled  in  the  late nineteenth century by railroad companies using the stream valleys as track beds for railroad  lines servicing  industrial  Lowertown  in  downtown  St.  Paul.  Today,  these  streams  remain  buried underground for the majority of their lengths.  In the southwestern portion of District, Cascade Creek, originating near Randolph St. and Hamline Ave, once made  its way to  the Mississippi River.  In 1854,  John Ayd, a German  immigrant, bought 160 acres of  land bounded by present‐day Lexington, Victoria, St. Clair, and Randolph Avenues.  In 1860 he built a grist mill and mill house on Cascade Creek. The mill operated until 1878. In 1880, the Short Line, a commuter  rail  line built  to connect Minneapolis and St. Paul was completed, and a portion of the stream bed was filled  in at that time. Today, Ayd Mill Road follows a portion of the original  route of Cascade Creek.    Further detail on  the historic water  resources  can be  found  in Appendix D. 

Page 36: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  7

Figure 4. Historic Water Resources 

Page 37: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  8

Current Watershed Conditions The District is entirely developed with approximately 42% of the land being impervious.  Impervious roadways  alone make  up  nearly  a  quarter  of  the  total  land use  (Table  1).    The District  includes downtown St. Paul, a major commercial district with numerous businesses, entertainment services, tourist  attractions,  and  industrial  facilities.    The  commercial  and  industrial  land  uses within  the District  are  generally  located  along  the major  roadways  or  rail  corridors  as  well  as  along  the Mississippi River.    Some natural  areas  still exist within  the District mostly  in  the  form of parks which offer District residents and others recreational opportunities.  The parks are distributed throughout District and include  small,  neighborhood  parks  as well  as  large  regional  parks  located  along  the Mississippi River.   The District also  includes the Minnesota State Fairgrounds and eight college and university campuses.    The dominant  land use  is  single  family  residential,  covering  approximately 32.6% of  the District. (See Figure 5) With an estimated population of 195,000,  the District  is densely populated with a diverse population. The population is projected to increase 15% by the year 2030 which will result in continued redevelopment with increasing density.    Table 1.  Present (2008) Land Use  

Land Use  Acres  % of Watershed Single Family Residential  8,467  32.6% Multi‐family Residential  907.9  3.5% Commercial  2,526  9.7% Agricultural  28  0.1% Institutional*  2,776  10.6% Parks and Open Space  2,252  8.6% Industrial  808.4  3.1% Railway   653.7  2.5% Roadway  6,079  23.4% Unclassified  1,488  5.7% Total  25,987  100.0% *Note:  The  “Institutional”  land  use  category  includes  the  University  of Minnesota  and  the Minnesota  State  Fair  Grounds  which  contain  lands  that could be considered parkland, agriculture or open space. Source:  Ramsey County, 2008 

Page 38: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  9

Figure 5. Present (2008) Land Use 

Page 39: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  10

Water Resource Monitoring The District began  its water  resource monitoring program  in 2004.    It  includes monitoring of  the water  quality  of  lakes, wetlands  and  stormwater  throughout  the District.   Monitoring  and  data collection provides valuable information to the District on the status of the water resources and is utilized to make management decisions.    In 2007, a wetland monitoring program was  initiated to collect biological data on wetlands around the District.   In 2008, the program monitored four lakes and  seven baseline  stormwater  stations.    Figure 6  identifies  the  locations where monitoring has occurred in the District.   The baseline stormwater monitoring stations collect flow and water quality data from stormwater leaving  the District.   Monitoring  results are  found  in Table 2 and  indicate  that water  leaving  the District is generally more polluted than the Mississippi River, its receiving water body.  In addition to the  District’s  monitoring  efforts,  other  entities  monitor  water  quantity  and  water  quality parameters in the Mississippi River including the United States Geologic Survey (USGS), Minnesota Department  of  Agriculture,  Metropolitan  Council,  and  Mississippi  Watershed  Management Organization.    Monitoring  results  are  more  fully  articulated  in  the  complete  Land  and  Water Resource  Inventory  (located  in  Appendix  A).    Future  monitoring  results  can  be  found  on  the District’s website.  Lake McCarrons, Como Lake, Loeb Lake and Crosby Lake are monitored to assess their health and determine  if  they  support  their  designated  uses  for  swimming,  fishing  and  aesthetics.  All  lakes receive  stormwater  inputs  from  their  subwatershed  and  then, with  the  exception  of  Loeb  Lake, eventually drain to the Mississippi. Both Como Lake and Lake McCarrons drain to the Trout Brook Storm Sewer Interceptor, owned by the District.   Lake monitoring  is performed by Ramsey County Public Works  (RCPW),  and  includes monthly  or  bi‐weekly  sampling  of  the  lakes.    At  each  lake, temperature and dissolved oxygen profiles, Secchi disk (water clarity) readings are taken and water samples are  collected.   The water  samples are analyzed  for  total phosphorus  (TP),  chlorophyll‐a, nitrate, ammonia, total kjehldahl nitrogen (TKN) and chloride ion concentrations.   In 2008, District  lake water quality was generally  consistent with previous  years  (Figures 7 & 8). Since monitoring  began,  Como  Lake  has  improved  slightly, with  large  year‐to‐year  variations  in pollutant  levels,  but  remains  a  eutrophic  lake  (high‐nutrient  level  lake  experiencing  frequent nuisance  algal  blooms).    Lake  McCarrons  has  improved,  especially  since  2004,  when  an  alum treatment was applied.   There are no  long‐term data on Loeb and Crosby as monitoring of  these lakes has only occurred since 2003 and 2004 respectively.   As of 2008, all  lakes but Como Lake meet the TP, Secchi depth and Chlorophyll‐a standards set by the MPCA for aquatic life, recreation and nutrients. In 2008, Como Lake exceeded the standards for TP. However, Como Lake was better than the standard for average Secchi depth for the majority of years it has been monitored.  Como Lake was better than the standard for Chlorophyll‐a in 2008, for the first time since 2004. 

Page 40: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  11

Figure 6. Water Monitoring Locations 

Page 41: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  12

Figure 7.  Historical Summer Average TP Concentrations in District Lakes 

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008

Year

TP (m

g/L)

Como

Crosby

Loeb

McCarrons

Deep Lakes Standard

Shallow Lakes Standard

 Figure 8.  Historic Summer Average Secchi Depth in District Lakes 

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008Year

Secchi Dep

th (m

)

Como

Crosby

Loeb

McCarrons

Deep Lakes Standard

Shallow Lakes Standard

 

Page 42: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  13

Table 2. Agency Standards for Pollutants and their average concentrations at Monitoring Sites  and in the Mississippi River 

     Mississippi River Reference Sites 

2008 CRWD Monitoring Sites  

  Standard (mg/L) 

Ford Dam 

Lamberts Landing 

East Kittsondale

Phalen Creek 

St. Anthony Park 

Trout Brook Outlet 

TPa  0.13  0.08  0.13  0.39  0.23  0.21  0.20 

TSSa  14  13  42  169  96  129  82 

Ammoniab  0.04  0.05  0.06  0.10  0.05  0.10  0.09 

TKNc  0.65  0.80  1.00  2.96  1.45  1.42  1.69 

Nitrated  NA  0.71  2.02  0.74  1.34  0.48  0.72 

Nitritec  1.00  0.04  0.05  0.06  0.03  0.04  0.04 

Cadmiume     0.0001  0.0001  0.0006  0.0005  0.0005  0.0006 

Chromiume     0.0008  0.0013  0.0087  0.0055  0.0054  0.0047 

Leade     0.0006  0.0011  0.0569  0.0234  0.0155  0.0090 

Zince     0.0111  0.0098  0.1139  0.0677  0.0734  0.0350 

Nickele     0.0022  0.0038  0.0075  0.0047  0.0083  0.0045 

Coppere     0.0015  0.0026  0.0249  0.0134  0.0145  0.0093 

Chlorideb  230  18  27  171  72  49  99 aThere  are  no  numeric  standards  for  TP  and  TSS.    These  values  are  NCHF  ecoregion  averages  from minimally  impacted  streams.  CRWD  monitoring  values  for  TP  and  TSS  are  flow‐weight  mean concentrations. bAmmonia, metals, and chloride standards are from the MPCA. cTKN and nitrite standards are from the EPA. dThere is no nitrate standard for surface water. e Metals standards are based on measured hardness values.  All numbers are in mg/L. Numbers highlighted in    exceed/equal the standard. Numbers highlighted  in green exceed/equal  the  river concentration at Ford Dam, but not at Lamberts Landing. Numbers highlighted in orange exceed/equal both river concentrations, but not the standard. Numbers highlighted in red exceed/equal both river concentrations and the standard. NOTE: the term ‘standard’ refers to surface water quality standard.  The use of this term in reference to stormsewer water quality is for illustrative purpose and not intended to infer that stormwater effluent is subject to that standard.  

Regulatory Framework Previous development and  redevelopment  in  the District have placed a significant burden on  the health  and  sustainability  of  the District’s water  resources  due  to  increasing  impervious  surfaces generating polluted stormwater runoff.   Regulations exist to  improve water resources and protect them  from  further  degradation.    Federal  and  state  regulatory  programs  have  established water quality  standards  and  best  management  practice  requirements  for  cities,  counties,  and  other 

Page 43: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  14

entities.  For example, the Stormwater Program for Municipal Separate Storm Sewer System (MS4) requires MS4s  to develop and  implement best management practices  to control  stormwater and improve water resources.  For further information on MS4s refer to Section 3.8.1 of Appendix A.   The Minnesota  Pollution  Control  Agency  (MPCA)  is  currently  working  on  the  Lake  Pepin  Total Maximum Daily Load (TMDL) Study which  includes the turbidity and nutrient related  impairments within  the Mississippi  River  between  the  confluence with  the Minnesota  River  and  Lake  Pepin.  There  is also a bacteria TMDL study for the Mississippi River between the Lower St. Anthony Falls and Lock and Dam #1; and between the Mississippi River’s confluence with the Minnesota River to the Metro Wastewater  Treatment  Plant  in  St.  Paul.    In  2010  the  Como  Lake  TMDL  study  for excessive  nutrients  was  approved.    This  was  a  continuation  of  the  Como  Lake  Strategic Management Plan of 2002.    The District also has regulatory authority that  it exercises  in the  form of Rules that protect water resources as development and redevelopment occurs.  The rules, at this time, require projects that disturb one  acre or  greater of  land  to  comply with  standards  for  erosion  and  sediment  control, water quality and quantity control, wetland protection and floodplain management.    Programs and Capital Improvement Projects In  addition  to monitoring  and  enforcing  regulations,  the District  coordinates  a  number  of  other programs  and projects  to protect  and  improve  the quality of  its water  resources.   Management plans written  for District water  resources  include: Como  Lake,  Loeb  Lake, Willow Reserve, Trout Brook, Sarita Wetland, and Lake McCarrons.   Education and outreach programs encourage District residents  to make  decisions  that  improve water  quality  and  avoid  those  that  harm  local water resources.      Through  studies  and  management  planning,  the  District  is  able  to  recognize  areas  where improvements can be made that would enhance the resources and improve water quality.   Capital Improvement  Projects  constructed  by  the  District  and  its  partners  include:  the  Arlington  Pascal Stormwater  Improvement  Project,  the  Villa  Park  Wetland  Improvements,  Sarita  Wetland Improvements, Gottfried’s  Pit  Lift  Station  Renovation  Project,  and  the  Trout  Brook  storm  sewer repairs and replacements.     Many of the projects were successfully implemented with cooperation of District partners.  Through partnerships,  the  District  is  able  to  augment  the  finances,  knowledge,  regulatory  authority  and other tools needed to carry out these projects that manage water resources.  In addition, through partnerships, best management practices are  implemented throughout the entire watershed.   For example, when constructing the Arlington Pascal Stormwater Improvement Project the District was able  to  work  with  Ramsey  County  and  the  Cities  of  Falcon  Heights,  Roseville  and  St.  Paul  to significantly  increase  the  amount  of  stormwater  treatment  in  conjunction  with  a  street reconstruction project.    The Districts approach to constructing projects is to identify known large redevelopment initiatives and work  to  incorporate water quality  improvements  into  the design.   The Central Corridor Light Rail, Ford Plant and 3M Property are examples of redevelopment  initiatives where the District has identified the opportunity to incorporate water quality improvements. 

Page 44: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

ISSUES AND GOALS

Page 45: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people
Page 46: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  15

Themes – Our Approach for Action During  the  development  of  the  District’s  second Watershed Management Plan, the organization has taken the opportunity to  reflect  on  where  it  has  been  and  to  challenge  itself  on where it is going during the next 10 years and beyond.  As part of that process, the District  identified key visions and themes to promote positive change in the watershed.  The key themes are  woven  throughout  the  District’s  activities.    The  icons shown below appear alongside  the  initiatives within  this Plan that  exemplify  the  respective  theme.    The  icons  are used  to provide a visual indicator for themes throughout the Plan.   

Bring Water Back to St. Paul From the beginning of this planning effort, the theme “Bring Water Back to St. Paul” has been  a  centerpiece.    The  concept  applies  to both  the physical  restoration of water resources within the urban watershed as well as bringing water back into the consciousness of the community.   

Partnership and Community Connections During  the public  input process of  the Plan developing and engaging partnerships was a recurring theme. Partnerships and community connects vital to the successful implementation of the Plan due to the diversity within the District.    

Innovation and Emerging Trends As  new  technologies  develop  and  the  water  resources  management  and engineering fields continue to evolve, the District is responsible for staying aware of trends  in  science, design,  and  climate,  and  to  interpret  those  trends  for practical application.  It is a priority of the District that programs and projects in the Plan be innovative and that the District anticipate emerging technological trends.    

Adaptive Management Adaptive management refers  to  the  feedback  loop of performance evaluation and update of management strategies.  Adaptive management initiatives are those that incorporate  monitoring,  evaluation,  and  assessment  followed  by  revisions  in process, design, or management.  

New Information Technology The District plans new  initiatives notable  for  their use of  technologically advanced information management systems.  Use of new information technology is necessary for the District to maintain a  leadership role  in urban water resource management and effectively implement the Plan.  

Page 47: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  16

Issues and Goals 

Issue Identification The  identification of  issues  forms  the basis of  the District’s watershed  management  plan.    At  the  beginning  of  the management  plan  development  process,  residents, stakeholders,  District  staff,  board  members  and  other interested parties were asked to identify concerns about the watershed  and  water  quality.    The  issues  identification process documented  the  concerns of  stakeholders  and was used  to  formulate  issue  statements,  goals,  and implementation  activities  for  the  watershed  management plan.    This section of the plan describes the public involvement aspect of the issues identification process, and  explains  how  comments  and/or  concerns  shared with  the  District  translated  into  the  issue statements and goals   contained  in the watershed management plan.   It should be noted that the comments and concerns identified in past plans completed by the District and its partners since the last watershed management plan in 2000 were incorporated into the issues identification process.      Initial Public Involvement Process The public involvement portion of the issues identification process began with a series of meetings held  with  the  District’s  existing  Citizens  Advisory  Committee  (CAC),  the  Technical  Advisory Committee  (TAC),  a  Community  Advisory  Group  developed  specifically  for  the  watershed management planning process, and individual community members.  One of the main objectives of the process was to reach as many constituents as possible  in an effort to solicit  issues, needs and concerns reflective of one of the most culturally and economically diverse watershed districts in the State of Minnesota.     A detailed description of  the District’s efforts  to  reach  a diverse  audience during the watershed management planning process is contained in Appendix B.  Each  of  the  meetings  held  during  the  issues  identification  process  began  with  an  educational presentation from District staff.  During this presentation, participants were introduced to a number of watershed management topics, the District’s current role in addressing these topics and what the District has done to address these topics to date.  The objective of this portion of the meeting was to provide participants with a base level of understanding in an effort to provide the proper context to share their experiences and desires for future watershed management activities.    

The educational presentation covered the following topics: • Urban Stormwater Management   • Monitoring and Data Assessment • Future Trends         • Education and Outreach 

• Funding and District Organization  • Regulations and Enforcement • Ecosystem Health  

 Following  the educational presentation, participants were  asked  to  voice  concerns,  comment on issues,  ask questions,  and discuss  the  topics.   Meeting minutes were  recorded  to document  the discussion (see Appendix B). 

Page 48: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  17

Development of Issues and Goals During the public involvement process all comments, concerns, issues, and ideas were documented in meeting minutes, which were  summarized  in  an  issues  identification matrix  that  tracked  the source of all comments and how  the comments were utilized  throughout  the  issue  identification process  (see  Appendix  C).  Issues  identified  in  previous  CRWD  plans,  and  the  plans  of  other community groups and partner agencies were also added to the matrix to ensure that all potential issues related to watershed management were considered during the planning process.     All  comments  and  issues  entered  into  the matrix  were  categorized  into  one  of  the  previously identified issue topics, or a new topic. Each comment was classified as an issue, a goal, or a specific implementation initiative.  Issue statements were then crafted to encompass all comments received on each particular  topic.   The  issue statements  identify what needs  to be addressed within  the timeframe of the watershed management plan.    Issue statements guide the development of the District’s goals, and implementation activities.  The issues matrix was used as an organizational tool that allowed transparent documentation of what input the District collected and how it responded.    With  issue  statements  defined,  the  categorized  comments  were  used  to  write  goals,  and implementation  initiatives  for each  issue  statement.   Goals  are  statements of what  the District intends to achieve in order to address each specific issue.  There may be several goals needed to address  a  given  issue  statement.    The  specific  actions  taken  are  classified  as  implementation initiatives.   As with  the  issues  identification process,  the goals  identified  in previous CRWD plans and  plans  from  the  cities within  the District  and  Ramsey  County were  archived  in  a matrix  and utilized in the development of goals.     A draft of this section of the plan was provided to the District’s CAC, TAC and the Community Group for  their  review  and  input.    Participants  from  these  groups  submitted  over  100  comments  in response to their review of the section.   Many of  the comments provided suggestions on how to improve  the  Issues  Identification and Goal  Setting  section, while others provided  suggestions on implementation activities aimed at reaching various goals.     Cooperation – The Guiding Principle During  the  review process  for  the  Issues and Goals  section  cooperation with District partners  to achieve the District goals was a recurring theme.   Cooperation with partners within the District as well as partners in adjacent jurisdictions will yield benefits to all parties.  The need to work with the District partners  to  identify stormwater management  retrofit opportunities was  initially  identified as the first issue, however, the need for cooperation was repeated in virtually all of the subsequent issues.  It was determined that this concept should be highlighted as an overriding principle of the plan.   

Page 49: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  18

 The District  recognizes  that  it does not bear  the  sole  responsibility  for  stormwater management within the watershed.     Also, the District does not possess all the resources  ‐ financial, regulatory authority,  or  knowledge  ‐  needed  to meet  the  challenge  of managing water  resources.   District partners  can  provide  access  to  opportunities  to  incorporate  stormwater management  practices throughout the watershed.   An example of this type of cooperation is the Arlington Pascal Project where  the District was able  to add a  significant amount of  stormwater  treatment  in  conjunction with  a City of  St. Paul  street  improvement project.   Another benefit of  cooperation  is  the more efficient completion of common tasks and meeting common goals.   Working together also allows sharing of  knowledge  and  information  about new  technologies  and  innovative  approaches.    The District has overlapping missions, goals and responsibilities with many of its partners.  Coordination of efforts results in greater efficiency and a reduction in expenditure.    In addition to collaborating with partners, the District recognizes the important role that residents play  in  watershed  management.    The  goal  of  improved  water  quality by  applying  stormwater management practices throughout the District is best accomplished by recruiting residents to apply these practices at the individual home level.  When residents manage their own stormwater runoff it  minimizes  the  need  for  large  stormwater  management  projects.    In  cases  where  larger stormwater management practices are needed, or when opportunities arise to bring water features back  to  the  landscape of  the District,  it  is  critical  that  there  is  support  from  the  residents.    The District  intends to utilize the energy and skills of  its residents to promote  local  initiatives to bring water back.     District Partners • Municipalities     • University of Minnesota   • Minnesota State Fair Board   • Federal Agencies (EPA, COE)     • Water Utilities     • People who live, work, or recreate in the 

District 

• Ramsey County  • Ramsey Conservation District  • State Agencies (MnDOT, DNR, PCA, BWSR) • Metropolitan Council  • Local businesses and institutions  • Other watershed organizations 

  

Organizational Structure of the Issues and Goal Section This section of the plan is organized by issue topic and begins with a narrative of the topic: what is the status of this topic today, and why does the District need to address this topic during the next ten years.  The narrative goes on to explain what issues or concerns were raised during the public involvement process for each particular topic.    Following  the  narrative  is  one  or  more  issue  statements  addressing  the  topic.    These  issue statements  include  all  comments  received  for  a particular  topic.  (See  issues matrix, Appendix C)  Below the issue statements are goals that reflect the comments and concerns expressed during the public  involvement process.   In many cases, further detail of the approach for reaching the goal  is provided. 

Page 50: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  19

Education and Outreach, Issues and Goals   

Although  nonpoint  source  pollution  has  become  a  more prominent  issue  in the  last several years, there  is still a  lack of  understanding  by  the  general  public  about  the  role  of stormwater  runoff  in  water  pollution.    There  is  a  lack  of awareness  that everyone who  lives, works, and recreates  in that landscape is part of the solution.  This lack of awareness is particularly pronounced in the District because the level of development has  limited  the  connections people have with water.  Because water quality is a function of how people go about  their everyday activities, educating  the general public about how to modify those activities is an important goal for improving  water  quality.  A  watershed,  with  its  natural boundaries dictating the flow and fate of water through the landscape, provides a logical context for educational efforts.  Creating an informed community and thereby empowering those citizens to be stewards of the land and water  resources where  they  live,  is  the goal of watershed education.    Individuals within  the community can make a significant difference in protecting our water resources.  Effective education programs and making information available to the public enhance participation in District activities and increase public knowledge relative to water.  The  comments  received  throughout  the  issues  identification emphasized  the need  for  continued education throughout the District.   Specifically  identified was the need to target groups that have not  previously  been  reached  by  education  and  outreach  programs.    The  District  is  a  diverse watershed and  in the past not all communities have been  involved  in District activities.    It will be important for the District to be aware of varying uses, values, ideas and celebrations of water that exist  in the District. The District will need to continually seek  input  from the diverse communities within  the  District  to  maintain  this  understanding.  Educational  approaches  will  need  to  be developed to serve the needs of each community in different ways.    An  additional  issue  identified was  the  overarching  problem  of  residents  not  feeling  a  personal connection with water.  Water is taken for granted and not seen as a finite resource.  The District’s programs will not only need to educate the public about the  local water resources, water quality, stormwater management,  and  the  role  of  the  District,  but will  also  need  to  create  a  sense  of ownership  for  the  residents  and  invoke  a  change  in people’s perceptions of  and  their behaviors related to water.     The District developed an Education and Outreach Plan which was adopted on May 6, 2009.   The Plan is found in Appendix E.  

Page 51: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  20

Education and Outreach Issues and Goals

Issue 1    Many District residents, businesses and institutions do not feel a personal connection with water and natural resources and therefore do not have a sense of responsibility or ownership which negatively impacts their ability to change behaviors and increase stewardship 

 Goal 1.1  Increase the awareness of water 

    1.1.a  Determine the baseline knowledge level regarding basic watershed 

and stormwater concepts       

1.1.b  Increase  the  understanding  of  basic  watershed,  stormwater, groundwater  and  water  pollution  concepts  through  watershed education and outreach 

 1.1.c  Measure the change  in knowledge and behavior as a result of the 

education and outreach efforts    

Goal 1.2  Increase public knowledge and appreciation for local water resources in the District 

 1.2.a    Utilize  District  infrastructure  to  increase  awareness  and 

appreciation of water resources and watershed management         

Goal 1.3  Raise  an  awareness  of  the  District  and  increase  the  interest  and  public participation in its activities 

 Issue 2    The District’s diverse community has a wide  range of cultural,  social and 

political  relationships  with  water,  community  interests,  priorities,  and opinions of the District’s water resources  

 Goal 2.1  Increase  communication  and  encourage  long  term  involvement  with 

groups not previously involved in District programs   

 

Page 52: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  21

Urban Stormwater Management, Issues and Goals  

 A significant portion of the District is made up of impervious surfaces.   These  impervious surfaces  increase the volume of stormwater runoff and the pollutant load being discharged to District  wetlands,  lakes  and  the  Mississippi  River  with detrimental effects on water quality.   The  increased volume of  runoff  also  increases  the  likelihood  of  flooding,  which threatens  public  safety  and  increases  the  potential  for infrastructure  damage.    Both  historic  and  current development practices have contributed to compacted soils, the placement of  fill material,  the underground disposal of waste materials, and the presence of contamination.   These factors and others make Best Management Practices (BMPs) and other green  infrastructure  techniques more challenging to implement.   The  urban  stormwater  management  category  received  the  most  comments  during  the  issue identification process.  The primary focus was water quality protection for District water resources.  All groups identified the need for on‐going management and maintenance of District resources and stormwater management facilities as an  important  issue for the watershed management plan.    In addition,  all  groups  strongly  expressed  that  the  District  should  lead  the  investigation  of  the effectiveness of new stormwater management techniques.  The promotion of green infrastructure and  identification  of  opportunities  to  increase  the  level  of  stormwater management were  also identified  as  key  roles  for  the  District.    Existing  storm  sewer  infrastructure  capacity  and corresponding flooding problems was also identified as an issue that needs to be addressed in the next  ten  years,  as  was  the  need  to  develop  a  better  understanding  of  the  role  stormwater management has on groundwater resources.  The District’s  lake management plans  for Como  Lake,  Loeb  Lake,  and  Lake McCarrons  identified goals for the future condition of these vital resources.  Numerical goals were set for loading of total phosphorus to Como Lake and a target in‐lake total phosphorus concentration was established for Lake McCarrons.   These performance standards have been  incorporated  into Goal 2.1 as originally stated in those plans.  Section  303(d)  of  the  Federal  Clean  Water  Act  requires  that  states  establish  pollutant  Total Maximum Daily  Loads  (TMDLs)  for water  bodies  that  do  not meet water quality  standards.  The loading limits are to be calculated such that, if achieved, the water body would meet the applicable water quality standard.    Como  Lake  and  the  Mississippi  River  are  listed  on  the  2008  303(d)  list  of  impaired  waters.  Downstream of the District, there are impairments within the Mississippi River for turbidity, PFOS, PCBs, and mercury.    In addition, Spring Lake and Lake Pepin,  located downstream of District, are impaired for excess nutrients and biological indicators. 

Page 53: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  22

In 2010, the District converted the Como Lake Strategic Management Plan  into a TMDL  for Como Lake.    The  MPCA  is  currently  working  on  the  Lake  Pepin  TMDL  which  includes  the  turbidity impairments within  the Mississippi River  between  the  confluence with  the Minnesota River  and Lake Pepin and also a Bacteria TMDL for the Mississippi River between the Lower St. Anthony Falls and  Lock  and  Dam  #1  and  between  the  confluence  with  the  Minnesota  River  to  the  Metro Wastewater Treatment Plant in St. Paul.   

 Urban Stormwater Management Issues and Goals

 

Issue 3     Regular maintenance  is critical to the success of stormwater BMPs and  is not consistently performed to achieve desired performance 

 

Goal 3.1  Work  to  improve  the  short‐  and  long‐term  maintenance  of  stormwater BMPs  

 3.1.a  Coordinate  the  development  and  implementation  of  a  multi‐

jurisdictional  BMP  management  plan  that  includes  identifying responsible  parties,  define  roles  and  determining  maintenance schedules for all stormwater BMPs located in the District   

 

Issue 4    The pollutant load of stormwater has impacted the quality of water in the District’s lakes, wetlands and the Mississippi River   

  Goal 4.1  Reduce  the  chemical  pollutant  load  to  District  lakes,  wetlands  and  the 

Mississippi River   

4.1.a   Achieve a Phosphorous Trophic State Index (TSI‐P) of 60 for Como Lake  by  reducing  the  average  annual  total  phosphorus  load  to Como Lake by 60% 

     4.1.b  Achieve  the  summer  average  lake  concentration  of  total 

phosphorus at 33 parts per billion (ppb) or less for Lake McCarrons  

4.1.c  Maintain  water  quality  of  Loeb  Lake  at  current  conditions (nondegradation) 

 

4.1.d  Achieve  the  District’s  total  phosphorus  loading  requirements  for the Lake Pepin TMDL in the Mississippi River 

 

4.1.e  Develop  a  target  reduction  for  metals,  pesticides,  nutrients, chloride,  organic  contaminants,  etc,  discharged  to  District  lakes, wetlands and the Mississippi River and work towards reaching that target   

 

4.1.f     Identify and manage the internal phosphorus load in District lakes, wetlands and the Mississippi River 

 4.1.g     Identify and eliminate illicit discharges into District lakes, wetlands 

and the Mississippi River  

Page 54: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  23

Goal 4.2  Reduce physical pollutant load to District lakes, wetlands and the Mississippi River 

   

4.2.a  Develop  a  target  reduction  for  the  amount  of  trash  entering District lakes, wetlands and the Mississippi River and work towards reaching that target 

 4.2.b  Develop  a  target  reduction  for  sediment  entering  District  lakes, 

wetlands and the Mississippi River and work towards reaching that target 

   4.2.c    Achieve  District  load  requirement  established  in  the  turbidity 

component of the future Lake Pepin TMDL  

4.2.d  Identify and eliminate illicit discharges into District lakes, wetlands and the Mississippi River 

 

Goal 4.3   Reduce bacteria pollutant load to District lakes, wetlands and the Mississippi River 

 

4.3.a  Develop a  target  reduction  for  the amount of waterfowl and pet waste  entering  District  lakes, wetlands  and  the Mississippi  River and work towards reaching that target 

 4.3.b  Identify and eliminate illicit discharges into District lakes, wetlands 

and the Mississippi River  

4.3.c  Meet  the  District’s  bacteria  load  requirement  established  in  the future Upper Mississippi River bacteria TMDL 

Page 55: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  24

 Issue 5    The quantity of  runoff  from a highly urbanized area  increases  the  risk of 

flooding and puts added strain on the infrastructure within the District  

Goal 5.1    Minimize existing and potential flooding problems    

5.1.a  Work  to  identify  existing  and  potential  infrastructure  capacity issues and flooding problems  

 5.1.b  Utilize  structural  and  nonstructural  flood  control  techniques  to 

improve infrastructure capacity and reduce flooding problems  

5.1.c  Evaluate the impact of climate change on infrastructure capacity in the future and identify potential flooding issues   

 5.1.d  Preserve  existing  floodplain  storage  capacity  and  prohibit 

floodplain filling unless compensatory storage is provided  

5.1.e  Identify opportunities to reestablish lost floodplain areas     

Goal 5.2  Manage the volume of water in the Trout Brook storm sewer Interceptor to protect the integrity of District infrastructure.  

 Issue 6    Within an urbanized area,  runoff  from  impervious  surfaces  is directed  to 

storm sewers and discharged to surface waters rather than infiltrating into the  ground  resulting  in  reduced  groundwater  recharge  and  impacts  to receiving waters  

   Goal 6.1  Promote  groundwater  recharge  through  increased  use  of  infiltration 

techniques to manage stormwater   

6.1.a   Develop  incentives/regulations to promote the use of stormwater infiltration techniques 

     6.1.b   Identify  those  portions  of  the  District  most  conducive  to 

stormwater infiltration  

Goal 6.2  Protect the groundwater resource  

6.2.a   Support  and  collaborate with Ramsey County,  state  and  regional agencies  to  better  understand  and monitor District  groundwater resources 

 6.2.b  Support  and  collaborate with Ramsey County,  state  and  regional 

agencies on groundwater quantity and quality protection   6.2.c  Avoid infiltrating stormwater in areas of contaminated soils 

Page 56: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  25

 

Monitoring and Data Assessment, Issues and Goals  To evaluate the quality District water resources, a monitoring program was  initiated  in  2004.    The monitoring  data  helps determine the type and quantity of pollutants discharged to surface  waters  of  the  District.    This  baseline  data  is  the ultimate  report  card  for  the District.   As Best Management Practices  (BMPs) are  implemented,  it  is  important  to collect data and monitor the effectiveness of the BMPs in managing and  treating stormwater.   The monitoring data will be used to  guide  future management decisions  and  to  calibrate  the District’s  hydrologic,  hydraulic,  and  water  quality  loading models, which are tools used to evaluate current conditions and predict future conditions.    Monitoring and data assessment are key roles of the District.  The information collected is utilized to  make  management  decisions  not  only  by  the  District  but  by  the  local  communities  and neighboring watershed management organizations.    In addition, the monitoring program data are used  to  convey  information  about  stormwater management  and water  quality  to  the  residents through education and outreach programs.       During  the  issue  identification  process,  comments  and  concerns  related  to monitoring  and  data assessment  focused on  two  fundamental  issues:  the need  to  improve dissemination of  collected data, and the need to expand the monitoring program to collect additional data.    The District needs  to  improve  the way  in which  information  is delivered  to  the public by making monitoring data available in user friendly formats.  Comments were also received about the District becoming a “clearinghouse” of information about current water issues.  The District should compile published  research  from  local,  national  and  international  sources  for  use  by  the District  and  its partners.   The second  issue  identified was regarding  the need  to continue  the monitoring program and add additional monitoring  locations.   Currently,  the District has an extensive monitoring program  that collects data at  four major outfalls  to  the Mississippi River,  specific water  resources, and  several BMPs  in the District.   See Figure 5  for  locations of monitoring sites.   Expansion of the monitoring and  data  assessment  program  would  allow  the  District  to  gain  additional  information  about groundwater, wetlands, soils, and other types of BMPs.   

Page 57: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  26

Monitoring and Data Assessment Issues and Goals  

Issue 7   Monitoring  and  research data  are needed  to understand  the watershed, identify  problems,  and  determine  appropriate  watershed  management approaches within the District

 Goal 7.1  Collect monitoring data and perform research to gather valuable information 

about the District   

7.1.a   Collect data on selected BMPs installed in the District and evaluate performance, maintenance, and longevity 

 7.1.b   Monitor  the  condition  of  District  surface  waters  and  major 

subwatersheds  to  establish  baseline  conditions  and  determine trends 

 7.1.c   Identify and support a program to collect soil and geologic data in 

order to assess the infiltration potential within the District  

Goal 7.2  As part of  the annual budgeting process,  review and  refine  the monitoring and  data  assessment  program  to  improve  efficiency  and  utilize  the  best technology 

 Goal 7.3  Utilize  data  as  part  of  a  regular  evaluation  of  current  water  issues, 

performance of District programs and District rules    

Issue 8    Monitoring  and  research  data  are  difficult  for  the  public  to  access  and understand   

Goal 8.1  Make  monitoring  and  research  data  available  and  understandable  to  a 

broader audience        Goal 8.2  Serve  as  a  clearinghouse  for water  resource management  information  to 

assist District stakeholders and partners   Goal 8.3  Establish partnerships to improve the District’s ability to increase access and 

understanding of monitoring and research data  

Page 58: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  27

Future Trends, Issues and Goals  The District recognizes that  in order to stay at the  forefront of the rapidly changing field of watershed management, it is necessary  to be aware of new  information,  technology and methods  that  will  inform  management  decisions.  Maintaining  a  forward‐thinking  approach  and  anticipating changes  is critical.   By  staying proactive on emerging  issues rather than reactive, the District will realize cost savings and more effective stormwater management.    During the  issues  identification process, a number of future trends were  identified for  inclusion  in the plan.  All of the groups in the public involvement process identified climate change as an issue that needs to be addressed in the next ten years.  While it is unclear what the District’s role should be  in  addressing  climate  change,  it  is necessary  for  the organization  to evaluate  and  coordinate mitigation efforts.    The need to be at the forefront of emerging trends in watershed management is accentuated due to the dense urban development of the District.  The highly developed nature of the District results in  limited opportunities  to  incorporate  traditional stormwater management practices, since  these typically require large areas for implementation. Because of this limitation, it is vital that the District investigate  new,  innovative  approaches  to  stormwater  management  that  utilize  techniques appropriate to highly urbanized areas.  An example of this type of alternative practice is the use of ‘green  infrastructure’  where  vegetation  is  used  to  compliment  traditional  approaches  to stormwater  management.    The  level  of  imperviousness  of  the  District  also  makes  it  more susceptible to changes in hydrologic patterns that may arise in the future.    Future Trends Issues and Goals

Issue 9    Future  watershed  management  strategies  need  to  be  responsive  to emerging issues resulting from climate change and technological advances 

 Goal 9.1  Develop  a  better  understanding  of  climate  change,  its  impacts  to  District 

natural and water resources and adaptive management strategies to address this emerging issue

 9.1.a  Participate in climate change working groups/forums  

 9.1.b  Determine  the  District’s  strategies  in  addressing  climate  change 

impacts on watershed management  

Goal 9.2         Be a  leader  in conducting original research and reviewing existing research on new stormwater management technologies to facilitate decision making by the District and its partners 

Page 59: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  28

 9.2.a    The  District  will  evaluate  innovative  stormwater  management 

techniques,  information management  techniques, and monitoring and  modeling  techniques  used  locally,  nationally,  and internationally 

 9.2.b    The  District  will  conduct  research  on  stormwater  management 

BMP performance, applicability in different settings, and long‐term maintenance needs.   

  Goal 9.3  Promote  the  use  of  emerging  technologies  and  innovative  watershed 

management techniques   

9.3.a    Promote Green Infrastructure initiatives.  9.3.b    Determine  optimal  balance  of  incentive‐based  strategies  and 

regulatory‐based watershed management strategies   

Page 60: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  29

Funding and Organization, Issues and Goals   The  District  takes  its  financial  responsibility  seriously,  is sensitive  to  the  economic  status  of  its  residents,  and  is mindful of the  importance of maintaining public support  for expenditures  on  water  quality  improvement.    The  District levies  taxes  through  its authority under MN Stat. 103D and 103B  to  fund  programs,  projects,  and  capital  improvement projects  identified  in  its watershed management plan.   The District  has  also  issued  bonds  and  actively  pursues  outside funding  sources  to  augment  its  tax  levy.    The  District  has been  successful  in  obtaining  grants  from  the  State  and securing local cost‐share funding from its partners.  The District seeks to create funding partnerships with Ramsey County, municipalities, agencies, and other  entities  within  its  jurisdiction  that  have  common  goals  and  responsibilities  for  resource protection.  These  partnerships  result  in  greater  cost  effectiveness  and  provide  the  additional benefit of creating ownership of the resources by a broader constituent base.   

 The District has  created  several grant programs  to make  funds available  to District partners and residents.   The grant programs promote  local projects  that benefit water  resources and  serve as models for District residents.  Beyond discussions of the importance of District grant programs, the most prevalent theme heard during the issues identification process was the need for coordination between the District and its partners.    The  District was  encouraged  to  take  a  leadership  role  in  identifying  opportunities  to collaborate on large scale redevelopment projects as well as programmatic approaches to resource protection.    The  district  recognizes  the  impact  of  large  scale  redevelopment  projects  extends beyond the boundary of the project and intends to identify and capitalize on opportunities adjacent to  these  projects.    Another  common  theme  of  the  comments  from  participants  in  the  issue identification process was the need to prioritize District activities to maximize resource protection while minimizing the cost to residents.  Funding and Organization Issues and Goals

Issue 10    Many  District  partners  and  residents  are  willing  to  help  the  District accomplish its mission if assistance is made available     

 Goal 10.1  Encourage District partners and residents to implement local water resource 

improvement projects  

10.1.a  Provide  financial and  technical assistance  for  resource protection projects and efforts by District residents and partners 

Issue 11    The  District  is  uniquely  positioned  to  be  able  to  identify  and  support collaborations  between  various  partners/stakeholders  with  compatible projects and programs 

 

Page 61: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  30

Goal 11.1  Coordinate efforts with partners  to ensure  the most  cost effective uses of funds for water resource management  

 

11.1.a  Coordinate  the  water  resource  management  efforts  that  the District and its partners are currently undertaking 

 

11.1.b  Identify opportunities to  incorporate water resource management efforts  into  capital  improvement  projects  and  large  scale redevelopment projects of District partners  

 

11.1.c  Provide support to District partners for activities with a connection to water resources 

 

11.1.d  Maintain active membership  in  the Ramsey County Groundwater Partnership  

 

Issue 12    Multiple funding mechanisms and outside funding sources are available for the District to pursue to offset financial needs  

 

Goal 12.1  Increase the funds available to the District to meet its goals and objectives  

12.1.a  Identify new and supplemental funding sources  

12.1.b  Evaluate  the  optimal  balance  of  financing  options  or  revenue sources  

 

 Issue 13    The District must prioritize programs and projects to ensure that goals are met in the most efficient, and cost effective manner  

 

Goal 13.1  Utilizes  long‐term  planning  and  pursue  the most  cost  effective  solutions when carrying out resource protection programs and projects 

 

13.1.a  Evaluate  the  results  and  costs  for  programs  and  projects  to demonstrate their effectiveness 

 

13.1.b  Consider  initial   and  life‐cycle costs associated with programs and projects when evaluating their effectiveness 

 

Issue 14    An effective watershed organization needs to plan for change, growth, and development 

  Goal 14.1  Strengthen the District’s capacity to accomplish its mission   

Goal 14.2  Strive  for  excellence,  with  competent,  knowledgeable,  committed,  and innovative Board members, advisory committees, and staff 

 

Goal 14.3  Provide research‐based, informed, mission‐driven decision making  Goal 14.4  Be  an  open,  approachable,  facilitator  of  partnerships  to  enhance  the 

District’s capacity to protect, maintain and improve water resources  

Page 62: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  31

Regulations and Enforcement, Issues and Goals  The District has the authority to develop and adopt Rules to protect  water  resources.  The  District  currently  regulates development  and  redevelopment  projects.    Rules  and regulations were established  to ensure  that water  resource management  standards  are  met  and  that  the  water resources  in  the District are protected as development and redevelopment  occurs.    The  District  currently  implements rules  adopted  in  September  2006  and  revised  in  January 2009.    In  addition  to water  quality  and  quantity,  the  rules establish  standards  for  erosion  and  sediment  control, wetland  protection,  connections  to  the  Trout  Brook  Storm Sewer  Interceptor,  and  floodplain  management.    District Rules  and  permitting  currently  require  proper  stormwater management  on  all  development  and  redevelopment projects that disturb one acre or greater of land.    The District reviews it rules and permitting program regularly with the District’s Technical Advisory Committee (TAC).  During this process, the District’s Rules are reviewed to assure they are effective, reasonable and implemented as efficiently as possible.   The District will demonstrate a willingness to look at alternatives in order to make the Rules as workable as possible.    The public involvement process identified the need for improved Rule compliance, and inspections.  Additionally it was noted that the District needs to maintain clear and efficient rules by utilizing the most  current  research  and  science.  The  need  to  efficiently  coordinate  regulatory  requirements, specifically those of the NPDES MS4 program, was identified as an area where the District should be the lead agency.   Regulations and Enforcement Issues and Goals

 

Issue 15    The District needs to maintain clear and effective Rules utilizing the most current research and science available   

 Goal 15.1  Ensure  that  the  rules  are  regularly  reviewed,  updated  and  readily 

understood by the regulated community.   

15.1.a  Ensure effective Rules in meeting the District’s goals while allowing some flexibility  

 Issue 16   Coordination  with  District  partners  on  regulatory  issues  is  needed  for  more 

efficient and effective stormwater regulation across all jurisdictions      Goal 16.1  Work  with  District  partners  to  improve  the  District  Rules  and  other 

municipal/agency stormwater ordinances  

16.1.a  Work with District  partners  to make  ordinances  compatible with stormwater management goals and objectives  

Page 63: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  32

 16.1.b  Work with District partners to coordinate permit applications early 

in the design stage   

16.1.c  Work with District partners to achieve volume reduction on small sites  (disturbing  less  than  one  acre)  through  District  Rules  or municipal ordinances  

 Goal 16.2  Collaborate  with  partners  to  ensure  that  proper  BMP  construction,  and 

erosion and sediment control techniques are being implemented throughout the District  

 16.2.a  Ensure  that  effective  routine  inspections  are  conducted  on  all 

construction in the District   

16.2.b  Ensure  that  appropriate  long‐term  maintenance  is  being performed on stormwater management practices in the District  

 Goal 16.3  Continue  to work with  surrounding watershed management  organizations 

and  state  agencies  to  develop  rule  language  that maximizes  effectiveness while  ensuring  their  consistency  and  ease  of  use  throughout  the region/metro area.  

 16.3.a  Compare  District  Rule  language  with  that  of  surrounding 

watershed  management  organizations  to  identify  consistencies and inconsistencies 

 16.3.b  Evaluate the  feasibility of addressing  inconsistencies  in watershed 

management organization rules  in consultation with the Technical Advisory Committee (TAC) 

 Goal 16.4  Comply with applicable local, state, and federal watershed regulations 

 16.4.a    Comply with the provisions of the District MS4 permit.   

 16.4.b    Collaborate with all permitted MS4s within with District on TMDL 

load reduction efforts   

Page 64: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  33

Ecosystem Health, Issues and Goals  It  is the primary focus of the District to protect and  improve water  quality,  but  the  health  of  the  overall  ecosystem  has been  recognized as a complimentary  issue.   There are ways of managing stormwater runoff that have secondary benefits of  promoting  healthy  and  viable  natural  ecosystems. Additional partners and collaborations can be  identified and utilized when  considering  an  ecosystem  approach  to water resource management.    This  help  to  ensure  the  ecological integrity  of  District  natural  resources  are  protected  and improved in conjunction with water resource improvement.    A  consistent  message  heard  throughout  the  issues  identification  process  was  the  need  for ecological restoration within the watershed to correct mistakes from the past.  Stakeholders in this highly urbanized area recognize that the majority of natural areas have been paved or built upon. Streams that once flowed across the watershed down to the Mississippi River have been converted to large, underground storm pipes.  Wetlands and even some smaller lakes in the area were filled in for development.    Many of the remaining natural areas in the District have become significantly degraded over time.  The areas consist primarily of non‐native or  invasive species and  lack the ecological  integrity they once displayed.  This degradation has reduced the effectiveness of remaining natural areas’ ability to protect and buffer District water resources.  Comments  received  from District  stakeholders  ranged  in  specificity  from  identifying  the need  to develop  regional  ecological  greenways  throughout  the metropolitan  area,  to  the  restoration  of historic resources (Bring Water Back to St. Paul), to encouraging native plantings and restoring plant communities at specific locations within the District.   Ecosystem Health Issues and Goals

 

Issue 17    The  ecological  integrity  of  many  District  lakes,  wetlands,  and  the Mississippi  River  has  degraded  to  a  point where  the  resources  are  not providing their original level of function or value  

 Goal 17.1  Improve  the  ecological  integrity  of  District  lakes,  wetlands,  and  the 

Mississippi River  

17.1.a  Restore  native  plant  communities  and  increase wildlife  diversity and  habitat  in  and  around  District  lakes,  wetlands,  and  the Mississippi River 

Page 65: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan — 9/1/2010  34

 Issue 18    The  loss  of  natural  areas  has  decreased  the  ability  of  the watershed  to 

capture, filter and infiltrate rainwater prior to discharging to District lakes, wetlands, and the Mississippi River  

 Goal 18.1  Support  increasing  the  amount  and  quality  of  open  space  as  a means  to 

restore habitat, and protect surface water and groundwater quality   

Goal 18.2  Mitigate the loss of pervious areas by incorporating green infrastructure into the built environment of the District    

 Issue 19    Reduced  connectivity  of  natural  habitat  areas  in  the  District  limit 

movement between the District’s resources    Goal 19.1  Coordinate with District partners to  improve accessibility to and movement 

between natural habitat areas within the District  

19.1.a  Support the creation of travel corridors between natural areas for wildlife 

 19.1.b  Support the creation of access points for people to better connect 

with the water resource of the District  

Issue 20    The  land  within  the  District  developed  during  a  time  when  resource protection  was  not  a  priority.   As  a  result,  there  are  a  number  of opportunities to restore historic resources 

 Goal 20.1   “Bring water back to St. Paul”  

 20.1.a   Increase awareness of current and historical water resources of the 

District  

20.1.b  Identify and restore historic wetland resources of the District  

20.1.c   Identify opportunities to restore portions of historic streams of the District  by  providing  surface  flow  where  water  is  currently conveyed through an underground pipe 

  

Page 66: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

IMPLEMENTATION PLAN

Page 67: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people
Page 68: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  35

Implementation Plan  Introduction The  implementation  section  of  the  District’s  Plan  includes  programs,  projects,  and  capital improvements.    The  implementation  plan  identifies  the  specific  projects,  studies,  and  other activities necessary  to  implement District  goals  and policies.   This  implementation plan  identifies initiatives  that were suggested during  the public  involvement process. The  initiatives contained  in the  implementation  plan  seek  to  protect  and  improve  District water  resources.  Inclusion  of  an initiative  in  the  implementation  plan  is  a  statement  of  intent  by  the District.  Final  decisions  on implementation  rest with  future decisions by  the District’s Board of Managers  to budget  for and authorize  the  initiative.    In most  cases,  implementation may  require  further  action  and/or  the approval and participation of other parties.   The District will regularly evaluate the water resource needs within the watershed and make appropriate changes in priorities during the 10‐year term of the Plan.  Important Water Resources: • Mississippi River • Como Lake • Lake McCarrons • Loeb Lake 

• Crosby Lake • Trout Brook Storm Sewer • Historic Streams • Wetlands

• Groundwater • Springs  

 The District  commits  to  regular  assessment  of  its  programs, projects,  and  capital  improvements.  The District intends to engage the Technical and Citizens’ Advisory Committees in periodic (at least annually) review of  its work program and progress towards  implementing this Plan.  In response to feedback, the District will, if necessary, revise the implementation plan through public input and the required watershed management plan amendment process.  The District is committed to providing clear  communications  and  documentation  of  implementation  of  this  Plan  to  allow  for  objective evaluation of implementation success.    Similarly, over  the 10‐year period of the Plan, as  information becomes available, priorities evolve, new concerns emerge, or new technical approaches are developed, the District will likely adapt the implementation plan to reflect this new information.  The listing of initiatives in the implementation plan  is  not  intended  to  exclude  other  initiatives  consistent  with  the  issues,  goals,  and  policies identified in the Plan. If the new activity is widely different in scope or cost from that detailed in the implementation plan, the District would be required to amend the Plan.    If not, the District would proceed with a new initiative under the existing Plan. 

Page 69: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  36

Management Areas The  District  uses  a watershed  framework  to  implement  its management  activities. Watersheds draining to primary District water resources are evaluated and potential management activities are developed.  In many cases, as with Como Lake and Lake McCarrons, this approach has been further refined by evaluating  the  individual  subwatersheds draining  to each  lake.    The major watershed planning areas that are used by the District and form the framework for the  implementation plan are:  Como  Lake  Watershed,  Lake  McCarrons  Watershed,  Loeb  Lake  Watershed,  Trout  Brook Watershed, Crosby Lake Watershed, and Mississippi River Subwatersheds.  (See Figure 9)  It should be noted that the Como, McCarrons, and Loeb Watersheds are subwatersheds to the Trout Brook Watershed. Also, the Mississippi River Watershed is made up of several watersheds that at a future date may be subdelineated for further evaluation, planning, and implementation purposes.   

Figure 9.  Watershed Planning and Implementation Areas 

  

Page 70: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  37

Implementation Plan Structure In order to maintain consistency and strengthen the link between the implementation plan and the annual budgeting process,  the  structure of  the  implementation plan was based on  the District’s 2009 Annual Budget format.  Accordingly, activities were organized into four main categories: • Administration (100 series) • Programs (200 series) 

• Projects (300 series) • CIPs (Capital Improvement Projects) (400 series)  

 

The Administration and Program categories consist of the general operation of the District and are generally  carried  out  by  District  staff.    The  Projects  category  (300  series)  generally  consists  of feasibility  studies  and plans, while  the CIPs  category  (400  series)  is  solely  construction  activities.  Within each category are activity areas  identified with a 3‐digit code and a  title. Finally,  the most specific  level  of  the  implementation  plan  structure  is  the  implementation  initiatives  that  were determined  following  an  extensive  public  input  and  review  process.    A  summary  of  the implementation plan structure is summarized as follows: 

 

• Implementation Categories – Ex., Programs (200s), Projects (300s) o Implementation Activities – Ex., Permitting (208),Como Lake Subwatershed (305) 

� Implementation Initiatives – Ex., 208B Web Based Permit Tracking Tool Implementation Plan Organization – The Major Categories and Activities: 

Code  ADMINISTRATION  Page 

101  Administration  41 Code  PROGRAMS  Page 201  Groundwater Protection   43 207  Rulemaking/Rule Revisions  45 208  Permitting  47 210  Stewardship Grant  49 211  Monitoring and Data Assessment  52 220  Education and Outreach  55 225  Technical Resources and Information Sharing  59 228  Future Trends: Research and Positioning  64 230  GIS – Geographic Information System  67 240  Safety Program  69 Code  PROJECTS  Page 301  Shoreline Streambank Maintenance  70 305  Como Lake Subwatershed  72 313  Lake McCarrons Subwatershed  75 315  Loeb Lake Subwatershed  77 317  Crosby Lake Subwatershed  79 320  Trout Brook Subwatershed  80 325  Wetland, Stream, and Ecosystem Restoration – Planning (includes Trout Brook)  83 330  Mississippi River Subwatersheds  89 370  Watershed Management Planning  92 390  Special Projects and Grants  93 Code  CAPITAL IMPROVEMENT PROJECTS  Page 401  Shoreline and Streambank Restoration  94 405  Como Lake Subwatershed BMPs  96 413  Lake McCarrons Subwatershed BMPs  99 415  Loeb Lake Subwatershed BMPs  101 417  Crosby Lake Subwatershed BMPs  102 420  Trout Brook Subwatershed BMPs  103 425  Wetland, Stream, and Ecosystem Restoration – Implementation   105 430  Mississippi River Subwatersheds BMPs  107 435  Stormwater Impact Fund Implementation  108 440  Special Projects and Grants  109 450  Future Trends: Implementation  111 490  Debt Service  112 

Page 71: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  38

Information  regarding  the  anticipated  initiatives,  partners,  and  costs  involved  for  each  of  the implementation activities is presented in the implementation plan table and in narrative sections for each activity area. 

Implementation Plan Table The implementation plan table provides a summary of key information about each implementation initiative  including  cost  estimates,  scheduling,  specific  issues  and  goals  to  which  each implementation  initiative addresses, potential partners, and  level of  financial commitment by  the District.   Where  applicable,  implementation  initiatives  and  their  associated  cost  estimates were taken from previous studies.  In other cases, the indicated costs are a planning‐level estimate based on current understanding of the scope of the  initiative.    In general, the table provides a planning‐level projection that can be used as a guide or starting point for the more detailed annual budgeting process.   The  implementation plan  table  includes a general  timeline, of how  the  implementation  initiatives could be  implemented over  the 10 years of  the Plan.   Priority  initiatives are slated  to occur early (years  1‐3), middle  (years  4‐6),  and/or  late  (years  7‐10)  in  the  10‐year  period  of  the  Plan.   Cost estimates are shown as either a one time cost (typical of feasibility studies and capital improvement projects) or as annual costs  in  the case of on‐going programs.   An annual  inflation rate of 3% has been applied  to account  for  the expected  increase  in costs  for  initiatives which occur  later  in  the schedule.   All projects  in the Watershed Management Plan (including any  in future amendments) will not be implemented without landowner (including City) approval and a formal agreement.  

District Financing Approach This section of the Plan describes financing options, including tax levy and other sources of revenue, the District intends to utilize when implementing the Plan.  The District will seek funding for District programs,  projects,  and  capital  improvement  projects  through  grants  and  outside  cost‐share funding.   Where  known  cost‐share opportunities are  lacking, partnerships may be developed  for cost and workload sharing.  Costs and responsibility will be shared with partners whenever possible. 

 In the Twin Cities metropolitan area, watershed districts have the authority to  levy an ad valorem tax (a tax on all taxable parcels in the District that is based on property value) to pay for the costs of implementing  their watershed management plan.   These  authorities are granted  in MN  Statutes 103B and 103D.   These costs  include the District’s administration, programs, projects, and capital improvement projects.   The District  legal boundary defines the area of  land that comes under the District’s jurisdiction, and the area upon which the ad valorem tax is applied.  The District will keep the District’s legal boundary as accurate as possible, closely matching it to the hydrologic boundary, so that the land that drains to District water resources is captured within the legal boundary.  The legal boundary must follow property boundaries or other legally definable boundaries (e.g., roads), and a  single property  cannot be  in more  than one watershed district.   This means  there  can be differences between  the  legal boundary  and  the hydrologic boundary.    The District  also has  the authority to finance large capital projects by selling bonds or securing loans. 

Page 72: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  39

 The District will fund its implementation program using four primary sources of revenue: 

1. Property tax levy 2. Grant funds 3. Local partner cost‐sharing funding 4. Bonds and Loans 

 

The District’s financing approach for operations (administration, programs, and projects) will be to fund  the  costs primarily  through  the annual  levy, however,  typically 5%  is  raised  through grants, fees,  interest  income,  and  local  cost‐share  funding.    The  financing  approach  for  capital improvement projects is planned to be 25% through the annual levy and 75% through grants, loans, and  bond  proceeds.    Small  capital  improvement  projects  (less  than  $250,000) will  be  financed through  the annual  levy.    Larger projects will have  the  costs  spread  to  the  long‐term benefitting parties  through  financing  via  bonds  and  loans.    The  District  will  seek  local  partner  cost‐share funding for capital improvement projects of all sizes to off‐set the District’s contributions.  Current and past bond issues, loans and grants and their original amounts are listed below.  

Current and Past Bond Issues, Loans and Grants 

Project Finance Type 

Year  Amount  Note 

Como Lake Strategic Management Plan 

Grant  2000  $80,000 BWSR‐‐Local Water Management Challenge Grant 

Arlington Pascal Stormwater Improvement Project 

Grant  2005  $75,000 BWSR‐‐Local Water Management Challenge Grant 

Arlington Pascal Stormwater Improvement Project 

Grant  2006  $54,000  MPCA‐‐Clean Water Legacy Grant 

Arlington Pascal Stormwater Improvement Project 

Bonds  2007  $1,550,000  District Bond Issue 

Green Infrastructure Practices in the CCLRT Project 

Grant  2010  $665,000  BWSR‐‐Clean Water Program 

Villa Park Wetland Improvement Project 

Loan  2010  $430,000  MPCA‐‐Clean Water Partnership 

Crosby Lake Management Plan  Grant  2010  $50,000  MPCA‐‐Clean Water Partnership  

Grants and  loans will  likely remain a small  (5%) percentage of the District’s  funding sources.   The District will continue  to apply  for grants and  loans  to offset project costs whenever possible and cost effective.  However, grant and loan programs change frequently as existing grant/loan amounts and priorities change, new grant and loans become available, and existing programs are terminated. The District will also seek partnerships, or cost‐sharing, to distribute a portion of project costs to all the benefitting organizations.  

To  implement  the  projects,  programs,  and  capital  improvements  during  the  10‐year  life  of  the WMP, the District’s annual levy will increase from a 2010 amount of $1.7 million to approximately $3.8 million.   This will  result  in a property  tax  rate change  from 0.76%  in 2010  to approximately 1.65%  by  the  end  of  the  plan  period.    This  equates  to  an  increase  from  $7.60  per  $100,000  of property value in 2010 to approximately $19 per $100,000 of property value by 2020.  This increase is  the  result  of  the District  evolving  into  a more mature  organization  and will  allow  for  the  full implementation of the initiatives contained within the WMP.    

At  this  time,  the District  does  not  intend  to  ask  Ramsey  County  to  use  their  taxing  or  bonding authority  to  fund District  capital projects  contained  in  this Plan.   However,  if District  revises  this Plan to make such a request to Ramsey County, the District will follow appropriate policies set by Ramsey County for the request. 

Page 73: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan —9/1/2010  40

 

Page 74: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  41 

101 – Administration Description and Purpose of Activity Provide  overall  administrative  services,  manage  employees and oversee consultant services.  Support all District activities and programs  such as planning and design,  Lake McCarrons Improvements and Como Lake Improvements, the monitoring program,  education  and  grant  programs,  permitting,  and management  of  existing  stormwater  facilities  including  the Trout Brook Storm Sewer Interceptor.   Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Program Initiatives  $387  $398  $410  $423  $435  $2,380  $4,434 

Planned Initiatives B. Clean Water Legacy & Other Funding 

Opportunities ‐  ‐  ‐  ‐  ‐  $109  $109 

C. Program Effectiveness Audit  $3  $3  $3  $3  $3  $16  $30 

D. Annually complete BWSR’s PRAP and achieve the high performance standards 

$3  $3  $3  $3  $3  $16  $30 

Total for 101‐ Administration  $393  $404  $416  $429  $441  $2,521  $4,603 

  Amounts are expressed in thousands of dollars 

Objectives The  Administration  program  objectives  include  effectively  administering,  coordinating,  and evaluating  all  operating  programs,  services,  and  facilities  provided  by  the District  and  providing financial management of the District.  This program will also provide overall management of District operations, construction, maintenance, and monitoring and will oversee the review and update of the District work plan and goals.  

Program Initiatives A. Administration initiatives include ongoing activities that recur annually to satisfy Minnesota 

Rules for watershed districts and those that pertain to the organization, administration and coordination  of  programs,  services  and  facilities  provided  by  the  District.  Administration initiatives also include organization and coordination of the Citizen Advisory Committee and its activities.  A complete list of program initiatives is provided below. 

 • 2010 Budget and Levy • Annual Audit • Debt Service Requirements • Citizen Advisory Committee (CAC) 

• Annual Report • Manage and Evaluate Staff  • Lease 

 

Page 75: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  42 

Explanation of Planned Initiatives B. Clean Water Legacy and Other Funding Opportunities   

Pursue grant  funding opportunities  such as Clean Water  Legacy  funding.   Develop a grant cycle calendar  to keep abreast of  funding cycles.   Continually assess agency priorities, and develop competitive proposals.   

                                                                                C. Program Effectiveness Audit  

Develop protocols for and perform cost/benefit evaluations of District programs and projects at  least  every  5  years.  Protocols will  include  industry  accepted  indices  and  benchmarks.  Programs  and  projects will  be  evaluated  and  described  in  terms  of  their  benefit  to  the District and their potential to improve or protect water quality. 

                                                        D. Annually complete BWSR’s Performance Review and Assistance Program (PRAP) 

and Achieve the High Performance Standards  

Achieve and maintain the PRAP high performance standards. Develop and annually conduct an objective performance evaluation of District programs and projects to be included in the District’s annual report.   

Page 76: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  43 

 

201 – Groundwater Protection

Description and Purpose of Activity In  the metro area all cities use deep groundwater  resources for  some  or  all  of  their  drinking  water.    Protecting groundwater quality is necessary to protect public health. Soil contamination  and migration  of  pollutants  through  the  soil profile  can  result  in  groundwater  contamination.    Unused wells  that have not been properly  sealed  are  also potential sources of groundwater contamination and can act as direct pathways  to  the  groundwater,  making  groundwater vulnerable to pollutant contamination.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Program Initiatives  $20  $20  $21  $22  $22  $121  $226 

Planned Initiatives 

B.  Groundwater Studies  ‐  ‐  ‐  $28  $29  $158  $216 

C.  Local Groundwater Protection Initiatives  $26  $27  $27  $28  $29  $158  $295 

Total for 201‐ Groundwater Protection  $46  $47  $48  $78  $80  $437  $737 

Amounts are expressed in thousands of dollars 

Objectives Groundwater  is best protected by  identifying potential  sources of  contamination  and developing methods  and  protocols  to  limit  their  impact.    A  planned  initiative  includes  a  District‐wide groundwater/soil  contamination  assessment  to  identify  problem  areas,  potential  sources,  and ultimately  provide  guidance  for  future  groundwater  protection  efforts.  Collaboration with  local, regional, and state agencies on groundwater protection efforts will be a priority of the District.  Program Initiatives A.    Groundwater and well sealing initiatives that were begun prior to this Plan will continue. The 

well sealing cost share program will continue to be implemented throughout the term of this plan. A complete list of program initiatives is provided below. 

  

• Well Sealing Cost Share • Cleveland/Randolph Groundwater Study

Page 77: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  44 

Explanation of Planned Initiatives B.  Groundwater Studies  

The District will be an advocate for the completion of a Ramsey County Groundwater Plan.  The  District will  complete  a  surficial  groundwater  and  soil  contamination  assessment  to better inform stormwater management decision making. The assessment will document the existing  sources  of  contamination  and  contaminate  treatment  effort  (i.e.  pumping).    A groundwater monitoring plan will be developed and  implemented as part of this  initiative, which  would  measure  if,  how,  and  where  contamination  is  entering  District  resources.  Contamination plumes will be mapped and  the  interaction with  storm  sewer conveyances would  be  examined.    Findings  from  local  groundwater  protection  planing  initiatives may augment the Districts surficial groundwater and soil contamination assessment.  The District will work with appropriate agencies to assess the quantity and quality of the aquifer  in the District.   The District will stay  informed about research that examines the replenishment of groundwater in urban areas.  

 C.  Local Groundwater Protection Initiatives  

Implement initiatives for watershed districts as identified in regional and local groundwater protection planning efforts.   

Page 78: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  45 

207 – Rulemaking-Rule Revisions

Description and Purpose of Activity State  statute  103D  provides  for  and  requires  watershed districts  to  adopt  Rules.    In  2005‐2006,  the District  drafted and  adopted  Rules  that  apply  to  stormwater management, floodplains,  wetlands,  erosion  &  sediment  control,  and connection  to  Trout  Brook  Storm  Sewer  Interceptor.  As development  and  redevelopment  occur,  it  is  important  to incorporate  stormwater  management  facilities  into  site designs.  As  new  science  identifies  more  efficient  and/or necessary  volume  control,  water  quality  treatment,  or erosion & sediment control approaches, District rules will be reviewed and revised.   Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Program Initiatives  $12  $13  $13  $14  $14  $76  $142 

Planned Initiatives 

B. Rule Comparison/Review with Other WMOs  $15  $16  $16  ‐  ‐  ‐  $48 

C. Evaluate Green Regulatory Framework  $5  $5  $5  ‐  ‐  ‐  $16 

Total for 207‐Rulemaking  $32  $34  $34  $14  $14  $76  $206 

Amounts are expressed in thousands of dollars 

Objectives As the District regularly reviews and maintains  its Rules,  it strives to conduct research and uphold environmentally sound development and redevelopment standards.  During the period of this plan, the District will  consider green  infrastructure  initiatives as part of  its  regulatory  framework.   The District  will  also  consider  how  existing  Rules  compare  to  other  watershed  management organizations, and will explore opportunities to apply standards to existing sites.  Program Initiatives A.    The District regularly reviews its Rules with support from the Technical Advisory Committee 

(TAC) to satisfy both the spirit and letter of State statute 103D, described above. The District strives  to  implement  progressive  Rules  that  are  effective,  practical  and  economically reasonable.  The  District works with  adjacent watershed  districts  to  ensure  protection  of water  resources,  including  groundwater,  and  to  encourage  practices  that  promote  clean water.   The program  initiatives of  the District  include  regular evaluation and discussion of the  Rules with  the  District  TAC,  including  assessment  of  barriers  and  benefits  of  various implementation approaches.  The District will regularly review all of its rules, specifically the wetland management  rule  to consider  incorporating  the  recommendations of  the wetland management  plan.    The  District  intends  to  review  all  the  options  for  wetland  rule amendments in 2011.  See Appendix F for the District Wetland Management Plan.  

 

Page 79: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  46 

Explanation of Planned Initiatives B.  Rule Comparison/Review with Other WMOs  

Compare  the  District’s  Rules  with  those  of  surrounding WMOs  in  an  effort  to  improve consistency of  language and  format.   Research water management organization  rules and regulations, nationally, in order to gain a clearer understanding of the state of the practice.  Suggested modifications will  be  addressed with  the  Technical  Advisory  Committee  (TAC), Metro MAWD, and/or a  joint WMO group.   The regular  review and comparison of District Rules  to  standards  from  across  the  nation will  allow  the District  and  adjacent WMOs  to ensure that Rules do not unreasonably deter appropriate development and redevelopment and create regional understanding of straightforward regulations.  

 C.  Evaluate Green Regulatory Framework  

Green infrastructure initiatives such as LEED and State of MN B3 have gained acceptance in the  last decade as effective  incentives  for environmentally protective design.   The District will review these and other green  infrastructure  initiatives  in relation to, how, and to what extent  these  initiatives  relate  to  stormwater  and  how  they  could  be  incorporated  in  an updated regulatory framework.   Findings may lead to recommendations for Rule updates or the development of funding  incentives apart from the Rules process. The District will share information with  its partner agencies and will evaluate how  the permit program  could be used  to  encourage  or  require  the  increased  use  of  green/vegetated  stormwater infrastructure.  

  

Page 80: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  47 

208 – Permitting

Description and Purpose of Activity The  District  establishment  Order  stated,  “The  Board  of Managers  of  the  Capitol  Region Watershed  District  should highly consider  to: … set  target pollutant  loads and  improve the water quality of Lakes Como and McCarrons and require erosion  control  for  development  and  redevelopment.”  The District  initiated  a  rulemaking process  in  2005  and  adopted rules in 2006.  The permitting program enforces the Rules and is  essential  to  the  protection  of  District  water  resources.  Issuing  permits  provides  a mechanism  for  requiring  proper stormwater management and the authority for requiring BMP maintenance.     

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Program Initiatives  $132  $135  $140  $144  $148  $810  $1,508 

Planned Initiatives 

B. Web Based Permit Tracking Tool  $10  $11  $11  $6  $6  $32  $75 

C. Provide District Industrial Permittees Technical Assistance 

$9  $10  $10  $6  $6  $32  $72 

Total for 208‐ Permitting  $151  $156  $161  $156  $160  $874  $1,655 

Amounts are expressed in thousands of dollars  

Objectives Initiatives  that  will  support  the  permitting  program  in  the  next  10  years  include  a  web‐based tracking  tool  that will  automate  some  administrative  elements  of  the  process.    The District will coordinate with  its partners to develop a  joint BMP  inspection and maintenance program and will provide  inspection  support  for  partners.    Efficient  stormwater  regulation  and  maintaining progressive Rules are key areas of concern for regulation and enforcement identified in the District issues identification process.  The following initiatives are intended to address these issues.  Program Initiatives A. Continued  efficient  and equitable  implementation of  the permitting program depends on 

evaluation  and  discussion  of  revisions  to  adopted  rules,  evaluation  of  administrative processes  associated with  permitting,  and  gathering  and  dissemination  of  useful  findings gleaned  from  implementing  the  permitting  program  itself.  A  complete  list  of  program initiatives is provided following this page. 

 

Page 81: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  48 

• Implement Permitting Program • Evaluate dollar amounts for fees, etc. • Electronic permit/fee tracking system • Assess compliance rates •  Monitor effectiveness of filtration BMPs 

 

• Assist all applicants with permits and provide guidance and suggests to meet District requirements 

• Explore correlations between monitoring and permitted sites 

• Permit closeout inspection process  

Explanation of Planned Initiatives B. Web Based Permit Tracking Tool  

The District will  build  a web  based  permit  tracking  tool  to  increase  the  efficiency  of  the permitting process.  The tool will identify sites in the District that apply for permits and will be designed  to automate  inspection  reports and violation notifications.   The  tool will also give the District and its partners shared access to inspection information.  

 C. Provide Technical Assistance to Industrial Permittees within the District   

During  years  one  through  three  of  this  Plan,  the  District  will  study  its  role  in  the implementation  of  the  new  MPCA  Industrial  Stormwater  Multi‐Sector  General  Permit (Industrial Permit) in anticipation of an expanding number of industrial sites triggered by it.  The study will identify how the District can provide technical assistance to new permittees as they develop appropriate stormwater management practices for their  industry sector.   The District will  also  consider  expanding  its  role  in  the  Industrial  Permit  process  in  order  to promote  educational  information  about  stormwater  management  and  applications  that exceed  requirements  and  provide  greater  benefits  to  District  resources.    Based  on  the findings  and  recommendations  of  the  District  regarding  roles  and  opportunities  in  the Industrial  Permit  process,  the District will  implement  the  recommended  initiatives  during years four through ten of the plan. 

 

        

Page 82: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  49 

210 – Stewardship Grants

Description and Purpose of Activity The District values and encourages  the efforts of  individuals and  organizations  to  participate  in  its  mission  to  protect, manage, and improve the water resources within the District.  To  further  this  goal,  the  District  created  the  Stewardship Grants Program in 2001.  The program is designed to provide financial  grants  and  technical  assistance  for  residential, business, and non‐profit Best Management Practices  (BMPs) and  education/outreach  activities  that  encourage  the protection, enhancement, and improvement of water quality within the District.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Totals 

A. Program Initiatives  $105  $108  $111  $115  $118  $646  $1,203 

Planned Initiatives 

B. Actively Promote Grant Projects as Demonstration Sites 

$5  $5  $5  $6  $6  $32  $58 

C. Evaluate Grant Distribution and Target Areas  $3  $3  $3  $1  $1  $6  $17 

Total for 210‐Stewardship Grant  $113  $116  $119  $122  $125  $684  $1,278 

Amounts are expressed in thousands of dollars  

Objectives The Stewardship Grants Program is designed to support projects that improve water quality, reduce stormwater  runoff,  or  educate  individuals  about  water  quality  protection.    The  promotion  and distribution of  stewardship grants provides  incentive  for  individuals and organizations  to become stewards of their water resources through projects or activities that will help improve water quality.  Previous  projects  funded  by  Stewardship  Grants  include:  raingardens;  rain  barrels;  green  roofs; pervious pavement; soil erosion control; shoreline  restoration; native habitat  restoration adjacent to waterways, ponds  and  lakes; water quality  education;  events or  festivals;  educational printed material,  video  or  posters;  efforts  that  enhance  participation  of  watershed  residents  in  CRWD activities.  Program Initiatives The Stewardship Grants Program will continue to be implemented throughout the duration of this plan.    Program  initiatives  develop  relationships  with  local  residents,  community  groups,  and program partners. Annual  inspections of  these projects  to  ensure  continued  function  and water quality benefits will be completed.    The  Stewardship  Grants  Program  is  primarily  directed  to  residential  or  small‐scale  projects  and consists of reimbursement grants up to $2,000 to property owners, schools, or community groups.  The Partner Grants Program provides funding opportunities for projects of larger scale, or projects 

Page 83: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  50 

with a number of collaborators like homeowner associations, district planning councils, or projects that involve several municipal departments with reimbursement grants up to $20,000.  The  Stewardship  and  Partner Grants  programs  aim  to  accomplish  one  or more  of  the  following goals: 

Improve  water  quality  by  decreasing  stormwater  runoff  and  increasing  stormwater infiltration; Preserve and protect plant and wildlife communities adjacent to lakes, rivers and wetlands; Develop and deliver water quality education programs; or Develop initiatives that establish links between people and water resources. 

 The following criteria will be considered in evaluating grant applications 

Will the project improve water quality? Will the project reduce stormwater runoff? Are project results measurable? Does the proposal include a reasonable budget, work plan and timeline? Is the site highly visible, or does it have a potentially high educational value? Does  the project have an educational component?  If so,  is  the audience clearly  identified and a specific outreach method described? Are local citizens involved in planning and implementing the project? Does the project involve partners with other organizations or groups? Does the proposal address long‐term project maintenance? Does the project provide water quality treatment for a large parcel of land? 

 Application materials and process are available on the Districts website. 

 A complete list of program initiatives is provided below.  

• Stewardship/Partner Grants community outreach 

• Stewardship/Partner Grants project inspection 

• Pre‐application site visits • Partnership with Ramsey    Conservation District

Page 84: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  51 

Explanation of Planned Initiatives  

B. Actively Promote Grant Projects as Demonstration Sites  

Stewardship grants projects can be used more effectively  to  teach District  residents about the  importance  of  stormwater management  and water  quality.    The District will  identify improved methods to utilize grant projects as demonstration sites. 

 C. Evaluate Grant Distribution and Target Areas  

The District will evaluate the location of previous grants and seek to balance the geographic distribution of  the grant  funds. The District will also  target areas where stewardship grant projects would have the greatest impact on District water resources.  Potiental areas will be evaluated on water quality treatment, overall environmental health, volume control, and/or public access/visibility.  The District will focus outreach efforts to these target areas. 

Page 85: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  52 

211 – Monitoring & Data Assessment

Description and Purpose of Activity Since  the  establishment  of  a  water  quality  and  quantity monitoring program  in 2004, monitoring and data collection has formed a foundation for District initiatives, programs, and standards.    The monitoring  program  allows  the District  and others  to  characterize  the  current  state  of water  resources and  identify  trends  over  time.    Ultimately,  the monitoring data will allow the District to assess achievement of its goal to improve water  quality.    In  addition, monitoring  helps  guide appropriate  selection and design of BMPs and development of  TMDLs.      Monitoring  guides  District‐wide  stormwater management  improvements  and  provides  a  mechanism  to evaluate individual BMP performance.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Totals 

A. Program Initiatives  $284  $292  $301  $310  $319  $1,747  $3,254 

Planned Initiatives 

B. 10‐Year District‐Wide Monitoring Plan  $16  $16  $18  $8  $8  $40  $96 

C. Source Assessment Monitoring  ‐  ‐  ‐  $23  $23  $75  $121 

D. Analysis, Reporting and Dissemination of Monitoring Data 

‐  ‐  ‐  $13  $14  $40  $66 

E. On‐line Monitoring Data  ‐  ‐  ‐  $6  $6  $17  $29 

Total for 211‐ Monitoring & Data Collection  $300  $308  $319  $360  $370  $1,919  $3,566 

Amounts are expressed in thousands of dollars 

Objectives With an organized, extensive monitoring program already in place, the District is well positioned to provide  guidance  on  regional  water  quality  decision  making,  develop  an  accessible  data dissemination  tool,  and  expand  the  program  to  include  citizen monitoring.      The  collected  and analyzed  data will  be  used  to make  decisions  about  future  BMPs  and  to  calibrate  the  District’s hydrologic, hydraulic, and water quality loading model (tools used to predict future conditions).  The monitoring program  is also meant to address the  issues and associated goals  identified  in the Plan including using data to identify problems, appropriate solutions, and increase the public’s ability use the data.  The District intends to continue to utilize its monitoring data to evaluate the performance of  its programs,  standards, and BMPs.   A  further description of  the Districts monitoring program including monitoring findings can be found in section 4.6 of the Land and Water Resource Inventory which is located in Appendix A.     

Page 86: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  53 

Program Initiatives A. Collecting stormwater data  is necessary  to assess achievement of water quality standards, 

evaluate BMP programs, calibrate computer models and perform  trend analysis.   Baseline data  is  needed  for  the  water  resources  of  the  District  including:  lakes,  wetlands, groundwater, and the Trout Brook Storm Sewer.  The program initiatives listed below serve as the foundation for the monitoring program. 

• Water quality monitoring stations • Villa Park monitoring • Annual Water Monitoring Report • Plan based on Annual Water Monitoring Report 

• Long term storage of monitoring data • Coordinated illicit discharge program • Lake monitoring 

• Assist St. Paul with NPDES monitoring • Wetland biological integrity monitoring 

• Loeb Lake/Willow Reserve monitoring • Monitoring quality assurance plan • BMP Monitoring • Non‐CRWD BMP Inventory 

Explanation of Planned Initiatives B. 10‐Year District‐Wide Monitoring Plan  

Develop  a  10‐year District‐wide monitoring  plan  that  establishes  the monitoring  program framework.    The monitoring  plan will  define  the  questions  that monitoring will  address, identify  measureable  objectives,  and  include  specifics  on  monitoring  sites,  parameters, methodologies,  timelines  and  direct  the District  to  other monitoring  needs  and  research.  The  plan will  document  the  field  and  lab  procedures  used  in monitoring  and  serve  as  a Quality Assurance Project Plan (QAPP). Water quality monitoring needs and goals identified in other subwatershed or lake management plans (e.g., the Loeb Lake/Willow Reserve Plan) will be incorporated into the overall monitoring plan.  The monitoring plan will also include periodic program evaluation.   Other water quality and water quantity monitoring data will be incorporated in the the plan.  (e.g. Water treatment plants, MNDNR fish and macrophyte surveys, and beach monitoring)   Finally, the plan will consider a more rigorouse anlaysis of the District’s monitoring data twice during the 10‐year term of the Watershed Management Plan.  This more detailed analysis will include statistical analysis to further document spatial, temporal, and climatic correlations between pollutant levels and other factors. 

 C. Source Assessment Monitoring  

Develop  a  program  to  systematically  assess  the  various  sources  of  pollutants within  the District by  land type.   The program will assess pollutant sources based on variables such as roof types, road surfaces, land use, age of housing, building type, and vegetative cover.  This data  could be used  to better assess  the  specific pollutant  loading by  land use  type  in  the District for comparison to nationally accepted data.   

 D. Analysis, Reporting and Dissemination of Monitoring Data  

Determine the best tools for disseminating monitoring accessible to citizens so they may use the data design, water quality/quantity assessments, current state of  the water quality, or other studies.  Audiences will be District residents including non‐english speakers, university 

Page 87: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  54 

researchers,  students, members of  the media,  and  local  government, or non‐profit water resource managers, planners, and decision‐makers.  Data will be analyzed and reported in a fashion that enables comparison to the National Stormwater Quality Database. Reports will be comparable to local/regional/national stormwater reports.   

E. Online Monitoring Data  

Publish monitoring data online in formats typically used by water resource practicioners and researchers.    An  initial  step  in  this  initiative  is  an  exploration  of  software  and  staff  time needed  to accomplish  this  initiative.   Maintenance needs  including  the updating processes and scheduling will be identified and documented. 

  

Page 88: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  55 

220 – Education & Outreach

Description and Purpose of Activity The  Education  and Outreach Program provides  those  living, working  and  recreating  in  the  District with  knowledge  and skills  required  to assure protection and  improvement of  the District’s  surface  water  and  groundwater  resources.   Watershed education has two crucial components: building awareness  lays  an  important  foundation,  and  social marketing  to effect behavior  change. CRWD will  continue to  involve multiple  stakeholders  to  implement  and  adapt the 2009 CRWD Education and Outreach Plan, which was developed  in  response  to  three  driving  forces:  public concern,  regulatory  compliance,  and  pollutant  levels  of District stormwater (based on CRWD monitoring data).     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Program Initiatives  $21  $21  $22  $23  $23  $127  $236 

Planned Initiatives 

B. (Education Plan)         Stormwater Education: Homeowners 

$62  $64  $66  $68  $70  $380  $708 

C. (Education Plan)  Stormwater Education: Municipal Staff 

$21  $21  $22  $23  $23  $127  $236 

D. (Education Plan)  Stormwater Education: Contractors 

$21  $21  $22  $23  $23  $127  $236 

E. (Education Plan) Knowledge and  Behavior Change Measurement 

$15  $16  $16  ‐  ‐  ‐  $48 

F. Water Awareness via District Infrastructure  $9  $9  $9  $6  $6  $32  $70 

G. Public Awareness and Participation  $34  $35  $36  $28  $29  $158  $322 

H. Collaboration for Diverse Group Outreach  $21  $21  $22  $23  $23  $127  $236 

I. District BMP Walking Tour Guides  ‐  ‐  0  $3  $3  $8  $14 

J. “Bring Water Back to St. Paul” Campaign  $34  $35  $36  $23  $23  $127  $279 

Total for 220‐ Education & Outreach  $238  $243  $251  $220  $223  $1,213  $2,385 

               

 Amounts are expressed in thousands of dollars 

Page 89: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  56 

Objectives The District’s Education and Outreach Plan provides  the  framework  to build basic awareness about  stormwater  runoff;  to  address  the  existence  of multiple  water  quality  problems;  to articulate the behaviors responsible for those problems; and to modify those behaviors through outreach to the community.  Objective “building blocks” used to measure and track willingness to  change  behaviors  that  protect  water  quality  including  (a)  pollutant  identification;  (b) pollutant‐generating  behavior  identification;  and  (c)  outreach  to  groups  engaging  in  those behaviors.   The District Education and Outreach Plan can be found in Appendix E.    Program Initiatives A. The program initiatives listed below are ongoing education and outreach programs.    

• Watershed evaluation (survey and focus group methodologies) 

• Media and public relations outreach • Water quality education field events for schools, student groups 

• Public water quality education field events 

• Printed material production • Collaborative education partnerships: Blue Thumb, WaterShed Partners, Clean Water Media Campaign, Eco Education 

• Baseline Stormwater Knowledge Survey  

Explanation of Planned Initiatives B. (Education Plan) Stormwater Education: Homeowners  

Increase  homeowner  understanding  of  basic watershed,  stormwater  and water  pollution concepts as defined  in  the Education Plan. Through education of homeowners  the District will 1)  increase awareness of    collective  impact on water  resources; and 2) aim  for group behavior  change. Behavior  change  can  occur when  citizens  adopt  a  sense  of  stewardship toward  local  water  resources.    Stewardship  will  be  encouraged  through  various  means including community outreach; media and public relations campaigns;  information sharing; and  education.  Community  outreach  efforts  will  include  neighborhood  engagement programs with multiple partners, a corps model with a groups of students or citizens focused on  one  pollutant  generating  behavior  in  an  area  identified  through  the  District’s  2009 watershed  evaluation.  District  efforts  will  be  multiplied  by  use  of  citizen  volunteers.  Information sharing will  include the production of printed and display materials. Education will include classroom presentation, field experiences, workshop models, and tours.  

 C. (Education Plan) Stormwater Education: Municipal Staff  

Increase  municipal  staff  understanding  of  water  quality  protection  behaviors  and technologies  as  defined  in  the  Education  Plan.  This  initiative  will  include  training oppurtunities  for  continuing  education,  tours,  and  workshops  that  contribute  to  the professional development of municipal staff.  This initiative will also seek to edcuate elected decision makers through established training programs such as Northland NEMO (Nonpoint Education for Municipal Officials) and other technical programming. 

Page 90: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  57 

 D. (Education Plan) Stormwater Education: Contractors  

Increase  contractor  understanding  of  basic  watershed,  stormwater  and  water  pollution concepts  to  be  defined  in  the  Education  Plan.  Some  contractor  outreach  efforts  are: exploring education methods and possible enforcement measures  to  increase  certification among unlicensed individuals, promoting education of consumers about hiring only licensed professionals for pesticide application, and establishing a voluntary certification program for landscape  professionals  not  covered  by  Minnesota  Department  of  Agriculture  (MDA) certifications.  This  program  will  likely  be  conducted  in  collaboration  with  an  education professional. 

 E. (Education Plan) Knowledge and Behavior Change Measurement  

Measure and evaluate the change  in knowledge and behavior as a result of education and outreach  efforts.    Effort  will  be  assesed  by  both  process  indicators  like  event  attendee numbers, and impact indicators like measurment of outcomes from pre‐ and post‐ program testing; or measurments of pollutant  loading  reduction. The actual mix of evaluation  tools will depend on timing and resources.  

 F. Water Awareness via District Infrastructure  

In  cooperation  with  partners,  identify  and  implement  methods  to  utilize  District infrastructure  to  increase  awareness  of  water  resources  and  water  management  (Art, Signage,  Interactive Exhibits).   Develop a District Art Policy and Plan  in  collaboration with District partners.  

G. Public Awareness and Participation  

Identify  and  implement  methods  to  increase  awareness  of  the  District’s  existence  and mission and increase public participation in its activities. This initiative includes use of media and  development  of  a  communication  program  that  includes  the  production  of  printed materials, display materials, project and BMP guides, and other communication products.   In order  to  increase  outreach  capacity,  the  District  will  update  its  internal  communication infrastructure by purchasing  software  to  create  and maintain  a  contact  database;  and by enhancing electronic communication capabilities. 

 H. Collaboration for Diverse Group Outreach  

Identify  and  collaborate with  other  organizations  to  diversify  the  age,  income  level,  and cultural identity of those participating in all District initiatives.       

 I. District BMP Walking Tour Guides  

The District will  create walking  tours  of District  BMPs  that  can  be  downloaded  from  the District website  and  used  to  learn  about  the  improved water  quality  resulting  from  local stormwater management practices.   Printed tour guides will require  identifying geographic regions  of  focus,  generating mapping  and  routes  that  are  conducive  to  a wide  range  of audiences and promotion of the tours. 

Page 91: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  58 

 J.  "Bring Water Back to St. Paul" Campaign  

The  Bring  Water  Back  to  St.  Paul  campaign  will  develop  the  detailed  approach  and implementation plan for the campaign to reconnect the community to  its water resources, including  the Mississippi  River.    The  campaign will  interface with many  other  efforts  by identifying/promoting programs and projects to  increase the use and awareness of District water bodies and the Mississippi River.  The campaign will enlist public participation early in the  planning  process  to  ensure  it  is  a  collaborative  process.    To  have  success  in  bringing water back, figuratively and literally, it must be a collaborative effort.  Target audiences and mechanisms will be  identified  to  reach  residents and neighborhoods.   The campaign goals are to engage residents and create enthusiasm among the public for campaign initiatives.  It is also  important to encourage the member cities and the National Park Service to  identify the  need  for  and  potential  location  of  additional  water  resource  access  points  in consideration of population density, safety, and site specific amenities.  

Page 92: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  59 

225 – Technical Resources & Information Sharing

Description and Purpose of Activity As  new  technology  is  developed  in  the  field  of  water resources management, science, and engineering, the District needs  to  work  and  interact  regularly  with  its  agency  and technical partners so  that  information can be shared among various entities.  This will enable the District to stay aware of new  developments  and  provide  better  technical  guidance.  Activities such as plan review and web tool development also create  opportunities  for  collaboration,  on  regional  projects and inform partners and citizens.   

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015 

2016‐20 

Ten Year Total 

Planned Initiatives A. Interactive Storm Sewer/Pollutant Map  ‐  ‐  ‐  $15  $15  $42  $72 B. Information Dissemination: Multiple 

Audiences/Languages $5  $6  $6  $2  $2  $13  $34 

C. Watershed Information Clearinghouse  $5  $5  $5  $6  $6  $32  $59 D. Annual Capital Improvement Project (CIP) Review, 

Planning and Coordination with Partners ‐  ‐  ‐  ‐  ‐  $77  $77 

E. Review of District Partner Planning Documents (Non‐CIP) 

$5  $5  $5  $6  $6  $32  $59 

F. Unregulated Property Stormwater Management Planning 

‐  ‐  ‐  ‐  ‐  $26  $26 

G. Alternative (Non‐Infiltration) Volume Reduction BMP Guidance 

$7  $7  $7  ‐  ‐  ‐  $21 

H. BMP Performance Database  ‐  ‐  ‐  $17  $17  $44  $78 I. Watershed Approach: TMDLs & NPDES  $103  $106  $109  $56  $58  $317  $750 J. Strategic Project Preparation  $21  $21  $22  $23  $23  $127  $236 K. Joint BMP Inspection and Maintenance Program  $21  $21  $22  $11  $12  $63  $150 L. Inspection Support for Partners  ‐  ‐  ‐  $6  $6  $32  $43 Total for 225‐ Technical Resources & Information Sharing 

$167  $171  $176  $142  $145  $805  $1,605 

  Amounts are expressed in thousands of dollars  

Objectives The District will collaborate with partner organizations  to study  regional water quality  issues and make District  information such as storm sewer maps,  local pollutant  loading, and monitoring data available to the partners.  In order to effectively share information, the District will develop efficient information distribution systems.  The District will also be more involved in partner agency Capital Improvement Plans (CIPs) and planning documents.  As identified in its issues identification process, the  District  could  more  effectively  identify  and  support  collaborations  between  various partners/stakeholders  who  have  similar  projects  and  programs.    The  District  inspects  its  BMP facilities and BMPs  it has permitted, but  it has become apparent that a  joint BMP  inspection and maintenance  program  with  District  partners  could  increase  efficiency  of  maintenance  and  the performance of BMPs.  The Technical Resource and Information Sharing initiatives will help address this need and result in a better use of funds to accomplished shared objectives.   

Page 93: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  60 

Program Initiatives This budget item was formerly called Information Sharing.  Its renaming has subsequently resulted in development of the new initiatives identified below. 

 Explanation of Planned Initiatives A. Interactive Storm Sewer/Pollutant Map  

Develop an  interactive Storm Sewer/Pollutant Mapping Application Tool that will allow the user to view the path stormwater takes to downstream resource and the pollutant  loading per acre of contributing area.   A pilot project will be completed to establish protocols and determine the level of effort needed to fully develop the tool.  The project will involve taking storm sewer network data and adding direction of flow and connectivity information. 

 B. Information Dissemination: Multiple Audiences/Languages  

Assess  the  need  for  information  in  multiple  languages  for  citizens  within  the  District.   Identify  information relevant to multiple public audiences and make  it available  in multiple languages.    Initial  steps  will  include written  translation,  when  appropriate,  of  non‐point source pollution prevention and preferred behaviors. 

 C. Watershed Information Clearinghouse  

Identify key categories of applied watershed  information needed by District partners.   This initiative will  involve  review  of  agency/partner  planning  efforts  and  soliciting  input  from District  partners  through  meetings  and  surveys.  Identify  and  implement  standards  and procedures for processing applied watershed information once the partner needs have been identified. 

 D. Annual Capital  Improvement Plan  (CIP) Review, Planning, and Coordination with 

Partners  

Schedule  annual meetings with  partners  to  review  CIPs  as  part  of  the  annual  budgeting process.  Annual meetings will be followed by internal assessments of potential projects and partnerships or potential  information  sharing opportunities.  Schedule  regular meetings  to provide  input  on  school    districts  construction  plans  and  other  partner  agency  capital projects.  This initiative will require, where necessary, establishing strong relationships with agencies and educational institutions and providing financial resources in order to have the greatest  success.    Use  the  CIP  review  process  of  partner  agencies  to  introduce  District concerns and recommend actions related to water resource management.   The District will remain aware of  the  timing of various agencies’ CIP  review schedule  in order  to  introduce issues and ideas at appropriate times. 

 E. Review of Other Partner Planning Documents (Non‐CIP)  

Regularly review District partner planning documents to identify collaboration opportunities.  Planning documents to be reviewed may  include sustainability, wetland management, park improvement,  local water,  large  scale  redevelopment,  local  area,  comprehensive, or  road salt management plans. 

Page 94: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  61 

 F. Unregulated Property Stormwater Management Planning  

Develop  an  approach  to  improve  stormwater management  and water  quality  protection measures on properties unregulated by District  rules.   Currently,  these properties  include State  of Minnesota,  State  Fairgrounds,  University  of Minnesota,  and  railroad  properties.  These properties are of interest to the District since they contain significant water resources such  as  the  Sarita Wetland  and  the Burlington  Pond  and  represent  significant watershed areas  to  other  District  water  resources.    A  preliminary  step  will  be  to  evaluate  the opportunities  for  providing  input  based  on  the  owners,  operations,  and  existing  planning efforts.    Incentives and  federal  regulations  for  railroads and  their property owners will be researched.   Designs and applications specific  to pollutants of concern associated with  the properties will be considered. 

 G. Alternative (Non‐Infiltration) Volume Reduction BMP Guidance  

Not all areas in the District are conducive to infiltration due to soil type,  soil contamination, groundwater elevation, or pollutants associated with the land use.  For this initiative, volume reduction  alternatives  other  than  infiltration  such  as  stormwater  reuse will  be  evaluated.  Guidence on the alternative practices will be developed.  

 H. BMP Performance Database  

Develop a database of cost/benefit ratios based on BMP removal efficiencies.  Relevant data will  be  obtained  from  the District  and  its  partners.    Summarize  findings  in  a  format  that provides  information  and  guidance  for  developer,  District  partners  and  future  District projects. A standardized record keeping procedure will be developed. 

 I. Watershed Approach: MS4 & TMDL Compliance  

 

MS4 Compliance  The District;  cities of  St. Paul, Maplewood,  Falcon Heights,  Lauderdale, and Roseville; MN DOT,  Ramsey  County,  University  of  Minnesota,  Minnesota  State  Fair,  and  Metro  State University  are  all  regulated MS4s  under  the  Clean Water  Act  and  are  required  to  be  in compliance with  the MS4  General  Permit,  issued  by  the  State  of Minnesota.    The MS4 General Permit  requires each  regulated MS4  to develop a Storm Water Pollution Program that addresses each of six minimum control measures (MCMs) including: 

 

MCM #1  Public education and outreach; MCM #2  Public participation and involvement; MCM #3  Illicit discharge detection and elimination (IDDE); MCM #4  Construction site runoff; MCM #5  Post‐construction runoff control; and MCM #6  Pollution prevention and good housekeeping. 

 

Collaboration  between  regulated  MS4s  can  result  in  cost  savings  and  enhanced  water resource protection.   Key elements of a Watershed Based MS4 Compliance program could include: 

 

1. District providing public education and outreach (MCM #1) related to water resources to fulfill  the  regulated MS4  responsibilities  through  existing  CRWD  education  staff  and programs. 

 

Page 95: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  62 

2. District and regulated entities combine annual meetings to meet MCM #2 requirements.  This  combined  annual meeting  could  include  an open house,  education  components, and presentations by District and MS4 staff to city elected officials as well as the public.  

   

3. Develop a program to work together on  IDDE programs.   Specifically a non‐public web accessible map  of  all  stormwater  drainage  networks  could  be  developed  to  facilitate tracking of  illicit discharges.   This  is  important on a watershed  scale because of  cross municipal drainage issues.  Inspections and education related to MCM #3 requirements could also be shared between the District and regulated MS4s.   

 

4. Inspections  related  to  construction  site  runoff  requirements  could  be  shared  by  the District and regulated MS4s as required under MCM # 4.  

    In  each  of  the  subwatersheds  of  the  District  multiple  MS4s  exist  and  have  legal responsibilities to manage water.  The table below identifies the overlapping MS4s that exist in each of the subwatersheds of the District.     

  Subwatershed  MS4s Permittees Como Lake  St. Paul, Falcon Heights, Roseville, MnDOT, Ramsey County Crosby Lake  St. Paul, MnDOT, Ramsey County Davern  St. Paul, MnDOT, Ramsey County Downtown  St. Paul, MnDOT, Ramsey County East Kittsondale  St. Paul, MnDOT, Ramsey County Goodrich‐Western  St. Paul, MnDOT, Ramsey County Hidden Falls  St. Paul, Ramsey County Lake McCarrons  Roseville, MnDOT, Ramsey Mississippi River Blvd.  St. Paul, MnDOT, Ramsey County Phalen Creek  St. Paul, MnDOT, Ramsey County, Metro State University St. Anthony Hill  St. Paul, Ramsey County, St. Paul Community and Technical College 

St. Anthony Park St. Paul, Falcon Heights, Lauderdale, MnDOT, Ramsey County, Metro State University, University of Minnesota 

Trout Brook St. Paul, Maplewood, Roseville,  MnDOT, Ramsey County, Capitol Region Watershed District 

Urban  St. Paul West Kittsondale  St. Paul, MnDOT, Ramsey County West Seventh  St. Paul, MnDOT, Ramsey County 

 TMDL Compliance In  addition  to  the  specifically  spelled  out MCM  requirements,  collaboration  between  the regulated MS4s  can be  an  effective mechanism  to  implement  Total Maximum Daily  Load (TMDL) study requirements.    

The District and  its partners will soon be subject to the requirements of several TMDLs for impairments  in  the Mississippi  River  and  Lake  Pepin.    Each  of  the  TMDLs will  develop  a pollutant  loading  goal  and will  require  a  specific  reduction  to  be  achieved  by  all  of  the entities that drain to the resource.  The majority of pollutant sources within the District will be  regulated under  the NPDES Program  (i.e. MS4,  Industrial Stormwater and Construction Site Stormwater permittees).  Each of the regulated entities will be required to demonstrate how they are complying with each of the TMDLs.    

The District will make use of its subwatershed management planning process to address the requirements of the various TMDLs.  The subwatershed based approach to TMDL compliance 

Page 96: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  63 

would  consist  of  coordinating  the  efforts  of  the  District  and  the  other  regulated MS4s.    Initially,  the District will develop a process  to define  the role of each of  the partners.   The District could potentially take on a role that would  include  inventorying and accounting for reductions  in pollutant  loading  in  the watershed and  representing  the MS4s  in  large  scale TMDL  studies.   The District could  serve as  the “aggregator” or TMDL coordinator  to assist each  of  the MS4s,  in  coordination,  in meeting  their  individual  TMDL  requirements.    The District could also serve as a technical resource for the regulated MS4s with regards to TMDL implementation  requirements.    The  Districts  monitoring  program  could  be  used  to determine what progress was being made on load reductions.  Finally, the District could take the lead on providing documentation to collectively meet the annual reporting requirements of the MS4 Permits.  

The  specific  approach  for  TMDL  compliance  would  be  developed  through  the  District’s subwatershed  management  planning  process.    At  the  onset  of  each  subwatershed management plan,  the District will  identify each MS4  involved  in  the  subwatershed.   The District will  develop  a  technical  approach  for  evaluating  the  subwatershed  and  potential water quality improvement opportunities.  The District will develop an agreement between the MS4s within  the  subwatershed on  the approach,  including a  cost distribution plan  for improvements.     

J.  Strategic Project Preparation  

In  response  to  several  grant  programs  preferring  to  fund  implementation  rather  than planning activities, take selected projects through design to a level where they are ready for bidding in advance of available funding. 

 K.  Joint BMP Inspection and Maintenance Program  

Develop a program with District partners to  identify consistent, reasonable BMP  inspection and maintenance protocols.  This coordination will identify the most effective inspection and maintenance  approaches  being  practiced  today.    The  program  is  expected  to  increase inspection and maintenance efficiency and, ultimately, BMP performance.   The District will ensure  that  the  permitting  process  encourages  following  through  with  maintenance activities. 

 L.  Inspection Support for Partners  

Through  cooperation,  District  staff  and  District  partners  can  assist  one  another  with inspection responsibilities.  The District will communicate to its partners that the District's is available to help achieve their inspection objectives and stay on schedule. This initiative will help ensure long‐term performance of BMPs and reducing erosion and sedimentation from construction sites in the District.   

Page 97: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  64 

228 – Future Trends - Research & Positioning

Description and Purpose of Activity While  the  future  is  uncertain  with  regard  to  climate, technology, and policy,  it  is  important to have a strategy  for incorporating  new  information  as  it  becomes  available.  To maintain  a  leadership  role  with  regard  to  how  key  water resources  concerns  are  addressed  in  an  urban  setting,  a deliberate effort is needed to stay aware of trends in science, design,  and  climate,  and  to  interpret  those  trends  for practical application.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives A. Climate Change Impacts: Research & Analysis  ‐  ‐  ‐  $21  $21  $73  $115 B. Climate Change Impacts: Action  ‐  ‐  ‐  ‐  ‐  $39  $39 C. Research on Innovative BMPs  $67  $69  $71  $73  $75  $412  $768 D. Design for Water Resources Awareness  $31  $32  $33  $34  $35  $190  $354 E. National Speakers on Key Topics  $5  $5  $5  $6  $6  $32  $59 F. Goals for Emerging Issues: Contaminants  $10  $11  $11  ‐  ‐  ‐  $32 G. Analysis of Emerging Issues: Contaminants  ‐  ‐  ‐  $30  $31  $32  $93 H. Project to Address Emerging Issues: 

Contaminants ‐  ‐  ‐  ‐  ‐  $154  $154 

 I. Assessment of Water Quality and Ecology of 

Springs ‐  ‐  ‐  ‐  ‐  $13  $13 

 J. Evapotranspiration Rates Investigation  ‐  ‐  ‐  ‐  ‐  ‐  ‐ K. Green Infrastructure Barriers Assessment  ‐  ‐  ‐  $6  $6  $6  $17 L. Strategy for Existing Site Stormwater 

Standards ‐  ‐  ‐ 

$56  $58  $60  $174 

 Total for 228‐ Future Trends – Research & Positioning  

$113  $117  $120  $225  $232  $1,011  $1,818 

  Amounts are expressed in thousands of dollars 

Objectives Looking forward to the next 10 years, key  issues for the District are climate change,  innovations  in green  infrastructure,  and  consideration  of  additional  pollutants  beyond  those  that have  typically been  the  focus  of  water  resources management.    These  issues  are  relatively  unfamiliar  to  the District. The strategy will be to  investigate the  issue during years 1‐3 of the plan, perform analysis and scoping of applicable projects during years 4‐6 of the plan, and implement the projects during years  7‐10 of  the plan.   As new  ideas  are explored,  the District will  seek  to  involve  citizens  and partners in projects, programs, and areas of interest. 

Page 98: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  65 

Program Initiatives This  budget  item was  formerly  called  Future  Trends.  Its  renaming  has  subsequently  resulted  in development of the new initiatives identified below.  

Explanation of Planned Initiatives A. Climate Change Impacts: Research & Analysis  

Research  the  potential  impacts  of  climate  change  as  they  apply  to  the  resources  of  the District during years one through three of the plan. Complete modeling and analysis of the likely  impact(s) of climate change on hydrologic conditions within  the District  from both a water quantity and quality perspective  to  identify areas of concern.   Analyze  the District’s role in addressing and responding to the potential impacts.  This will take place during years four through six of the plan. 

 B. Climate Change Impacts: Action  

Formalize a District effort to address the identified local and watershed impacts from climate change, if any, during years seven through ten of the plan. 

 C. Research on Innovative BMPs  

Research  innovative  BMPs  focusing  on  performance,  applicability  in  various  settings,  and their long‐term maintenance requirements.   

 D. Design for Water Resources Awareness  

Identify stormwater design methods/techniques that maximize water resources awareness, visual appeal, and public understanding.  Designs include stormwater management functions as well as structural or artistic components that communicate the stormwater management function to the viewer.   

 E. National Speakers on Key Topics  

Sponsor/coordinate  workshops  with  nationally  known  speakers  on  innovative  urban management techniques, future trends, etc. 

 F. Goals for Emerging Issues: Contaminants  

Determine the need for and if necessary develop quantitative goals for additional pollutants in District  resources  including metals,  chloride, bacteria, pesticides, other  toxic  chemicals, and trash through a technical and public stakeholder process.   (Years 1‐3) 

 G. Analysis of Emerging Issues: Contaminants  

Work with partner agencies  to  study water quality  issues of  regional  concern based upon District monitoring data and  findings  from  the  review of partner planning documents and partner agency CIPs.   Perform analysis to  identify projects to achieve desired reductions  in metals, chloride, bacteria, and trash (Years 4‐6).  

 H. Projects to Address Emerging Issues: Contaminants  

Page 99: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  66 

Implement  projects  to  achieve  desired  reductions  in metals,  chloride,  bacteria,  and  trash (Years 7‐10). 

 I. Assessment of Water Quality and Ecology of Springs  

Complete assessment of water quality and ecological significance of springs. The springs are unique water resources which may contain species requiring additional protection. 

 J. Evapotranspiration Rates Investigation  

Promote  investigation by other research entities of the evapotranspiration rates of various plant species to maximize non‐infiltration volume reduction.  Results will help document the volume  reduction  achieved  by  trees  and  plants  and  determine  which  species  are  most effective  for  volume  reduction  on  green  roofs  and  other  stormwater  management techniques that utilize plants. 

 K. Green Infrastructure Barriers Assessment  

Review municipal ordinances to  identify barriers to  implementation of green  infrastructure including  graywater/re‐use  systems,  and  work  with  partners  to  remove  the  barriers.  Evaluate  street  design  standards  to  determine  barriers  to  green  infrastructure implementation and tools to overcome those barriers. 

 L.  Strategy for Existing Site Stormwater Standards   

Stormwater management requirements for new and redeveloping sites are already in place in the District Rules.  However, existing sites not slated for redevelopment make significant contributions  to  stormwater  and  pollutant  loads within  the District.   The  purpose  of  this initiative is to analyze the need for and feasibility of implementing stormwater treatment for existing  sites  and  to  assess  barriers  and  benefits  of  various  implementation  approaches.  Regulatory  requirements,  financial  incentives,  and  other  strategies  will  be  considered. Research will examine example  stormwater  standards and  incentive programs  for existing sites.  

 The importance of treating stormwater runoff from existing sites is made clear by looking at the  amount  of  treatment  achieved  in  the  past  several  years  of  the  current  permitting program.  From 2007‐2009, runoff treatment has been provided for approximately 197 acres of the District’s  impervious area.  Assuming that this rate of redevelopment continues, this would mean that every year under the current permitting program, an additional 0.6% of the District’s  impervious  area  would  be  treated.   This  would  mean,  at  this  rate  9%  of  the impervious  area would  be  treated  after  15  years,  18%  of  the  impervious  area would  be treated after 30 years, and so on.  Future  rates  of  redevelopment  are  uncertain,  and  even  at  the  current  rate  of redevelopment, progress  toward  the desired degree of water  resources protection will be slow.  While  substantial  treatment  is being provided  and  gains  in water quality  are being made under  the  current program,  to  truly  achieve  significant water quality  improvement, the impact of existing site runoff must be addressed. 

Page 100: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  67 

230 – GIS (Geographic Information Systems)

Description and Purpose of Activity Geographic  Information Systems, or GIS,  is an effective  tool for  water  resources  management.    GIS  enables  detailed mapping  and  analysis  of  hydrology,  land  use,  land  cover, population  dynamics,  or  any  data  that  has  a  spatial component.  It also provides a central location for the District to maintain an  information  inventory  that  is up‐to‐date and easily accessible.  GIS staff and training are essential to apply this tool.  Initiatives that are primarily driven by GIS mapping and analysis are included herein. 

     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Program Initiatives  $60  $62  $64  $66  $68  $371  $692 

Planned Initiatives 

B. GIS Program Development  $3  $3  $3  $2  $2  $10  $21 

C. Permitted Discharge Assessment  ‐  ‐  ‐  $9  $9  $14  $32 

D. Stormwater BMP Inventory & Multi‐Jurisdictional Database 

$27  $28  $29  $11  $12  $63  $171 

E. District Boundary Correction  ‐  ‐  ‐  ‐  ‐  $26  $26 

Total for 230‐ GIS  $90  $93  $96  $88  $91  $484  $942 

  Amounts are expressed in thousands of dollars 

Objectives GIS Program expansion is imminent based on the District’s needs and potential applications for GIS.  The Program is intended to enable more in depth analysis of the state of the watershed in order to conduct source water assessments or preemptively identify pollutant sources.  The District will also use GIS  as  a  database/inventory  tool  for  tracking  the  condition  and  performance  of  stormwater treatment BMPs.   Program Initiatives A. An ongoing GIS Program element is the acquisition and maintenance of proper software and 

hardware to run and apply GIS effectively.  GIS training continues to be a key element to the Program. 

Page 101: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  68 

Explanation of Planned Initiatives B. GIS Program Development   

The  GIS  Program will  be  expanded  to  include  geographic  analysis,  decision  support,  and interactive applications for the public.  The expansion will require staff to be trained on the potential of GIS applications.   This will enable the District to develop projects that can fully utilize the GIS software.  Initiatives below begin to accomplish this goal.   

 C. Permitted Discharge Assessment  

GIS will be used to conduct a point source water assessment of stormwater pollution. The project will document the  location of all the permitted and  illicit discharges  in the District.  Additional  spatial  data  such  as  land  use  may  be  used  to  identify  potential  sources  of stormwater contamination. 

 D. Stormwater Inventory & Multi‐Jurisdictional Database  

GIS will be used to track the  location of BMPs based on the volume of stormwater treated and  infiltrated.   BMPs will be  identified by  category  (permitted,  stewardship  grants, CIPs, others) as mechanism to identify the relative effectiveness of District programs. 

 

GIS will be used as a tool to develop and maintain a database of all stormwater BMPs in the District categorized by jurisdiction.  This initiative will require on the ground research, multi‐agency coordination, and a significant effort for initial data entry.  Maintenance and upkeep will be required after the capital investment. 

 E. District Boundary Correction 

 

GIS will be used to continue and complete the periodic correction and update of the District boundary due to further refinement of the District’s hydrologic boundary as outlined in MN Statutes 103B.215 and 103D.251.  Coordination with surrounding watershed districts is a key factor in the success and speed of completion of the project. 

 

Page 102: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  69 

240 – Safety Program

Description and Purpose of Activity Because  of  the  nature  of  the  work  and  operations  at  the District  including entry  into storm sewers, work  in roadways, inspection  of  construction  sites,  and  use  of  hand  tools,  the District  strives  for  the  highest  safety  standards  for  its employees  through  a  comprehensive  health  and  safety program.   The purpose of  the program  is  to  implement  the policies,  procedures  and  operations  in  the  office,  shop  and field  that  shall  ensure  healthy  and  safe  conditions  in  the workplace  and  minimize  the  frequency  and  severity  of hazards for its employees.   Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Program Initiatives  $17  $18  $18  $19  $20  $107  $200 

Planned Initiatives 

B.  Regular Safety Audits  ‐  $3  ‐  ‐  $3  $3  $9 

Total for 240‐ Safety Program  $17  $21  $18  $19  $23  $110  $209 

Amounts are expressed in thousands of dollars  

Objectives The  objective  of  the  Safety  Program  is  to  provide  safe  working  conditions  through  training, education, and proper equipment.    

Program Initiatives A.    Safety Program elements comprise the majority of the cost and staff time of the  initiative.  

The  District’s  commitment  to  facilitating  safe  working  conditions  is  ensured  through provision  of  proper  field  operations  equipment  and  routine  equipment maintenance  and calibration.  Safety training is an equally vital program element.  A complete list of program initiatives is provided below. 

 

• Proper equipment • Equipment repair and maintenance 

• Confined space entry (CSE) • Staff CSE and other safety training  

 Explanation of Planned Initiatives B. Regular Safety Audits  

The  District  will  conduct  a  safety  audit  every  three  years  or more  frequently  if  District activities  or  operations  change.    The  audit  will  include  equipment  and  operational inspections, status of staff safety training, and a review of working conditions.   This initiative includes rectifying all issues identified as a result of the audit. 

Page 103: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  70 

301 – Shoreline and Streambank Assessment and Maintenance

Description and Purpose of Activity Shoreline  areas  of  the  District’s  water  resources  serve  a critical  function  of  filtering  pollutants  from  runoff  before  it enters the water resource.   Maintaining shoreland areas  in a perpetually  stable  condition  with  native  plants  is  an important  component  of managing  the  existing  and  future water resources of the District.     

Projected Expenditures

10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 Ten Year Total 

A. Project Initiatives  $13  $13  $13  $14  $14  $78  $146 

Planned Initiatives 

B. Mississippi River Streambank and Bluff Erosion Inventory 

‐  ‐  ‐  $19  $19  $20  $58 

C. Loeb and Crosby Lakes Shoreline Restoration ‐ Planning 

$26  $27  $27  ‐  ‐  ‐  $80 

Total for 301‐ Shoreline & Streambank Assessment & Maintenance 

$39  $40  $40  $33  $33  $98  $284 

Amounts are expressed in thousands of dollars 

Objectives District  objectives  include  completing  shoreland  assessments  and  developing  plans  to  restore degraded  shoreland  in  the  District.    This  project  also  will  maintain  restored  shorelines  and streambanks so they become well established over the long‐term.    Project Initiatives A.    Since the Como Lake Shoreline Vegetation Management Plan has been in place, the District 

has  helped  fund  projects  around  Como  Lake.    Similarly,  implementation  of  a  shoreline restoration program for Lake McCarrons was underway in 2009.  Lake McCarrons and Como Lake Shoreline Restoration Projects will continue with Ramsey Conservation District and the City  of  St.  Paul  as  project  partners,  respectively,  to  assist  in  identification  and implementation of shoreline and streambank assessment and maintenance projects.  These project initiatives are listed below. 

 

• Lake McCarrons Shoreline Restoration Project 

• Sponsor Natural Resources Intern with City of St. Paul for Como Lake Projects 

 

Page 104: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  71 

Explanation of Planned Initiatives B. Mississippi River Streambank and Bluff Erosion Inventory 

The District will  identify and categorize streambank and bluff erosion  issues. This  initiative will primarily focus on Mississippi River streambank and bluff areas. 

  

C. Loeb and Crosby Lakes Shoreline Restoration ‐ Planning  

Assess the current conditions of Loeb Lake and Crosby Lake and develop plans for restoring necessary sections. 

   

Page 105: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  72 

305 – Como Lake Subwatershed

Description and Purpose of Activity The District and its partners have constructed several BMPs in the  Como  Lake  Watershed.    These  BMPs  require  regular inspection, maintenance  and monitoring  to ensure  they  are performing  as  intended.    Individual  subwatersheds  draining to Como Lake have had subwatershed studies completed that identify BMPs to be implemented. In 2002, the District and its partners developed a  lake management plan  for Como Lake that  identified  subwatershed‐based  phosphorus  load reduction goals.    In 2010 the approach  for reducing  loads to Como  Lake was  converted  into  a  TMDL  in  response  to  the Lake’s status as an impaired water.       Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  $99  $102  $105  $108  $111  $609  $1,134 

Planned Initiatives 

B. Internal Loading Study and Management  ‐  ‐  ‐  ‐  ‐  $32  $32 

C. Fish Population Monitoring  ‐  ‐  ‐  ‐  ‐  ‐  ‐ D. Invasive and Exotic Biota Monitoring & 

Management ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

E. Como 2 Feasibility Study  $21  $21  $22  ‐  ‐  ‐  $64 

F. Como 4 Feasibility Study  ‐  ‐  ‐  $23  $23  $24  $70 

G. Como 5 Feasibility Study  ‐  ‐  ‐  ‐  ‐  $51  $51 

H. Como 6 Feasibility Study  ‐  ‐  ‐  ‐  ‐  $51  $51 

I. Como Lake Implementation Reporting & Audit 

‐  ‐  ‐  $8  $8  $8  $23 

Total for 305‐ Como Lake Subwatershed  $120  $123  $127  $139  $142  $775  $1,425 

Amounts are expressed in thousands of dollars 

Objectives The objective is to complete Como Lake subwatershed planning studies to identify opportunities for water  resource  improvements  for  implementation  by  the District,  the  City  of  St.  Paul  and  other partners.  This program also inspects and maintains BMPs that have been implemented in order to ensure intended performance. 

Page 106: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  73 

Project Initiatives A.    BMPs  planned  for  or  already  constructed  in  the  Como  Lake  Subwatershed  (will)  require 

regular  inspection, maintenance, monitoring,  and/or  installation.   As  a  result,  this budget item  includes  inspection  and  maintenance  initiatives  and  a  demonstration  project.    In addition, the District continues to sponsor interns with the City of St. Paul to help maintain rain  gardens,  restored  shorelines  and  other  natural  areas.    A  complete  list  of  project initiatives is provided below. 

 

• Arlington Pascal Project Stormwater Improvement Project 

• Street Maintenance 

• Trash Net Demonstration Project • St. Paul Natural Resources Intern   

  Explanation of Planned Initiatives B. Internal Loading Study and Management  

Reevaluate  internal  loading  in  Como  Lake  and  investigate  management  options.    This initiative  is  a  priority  for  improving  the  water  quality  of  Como  Lake  and  successful implementation will  only  occur  through  partnership with  other  agencies  identified  in  the planning process.   The District will  take  the  lead on  this  initiative with participation  from Ramsey County Public Works and the City of St. Paul. 

 C. Fish Population Monitoring  

Monitor  fish population  in Como  Lake.   This  initiative will be used  to guide water quality improvement  decisions  for  Como  Lake,  but  will  likely  be  carried  out  by  other  agencies identified  in the planning process.   The Minnesota Department of Natural Resources (DNR) and  Ramsey  County  Public Works  are  the  lead  agencies  on  this  initiative.  The  District  is committed  to working with  the DNR and Ramsey County Public Works  to complete  these activities. 

 D. Invasive and Exotic Biota Monitoring and Management  

Monitor for and manage invasive exotic vegetation in and around Como Lake.  This initiative is  a  priority  for  improving  the water  quality  of  Como  Lake,  but  it  is more  appropriately implemented  by  other  agencies  identified  in  the  planning  process.    St.  Paul  Parks  and Recreation and Ramsey Conservation District  (RCD) are the  lead agencies on this  initiative. The District is committed to working with St. Paul Parks and Recreation and RCD to complete these  activities.    The  District  will  also  collaborate  on  efforts  in  the  Ramsey  County Cooperative Weed Management area. 

 E. Como 2 Feasibility Study  

Complete  the  Como  Subwatershed  #2  feasibility  study  to  fulfill  the  Como  Lake  Strategic Management Plan.    

F. Como 4 Feasibility Study  

Page 107: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  74 

Complete  the  Como  Subwatershed  #4  feasibility  study  to  fulfill  the  Como  Lake  Strategic Management Plan. 

 G. Como 5 Feasibility Study  

Complete  the  Como  Subwatershed  #5  feasibility  study  to  fulfill  the  Como  Lake  Strategic Management Plan. 

 H. Como 6 Feasibility Study  

Complete  the  Como  Subwatershed  #6  feasibility  study  to  fulfill  the  Como  Lake  Strategic Management Plan. 

 I. Como Lake Implementation Reporting & Audit    

The Como Lake Strategic Plan was adopted in 2002 and was converted into a TMDL in 2010.  The plan provides  a  target  in‐lake water quality  goal  and establishes watershed pollution reduction targets by subwatershed.  The plan provides projects and cost estimates.  Several subwatershed  initiatives from the plan have been  implemented.   When approximately half the  subwatershed plans are  implemented an  audit will be  conducted  to:   use monitoring data  to evaluate performance,  review which project  types are most cost effective,  track  if load reduction goals are being met, and update cost estimates for future work.   The District will make use of its subwatershed management planning process to implement the Como  TMDL.    The  subwatershed based  approach  to  TMDL  compliance will  consist of coordinating the efforts of the District and the other regulated MS4s.    Initially, the District will develop a process to define the role of each of the partners.  The District will take on a role  that would  include  inventorying and accounting  for  reductions  in pollutant  loading  in the watershed and representing the MS4s in large scale TMDL studies.  The District will serve as  the  “aggregator”  or  TMDL  coordinator  to  assist  each  of  the MS4s,  in  coordination,  in meeting  their  individual  TMDL  requirements.    The  District will  also  serve  as  a  technical resource for the regulated MS4s with regards to TMDL  implementation requirements.   The District’s monitoring program could be used to determine what progress was being made on load  reductions.    Finally,  the  District  will  take  the  lead  on  providing  documentation  to collectively meet the annual reporting requirements of the MS4 Permits. 

  

Page 108: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  75 

313 – Lake McCarrons Subwatershed

Description and Purpose of Activity The District planned, designed, and constructed the Villa Park Wetland  Improvement  project  consistent  with  the  Lake McCarrons  Lake Management  Plan.    The  District  owns  the four weir structures of the Villa Park Wetland System which is located  on  Roseville  City  park  property.  The  District  also modified  the  existing  outlet  structure  for  the  system.  The District  cooperatively  manages  and  maintains  the  weir structures in Villa Park with the City of Roseville.  These weir structures  were  designed  to  reduce  the  amount  of phosphorus  from  entering  Lake  McCarrons.  An  alum treatment was also applied to the lake in the fall of 2004.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  $32  $33  $34  $35  $36  $199  $370 

Planned Initiatives 

B. Fish Population Monitoring  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

C. Exotic and Nuisance Species Prevention Program  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

Total for 313‐ Lake McCarrons Subwatershed  $32  $33  $34  $35  $36  $199  $370 

Amounts are expressed in thousands of dollars 

Objectives The primary objective of this  initiative  is to maintain  in place BMP projects  in the Lake McCarrons Subwatershed and to monitor the lake to determine the need for further management activities for implementation by the District, the City of Roseville and other partners.     Project Initiatives A. BMPs planned  for or  already  constructed  in  the  Lake McCarrons watershed  (will)  require 

regular  inspection, maintenance, monitoring,  and/or  installation.   As  a  result,  this budget item  already  includes  existing  monitoring  and  maintenance  initiatives  and  an implementation project.  A complete list of project initiatives is provided below. 

 

• Villa Park weir monitoring • Villa Park implementation Phase 1 • McCarrons Subwatershed Analysis 

• Lake McCarrons Alum Treatment Project • Shoreline Restoration • Villa Park Subwatershed Management Plan  

 

Page 109: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  76 

Explanation of Planned Initiatives B. Fish Population Monitoring  

Monitor  the  fish population  in  Lake McCarrons.  Improve  the  fishery by preventing winter fish kills (by keeping winter oxygen levels up) and by maintaining diversity of gamefish. The DNR will continue implementing its fisheries management plan for Lake McCarrons.  

 C. Exotic and Nuisance Species Prevention Program  

Promote and support an exotic and nuisance species prevention program.  The program will monitor  for  new  invasive,  exotic  species  infestations  as  well  as monitoring  the  existing Eurasian water milfoil  infestation  found  in 2004 to determine  if  it  is expanding.   An action plan  for mitigating new exotic  species will be developed. The program will also use every reasonable means  to prevent new  invasive,  exotic  species  from  entering  Lake McCarrons and  to prevent existing populations  from expanding. The District will  implement  the  Lake McCarron’s Aquatic Plan Management Plan developed  in cooperation with  the Minnesota DNR in 2010. This plan can be found on the District website. 

Page 110: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  77 

 

315 – Loeb Lake Subwatershed

Description and Purpose of Activity The  Loeb  Lake  and  Willow  Reserve  Management  Plan described the history and defined the value of Loeb Lake as a District water  resource.    The  purpose  of  this  initiative  is  to conduct the necessary studies and coordination with partners to develop an implementation plan and carry out the projects for protecting and  improving Loeb Lake and Willow Reserve identified in the plan.  

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. (Loeb/Willow) Southeast Pond Investigation  $9  $9  $9  ‐  ‐  ‐  $27 

B. (Loeb/Willow) Good Housekeeping Assessment  $5  $5  $5  ‐  ‐  ‐  $16 

C. (Loeb/Willow) Invasive Species Monitoring  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

D. (Loeb/Willow) Aquatic Plant Management Coordination 

‐  ‐  ‐  ‐  ‐  ‐  ‐ 

E. (Loeb/Willow) Fish Stocking Plan with DNR  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

F. (Loeb/Willow) Planning with Stakeholder Group  $7  $7  $7  ‐  ‐  ‐  $21 

 Total for 315‐ Loeb Lake Subwatershed  

$21  $21  $22  ‐  ‐  ‐  $64 

  Amounts are expressed in thousands of dollars 

Objectives The studies and work conducted by the District, the City of St. Paul and other partners as part of this initiative are aimed at achieving the primary District goal for Loeb Lake which  is to maintain water quality at current conditions  (nondegradation).   Objectives  to achieve  this goal  include: provide a natural  land/water  interface  that  reduces  runoff and enhances pollutant  filtration while providing access for recreational use of the lake, raise awareness of nonpoint source pollution and its effects on  lake water quality, promote a healthy and balanced fish community, and achieve a healthy and diverse  community  of  native  plants  and  animals.    An  additional  objective  for  this  activity  is  to improve the functions and value of the Willow Reserve Wetland.  Project Initiatives None. 

Page 111: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  78 

Explanation of Planned Initiatives A. (Loeb/Willow) Southeast Pond Investigation  

Investigate the performance of the stormwater pond at the southeast corner of Loeb Lake.    

B.  (Loeb/Willow) Good Housekeeping Assessment  

Assess  current  municipal  good  housekeeping  practices  and  determine  the  need  for increased level of practices in the watershed. 

 C. (Loeb/Willow) Invasive Species Monitoring  

Monitor  invasive  plant  populations.  Specifically,  record  the  spatial  presence  of  curly  leaf pondweed,  purple  loosestrife,  and  Eurasian water milfoil  using  qualitative measurement techniques. 

 D. (Loeb/Willow) Aquatic Plant Management Coordination  

Partner  with  St.  Paul  Parks  and  Recreation  and  the  DNR  to  develop  an  aquatic  plant management plan. 

 E. (Loeb/Willow) Fish Stocking Plan with DNR  

Partner with  the DNR  to  develop  a  fish  stocking plan  that maintains  top  predators  in  an effort to maintain good water quality. 

 F. (Loeb/Willow) Restoration Planning with Stakeholder Group  

Develop  a  restoration  plan  for Willow  Reserve  by  forming  a  stakeholder  group  to  help determine the desired uses and ultimate restored condition of Willow Reserve. 

  

Page 112: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  79 

 

317 – Crosby Lake Subwatershed

Description and Purpose of Activity A study of the Crosby Lake subwatershed will yield information to aid development  of  the  appropriate  strategy  and  activities  for  water quality protection and improvement in Crosby Lake.      

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. Crosby Lake Management Plan  $50  ‐  ‐  ‐  ‐  ‐  $50 

B. Crosby Lake Studies  ‐  ‐  $50  ‐  ‐  $50  $100 

 Total for 317‐ Crosby Lake Subwatershed  

$50  ‐  $50  ‐  ‐  $50  $150 

Amounts are expressed in thousands of dollars 

Objectives When the Crosby Lake Management Plan is completed, the District will identify specific projects that can be  implemented by the District and  its partners to  improve the  long term water quality of the Lake.  The District will collaborate with partners to achieve management goals.   Project Initiatives Starting in 2010 the District in cooperation with the City of St. Paul and other partners began work on the Crosby Lake Management Plan.    Explanation of Planned Initiatives A. Crosby Lake Management Plan  

Complete  development  of  a  Lake  Management  Plan  for  Crosby  Lake,  in  which  specific potential BMPs and other projects are  identified along with partnership opportunities and issues.  

B. Crosby Lake Studies Complete further studies identified in Crosby Lake Management Plan.  

Page 113: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  80 

320 – Trout Brook Subwatershed

Description and Purpose of Activity In 2006, the District formally assumed ownership of the Trout Brook  Storm  Sewer  Interceptor  (TBI)  from  the Metropolitan Council.   Owning and operating this  large trunk storm sewer involves  regular  maintenance,  inspection  and  monitoring.  Project planning and studies will be completed to identify and determine future repair projects.     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  $110  $113  $116  $120  $123  $675  $1,257 

Planned Initiatives 

B. Upgrade/Calibration of TBI Model  $34  $35  $36  ‐  ‐  ‐  $106 

C. MS4 Compliance and Annual Review of MS4 Requirements 

$1  $1  $1  $1  $1  $6  $12 

D. Restoration and Daylighting Assessment  ‐  ‐  ‐  $15  $15  $16  $46 

E. (TBI) Easement Verification  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

F. (TBI) Regular Inspection  $4  $85  $4  $5  $5  $124  $227 

G. (TBI) Television Inspection  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

H. Web System for Receiving/Addressing Illicit Discharge Reports 

‐  ‐  ‐  ‐  ‐  $12  $12 

I. Determine Long‐Term Single Ownership of TBI  ‐  ‐  ‐  $6  $6  $6  $17 

J. Feasibility Study For Reducing Storm sewer Connections 

$5  $5  $5  ‐  ‐  ‐  $16 

K. Maplewood Landlocked Area Feasibility Study  ‐  ‐  ‐  $9  $10  $10  $29 

L. TBI Subwatershed Studies  $51  $53  $55  ‐  ‐  ‐  $159 

 Total for 320‐ Trout Brook Subwatershed  

$205  $292  $217  $156  $160  $849  $1,881 

  Amounts are expressed in thousands of dollars 

Objectives The objectives of this program are to successfully own and maintain the Trout Brook Storm Sewer Interceptor  System  in  good  operating  condition  and  to  ensure  planning,  engineering  and construction  complies with  the  10‐year maintenance,  repair,  and  improvement  plan  adopted  in 2009.   See Appendix G  for  the 10 Year Maintenance, Repair, and  improvement Plan  for  the Trout Brook Storm Sewer Interceptor. 

Page 114: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  81 

Project Initiatives  

A.    In keeping with the responsibilities of ownership of the Trout Brook Storm Sewer, inspection and  maintenance  initiatives  have  been  implemented  and  will  continue  throughout  the duration of ownership.  Associated projects have also been initiated in an effort to improve watershed hydrology and water quality, facilitate stormwater education, and to comply with NPDES requirements. A complete list of project initiatives is provided below. 

 

• Inspection of system • Tunnel repairs  • MS4 compliance and BMP implementation 

• Illicit discharge detection/monitoring 

• Center/Rice Street subwatershed analysis 

• Upper Mississippi River Bacteria TMDL • Use TBI as educational/WQ tool to increase stormwater awareness   

   Explanation of Planned Initiatives B. Upgrade/Calibration of TBI Model  

Upgrade TBI hydraulic and hydrologic (H&H) model including calibration.  Identify undersized and over‐capacity pipe  sections and  implement pipe upgrades.  Investigate  the  function of the TBI stormwater ponds. 

 C. MS4 Compliance and Annual Review of MS4 Requirements  

Coordinate District MS4 requirements in cooperation with District partners.  

D. Restoration and Daylighting Assessment  

Conduct surveys of the upper portion of Trout Brook that is not buried to identify restoration opportunities. Evaluate various portions of the TBI  for daylighting  feasibility with emphasis on  the  Trillium  site  (proposed  St.  Paul  parkland  along  Trout  Brook  alignment,  south  of Maryland Avenue) and the area near Arlington Jackson pond.  Land use, property ownership, grades,  hydrologic  impacts,  and  existing  soil  contamination  are  a  few  of  the  criteria  to determine  feasibility.  Final  recommendations  will  also  be  based  upon  the  projected environmental and water resource benefits of daylighting each stream segment analyzed. 

 E. (TBI) Easement Verification  

Complete easement verification work for TBI and work towards correcting errors in location and filling gaps where there are no easements.  

 F. (TBI) Regular Inspection  

Regularly conduct TBI inspection.  G. (TBI) Television Inspection  

Conduct television inspection of TBI from Dale Street to Como Lake. 

Page 115: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan – 9/1/2010  82 

H. Web System for Receiving/Addressing Illicit Discharge Reports  

Develop a web‐based system for citizen reporting of potential illicit discharges. Include in the application  specific definition of District  authorities  and  improved  rules  for  responding  to illicit discharge complaints.  Ensure that the system is anonymous and user‐friendly. 

 I. Determine Long‐Term Single Ownership of TBI  

Determine potential long‐term benefits of single ownership of the Trout Brook Interceptor.  

J. Feasibility Study For Reducing Storm Sewer Connections  

Study the feasibility of reducing the number of storm sewer pipe connections to the TBI.  The investigation will  include  an  analysis  of  treatment  options,  and will  focus  on  surcharging areas as defined by the District’s Hydraulic & Hydrologic model. 

 K. Maplewood Landlocked Area Feasibility Study  

Complete  feasibility  study  to  evaluate  management  options  for  the  landlocked  part  of Maplewood  within  the  District  as  well  as  those  within  the  Ramsey  Washington  Metro Watershed  District  that  are  occasionally  pumped  into  the  District.  The  District  will  also examine the appropriateness of adjusting the District legal boundary. 

 L. TBI Subwatershed Studies 

 

Conduct  three  studies within  the  Trout  Brook  subwatershed  (for  the  Upper  East,  Upper West,  and  Lower  portions  of  the  drainage  area),  to  evaluate  conditions  and  develop appropriate  management  strategies  and  implementation  plans  for  water  quality improvement and flood reduction for implementation by the District and its partners.  

Page 116: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  83 

325 – Wetland, Stream, & Ecosystem Restoration – Planning

Description and Purpose of Activity Nearly all pre‐settlement wetlands of  the District have been lost  to  development  and  other  ecosystems  are  significantly degraded.  Wetlands,  oak‐maple‐basswood  forests,  dry sandstone cliffs, and other native ecosystems offer significant water  quality,  flood  prevention,  habitat  and  aesthetic benefits.    Some  of  these  benefits  can  be  recovered  by increasing  the number of wetlands,  streams, and associated ecosystems.  

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. Green Corridor Restoration Strategy  ‐  ‐  ‐  $13  $14  $14  $41 

B. Wetland Reestablishment Feasibility Study  $51  $53  $55  ‐  ‐  ‐  $159 

C. Stream Corridor Restoration Feasibility Studies  $77  $80  $82  $84  $87  $90  $500 

D. Study of RR Lands for Wetland Restoration, Infiltration, Soils 

‐  ‐  ‐  $19  $19  $20  $58 

Total for 325‐ Wetland, Stream, & Ecosystem     Restoration ‐ Planning 

$128  $133  $137  $116  $120  $124  $758 

Amounts are expressed in thousands of dollars  

Objectives This  program  will  achieve  wetland,  stream,  and  ecosystem  restorations  as  opportunities  arise.  Protection  of District water  resources  is  essential.   However,  complete  ecosystem  health  can  be expanded through restoration of District wetlands and adjacent ecosystems.    Project Initiatives None. This budget item was formerly called Ecosystem Health & Integrity. Renaming has resulted in the subsequent development of new initiatives identified below.  Explanation of Planned Initiatives A. Green Corridor Restoration Strategy  

During years one  through  three of  the plan,  research and analysis of  strategies  to  restore native plants, wildlife habitat and wildlife corridors will be conducted.   The analysis will be coordinated  with  efforts  to  restore  stream  corridors  and  reestablish  wetlands.  Recommended corridor restoration strategies will be determined. 

Page 117: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  84 

Figure 10 Wetland Reestablishment Sites 

B. Wetland Reestablishment Feasibility Studies  

This initiative will investigate the feasibility of specific reestablishment projects identified in the  wetland  management  plan.    The  District  refers  to  this  process  as  wetland ‘reestablishment’  in  an  effort  to  distinguish  it  from  the  terms  ‘restoration’  or  ‘creation’ which  have  specific  definitions  is MN  Rules  8420 Wetland  Conservation  Act.    The  entire Wetland Management Plan can be  found  in Appendix F.   Specific wetland reestablishment opportunities  at  key  redevelopment  sites  such  as  the  Ford  Plant  will  be  studied.    It  is anticipated that 4‐6 detailed feasibility studies will be conducted.   Citizens are expected to have a role in selecting and prioritizing sites for restoration and will hopefully participate in the  implementation  of  the  projects. Areas with  active,  interested  citizen  groups  that  can assist the District in implementation will be considered in the site‐selection process.    The creation of additional wetland resources within a watershed enhances overall wetland functions.    Especially  in  an urban  setting,  the  contribution of  additional wetlands provide additional wildlife  habitat,  improve water  quality  of  adjacent waterbodies,  increase  local vegetative  diversity,  and  reduce  the  amount  of  pollutants  that  ultimately  reach  the Mississippi  River  or  District  Lakes.    The  District  has  committed  staff  and  resources  to identifying  opportunities  for reestablishment  of  historic wetland resources within the District.    The  District  is  also committed  to  monitoring and maintenance  of  created wetland features.     The  methodology  used  to define  potential  Wetland Reestablishment  sites focused  on  sites  containing historic  wetland  resources.   This  process  began  with  a review  of  historic  maps generated  for  the  District Land  and  Water  Resource Inventory  from  the  2010 Watershed  Management Plan.      

    

C. Stream Corridor Restoration Feasibility Studies  

As  part  of  the  Bringing Water  Back  to  St.  Paul  campaign,  the  District  will  explore  the feasibility and value of restoring a number of stream corridors during years 1‐6 of the plan.  A preliminary list of potential restoration sites has been developed for consideration.  Sites were selected based on historical water features, site topography,  infrastructure,  land use, ownership,  hydrologic  impacts,  and  existing  plans  for  redevelopment  or  restoration. Citizens,  landowners, and government agencies will play a key role  in guiding the scope of the Feasibility Studies.  To have success in “bringing water back”, figuratively and literally, a 

Page 118: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  85 

collaborative effort is important.  All District partners are expected to have a role in selecting and prioritizing sites for restoration.  The District will look to and support citizens who garner grass  roots  community  support  for projects.   The Stream Corridor Restoration Plan which can be  found  in Appendix H describes  the  stream  corridor  identification process,  the  site selection process  for  feasibility  studies during  the period of  the plan, and  the  strategy  for implementation.  It is anticipated that 4‐6 detailed feasibility studies will be conducted. 

 

• Trout Brook • Hidden Falls Creek • Phalen Creek • Sarita Stream • Finn's Stream • Edgecumbe Stream 

• Mears Creek • Highland Creek • Rice's Brook • Gateway Creek  • Cascade Creek/Fountain Creek • Loeb Creek   

 Figure 11: Stream Restoration Opportunities 

Page 119: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  86 

The  twelve  potential  stream  corridors  have  been  categorized  into  one  of  three  ratings according to the opportunities that may facilitate  implementation. Physical constructability (not  accounting  for  “political/neighborhood”  considerations)  and  the  potential  corridor’s link  to  District  Goals  &  Initiatives,  e.g.  accessibility,  visibility,  proximity  to  focus redevelopment  sites,  connectivity  to  existing  water  features  of  interest  and  hydrologic function also inform the rating done here.  It should be understood that the rating is based on fairly limited data and a general, “high altitude” look at the various factors effecting their feasibility for implementation.  It is understood that as new information becomes available, residents  and  communities  are  engaged,  and  funding  sources  become  available,  the priorities  could  shift.    The  following  table  illustrates  the  established  priority  ranking developed at this broad, planning‐level.  It is recommended that at least 4‐6 of the top rated corridors, which would include all Level 1 and some Level 2 stream corridors, be selected for completion of a feasibility study during years 1‐6 of the plan.   Due to the many variables affecting feasibility, corridor selection for feasibility studies needs to be flexible.  Those corridors that are selected for technical feasibility studies will be based on the findings noted in the following table which could change as new information comes to  light.    Time  sensitive  factors  that will  guide  the  selection process  include, but  are not limited to, community support, funding opportunities and timing of redevelopment projects.  Citizen participation will play a key role in selecting sites for restoration.  Areas with active, interested citizen groups will be weighted in the site‐selection process.  Based on findings of the  feasibility  studies,  we  expect  that  one  to  three  of  these  stream  corridors  will  be implemented during  years 4‐10 of  the plan.    It  is desired  that  citizen  involvement  at  the planning stage will be coupled with participation at  the construction stage.   Opportunities for  involvement  will  be  explored  (e.g.  streambank  plantings  ‘adopted’  by  residents, associated green infrastructure such as rain gardens).  Stream Corridor Restoration Ratings 

Opportunity Rating  High Location Through Ford Plant/redevelopment site to Mississippi River Opportunity Ford Plant Redevelopment Site Constructability* High District Goals** High Hidden 

Falls Creek Additional Highlights: Why Is This Site A Good Candidate?

Good  visibility;  identified  for  restoration  by  Saint  Paul  on  the Mississippi Design Center  (City of Saint Paul and  the Riverfront Corporation);  full  site  redevelopment  gives  design  flexibility; potential  to  include  entire  historic  creek;  demonstration  site potential for future stream corridor restorations.

Opportunity Rating  High Location Stream under foot: Mears Park or Rice Park to Mississippi River 

in downtown St. Paul Opportunity Central Corridor Light Rail Development Constructability* Low District Goals** High

Mears Creek

Additional Highlights: Why Is This Site A Good Candidate?

"Stream under foot;" represented with artistic elements (grates, stamped concrete, sculptures ‐ see photos); popularity of and Connectivity to Mears Park “Stream”; high visibility and social/educational impact; establishes the campaign's presence in the downtown area. 

Page 120: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  87 

Opportunity Rating  High Location Restoration of upper Trout Brook and 'daylighting' lower Trout 

Brook to Mississippi River Opportunity Trillium Site Trout Brook Greenway Plan (City of St. Paul); CRWD 

owns Trout Brook Interceptor; Redevelopment SE of LaFayette Bridge and I‐94 

Constructability* High District Goals** High

Trout Brook

Additional Highlights: Why Is This Site A Good Candidate?

Constant inflow (water treatment plant); proximity to Bruce Vento Nature Sanctuary; partnership and public support/financing likely; Trout Brook is the largest historical stream in CRWD; phased implementation likely; restoration of existing surface reach. 

Opportunity Rating  High Location Along Phalen Blvd to Swede Hollow Park 

Opportunity 3M Redevelopment Site Constructability* High District Goals** High Phalen 

Creek Additional Highlights: Why Is This Site A Good Candidate?

Site is along an existing bicycle trail and connected to stream daylighted in Swede Hollow Park;  restoration of existing daylighted reach; good visibility; steady flow possible due to collection of spring water; close approximation of historical Phalen Creek. 

Opportunity Rating  High Location Through Fairgrounds to Sarita Wetland ‐ back into stormsewer 

Opportunity Local flooding and water quality corrections needed 

Constructability* High District Goals** High

Sarita Stream

Additional Highlights: Why Is This Site A Good Candidate?

Amenity for State Fair; high visibility and collaboration; connects to Sarita Wetland; open areas (UM farms, Fair parking) provides flexibility in restoration footprint. 

Opportunity Rating  Medium Location Along Ayd Mill Road to Mississippi River 

Opportunity  

Constructability* Medium District Goals** Medium

Cascade Creek/ Fountain Creek  Additional Highlights: 

Why Is This Site A Good Candidate?

Existing plan for Ayd Mill bike path (?); access to Fountain Cave; steady flow possible due to collection of spring water; close approximation of historical Cascade Creek and Fountain Creek. 

Opportunity Rating  Medium Location Summit Avenue to Shadow Falls/Finn's Glenn 

Opportunity Constructability* High District Goals** Medium Finn's 

Stream Additional Highlights: Why Is This Site A Good Candidate?

Wide parkway (easier construction) flows toward River; high visibility from running trail and local traffic (showcase); approximation of historical stream feeding Shadow Falls/Finn's Glenn; West Summit Avenue on National Register of Historic Places. 

Page 121: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  88 

Opportunity Rating  Medium Location Edgecumbe/St. Paul Ave to Mississippi  River 

Opportunity Constructability* High District Goals** Medium

Edgecumbe Stream

Additional Highlights: Why Is This Site A Good Candidate?

Corridor along St. Paul Avenue parkway; possible pilot Street Edge Alternative (SEA) site (as used in Seattle, WA); large‐lot industrial corridor at southernmost section; approximation of historical stream. 

Opportunity Rating  Medium Location Highland Golf Course to Mississippi River 

Opportunity Constructability* High District Goals** Low

Highland Creek

Additional Highlights: Why Is This Site A Good Candidate?

Through open space; potential park/golf course amenity; some design flexibility; flow input from springs or leaking water storage tanks?; close approximation of historical stream. 

Opportunity Rating  Low Location Como Lake “to” Loeb Lake along Maryland Avenue 

Opportunity Constructability* Medium District Goals** High Loeb Creek

Additional Highlights: Why Is This Site A Good Candidate?

Connects two District resources of interest; facilitates recreational movement across District; existing drainage infrastructure at low point of Maryland Avenue. 

Opportunity Rating  Low Location Irvine Park through Science Museum to Mississippi River 

Opportunity Constructability* Medium District Goals** Medium

Rice's Brook

Additional Highlights: Why Is This Site A Good Candidate?

Downtown amenity and artistic opportunity; high visibility; approximation of historical stream, Rice's Brook. 

Opportunity Rating  Low Location Gateway Trail to Trout Brook 

Opportunity Constructability* Low District Goals** High

Gateway Creek

Additional Highlights: Why Is This Site A Good Candidate?

Existing bicycle trail; connected to Trout Brook. 

  

D. Study of Railroad Lands for Wetland Reestablishment, Infiltration, Soils  

Railroad properties are not under  the  jurisdiction of  the District and often have significant impacts on District water  resources and  restoration efforts.   A  study will be  conducted  in order to determine the best strategy, methods, and opportunities for reducing stormwater runoff and other impacts from railroad land within the District. 

Page 122: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  89 

330 – Mississippi River Subwatersheds

Description and Purpose of Activity The District will provide technical assistance and planning on stormwater  management  for  these  projects.    Additionally, inspecting,  maintaining  and  monitoring  projects  after  they are constructed will help to ensure they function as intended for  the  long‐term.  This  activity  is  intended  to  capture initiatives  in  all  areas  outside  of  specifically  named subwatersheds of Como, McCarrons, Loeb, Crosby, and Trout Brook.     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  $27  $28  $29  $30  $31  $168  $313 

Planned Initiatives 

B. Large Scale Redevelopment Stormwater Management Planning 

$150  $150  $50  $50  $50  $250  $700 

C. Perform Stormwater Audits and Provide Recommendations 

‐  ‐  ‐  $30  $31  $135  $196 

D. Complete Strategic Street Sweeping/Structure Vacuuming 

‐  ‐  ‐  $17  $17  $95  $129 

E. Subwatershed Contamination Mitigation: Study  $26  $27  $27  ‐  ‐  ‐  $80 

F. Subwatershed Planning Process Schedule  $7  $7  $7  ‐  ‐  ‐  $21 

G. Sarita Wetland Plan Implementation Monitoring 

$2  $2  $2  $1  $1  $6  $15 

 Total for 330‐ Mississippi River Subwatersheds  

$212  $214  $115  $128  $130  $654  $1,454 

Amounts are expressed in thousands of dollars 

Objectives The objective  is to complete subwatershed‐based stormwater assessments and planning  for areas beyond  the  five  specifically named  subwatersheds  in  the District.   This  includes  investigation and management planning for specific areas of concern within the District and identification of BMPs for implementation by the District and its partners.  Project Initiatives A.    The  District  has  already  laid  the  groundwork  for  subwatershed  projects  outside  of  the 

McCarrons, Como, Loeb, Crosby, and Trout Brook watersheds.  Projects include early review and  coordination of  stormwater management planning  for major  redevelopment projects.  The  State  Fair  Board  and  the  University  of Minnesota  (U  of M)  continue  to  be  project partners on ongoing projects and  for opportunity  identification.   A complete  list of project initiatives is provided below. 

Page 123: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  90 

 

• Planning for Central Corridor, Ford Plant, etc. 

• Collaborate with U of M and State Fair • State Fair Progress Building rain garden maintenance 

• Participate on U of M Stormwater Steering Committee 

• U of M Sheep Pasture basin observation   

 Explanation of Planned Initiatives B. Large Scale Redevelopment Stormwater Management Planning  

The City of St. Paul is on the verge of one of the biggest redevelopment projects in decades. The  Central  Corridor  Light  Rail  Transit  Project  and  the  associated  redevelopment  that  is expected  to  occur  bisects  the  entire  District.  It  will  provide  many  opportunities  for development  and  redevelopment  throughout  the  entire  ten mile  corridor.    The  District intends to partner with the City of St. Paul, Ramsey County, and the Metropolitan Council to recreate and redevelop with sustainable stormwater management as a focus.  This approach began with the Central Corridor Light Rail Transit stormwater design workshop held on June 25,  2009  and  is  summarized  in  the Central Corridor  Light Rail  Transit  Stormwater Design Workshop Summary Report which can be found on the Districts website.    The  west‐central  portion  of  the  District  consists  entirely  of  large,  nearly  completely impervious land cover. The District will evaluate this area and develop area‐wide stormwater management approaches for large scale redevelopment properties. 

 C. Stormwater Audits and Provide Recommendations  

Develop  a  program  to  perform  stormwater  audits  for  residents,  businesses,  and  other property owners in the District. Emphasis will be on large parcels of land. Audits will identify stormwater issues and recommend potential management activities to address problems. 

 D. Strategic Street Sweeping/Structure Cleaning Plan  

Determine the most cost effective method to achieve greater  level of street sweeping and catch  basin  cleaning  throughout  the  District.    The  District  will  consider  the  option  of purchasing a combination street‐sweep/vacuum truck. 

 E. Subwatershed Contamination Mitigation: Study  

An  investigation  will  be  conducted  in  order  to  determine  the  source  of  high  levels  of contamination originating  from  subwatersheds of  the District.    Follow‐up/implementation activities will be performed as part of 430 A. 

 

F. Subwatershed Planning Process  

The  District  has  completed  a  management  plan  for  Como  Lake,  Loeb  Lake,  and  Lake McCarrons  as  well  as  for  specific  subwatersheds  within  each  of  the  larger  areas.  Subwatershed plans  for other key water  resources of  the District will be  scheduled under this  initiative.    In  addition,  the  District  will  outline  the  subwatershed  planning  process, creating a framework for future subwatershed plans. 

Page 124: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  91 

As part of  the  subwatershed planning  initiative,  the District will  identify priority areas  for water  quality,  hydraulic,  and  hydrologic  modeling  based  on  known  flooding  and  water quality  problems.  Existing  and  proposed model  scenarios will  guide mitigation measures.  Tasks  include  implementation  of watershed‐  and  conveyance‐based mitigation measures.  This initiative includes evaluation of alternatives to reduce flooding issues by implementing practices  in  the  watershed  as  opposed  to  providing  increased  conveyance.    Distributed upstream measures  can  also  have meaningful  ecological  and water  quality  impacts.    The modeling and analysis performed as part of the subwatershed planning efforts will be used to  identify  and  evaluate water  quality  treatment  or  improvement measures  in  the  given subwatershed.    In addition to addressing flooding  issues the subwatershed planning approach will be used to conduct water quality  improvement efforts to meet the various TMDLs being developed for  the Mississippi River and Lake Pepin.   The subwatersheds will be evaluated  to  identify potential water quality improvement opportunities to be implemented by the District and its partners.    Previously,  the  subwatershed  plans  have  included  a  partner  coordination component.    The partnership  approach will  allow  for  addressing  the  accounting of water quality treatment, and the plans will include a cost allocation approach to be agreed upon by each of the MS4 partners.  These plans will serve as the basis for the District’s subwatershed approach to addressing TMDL requirements.  Despite this coordinated effort, each MS4 will be ultimately responsible for their own area.    The Districts existing P8 water quality model and the findings of its monitoring program will be used to continue prioritization of subwatershed planning efforts, following the initial top priorities  of  East  Kittsondale  (based  on  high  pollutant  concentrations)  and  Trout  Brook (based on District ownership, MS4 responsibility, and high pollutant loadings).  The subwatershed management planning process will be one mechanism the District uses to keep  its Watershed Management Plan updated during  its ten year timeframe.   The District intends to use the subwatershed management planning process as a minor plan amendment process.  The public notification and review process of the minor amendment process will be followed in the subwatershed management planning effort and will result in an amendment to the Watershed Management Plan.  

G. Sarita Wetland Plan Implementation Monitoring  

The Sarita Wetland Plan was developed in 2003 and projects identified in the plan have been implemented.   This  initiative will monitor  the  implementation process. Monitoring  results will  be  analyzed  to  guide  future  work  on  Sarita  Wetland  and  for  other  similar implementation activities.   

Page 125: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  92 

370 Watershed Management Planning

Description and Purpose of Activity Watershed  Districts  are  required  to  develop  a watershed management  plan  according  to  Minnesota  State  Statute 103D.401.   The Board of Water and Soil Resources sets the requirements  of  the  plan.    Watershed  management planning  sets  the  stage  for  the  studies,  projects,  and programs  to be  implemented over  the planning period.    In 2000, the District adopted its first plan.  This second plan is the result of the required 10‐year update.  

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year  Total 

Planned Initiatives 

A. Third Generation Watershed Management Plan  ‐  ‐  ‐  ‐  ‐  $386  $386 

B. Strategic Planning  ‐  ‐  ‐  ‐  $12  $38  $50 

Total for 370 ‐ Watershed Management Planning  ‐  ‐  ‐  ‐  $12  $424  $436 

  Amounts are expressed in thousands of dollars  Objectives The major  objective  of watershed management  planning  is  to maintain  an  up  to  date  plan  that reflects the activities and  initiatives of the District.   This may necessitate plan amendments before the next required 10‐year update. 

 Project Initiatives None.    This  budget  item  has  historically  been  related  only  to  generation  of  the  next  generation watershed management plan. 

Explanation of Planned Initiatives

A. Third Generation Watershed Management Plan  

Completion of the Third Generation Watershed Management Plan will be required no  later than 2020.  This will be a multi‐year effort beginning in 2018. 

 

B. Strategic Planning  

Strategic  planning  will  be  conducted  as  an  initiative  under  watershed  management planning.  Every  five years  the District will complete a  situation assessment with  input  for District  partners  and  review  and  develop  the  District five year  vision.   Strategic  planning will allow  the  District  to  evaluate  how it  is  implementing  the  Plan  and  identify  ways  to improve implementation methods.  

Page 126: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  93 

390 – Special Projects and Grants

Description and Purpose of Activity The District is uniquely positioned to assist development and implementation of  special projects by District partners. This project will make grants available to support specific, timely, and  new  technologies  for  stormwater  management.  Programs across  the country may  inspire special projects, or they  may  come  out  of  local  planning  processes.  As opportunities  arise,  the  District  will  help  develop  and implement these special projects.     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  $8  $9  $9  $9  $9  $51  $95 

Planned Initiatives 

B. Green Infrastructure Incentive Program  $10  $11  $11  ‐  ‐  ‐  $32 

 Total For 390‐Special Projects and Grants  

$18  $20  $20  $9  $9  $51  $127 

Amounts are expressed in thousands of dollars 

Objectives Implement  specific  projects  and  grants  with  a  special  purpose  that  have  come  out  of  partner planning  processes.    This  budget  item  is  intended  to  provide  a  funding  source  for  campaigns, programs, and projects that are not routine and are not yet covered by an existing budget item. 

 Project Initiatives A. Staff and engineering support of special projects and grants.  Explanation of New Initiatives B. Green Infrastructure Incentive Program  

Work with member communities to develop an incentive program designed to improve the quantity and quality of environmentally  sensitive  landscaped areas while allowing greater flexibility for developers and designers to meet open space requirements and federal, state, and  local  stormwater  regulations  (e.g.  Seattle Green  Factor  Program).    This  program will increase green elements in the landscape which will improve air quality, reduce heat island effect,  help  reduce  energy  consumption,  provide  for  carbon  sequestration,  reduce stormwater runoff and provide water quality treatment. 

Page 127: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  94 

401 – Shoreline and Streambank Restoration

Description and Purpose of Activity The  City  of  Saint  Paul,  Division  of  Parks  and  Recreation developed  a  Como  Lake  Shoreline  Vegetation Management Plan with protocols  for managing vegetation  in 13  shoreline sections  around  the  lake.  This  plan  was  reviewed  and approved by  the  two St. Paul Planning Districts  in  the Como area,  Districts  10  and  6,  as  well  as  the  Environment Committee  of  District  10  and  the  Saint  Paul  Parks Commission.   The District assists with the  implementation of this  plan  through  cost‐share  funding.    The  District  also participates  in  a  shoreline  restoration  program  for  Lake McCarrons  in cooperation with Ramsey Conservation District and  BWSR.  Shoreline  restoration  for  other  District  water resources will also be studied and implemented.  Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A. Project Initiatives  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

Planned Initiatives 

B. Mississippi River Streambank and Bluff Restoration 

$45  $46  $47  $11  $12  $63  $224 

C. Loeb and Crosby Lakes Shoreline Restoration – Implementation  

$45  $46  $47  $11  $12  $63  $224 

Total for 401‐ Shoreline & Streambank Restoration  $90  $92  $94  $22  $24  $126  $448 

 Dollar amounts are expressed in thousands of dollars 

Objectives The  objectives  of  the  shoreline  and  streambank  restoration  programs  are  to  provide  cost‐share funding  for  the  shoreline  restoration work around Como and McCarrons Lakes and  to  implement the  shoreline  restoration  plans  for  Loeb  and Crosby  Lakes  and  streambank  and bluff  restoration adjacent to the Mississippi River. 

 Project Initiatives A.    Since the Como Lake Shoreline Vegetation Management Plan has been in place, the District 

has  helped  fund  projects  around  Como  Lake.    Similarly,  implementation  of  a  shoreline restoration program  for Lake McCarrons was underway  in 2009.   The Lake McCarrons and Como Lake Shoreline Restoration Projects will continue with Ramsey Conservation District and  the  City  of  St.  Paul  as  project  partners,  respectively.    These  program  initiatives  are expected to be largely completed by 2011.  Funding for maintenance only will be needed for Lake McCarrons and Como Lake shoreline restorations which will be accomplished through initiative 301.   

 

Page 128: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  95 

Explanation of Planned Initiatives  

B. Mississippi River Streambank and Bluff Restoration Streambank and bluff restoration plans developed under 301B will be implemented. 

 C. Loeb and Crosby Lakes Shoreline Restoration – Implementation  

Shoreline restoration plans developed under 301C will be implemented.  

Page 129: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  96 

405 – Como Lake Subwatershed BMPs

Description and Purpose of Activity Stormwater BMPs were analyzed and evaluated in the Como Lake Strategic Lake Management Plan to reach water quality goals.    Practices  considered  included:  water  quality  ponds, rain  gardens,  infiltration  trenches,  alum  treatment  for stormwater,  catch  basin  sump  manholes,  mechanical separators/filter  systems,  and  catch  basin  inserts.  Management activities were also  identified  for each area of concern, such as street sweeping.   This program  implements these stormwater BMPs in the Como Lake Watershed.    Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives A. (Como 3) Orchard Center Underground 

Infiltration $54  $56  $57  ‐  ‐  ‐  $167 

B. (Como 3) Horton and Van Slyke Rain Garden  $4  $4  $4  ‐  ‐  ‐  $11 C. (Como 3) McMurray Field Re‐Use Basin  $253  $260  $268  ‐  ‐  ‐  $781 D. (Como 3) Lake Como Pavilion Pervious 

Parking $40  $41  $42  ‐  ‐  ‐  $123 

E. (Como 3) Argyle and Van Slyke Rain Gardens  $15  $15  $16  ‐  ‐  ‐  $46 F. (Como 3) High School Pervious Parking  $56  $58  $59  ‐  ‐  ‐  $173 G. (Como 3) Bump‐out Rain Gardens  $14  $15  $15  ‐  ‐  ‐  $44 H. (Como 3) Chatsworth /        Como Underground Filtration 

$68  $70  $72  ‐  ‐  ‐  $209 

I. Como 2 Implementation Plan  ‐  ‐  ‐  $163  $168  $276  $607 J. Como 4 Implementation Plan  ‐  ‐  ‐  $206  $213  $348  $766 K. Como 5 Implementation Plan  ‐  ‐  ‐  ‐  ‐  $277  $277 L. Como 6 Implementation Plan  ‐  ‐  ‐  ‐  ‐  $277  $277 

Total for 405‐ Como Lake Subwatershed BMPs  $504  $519  $533  $369  $381  $1,178  $3,481 

Amounts are expressed in thousands of dollars 

Objectives Construct  the  BMP  facilities  identified  from  the  Como  3  and  Como  8  subwatershed  study recommendations  and  develop  implementation  plans  for  Como  2,  4,  5,  and  6.      District  urban stormwater management goals to reduce pollutant loading to the District’s water resources and to use volume  reduction  techniques  to manage  stormwater are addressed directly by  the  initiatives below.  Project Initiatives None  

Page 130: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  97 

Explanation of Planned Initiatives A. (Como 3) Orchard Center Underground Infiltration  

The Orchard  Recreation Center  contains  open  areas  used  for  soccer  and  baseball  by  the neighboring community.   Design and install an underground basin and associated diversion structure  that  discharges  to  Lake  Como.    This  will  provide  continued  recreation opportunities without the possibility of flooded or soggy fields. 

 B. (Como 3) Horton and Van Slyke Rain Garden  

The  intersection  of  Horton  Avenue  and  Van  Slyke  Avenue  currently  includes  a  mix  of medians  and  lane  separations  for  traffic  control.    In  one  such  triangular median  that  is currently grass covered and of  sufficient area, design and  install a depressed  rain garden.  Install curb cuts, valley gutters and/or street gradient adjustments to direct runoff to it. 

 C. (Como 3) McMurray Field Re‐Use Basin  

The St. Paul Park and Recreation Department is considering a major renovation of the Como Park swimming pool. Additionally, St. Paul Public Works  identified  this  location as a prime location to treat the largest stormwater subcatchment area due to the large trunk line under Lexington.     Design and  install an underground  storage  reservoir  for  irrigation use on  the pool  site  as  well  as  the  adjacent  McMurray  Field.    Obtain  additional  soil  borings  and determine the water table location to further evaluate the site for infiltration.   

 D. (Como 3) Como Lake Pavilion Pervious Parking  

The expansive parking lot located south of the Lake Como Pavilion slopes towards the lake.  Design and install pervious pavers or other porous pavement along the eastern parking stalls with an underdrain system discharging  into the existing storm sewer outfalls.   Runoff from the parking  lot as well as drainage from the hill to the west, would drain  into the pervious surface, through a rock media, and be collected by the underdrain system.  Evaluate the soils and  groundwater  table  elevation  to  determine whether  an  underdrain  system would  be needed. 

 E. (Como 3) Argyle and Van Slyke Rain Gardens  

Argyle Street  intersects Van Slyke Avenue  in a “Y” pattern  leaving a  large  triangle median and an expanse of pavement.  Design and construct the realignment of the intersection into a  traditional  “T”  using  the  resulting  berm  areas  for  rain  garden  development.    The  rain garden to the west would treat surface flows collected at the curb line from rooftops, yards and sidewalk from the west and south while an additional rain garden on the east side of the intersection  would  treat  curbline  flows  traveling  from  the  south.    Install  curb  inlets downstream of the curb openings into the rain garden to accept excess flows once the first 1.0‐inch of runoff is captured in rain gardens. 

Page 131: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  98 

 F. (Como 3) High School Pervious Parking  

The expansive parking lot located on the campus of Como Park Senior High School provides the  opportunity  to  construct  a  pervious  pavement  system.    Design  and  install  pervious pavers or another porous surface (concrete or asphalt)  in the vicinity of the existing storm drain inlet located at the western end of the parking lot.   Runoff from the parking lot would drain through a pervious surface, through rock media and would be held in void space below ground.  It is expected that the soils below the rock media will allow infiltration back into the groundwater  thereby  reducing  storm  sewer  water  quantity  as  well  as  improving  water quality. Since the site is currently paved, borings were not taken at this location.  Before final design,  a  boring  is  recommended  to  confirm  the  ability  to  infiltrate.    Excess  stormwater would be  collected by  a  catchbasin  and  conveyed  via  the existing  storm  sewer  collection system.   

 G. (Como 3) Bump‐out Rain Gardens  

The existing streets south of the railroad  in the subcatchments  identified as 3_2, 2_2, and 2_3 are scheduled  for  improvement by  the City of St. Paul.   This area  is  in  the City’s 2010 RSVP  (Residential  Street  Vitality  Program).  Orchard  Avenue  has  the  potential  for implementation of  small bump‐out  rain gardens at  the  street  intersections because  there are no sidewalks and fewer trees.  Construct bump‐outs to provide a depressed area where runoff  containing  the  first  flush  would  enter  via  curb  openings  and  either  infiltrate, evaporate or be taken up by plantings.  Engineered soil with an infiltration rate of 1.0‐in/hr is required due to the small footprint to maximize treatment. Runoff that  is greater than the garden  volume  would  bypass  the  depression  and  travel  to  a  traditional  curb  inlet.  If implemented,  the bump‐outs would provide visual enhancements  to  the street and  traffic calming benefits. 

 H. (Como 3) Chatsworth/Como Underground Filtration  

Design and construct an underground infiltration basin at the open turfed area located near the Chatsworth Street storm trunk line in the subcatchment identified as 3_1.  Divert flows from the trunk line under Chatsworth Street with a 12‐inch storm pipe.  Alternatively, divert flows  from  the  smaller  adjacent  storm  sewer  under  Como  Avenue.    Take  additional  soil borings that are deeper than 6‐feet to further evaluate the soils and infiltration ability.  

 I. Como 2 Implementation Plan  

Complete the Subwatershed #2 implementation plan based on the feasibility study.  

J. Como 4 Implementation Plan  

Complete the Subwatershed #4 implementation plan based on the feasibility study.  

K. Como 5 Implementation Plan  

Complete the Subwatershed #5 implementation plan based on the feasibility study.  

L. Como 6 Implementation Plan  

Complete the Subwatershed #6 implementation plan based on the feasibility study.  

Page 132: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  99 

 

413 – Lake McCarrons Subwatershed BMPs

Description and Purpose of Activity Stormwater BMPs were analyzed and evaluated  in  the  Lake McCarrons Management Plan  in combination to reach water quality goals.   Various practices have been considered.   This program  implements  these  stormwater  BMPs  in  the  Lake McCarrons subwatershed.   

   Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015 

2016‐20 

Ten Year Total 

Planned Initiatives 

A. (McCarrons 4) MnDOT Pond Baffle Skimmer  $1  $1  $1  ‐  ‐  ‐  $1 

B. (McCarrons 4) William Street Pond Retrofits  $5  $5  $6  ‐  ‐  ‐  $16 

C. (McCarrons 4) Lakeshore Buffer Improvements  $11  $11  $12  ‐  ‐  ‐  $34 

D. (McCarrons 4) Boulevard Hydrodynamic Separator  $8  $9  $9  ‐  ‐  ‐  $26 

E. (McCarrons 4) Boat Launch ‐ Pervious Pavement  ‐  ‐  ‐  $3  $3  $3  $10 

F. (McCarrons 4) Boulevard Infiltration Trenches  ‐  ‐  ‐  ‐  ‐  $48  $48 

G. Villa Park Performance Improvement Projects  $500  ‐  $200  ‐  ‐  $200  $900  Total for 413‐ Lake McCarrons Subwatershed BMPs  

$525  $26  $228  $3  $3  $251  $1,035 

Amounts are expressed in thousands of dollars 

Objectives Implement the recommendations from the Subwatershed #4 Subwatershed Management Plan and the  improvements  identified  in the Villa Park Wetland Management Plan. These  initiatives directly address  the  District  urban  stormwater  management  goals  to  reduce  pollutant  loading  to  the District’s water resources and to use volume reduction techniques to manage stormwater. 

 Project Initiatives None.   Explanation of Planned Initiatives  

A. (McCarrons 4) MnDOT Pond Baffle Skimmer  

Request  that Mn/DOT and Ramsey County  install a baffle  skimmer outlet at  the Mn/DOT facility on Highway 36 for those rare times that flow does leave the facility. A skimmer would keep most of the floatable organic debris from the highly vegetated storage area within the facility. The facility should be managed for infiltration and maintained accordingly. 

 

Page 133: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  100 

 B. (McCarrons 4) William Street Pond Retrofits  

The City of Roseville maintains a drainage easement for a detention facility  located east of William  Street  and  adjacent  to  the National Guard Armory.   Most  of  the  remaining  area  north of Lake McCarrons, not draining  to  the MNDOT pond and within  the subwatershed, drains  to  the William  Street  pond.    This  facility  has  a  large  amount  of  currently  unused volume  above  the  normal water  level  that  could  be  used  for  storage  and  treatment  of untreated  stormwater  runoff,  if  the outlet  structure were modified.     Retrofit  the existing detention pond in order to take advantage of the available storage and increase the pond’s treatment capacity.   

 C. (McCarrons 4) Lakeshore Buffer Improvements  

Install shoreline  restoration projects  in cooperation with  the Ramsey Conservation District cost‐share program. 

 D. (McCarrons 4) Boulevard Hydrodynamic Separator  

Due to space considerations and steep slopes, it would be difficult to install surface BMPs at a  location  that would  intercept  runoff  coming  from North McCarrons Boulevard.  Instead, install a hydrodynamic separating device within the stormwater drainage network. A logical location  for  such  a  device  would  be  on  North  McCarrons  Boulevard,  just  west  of  the Giesman Street intersection, where two pipes join together and then discharge to the south, down to Lake McCarrons. 

 E. (McCarrons 4) Boat Launch ‐ Pervious Pavement  

Install  a  3,600  square  foot  pervious  pavement  boat  launch  at  the  Ramsey  County  beach location.  The pervious pavement boat launch would be in an area heavily used by the public with great potential for an education project.  

 F. (McCarrons 4) Boulevard Infiltration Trenches  

Install  infiltration  trenches  in  several  areas  along  both  North  and  South  McCarron Boulevards within  the  road  right‐of‐way  to  treat  the  street  and near‐street drainage.   By routing  the  runoff  from  7.3  acres  of  land  in  these  areas  into  infiltration  trenches,  an additional 3.1 pounds of total phosphorus can be removed. 

 G. Villa Park Performance Improvement Projects  

Implement projects  recommended  in  the Villa Park Wetland Management Plan  (VPWMP) including  potential  watershed  improvement  projects.    The  VPWMP  is  available  on  the District website.   

Page 134: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  101 

415 – Loeb Lake Subwatershed BMPs

Description and Purpose of Activity Stormwater BMPs were recommended  in the Loeb Lake and Willow  Reserve  Management  Plan  to  reach  water  quality goals.    This  program  implements  stormwater  BMPs  in  the Loeb  Lake  subwatershed  and  restores  wetland  areas  in Willow Reserve.   

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. (Loeb/Willow) Skimmer Structure  $3  $4  $4  ‐  ‐  ‐  $11 

B. (Loeb/Willow) Stormwater Treatment Practices  $10  $11  $11  ‐  ‐  ‐  $32 

C. (Loeb/Willow) Willow Reserve Restoration  $26  $27  $27  $28  $29  $158  $295 

 Total for 415‐ Loeb Lake Subwatershed BMPs  

$39  $42  $42  $28  $29  $158  $338 

  Amounts are expressed in thousands of dollars 

Objectives Implement  the  relevant  recommendations  from  the  Loeb  Lake  and Willow Reserve Management Plan.  These  initiatives  directly  address  District  urban  stormwater management  goals  to  reduce pollutant  loading  to  the  District’s  water  resources  and  to  use  volume  reduction  techniques  to manage stormwater.  Project Initiatives None.  Explanation of Planned Initiatives A. (Loeb/Willow) Skimmer Structure  

Install a skimmer structure on the pipe connecting the southeast pond to Loeb Lake to retain floatable debris. 

 

B.  (Loeb/Willow) Stormwater Treatment Practices  

Install  stormwater  treatment  practices  in  the  Loeb  Lake  South  subwatershed  as opportunities arise. 

 C.  (Loeb/Willow) Willow Reserve Restoration 

 

Implement the restoration plan recommended by the stakeholder group. 

Page 135: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  102 

417 – Crosby Lake Subwatershed BMPs

Description and Purpose of Activity Stormwater  BMPs  will  be  analyzed  and  evaluated  in  the Crosby Lake Management Plan. Feasible projects identified in the plan will be implemented as part of this initiative.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. Crosby Lake Management Plan Implementation  ‐  ‐  ‐  $38  $39  $40  $116 

 Total for 417‐ Crosby Lake Subwatershed BMPs  

‐  ‐  ‐  $38  $39  $40  $116 

  Amounts are expressed in thousands of dollars 

Objectives Specific recommendations from Crosby Lake Management Plan (to be developed under 317 A) will be  implemented. These activities directly address District urban stormwater management goals to reduce pollutant  loading to the District’s water resources and to use volume reduction techniques to manage stormwater.  Project Initiatives None.  Explanation of Planned Initiatives A. Crosby Lake Management Plan Implementation  

Feasible restoration projects identified in the Crosby Lake Management Plan (317 A) will be implemented as part of this initiative.  

Page 136: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  103 

420 – Trout Brook Subwatershed BMPs

Description and Purpose of Activity In 2003,  the District  completed  the  first 10‐Year CIP  for  the Trout Brook  Storm  Sewer  Interceptor  system.    In  that plan, major  repairs  were  identified  in  the  vicinity  of  the intersection  of  the Maryland  Avenue  and  the  Trout  Brook Storm Sewer Interceptor as well as a segment of Trout Brook adjacent  to  Willow  Reserve.    These  major  repairs  were completed between 2006 and 2009.   The second generation 10‐year  CIP  was  completed  in  the  spring  2009  which identified future needed repairs for the TBI. The Trout Brook Interceptor CIP is included as Appendix G of the plan. 

   Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. (TBI) Repair Work Sta. 0+00 – 19+93  $81  ‐  ‐  ‐  ‐  ‐  $81 

B. (TBI) Repair Work Sta. 23+15 – 28+49  $22  ‐  ‐  ‐  ‐  ‐  $22 

C. (TBI) Repair Work Sta. 28+49 – 32+33  $16  ‐  ‐  ‐  ‐  ‐  $16 

D. (TBI) Repair Work Sta. 32+33 – 33+34  $4  ‐  ‐  ‐  ‐  ‐  $4 

E. (TBI) Repair Work Sta. 33+62 – 59+45  ‐  $105  ‐  ‐  ‐  ‐  $105 

F. (TBI) Repair Work Sta. 112+76 – 136+16  ‐  $95  ‐  ‐  ‐  ‐  $95 

G. (TBI) Repair Work Sta. 136+16 – 168+73  $132  ‐  ‐  ‐  ‐  ‐  $132 

H. (TBI) Repair Invert Sta. 185+82 – 186+94  $40  ‐  ‐  ‐  ‐  ‐  $40 I. (TBI) Repair Work (West Tunnel) Sta. 0+00 – 

17+62 $70  ‐  ‐  ‐  ‐  ‐  $70 

J. (TBI) Future Tunnel Repairs  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 

K. (TBI) General Tunnel Maintenance  ‐  ‐  $150  ‐  ‐  $150  $300 

L. TBI Subwatershed Study Implementation  ‐  ‐  ‐  $75  $77  $80  $232  Total for 420‐ Trout Brook Subwatershed BMPs  

$365  $200  $150  $75  $77  $230  $1,097 

Amounts are expressed in thousands of dollars 

Objectives Complete  necessary major  repairs  to  ensure  the  Trout  Brook  Storm  Sewer will  function  in  good operating condition.   Project Initiatives None. Explanation of Planned Initiatives

A. (TBI) Repair Work Sta. 0+00 – 19+93  

Complete Repair Work Sta. 0+00 to 19+93. 

Page 137: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  104 

 B. (TBI) Repair Work Sta. 23+15 – 28+49  

Repair and Replacement Work Sta. 23+15 to 28+49.  

C. (TBI) Repair Work Sta. 28+49 – 32+33  

Complete Repair Work Sta. 28+49 – 32+33.  D. (TBI) Repair Work Sta. 32+33 – 33+34   

Complete Repair Work Sta. 32+33 – 33+34.  E. (TBI) Repair Work Sta. 33+62 – 59+45   

Complete Repair Work Sta. 33+62 – 59+45.  

F. (TBI) Repair Work Sta. 112+76 – 136+16   

Complete Repair Work Sta. 112+76 – 136+16.  

G. (TBI) Repair Work Sta. 136+16 – 168+73   

Complete Repair Work Sta. 136+16 – 168+73.  

H. (TBI) Repair Invert Sta. 185+82 – 186+94   

Repair Invert Sta. 185+82 – 186+94.  

I.  (TBI) Repair Work (West Tunnel) Sta. 0+00 – 17+62   

Complete Repair Work (West Tunnel) Sta 0+00 – 17+62.  

J.  (TBI) Future Tunnel Repairs  

Complete repair work throughout tunnel based on inspection in 2012.  K. (TBI) General Tunnel Maintenance  

Complete minor tunnel maintenance work.    L. TBI Subwatershed Study Implementation 

 

Projects identified in TBI Subwatershed Studies (320 L) will be implemented.  

 

Page 138: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  105 

425 – Wetland, Stream & Ecosystem Restoration - Implementation

Description and Purpose of Activity Nearly all of the pre‐settlement wetlands of the District have been  lost  to  development  and  other  ecosystems  are degraded.  Wetlands,  oak‐maple‐basswood  forests,  dry sandstone cliffs, and other native ecosystems offer significant water quality, habitats and aesthetic benefits.  Some of these benefits  can  be  recovered  through  ecological  restoration projects.  The  District Wetland Management  Plan  evaluates the wetland resources of the District, describes the approach to  protecting  the  functions  and  diversity  of  the  District’s wetlands,  and  creates  the  framework  to  improve  these resources.      

Projected Expenditures

10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 Ten Year Total 

Planned Initiatives 

A. Green Corridor Restoration: Implementation  ‐  ‐  ‐  ‐  ‐  $103  $103 

B. Stream Corridor Restoration: Implementation  ‐  ‐  ‐  $563  $580  $2,527  $3,669 

C. Wetland Improvement  $31  $32  $33  $34  $35  $190  $354 

D. Wetland Reestablishment: Implementation        $100  $100  $400  $600 

E. Implementation of RR Land Restoration Projects  ‐  ‐  ‐  ‐  ‐  $257  $257 

Total for 425‐Wetland, Stream, and Ecosystem Restoration – Implementation 

$31  $32  $33  $697  $714  $3,477  $4,983 

  Amounts are expressed in thousands of dollars 

Objectives Identified  initiatives  to  implement wetland,  stream  and  ecosystem  restoration projects, will help ensure  the protection of wetlands and ecosystems, and encourage  the enhancement of wetlands and ecosystems.  A consistent message heard throughout the District’s issues identification process was the need for ecological restoration within the watershed.   These initiatives will directly address this need. 

Project Initiatives None. 

Page 139: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  106 

Explanation of Planned Initiatives  

A.   Green Corridor Restoration: Implementation  

Based  on  the  corridor  restoration  strategies  identified  and  recommended  in  the  through initiative  325A,  projects  for  native plant, wildlife,  and wildlife  corridor  restoration will  be implemented  during  years  4  through  10  of  the  plan.      Projects  in  this  initiative will  be coordinated with the Stream Corridor and Wetland Restoration initiatives. 

 B. Stream Corridor Restoration: Implementation  

As part of the Bringing Water Back to St. Paul campaign, the District will implement feasible restoration projects identified in 325C ‐ Stream Corridor Restoration Feasibility Studies. The District anticipated  implementing 1‐3 stream restoration projects  in years 4‐10 of the plan.  Site  selection  and  implementation  will  be  guided  by  technical  design  criteria  as  well  as community  vision  expressed  through  public  participation  in  the  process.    Availability  of funding and the timing of redevelopment are key variables expected to affect the timing and priorities  of  what  corridors  are  pursued  first.    The  Stream  Corridor  Restoration  Plan  in Appendix  H  describes  the  stream  corridor  identification  process,  the  sites  selected  for feasibility  studies  during  the  period  of  the  plan,  and  the  strategy  for  implementation.  Included in this initiative will be maintenance of the existing Phalen Creek stream restoration in  Swede  Hallow  Park.   Once  constructed,  the  District would  expect  these  reestablished water resources to achieve all applicable water quality standards.   

C. Wetland Improvement  

Conduct wetland  improvements  as  identified  in  the Wetland Management  Plan which  is included as Appendix F.  Improvements will include vegetation and hydrologic improvements that will be  conducted  through a program  that engages  residents of  the District.   Specific information  on  wetland  improvement  opportunities  and  priorities  can  be  found  in  the bulleted text on page F‐14 of Appendix F.   

 D. Wetland Reestablishment: Implementation 

 

Implementing  feasible  reestablishment  projects  identified  in  Wetland  and  Ecosystem Restoration ‐Planning (325 C), including key potential redevelopment sites such as the Ford Plant, will be implemented in years 4‐10 of the plan. Wetland Banking and projects identified in subwatershed analysis will be included for implementation.  Refer to Table 1 on page F‐20 of Appendix F for further information on wetland reestablishment sites. 

 E. Implementation of Railroad Land Restoration Projects 

 

Feasible  and  beneficial  projects  identified  in  325D  aimed  at  addressing  the  impacts  of railroad lands will be implemented in this initiative. 

Page 140: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  107 

430 – Mississippi River Subwatersheds BMPs

Description and Purpose of Activity In areas outside of the McCarrons, Como, Loeb, Crosby, and Trout Brook  subwatersheds, projects are being planned and constructed by the District.  This program will construct these projects  to  improve  water  quality.    The  most  significant project over  the 10‐year  life of  this Plan will be  the Central Corridor redevelopment project 

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. Subwatershed Contamination Mitigation: Implementation 

‐  ‐  ‐  $75  $77  $80  $232 

B.     CCLRT BMP Implementation  $100  $200  $100  $100  $100    $600 

Total for 430‐Mississippi River Subwatersheds BMPs 

$100  $200  $100  $175  $177  $80  $832 

  Amounts are expressed in thousands of dollars 

 Objectives Objectives of  this  initiative are  to complete planned projects  for areas outside of  the McCarrons, Como, Loeb, Crosby, and Trout Brook subwatersheds, that use cost effective stormwater BMPs for water quality improvements.  Through these projects the District will develop and maintain positive working  relationships  with  District  partners.    These  initiatives  directly  address  District  urban stormwater management goals  to  reduce pollutant  loading  to  the District water  resources and  to use volume reduction techniques to manage stormwater. 

Project Initiatives None.  Explanation of Planned Initiatives  A. Subwatershed Contamination Mitigation: Implementation  

Implement measures to mitigate the contamination present in subwatersheds of the District, per the investigation conducted as part of 330 E.  

B. Central Corridor Light Rail Transit: Implementation  

Implement 15  ‐ 20 green  infrastructure practices  in  the CCLRT area  to  reduce  stormwater runoff,  improve  water  quality  in  the  Mississippi  River  and  enhance  landscaping  and aesthetics of the corridor.  These projects will also raise public awareness of stormwater and its management.  

Page 141: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  108 

435 – Stormwater Impact Fund Implementation

Description and Purpose of Activity Rules were  adopted  by  the  District  in  September  of  2006.  The  alternative  compliance  section of Rule C provides  for  a payment  to  the  Stormwater  Impact  Fund  when  onsite compliance  with  the  volume  reduction  criteria  cannot  be achieved.    The  funds  collected  will  be  used  to  construct volume reduction BMPs of the equivalent magnitude of what could not be achieved on  the permitted project.   The  funds will  be  spent  according  to  the  Stormwater  Impact  Fund Implementation  Plan  adopted  by  the  District which  can  be found in Appendix I.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A. Volume Reduction BMP Implementation  ‐  ‐  ‐  $53  $54  $56  $162 

Total for 435‐Stormwater Impact Fund Implementation 

‐  ‐  ‐  $53  $54  $56  $162 

  Dollar amounts are expressed in thousands of dollars 

Objectives Stormwater Management Rule C of District Rules requires permanent Best Management Practices (BMPs) to achieve volume reduction  in the amount equivalent to one  inch of rainfall over the new impervious  surfaces  of  the  development.    The  alternative  compliance  section  of  Rule  C,  section 3(c)(2), part (iii) allows for payment to the Stormwater Impact Fund when on‐site practices, off‐site treatment, or banked  volume  reduction  credits  can not be used  to  achieve  compliance.   Money contributed  to  the  Fund will  be  used  to  provide  equivalent  volume  reduction  elsewhere  in  the District per the District Stormwater Impact Fund Implementation Plan.  See Appendix I.       Project Initiatives None.  Explanation of Planned Initiatives A. Volume Reduction BMP Implementation  

The funds collected through the Stormwater  Impact Fund will be used to construct volume reduction BMPs of  the equivalent magnitude  to what could not be achieved on permitted project sites per the District Stormwater Impact Fund Implementation Plan as amended.  See Appendix I.   

Page 142: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  109 

440 – Special Projects and Grants

Description and Purpose of Activity Periodically,  projects  initiated  by  other  entities  present  a great  opportunity  for  the  District  to  improve water  quality while  partnering  with  local  agencies.    These  projects  can difficult  to  anticipate  so  an  accessible  funding  source  is needed  so  the  District  can  take  advantage  of  these opportunities.    This  program  provides  stable  and  available funding  for  projects  initiated  by  the  District  and  other agencies.     Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Project Initiatives  $258  $265  $273  $281  $290  $1,585  $2,952 

Planned Initiatives 

B. Stormwater Reuse Demonstration  $27  $28  $29  ‐  ‐  ‐  $85 

Total For 440‐ Special Projects and Grants  $285  $293  $302  $281  $290  $1,585  $3,037 

  Amounts are expressed in thousands of dollars 

Objectives The  objectives  of  this  program  are  to  assist  in  funding  capital  improvement  projects  of  District partners. The intended outcome is cost effective water quality improvements and the development of  positive working  relationships with District  partners.     Goals  for  establishing  partnerships  are stated  throughout  the  Issues,  Goals  and  Policies  of  the  District.    Projects  and  grants  are  also intended to improve ecosystem health through the restoration of natural areas, an important issue identified during the issue identification process. 

Project Initiatives A.    The Special Projects and Grants Program has been active since 2008.    In  fact,  the District 

has  made  and  will  continue  to  make  significant  ongoing  efforts  for  implementing  the program  and  related  guidance,  leveraging  funding,  encouraging  partnerships  and implementing BMPs with partners.  A complete list of project initiatives is identified below. 

 • Implement Special Grant program, protocols, and guidance • Award grants for WQ, leveraged funding, partnerships • Work with partners to implement water quality practices  

Page 143: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  110 

The goal of the Special Grants program is to accomplish one or more of the following in partnership with governmental units and other entities:  

• Improve water quality by decreasing stormwater runoff and increasing pollutant removal 

• Preserve and protect plant and wildlife communities adjacent to lakes, rivers and wetlands 

• Establish links between people and water resources through education • Provide demonstration projects for innovative management practices 

 The Special Grants are primarily intended for public projects.  Private projects will be evaluated based on public benefit.  Only water resource improvement elements of the project are eligible for funding.  Projects must be located within the Capitol Region Watershed District.  Projects completed or in progress prior to application are not eligible for funding.  CRWD may offer to fund all, or a portion of, the requested amount.  The following entities are eligible for CRWD Special Grants:  

• Government agencies serving the CRWD • Public and private schools located within the CRWD • Nonprofit, faith‐based or religious organizations serving the CRWD  

 Special Grants Project applications will be evaluated against the following 3 major criteria:    1. Water Resource Management effectiveness and efficiency  2. Education and Demonstration Potential  3. Innovative Solution  

  

Explanation of Planned Initiatives B. Stormwater Reuse Demonstration  

Plan and implement a demonstration site utilizing a stormwater capture and reuse system.  

Page 144: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  111 

450 – Innovation and Future Trends

Description and Purpose of Activity As  new  technologies  emerge  in  water  resources management,  science,  and  engineering  and  the  fields continue  to  evolve,  the  District  is  responsible  for  staying aware of scientific trends and  interpreting them for practical application. The District is uniquely positioned to ensure that new  knowledge  is  properly  applied  within  its  boundaries.  This  is  necessary  in  order  for  the  District  to  maintain  its leadership role with regard to technical understanding of how key water  resources  concerns  are manifested  in  this  ultra‐urban setting.    

Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

Planned Initiatives 

A.  CRWD Green Office Building/Campus  ‐  ‐  ‐  $949  $978  $1,058  $2,985 

Total for 450‐ Innovation and Future Trends  ‐  ‐  ‐  $949  $978  $1,058  $2,985 

Amounts are expressed in thousands of dollars 

Objectives Looking forward to the next 10 years, emerging issues the District will need to address are climate change,  innovations  in green design, and consideration of additional pollutants beyond those that have  typically  been  the  focus  of  water  resources  management  initiatives.  The  District’s  Issues identification process  identifies one  issue statement pertaining to  future trends:  future watershed management  strategies need  to be  responsive  to emerging  issues  resulting  from  climate  change, and technological advances.  This program is intended to address, in part, the associated goals and policies. Given that  innovations and future trends are relatively new or unfamiliar  issues, only one initiative is identified to date.    Project Initiatives None.  Explanation of Planned Initiatives A.  CRWD Green Office Building/Campus  

Renovate  a  building  to  serve  as  the  District’s  office  incorporating  as  many  innovative stormwater  practices  and  sustainable  building  features  as  practical  to  demonstrate leadership  in  using  new  techniques.    This  building/campus  will  create  a  learning environment  for  the public and will be an accessible demonstration  site.   Monitoring and maintenance data from the BMPs used on‐site will supplement the growing District research database used to inform future work.  

Page 145: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  112 

490 – Debt Service

Description and Purpose of Activity Debt,  levy  limits  and  other  restrictions  established  under Minnesota State Statutes 103B and 103D, give the District the opportunity  and  the  responsibility  to  establish  realistic  and affordable Capital  Improvement  levies  for debt  service  from possible future bonds and  loans.   The financing approach for capital  improvement projects  is planned  to be 25%  through the  annual  levy  and  75%  through  grants,  loans,  and  bond proceeds.    Small  capital  improvement  projects  (less  than $250,000) will be  financed  through  the  annual  levy.    Larger projects  will  have  the  costs  spread  to  the  long‐term benefitting parties through financing via bonds and loans.       Projected Expenditures 10 Year Plan: annual schedule breakdown  2011  2012  2013  2014  2015  2016‐20 

Ten Year Total 

A.  Project Initiatives  $125  $125  $125  $125  $125  $624  $1,248 

Planned Initiatives 

B.  Planned Debt Service  ‐   $37  $37  $168  $168  $1,961  $2,371 

Total for 490‐ Debt Service  $125  $162  $162  $293  $293  $2,585  $3,619 

Amounts are expressed in thousands of dollars 

Objectives The objectives of the debt service initiative are to:  • Assist in the funding of capital improvement projects by other agencies • Improve water quality through capital improvement projects and housekeeping BMP • Use cost effective stormwater BMP’s for water quality improvements • Develop and maintain positive working relationships with our partners   Project Initiatives A.    Annually meet the full requirements of the Districts past debt service. 

Explanation of Planned Initiatives  

B. Planned Debt Service Annually meet  the  full  requirements of  the Districts  future debt  service.   The  costs  listed here are for finance issuance and interest only.   

 

Page 146: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

(VALUES ROUNDED TO NEAREST 1000, SUMMATION VALUES MAY BE SLIGHTLY OFF DUE TO ROUNDING.)

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 10-Year Total

#1 #2 #3 #4

$14,215,000 $2,461,000 $4,526,000 $4,128,000 $4,136,000 $5,421,000 $5,582,000 $5,786,000 $4,519,000 $4,642,000 $4,519,000 $4,586,000 $47,846,000

$5,000 $401,000 $392,000 $404,000 $416,000 $428,000 $441,000 $454,000 $494,000 $509,000 $524,000 $540,000 $4,602,000

101 Administration $5,000 $401,000 $392,000 $404,000 $416,000 $428,000 $441,000 $454,000 $494,000 $509,000 $524,000 $540,000 $4,602,000A [Administrative Initiatives] $376,000 $387,000 $398,000 $410,000 $423,000 $435,000 $448,000 $462,000 $476,000 $490,000 $505,000 $4,434,000

Budget and Levy xAnnual AuditDebt Service RequirementsCitizen Advisory CommitteeAnnual Report xEvaluate Staff RolesLease

B Clean Water Legacy and Other Funding Opportunities 12 x x 100% $5,000 $20,000 - - - - - - $26,000 $27,000 $28,000 $29,000 $109,000C Program Effectiveness Audit 13 x x 100% - $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $30,000D Annually complete BWSR's PRAP and achieve the high performance standards 14 x 100% - $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $30,000

$1,100,000 $1,128,000 $1,246,000 $1,286,000 $1,313,000 $1,395,000 $1,439,000 $1,479,000 $1,435,000 $1,478,000 $1,525,000 $1,567,000 $14,163,000

201 Groundwater Protection - $69,000 $45,000 $47,000 $48,000 $78,000 $80,000 $83,000 $85,000 $88,000 $90,000 $93,000 $737,000A [Program Initiatives] $19,000 $20,000 $20,000 $21,000 $22,000 $22,000 $23,000 $24,000 $24,000 $25,000 $26,000 $226,000

Well Sealing Cost Share xCleveland/Randolph GW Study x x x

B Groundwater Studies 7 6 x x 50% - $25,000 - - - $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $216,000C Ramsey County Groundwater Plan Initiatives 7 6 x x 100% - $25,000 $26,000 $27,000 $27,000 $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $295,000

207 Rulemaking/Rule Revisions $60,000 $12,000 $33,000 $34,000 $35,000 $14,000 $14,000 $14,000 $15,000 $15,000 $16,000 $16,000 $206,000A [Program Initiatives] $12,000 $12,000 $13,000 $13,000 $14,000 $14,000 $14,000 $15,000 $15,000 $16,000 $16,000 $142,000

Evaluate Rules x x x xAnnual TAC Meeting Re: Rules x x x x

B Rule Comparison/Review with Other WMOs 16 15 x x 100% $45,000 - $15,000 $16,000 $16,000 - - - - - - - $48,000C Evaluate Green Regulatory Framework 9 15 x x 100% $15,000 - $5,000 $5,000 $5,000 - - - - - - - $16,000

208 Permitting $27,000 $138,000 $151,000 $156,000 $160,000 $155,000 $160,000 $164,000 $169,000 $174,000 $180,000 $185,000 $1,655,000A [Program Initiatives] $128,000 $132,000 $135,000 $140,000 $144,000 $148,000 $152,000 $157,000 $162,000 $167,000 $172,000 $1,508,000

Implement Permitting ProgramEvaluate dollar amounts for fees, etc. xElectronic permit/fee tracking system xAssess compliance rates xInspection process for BMP function and surety funds xCorrelate monitoring data to permitted BMPs, activities xPresent at water resources conferencesMonitor effectiveness of filtration BMPs x x

B Web Based Permit Tracking Tool 16 3 9 x 100% $15,000 $5,000 $10,000 $11,000 $11,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $75,000C Provide Technical Assistance to Industrial Permittees within the District 4 x x 100% $12,000 $5,000 $9,000 $10,000 $10,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $72,000

210 Stewardship Grants $5,000 $108,000 $113,000 $116,000 $119,000 $121,000 $125,000 $129,000 $133,000 $137,000 $141,000 $145,000 $1,278,000A [Program Initiatives] $102,000 $105,000 $108,000 $111,000 $115,000 $118,000 $122,000 $125,000 $129,000 $133,000 $137,000 $1,203,000

Stewardship/Partner Grants community outreach x xStewardship/Partner Grants project inspection xPre-application site visits xPartnership with Ramsey Conservation District x

B Actively Promote Grants Projects as Demonstration Sites 10 1 x x 100% - $5,000 $5,000 $5,000 $5,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $58,000C Evaluate Grant Distribution and Target Areas 10 1 x x 100% $5,000 $1,000 $3,000 $3,000 $3,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $17,000

211 Monitoring and Data Assessment $76,000 $300,000 $300,000 $308,000 $309,000 $360,000 $370,000 $381,000 $368,000 $379,000 $390,000 $401,000 $3,566,000A [Program Initiatives] $276,000 $284,000 $292,000 $301,000 $310,000 $319,000 $329,000 $339,000 $349,000 $360,000 $370,000 $3,254,000

Water quality monitoring stations xVilla Park monitoring xAnnual Water Monitoring ReportPlan based on annual Water Monitoring ReportLong term storage of monitoring data xCoordinated illicit discharge program x x xLake monitoring xAssist St. Paul with NPDES monitoring xWetland biological integrity monitoringLoeb Lake/Willow Reserve monitoring x xMonitoring QA plan x xNon-CRWD BMP Inventory x x x x x x x x

B 10-Year District-Wide Monitoring Plan 13 7 x x x 100% $16,000 $8,000 $16,000 $16,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $8,000 $96,000C Source Assessment Monitoring 4 7 x x x 100% $30,000 $10,000 - - - $23,000 $23,000 $24,000 $12,000 $13,000 $13,000 $13,000 $121,000D Analysis, Reporting and Dissemination of Monitoring Data 8 2 x x x 100% $20,000 $5,000 - - - $13,000 $14,000 $14,000 $6,000 $6,000 $7,000 $7,000 $66,000E Online Monitoring Data 8 100% $10,000 $2,000 - - - $6,000 $6,000 $6,000 $2,000 $3,000 $3,000 $3,000 $29,000

220 Education and Outreach $125,000 $171,000 $216,000 $223,000 $229,000 $194,000 $200,000 $206,000 $210,000 $217,000 $223,000 $230,000 $2,149,000A (Program Initiatives 1 x x 100% - $20,000 $21,000 $21,000 $22,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $236,000B (Education Plan) Stormwater Education: Homeowners 1 x x 100% - $60,000 $62,000 $64,000 $66,000 $68,000 $70,000 $72,000 $74,000 $76,000 $78,000 $81,000 $708,000C (Education Plan) Stormwater Education: Municipal Staff 1 x x 100% - $20,000 $21,000 $21,000 $22,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $236,000D (Education Plan) Stormwater Education: Contractors 1 x x 100% - $20,000 $21,000 $21,000 $22,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $236,000

Implementation InitiativesCOSTS

Sch

ool D

istri

ct

Ram

sey

Cty

/RC

D

Uni

vers

ity/C

olle

ge

Age

ncie

s

CRWD Cost Share

Theme Key for Implementation Section :

Bringing Water Back to St. Paul

Partnership & Community Connections

Innovation & Emerging

Adaptive Management

New Information Technology

Annual Cost

PROGRAMS

ADMINISTRATION

TOTAL COSTS

One-Time/ Periodic

Cost

Issues Partners

Non

-Pro

fit/C

omm

unity

Gro

ups

Bus

ines

s/La

ndow

ners

Citi

es

WD

/ W

MO

CRWD 2010 Watershed Management Plan ‐ 9/1/2010 113

Page 147: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

(VALUES ROUNDED TO NEAREST 1000, SUMMATION VALUES MAY BE SLIGHTLY OFF DUE TO ROUNDING.)

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 10-Year Total

#1 #2 #3 #4

Implementation InitiativesCOSTS

Sch

ool D

istri

ct

Ram

sey

Cty

/RC

D

Uni

vers

ity/C

olle

ge

Age

ncie

s

CRWD Cost Share

Theme Key for Implementation Section :

Bringing Water Back to St. Paul

Partnership & Community Connections

Innovation & Emerging

Adaptive Management

New Information Technology

Annual CostOne-Time/ Periodic

Cost

Issues Partners

Non

-Pro

fit/C

omm

unity

Gro

ups

Bus

ines

s/La

ndow

ners

Citi

es

WD

/ W

MO

E (Education Plan) Knowledge and Behavior Change Measurement 1 x x 100% $45,000 - $15,000 $16,000 $16,000 - - - - - - - $48,000F Water Awareness via District Infrastructure 1 x x 100% $10,000 $5,000 $9,000 $9,000 $9,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $70,000G Public Awareness and Participation 1 x x x x x x x 100% $25,000 $25,000 $34,000 $35,000 $36,000 $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $322,000H Collaboration for Diverse Group Outreach 1 x x x x 100% - $20,000 $21,000 $21,000 $22,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $236,000I District BMP Walking Tour Guides 1 x 100% $5,000 $1,000 - - 0 $3,000 $3,000 $3,000 $1,000 $1,000 $1,000 $1,000 $14,000J "Bring Water Back to St. Paul" Campaign 20 1 4 x x x x x x 100% $40,000 $20,000 $34,000 $35,000 $36,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $279,000

225 Technical Resources and Information Sharing $265,000 $127,000 $167,000 $172,000 $177,000 $141,000 $145,000 $150,000 $156,000 $161,000 $166,000 $171,000 $1,605,000A Interactive Storm Sewer/Pollutant Map 8 1 20 x x 100% $25,000 $5,000 - - - $15,000 $15,000 $16,000 $6,000 $6,000 $7,000 $7,000 $72,000B Information Dissemination: Multiple Audiences/Languages 8 2 x 100% $10,000 $2,000 $5,000 $6,000 $6,000 $2,000 $2,000 $2,000 $2,000 $3,000 $3,000 $3,000 $34,000C Watershed Information Clearinghouse 8 x x x x 100% $5,000 $5,000 $5,000 $5,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $59,000D Annual CIP Review, Planning and Coordination with Partners 11 x x x x 100% - $15,000 - - - - - - $18,000 $19,000 $20,000 $20,000 $77,000E Review of District Partner Planning Documents (Non-CIP) 11 x x x x x 100% - $5,000 $5,000 $5,000 $5,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $59,000F Unregulated Property Stormwater Management Planning 4 11 100% - $5,000 - - - - - - $6,000 $6,000 $7,000 $7,000 $26,000G Alternative (Non-Infiltration) Volume Reduction BMP Guidance 15 9 x x x 100% $20,000 - $7,000 $7,000 $7,000 - - - - - - - $21,000H BMP Performance Database 13 x x 100% $30,000 $5,000 - - - $17,000 $17,000 $18,000 $6,000 $6,000 $7,000 $7,000 $78,000I Watershed Approach: MS4 & TMDL Compliance 16 11 4 x x x x 100% $150,000 $50,000 $103,000 $106,000 $109,000 $56,000 $58,000 $60,000 $61,000 $63,000 $65,000 $67,000 $750,000J Strategic Project Preparation 12 100% - $20,000 $21,000 $21,000 $22,000 $23,000 $23,000 $24,000 $25,000 $25,000 $26,000 $27,000 $236,000K Joint BMP Inspection and Maintenance Program 3 16 x x x 100% $30,000 $10,000 $21,000 $21,000 $22,000 $11,000 $12,000 $12,000 $12,000 $13,000 $13,000 $13,000 $150,000L Inspection Support for Partners 16 3 x 100% - $5,000 - - - $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $43,000

228 Future Trends: Research and Positioning $440,000 $115,000 $113,000 $117,000 $120,000 $225,000 $232,000 $239,000 $184,000 $190,000 $196,000 $202,000 $1,818,000A Climate Change Impacts: Research and Analysis 9 5 x x x 100% $25,000 $10,000 - - - $21,000 $21,000 $22,000 $12,000 $13,000 $13,000 $13,000 $115,000B Climate Change Impacts: Action 9 5 x x x 100% $10,000 $5,000 - - - - - - $9,000 $10,000 $10,000 $10,000 $39,000C Research on Innovative BMPs 9 x x x 100% - $65,000 $67,000 $69,000 $71,000 $73,000 $75,000 $78,000 $80,000 $82,000 $85,000 $87,000 $768,000D Design for Water Resources Awareness 1 20 x x 100% - $30,000 $31,000 $32,000 $33,000 $34,000 $35,000 $36,000 $37,000 $38,000 $39,000 $40,000 $354,000E National Speakers on Key Topics 11 9 x x x x 100% - $5,000 $5,000 $5,000 $5,000 $6,000 $6,000 $6,000 $6,000 $6,000 $7,000 $7,000 $59,000F Goals for Emerging Issues: Contaminants 4 x x x 100% $30,000 - $10,000 $11,000 $11,000 - - - - - - - $32,000G Analysis of Emerging Issues: Contaminants 4 x x x 100% $80,000 - - - - $30,000 $31,000 $31,841 - - - - $93,000H Project to Address Emerging Issues: Contaminants 4 x x x 100% $120,000 - - - - - - - $37,000 $38,000 $39,000 $40,000 $154,000I Assessment of water quality and ecology of Springs 20 7 x 100% $10,000 - - - - - - - $3,000 $3,000 $3,000 $3,000 $13,000J Evapotranspiration Rates Investigation 9 x x x 0% - - - - - - - - - - - - -K Green Infrastructure Barriers Assessment 17 x x x 100% $15,000 - - - - $5,628 $5,796 $5,970 0 0 0 0 $17,000L Strategy for Existing Site Stormwater Standards 4 5 6 15 x x x x 100% $150,000 - - - - $56,000 $58,000 $59,703 - - - - $174,000

230 GIS $93,000 $71,000 $90,000 $93,000 $96,000 $87,000 $90,000 $93,000 $94,000 $96,000 $99,000 $102,000 $941,000A [Program Initiatives] $59,000 $60,000 $62,000 $64,000 $66,000 $68,000 $70,000 $72,000 $74,000 $76,000 $79,000 $692,000B GIS Program Development 14 x 100% $3,000 $2,000 $3,000 $3,000 $3,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $21,000C Permitted Discharge Assessment 7 4 x 100% $20,000 $1,000 - - - $9,000 $9,000 $9,000 $1,000 $1,000 $1,000 $1,000 $32,000D Stormwater BMP Inventory & Multi-Jurisdictional Database 13 x x x 100% $50,000 $10,000 $27,000 $28,000 $29,000 $11,000 $12,000 $12,000 $12,000 $13,000 $13,000 $13,000 $171,000E District Boundary Correction 16 x x 100% $20,000 - - - - - - - $6,000 $6,000 $7,000 $7,000 $26,000

240 Safety Program $9,000 $17,000 $17,000 $21,000 $18,000 $19,000 $23,000 $20,000 $21,000 $21,000 $25,000 $23,000 $209,000A [Program Initiatives] $17,000 $17,000 $18,000 $18,000 $19,000 $20,000 $20,000 $21,000 $21,000 $22,000 $23,000 $200,000

Proper equipmentEquipment repair and maintenanceStaff CSE and other safety training

B Regular Safety Audits 14 100% $9,000 - $3,000 - $3,000 - - - $3,000 - $9,000

$2,003,000 $388,000 $826,000 $875,000 $764,000 $615,000 $643,000 $649,000 $671,000 $677,000 $605,000 $622,000 $6,948,000

301 Shoreline and Streambank Assessment and Maintenance $125,000 $12,000 $38,000 $40,000 $41,000 $33,000 $34,000 $35,000 $15,000 $16,000 $16,000 $17,000 $283,000A [Project Initiatives] - $12,000 $13,000 $13,000 $13,000 $14,000 $14,000 $15,000 $15,000 $16,000 $16,000 $17,000 $146,000

Lake McCarrons Shoreline Restoration Project x x xSponsor Natural Resources Intern with City of St. Paul for Como Lake Projects x

B Mississippi River Streambank and Bluff Erosion Inventory 17 18 x x x x 100% $50,000 - - - - $19,000 $19,000 $20,000 - - - - $58,000C Loeb and Crosby Lakes Shoreline Restoration - Planning 4 x x x 100% $75,000 $26,000 $27,000 $27,000 - - - - - - - $80,000

305 Como Lake Subwatershed $245,000 $96,000 $120,000 $123,000 $127,000 $138,000 $142,000 $147,000 $150,000 $155,000 $160,000 $164,000 $1,426,000A [Project Initiatives] $96,000 $99,000 $102,000 $105,000 $108,000 $111,000 $115,000 $118,000 $122,000 $125,000 $129,000 $1,134,000

Arlington Pascal project xStreet maintenance xTrash net demonstration project xSt. Paul natural resources intern x

B Internal Loading Study and Management 4 17 x x 100% $25,000 - - - - - - - $8,000 $8,000 $8,000 $8,000 $32,000C Fish Population Monitoring 17 2 4 x 0% - - - - - - - - - - - - -D Invasive and Exotic Biota Monitoring and Management 17 4 x x 0% - - - - - - - - - - - - -E Como 2 Feasibility Study 4 11 x x 100% $60,000 - $21,000 $21,000 $22,000 - - - - - - - $64,000F Como 4 Feasibility Study 4 11 x x 100% $60,000 - - - - $23,000 $23,000 $24,000 - - - - $70,000G Como 5 Feasibility Study 4 11 x x 100% $40,000 - - - - - - - $12,000 $13,000 $13,000 $13,000 $51,000H Como 6 Feasibility Study 4 11 x x 100% $40,000 - - - - - - - $12,000 $13,000 $13,000 $13,000 $51,000I Como Lake Implementation Reporting & Audit 13 x 100% $20,000 - - - - $8,000 $8,000 $8,000 - - - - $23,000

313 Lake McCarrons Subwatershed - $31,000 $32,000 $33,000 $34,000 $35,000 $36,000 $37,000 $39,000 $40,000 $41,000 $42,000 $370,000A [Project Initiatives] $31,000 $32,000 $33,000 $34,000 $35,000 $36,000 $37,000 $39,000 $40,000 $41,000 $42,000 $370,000

Villa Park weir monitoring xVilla Park implementation Phase 1 x

tes in Imp NaLake McCarrons Alum Treatment Project xShoreline restorationMcCarrons Subwatershed AnalysisVilla Park Subwatershed Management Plan

B Fish Population Monitoring 17 2 4 x 0% - - - - - - - - - - - - -

PROJECTS

CRWD 2010 Watershed Management Plan ‐ 9/1/2010 114

Page 148: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

(VALUES ROUNDED TO NEAREST 1000, SUMMATION VALUES MAY BE SLIGHTLY OFF DUE TO ROUNDING.)

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 10-Year Total

#1 #2 #3 #4

Implementation InitiativesCOSTS

Sch

ool D

istri

ct

Ram

sey

Cty

/RC

D

Uni

vers

ity/C

olle

ge

Age

ncie

s

CRWD Cost Share

Theme Key for Implementation Section :

Bringing Water Back to St. Paul

Partnership & Community Connections

Innovation & Emerging

Adaptive Management

New Information Technology

Annual CostOne-Time/ Periodic

Cost

Issues Partners

Non

-Pro

fit/C

omm

unity

Gro

ups

Bus

ines

s/La

ndow

ners

Citi

es

WD

/ W

MO

C Exotic and Nuisance Species Prevention Program 17 4 x x 0% - - - - - - - - - - - - -

315 Loeb Lake Subwatershed $60,000 - $21,000 $21,000 $22,000 - - - - - - - $64,000A (Loeb/Willow) Southeast Pond Investigation 4 x 100% $25,000 - $9,000 $9,000 $9,000 - - - - - - - $27,000B (Loeb/Willow) Good Housekeeping Assessment 4 x 100% $15,000 - $5,000 $5,000 $5,000 - - - - - - - $16,000C (Loeb/Willow) Invasive Species Monitoring 4 17 x 0% - - - - - - - - - - - - -D (Loeb/Willow) Aquatic Plant Management Coordination 4 17 x 0% - - - - - - - - - - - - -E (Loeb/Willow) Fish Stocking Plan with DNR 4 17 x 0% - - - - - - - - - - - - -F (Loeb/Willow) Planning with Stakeholder Group 17 19 20 11 x x x 100% $20,000 - $7,000 $7,000 $7,000 - - - - - - - $21,000

317 Crosby Lake Subwatershed $50,000 - $50,000 - $50,000 - - - - $50,000 - - $150,000A Crosby Lake Management Plan 4 17 x x x x 100% $50,000 - $50,000 - - - - - - - - - $50,000B Crosby Lake Studies - - $50,000 - - - - $50,000 - - $100,000

320 Trout Brook Subwatershed $350,000 $128,000 $206,000 $292,000 $218,000 $156,000 $160,000 $165,000 $238,000 $144,000 $149,000 $153,000 $1,881,000A [Project Initiatives] $106,000 $110,000 $113,000 $116,000 $120,000 $123,000 $127,000 $131,000 $135,000 $139,000 $143,000 $1,257,000

Inspection of systemTunnel repairsMS4 compliance and BMP implementation x x x xPlan based on 2008 Water Monitoring ReportIllicit discharge detection/monitoring x x xCenter/Rice Street subwatershed analysis x xUpper Mississippi River Bacteria TMDL xUse TBI as educational/WQ tool to increase stormwater awareness x x

B Upgrade/Calibration of TBI Model 5 x 100% $100,000 - $34,000 $35,000 $36,000 - - - - - - - $106,000C MS4 Compliance and Annual Review of MS4 Requirements 16 11 x x x 100% - $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $12,000D Restoration and Daylighting Assessment 20 1 x 100% $40,000 - - - - $15,007 $15,457 $15,921 0 0 0 0 $46,000E (TBI) Easement Verification 5 11 x x 100% - - - - - - - - - - - - -F (TBI) Regular Inspection 5 100% - $19,190 $4,000 $85,000 $4,000 $5,000 $5,000 $5,000 $103,000 $5,000 $5,000 $6,000 $227,000G (TBI) Television Inspection 5 100% - - - - - - - - - - - - -H Web System for Receiving/Addressing Illicit Discharge Reports 4 7 x 100% $5,000 $1,000 - - - - - - $3,000 $3,000 $3,000 $3,000 $12,000I Determine Long-Term Single Ownership of TBI 11 16 x 100% $15,000 - - - - $6,000 $6,000 $6,000 - - - - $17,000J Feasibility Study For Reducing Stormsewer Connections x 100% $15,000 - $5,000 $5,000 $5,000 - - - - - - - $16,000K Maplewood Landlocked Area Feasibility Study 5 x 50% $25,000 - - - - $9,000 $10,000 $10,000 - - - - $29,000L TBI Subwatershed Studies 4 5 11 x x x 100% $150,000 $51,000 $53,000 $55,000 - - - - - - - $159,000

325 Wetland, Stream, and Ecosystem Restoration – Planning $685,000 - $129,000 $133,000 $137,000 $116,000 $120,000 $123,000 - - - - $757,000A Green Corridor Restoration Strategy 17 19 x x x x 100% $35,000 - - - - $13,000 $14,000 $14,000 - - - - $41,000B Wetland Reestablishment Feasibility Study 20 x x x x x 100% $150,000 - $51,000 $53,000 $55,000 - - - - - - - $159,000C Stream Corridor Restoration Feasibility Studies 17 20 1 x x x x x 100% $450,000 - $77,000 $80,000 $82,000 $84,000 $87,000 $90,000 - - - - $500,000D Study of Railroad Lands for Wetland Reestablishment: Infiltration, Soils 4 11 17 x 100% $50,000 - - - $19,000 $19,000 $20,000 - - - - $58,000

330 Mississippi River Subwatersheds $118,000 $113,000 $212,000 $214,000 $116,000 $128,000 $130,000 $133,000 $127,000 $129,000 $132,000 $134,000 $1,454,000A [Project Initiatives] $27,000 $27,000 $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $35,000 $36,000 $313,000

Planning for Central Corridor, Ford Plant, etc. x x xCollaborate with U of M and State Fair x xProgress Building rain garden maintenance xParticipate on U of M Steering Committee xSheep Pasture basin observation x

B Large Scale Redevelopment Stormwater Management Planning 11 4 20 x x 100% - $50,000 $150,000 $150,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $700,000C Perform Stormwater Audits and Provide Recommendations 11 4 9 x 100% $20,000 $20,000 - - - $30,000 $31,000 $32,000 $25,000 $25,000 $26,000 $27,000 $196,000D Complete Strategic Street Sweeping/Structure Cleaning 4 x x 100% - $15,000 - - - $17,000 $17,000 $18,000 $18,000 $19,000 $20,000 $20,000 $129,000E Subwatershed Contamination Mitigation: Study 4 x 100% $75,000 - $26,000 $27,000 $27,000 - - - - - - - $80,000F Subwatershed Planning Process Schedule 4 11 13 x x x 100% $20,000 - $7,000 $7,000 $7,000 - - - - - - - $21,000G Sarita Wetland Plan Implementation Monitoring 4 11 x 100% $3,000 $1,000 $2,000 $2,000 $2,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $15,000

370 Watershed Management Planning $340,000 - - - - - $12,000 - $92,000 $133,000 $98,000 $101,000 $435,000A Third Generation Watershed Management Plan 13 14 x x x x x x x 100% $300,000 - - - - - - - $92,000 $95,000 $98,000 $101,000 $386,000B Strategic Planning 14 x x x x 100% $40,000 - - - - - $12,000 - - $38,000 - - $50,000

390 Special Projects and Grants $30,000 $8,000 $19,000 $19,000 $20,000 $9,000 $9,000 $10,000 $10,000 $10,000 $11,000 $11,000 $127,000A [Project Initiatives] x x x $8,000 $8,000 $9,000 $9,000 $9,000 $9,000 $10,000 $10,000 $10,000 $11,000 $11,000 $95,000

Staff and engineering support of special projects and grants x x xB Green Infrastructure Incentive Program 9 18 x x 100% $30,000 - $10,000 $11,000 $11,000 - - - - - - - $32,000

$11,108,000 $545,000 $2,062,000 $1,563,000 $1,643,000 $2,983,000 $3,058,000 $3,203,000 $1,919,000 $1,979,000 $1,865,000 $1,857,000 $22,133,000

401 Shoreline and Streambank Restoration $200,000 $20,000 $89,267 $91,945 $94,703 $22,510 $23,185 $23,881 $24,597 $25,335 $26,095 $26,878 $448,398A [Project Initiatives] - - - - - - - - - - - - -

Lake McCarrons Shoreline Restoration Project x x xComo Lake Shoreline Restoration - with City of St. Paul x x

B Mississippi River Streambank and Bluff Restoration 4 17 x x x x 50% $100,000 $10,000 $45,000 $46,000 $47,000 $11,000 $12,000 $12,000 $12,000 $13,000 $13,000 $13,000 $224,000C Loeb and Crosby Lakes Shoreline Restoration - Implementation 4 17 x x x x 50% $100,000 $10,000 $45,000 $46,000 $47,000 $11,000 $12,000 $12,000 $12,000 $13,000 $13,000 $13,000 $224,000

405 Como Lake Subwatershed BMPs $2,665,000 $65,000 $503,000 $518,000 $533,000 $370,000 $381,000 $392,000 $188,000 $193,000 $199,000 $205,000 $3,481,000A (Como 3) Orchard Center Underground Infiltration 4 x x 50% $157,000 - $54,000 $56,000 $57,000 - - - - - - - $167,000B (Como 3) Horton and Van Slyke Rain Garden 4 x 50% $10,000 - $4,000 $4,000 $4,000 - - - - - - - $11,000C (Como 3) McMurray Field Re-Use Basin 4 x 50% $736,000 - $253,000 $260,000 $268,000 - - - - - - - $781,000D (Como 3) Lake Como Pavilion Pervious Parking 4 x 50% $116,000 - $40,000 $41,000 $42,000 - - - - - - - $123,000E (Como 3) Argyle and Van Slyke Rain Gardens 4 x 50% $43,000 - $15,000 $15,000 $16,000 - - - - - - - $46,000F (Como 3) High School Pervious Parking 4 x 50% $163,000 - $56,000 $58,000 $59,000 - - - - - - - $173,000G (Como 3) Bump-out Rain Gardens 4 x 50% $42,000 - $14,000 $15,000 $15,000 - - - - - - - $44,000

CAPITAL IMPROVEMENT PROJECTS

CRWD 2010 Watershed Management Plan ‐ 9/1/2010 115

Page 149: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

(VALUES ROUNDED TO NEAREST 1000, SUMMATION VALUES MAY BE SLIGHTLY OFF DUE TO ROUNDING.)

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 10-Year Total

#1 #2 #3 #4

Implementation InitiativesCOSTS

Sch

ool D

istri

ct

Ram

sey

Cty

/RC

D

Uni

vers

ity/C

olle

ge

Age

ncie

s

CRWD Cost Share

Theme Key for Implementation Section :

Bringing Water Back to St. Paul

Partnership & Community Connections

Innovation & Emerging

Adaptive Management

New Information Technology

Annual CostOne-Time/ Periodic

Cost

Issues Partners

Non

-Pro

fit/C

omm

unity

Gro

ups

Bus

ines

s/La

ndow

ners

Citi

es

WD

/ W

MO

H (Como 3) Chatsworth/Como Underground Filtration 4 x 50% $197,000 - $68,000 $70,000 $72,000 - - - - - - - $209,000I Como 2 Implementation Plan 4 x 50% $375,000 $20,000 - - - $163,000 $168,000 $173,000 $25,000 $25,000 $26,000 $27,000 $607,000J Como 4 Implementation Plan 4 x 50% $475,000 $25,000 - - - $206,000 $213,000 $219,000 $31,000 $32,000 $33,000 $34,000 $766,000K Como 5 Implementation Plan 4 x 50% $175,000 $10,000 - - - - - - $66,000 $68,000 $70,000 $72,000 $277,000L Como 6 Implementation Plan 4 x 50% $175,000 $10,000 - - - - - - $66,000 $68,000 $70,000 $72,000 $277,000

413 Lake McCarrons Subwatershed BMPs $618,000 - $525,000 $26,000 $226,000 $3,000 $3,000 $3,000 $211,000 $12,000 $12,000 $12,000 $1,034,000A (McCarrons 4) MnDOT Pond Baffle Skimmer 4 x x 50% $1,000 - $200 $200 $200 - - - - - - - $1,000B (McCarrons 4) William Street Pond Retrofits 4 17 x x 50% $15,000 - $5,000 $5,000 $6,000 - - - - - - - $16,000C (McCarrons 4) Lakeshore Buffer Improvements 4 17 x x 50% $33,000 - $11,000 $11,000 $12,000 - - - - - - - $34,000D (McCarrons 4) Boulevard Hydrodynamic Separator 4 x 50% $24,000 - $8,000 $9,000 $9,000 - - - - - - - $26,000E (McCarrons 4) Boat Launch - Pervious Pavement 4 1 x x 50% $8,000 - - - - $3,000 $3,000 $3,000 - - - - $10,000F (McCarrons 4) Boulevard Infiltration Trenches 4 x 50% $37,000 - - - - - - - $11,000 $12,000 $12,000 $12,000 $48,000G Villa Park Performance Improvement Projects 4 x x 50% $500,000 - $500,000 - $200,000 - - - $200,000 - - - $900,000

415 Loeb Lake Subwatershed BMPs $40,000 $25,000 $39,000 $41,000 $42,000 $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $338,000A (Loeb/Willow) Skimmer Structure 4 x 100% $10,000 - $3,000 $4,000 $4,000 - - - - - - - $11,000B (Loeb/Willow) Stormwater Treatment Practices 4 x 100% $30,000 - $10,000 $11,000 $11,000 - - - - - - - $32,000C (Loeb/Willow) Willow Reserve Restoration 17 19 20 11 x x 50% $25,000 $26,000 $27,000 $27,000 $28,000 $29,000 $30,000 $31,000 $32,000 $33,000 $34,000 $295,000

417 Crosby Lake Subwatershed BMPs $100,000 - - - - $38,000 $39,000 $40,000 - - - - $116,000A Crosby Lake Management Plan Implementation 4 17 x x x 100% $100,000 - - - $38,000 $39,000 $40,000 - - - - $116,000

420 Trout Brook Subwatershed BMPs $1,065,000 - $365,000 $200,000 $150,000 $75,000 $77,000 $80,000 - $150,000 - - $1,097,000A (TBI) Repair Work Sta. 0 - 19+93 5 100% $81,000 - $81,000 - - - - - - - - - $81,000B (TBI) Repair Work Sta. 23+15 - 28+49 5 100% $22,000 - $22,000 - - - - - - - - - $22,000C (TBI) Repair Work Sta. 28+49 - 32+33 5 100% $16,000 - $16,000 - - - - - - - - - $16,000D (TBI) Repair Work Sta. 32+33 - 33+34 5 100% $4,000 - $4,000 - - - - - - - - - $4,000E (TBI) Repair Work Sta. 33+62 - 59+45 5 100% $105,000 - - $105,000 - - - - - - - - $105,000F (TBI) Repair Work Sta. 112+76 - 136+16 5 100% $95,000 - - $95,000 - - - - - - - - $95,000G (TBI) Repair Work Sta. 136+16 - 168+73 5 100% $132,000 - $132,000 - - - - - - - - - $132,000H (TBI) Repair Invert Sta. 185+82 - 186+94 5 100% $40,000 - $40,000 - - - - - - - - - $40,000I (TBI) Repair Work (West Tunnel) Sta. 0+00 - 17+62 5 100% $70,000 - $70,000 - - - - - - - - - $70,000J (TBI) Future Tunnel Repairs 5 100% - - - - - - - - - - - - -K (TBI) General Tunnel Maintenance 5 100% $300,000 - - - $150,000 - - - - $150,000 - - $300,000L TBI Subwatershed Study Implementation 4 5 x x x 100% $200,000 - - - - $75,000 $77,000 $80,000 - - - - $232,000

425 Wetland, Stream, and Ecosystem Restoration – Implementation $3,500,000 $50,000 $31,000 $32,000 $33,000 $697,000 $714,000 $733,000 $684,000 $702,000 $720,000 $638,000 $4,983,000A Corridor Restoration: Implementation 17 19 x x x 100% - $20,000 - - - - - - $25,000 $25,000 $26,000 $27,000 $103,000B Stream Corridor Restoration - Implementation 20 x x x 100% $3,000,000 - - - - $563,000 $580,000 $597,000 $461,000 $475,000 $489,000 $504,000 $3,669,000C Wetland Improvement 20 17 x x x x 100% - $30,000 $31,000 $32,000 $33,000 $34,000 $35,000 $36,000 $37,000 $38,000 $39,000 $40,000 $354,000D Wetland Reestablishment: Implementation 20 17 x x x x 100% $300,000 - $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 - $600,000E Implementation of Railroad Land Restoration Projects 4 11 17 x 100% $200,000 - - - - - - - $61,000 $63,000 $65,000 $67,000 $257,000

430 Mississippi River Subwatersheds BMPs $200,000 - $100,000 $200,000 $100,000 $175,000 $177,000 $80,000 - - - - $832,000A Subwatershed Contamination Mitigation: Implementation 4 x x 100% $200,000 - - - - $75,000 $77,000 $80,000 - - - - $232,000B CCLRT BMP Implementation $100,000 $200,000 $100,000 $100,000 $100,000 - - - - - $600,000

435 Stormwater Impact Fund Implementation $140,000 - - - - $53,000 $54,000 $56,000 - - - - $162,000A Volume Reduction BMP Implementation 4 17 x x x x 100% $140,000 - - - $53,000 $54,000 $56,000 - - - - $162,000

440 Special Projects and Grants $80,000 $250,000 $285,000 $294,000 $302,000 $281,000 $290,000 $299,000 $307,000 $317,000 $326,000 $336,000 $3,037,000A [Project Initiatives] - $250,000 $258,000 $265,000 $273,000 $281,000 $290,000 $299,000 $307,000 $317,000 $326,000 $336,000 $2,952,000

Implement Special Grant program, protocols, and guidanceAward grants for WQ, leveraged funding, partnerships x x x xWork with partners to implement water quality practices x x x x

B Stormwater Reuse Demonstration 9 x x x x 100% $80,000 - $27,000 $28,000 $29,000 - - - - - - - $85,000

450 Future Trends: Implementation $2,500,000 $10,000 - - - $949,000 $978,000 $1,007,000 $12,000 $13,000 $13,000 $13,000 $2,985,000A CRWD Green Office Building/Campus 13 9 1 x 100% $2,500,000 $10,000 - - - $949,000 $978,000 $1,007,000 $12,000 $13,000 $13,000 $13,000 $2,985,000

490 Debt Service - $125,000 $125,000 $162,000 $162,000 $293,000 $293,000 $461,000 $461,000 $536,000 $536,000 $592,000 $3,619,000A [Project Initiatives] $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $1,248,000B Planned Debt Service 100% - $37,000 $37,000 $168,000 $168,000 $336,000 $336,000 $411,000 $411,000 $467,000 $2,371,000

CRWD 2010 Watershed Management Plan ‐ 9/1/2010 116

Page 150: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

  

Watershed District Administration

Page 151: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

  

Page 152: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  117 

Watershed District Administration  Developing and utilizing partnerships to  fulfill the District mission has been  identified as a guiding principle of this Watershed Management Plan.   This approach requires  involvement from the  local government units within the District.    Since the District began  its rulemaking process  in 2005, the District and  its  local government units have had open communication. Since Rule adoption, the District has held regular meetings to solicit input on various facets of its rules and permitting program.    The activities that have been identified as having a financial contribution from a District partner are identified  in  the  implementation  table.    The  District  has  only  included  partner  contribution  for programs and projects which provide the partner with a direct means to meet their own stormwater management mission or benefits  them  in  some other way. Each of  the partners  is  committed  to effective  stormwater management  and  recognizes  the  efficiencies which  come  from working  in collaboration with the District.    

Existing Local Control The local government units in the District are affected by a wide array of stormwater management initiatives, programs and regulations coming from various Federal, State and regional entities.  Each local government unit has adopted a stormwater ordinance.  All of the local government units, with the exception of the City of St. Paul, have adopted the District Rules by reference.    The  District  Rules  require  stormwater management  permits  for  construction  projects  disturbing more  than one acre of  land. Most of  the District  is  fully developed, making  it necessary  to utilize stormwater  improvement  technologies  as  part  of  redevelopment  projects  to  reduce  stormwater pollution to District lakes, wetlands, and the Mississippi River. In order to achieve the Districts goal of cleaner water resources, the Rules require volume reduction practices that capture one  inch of rainfall over all newly constructed impervious surfaces. This is most often achieved by infiltration of runoff into the soil.    The following is a general summary of the Districts Rules.  The complete and most current Rules can be viewed on the District website and is also available at the District office.    Permits are required for projects under the following rules and have the following requirements:  

Rule C. Stormwater Management: Permit required for projects disturbing greater than one acre of land,  or  10,000  square  feet  of  land  adjacent  to  a  waterbody  and  repairs,  replaces,  or  creates impervious surface.  

Applicants are required to meet three stormwater management standards:  

1. Rate control ‐ Runoff rates shall not exceed existing runoff rates for the 2‐year, 10‐year, and 100‐year critical storm events.  

2. Volume  reduction  ‐  Stormwater  runoff  volume  reduction  shall  be  achieved  onsite  in  the amount of one inch of runoff from impervious surfaces.  

Page 153: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  118 

3. Water  quality  ‐  Stormwater  BMPs  shall  remove  90%  of  total  suspended  solids  from  the runoff generated by a 2.5‐inch rainfall event (NURP water quality storm).  

Rule D. Flood Control: Permit required if within the 100‐year floodplain of a waterbody. A floodplain is the area adjoining a watercourse or natural or man‐made waterbody, including the area around lakes, marshes and lowlands that is inundated during a 100‐year flood.  

 No  placement  of  fill  within  the  100‐year  floodplain  is  allowed  unless  compensatory  storage  is provided. Compensatory storage must be provided on the development or immediately adjacent to the development within the affected floodplain.  

Rule  E. Wetland Management:  Permit  required  for  any  work  that may  fill,  drain,  excavate,  or otherwise alter the character of a wetland. The District wetland rule adopts by reference the MN Wetland Conservation Act (WCA) with the following exceptions..  

(1)  The de minimis size will be zero. (2)  Flexibility Sequencing will not be allowed.  (3)  Public Value Credits can not be used for replacement.  (4)  All other WCA non‐temporary impact exemptions to wetlands will not be allowed.  (5)  All wetland replacements shall be within the Districts boundaries.  

The following steps are required for projects that will drain, fill or excavate wetlands:  

1. Attempt to avoid direct and indirect impacts to wetlands;  2. Minimize impacts to wetlands by limiting the degree or magnitude of wetland activity;  3. Rectifying temporary impacts by repairing, rehabilitating, or restoring the affected wetland;  4. Reducing or eliminating impacts to wetlands over time by preserving the wetlands through 

proper maintenance, management, and operation of the project to avoid further draining or filling of wetlands, and  

5. Replace unavoidable wetland  impacts by replacing with wetland areas of equal or greater public value. 

Rule F. Erosion and Sediment Control: Permit required for any land disturbing activity over one acre, or greater than 1,000 square feet and adjacent to a waterbody or within the 100‐year floodplain. 

Applicants  are  required  to  prepare  an  erosion  and  sediment  control  (ESC)  plan  that meets  the following requirements:  

1. ESC  plans  shall  comply with  the  standards  of  the MN  Pollution  Control  Agency's NPDES General Construction Permit except where more specific standards are required.  

2. Natural  site  topography  and  soil  conditions  shall  be  used  to  control  runoff  and  reduce erosion and sedimentation.  

3. Construction activity shall be phased when possible.  4. All construction waste shall be properly managed and disposed.  5. All  erosion  and  sedimentation  controls  shall  be  installed  before  commencing  the  land 

disturbing activity.  6. The permittee shall be responsible for proper operation and maintenance of all controls.  

Page 154: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  119 

Rule G. Illicit Discharge and Connection: Permit required for new direct connections or replacement of  existing  connections  to  the  Trout  Brook  Storm  Sewer  Interceptor  or  other  components  of CRWD's municipal storm sewer system. CRWD must approve the methods for making a new direct connection or replacing an existing connection.  

Peak  flow  rate and  the  total volume of  flow must not cause new water conveyance problems or exacerbate existing water conveyance problems. Enlargement of existing connections is considered a new connection.  

In addition to the Districts Rules, each of the local government units, as well as other entities, are all regulated Municipal  Separate  Storm  Sewer  Systems  (MS4s)  under  the  Clean Water  Act  and  are required to be in compliance with the MS4 General Permit, issued by the State of Minnesota.  The MS4 General Permit requires each regulated MS4 to develop a Storm Water Pollution Program that addresses each of six minimum control measures (MCMs) including:  

MCM #1  Public education and outreach; MCM #2  Public participation and involvement; MCM #3  Illicit discharge detection and elimination (IDDE); MCM #4  Construction site runoff; MCM #5  Post‐construction runoff control; and MCM #6  Pollution prevention and good housekeeping.  

Financial Impact on Local Government Potential costs to  local government units associated with adoption of the District Plan  include the development of a local water plan and cooperative roles in implementation programs and projects.  Each of  the Cities within  the District will be  required  to update  their  local water plan within  two years of adoption of this Plan which will be October 2012.  The cost for developing the local water plan can range from $25,000 to $100,000 depending on the level of detail.  As  identified  in the  implementation tables, the District  intends to seek financial participation from its partners on projects of mutual benefit.  Specifically, the District has identified implementation of water quality improvement projects as an activity where it anticipates having financial cooperation from  its  partners.    The  District  uses  a  subwatershed  analysis  approach  to  evaluate  stormwater runoff  issues  and  develop  potential  Capital  Improvement  Projects.    This  approach  engages  all affected  entities  and  identifies  opportunities  that  result  in  a  more  efficient  and  cost‐effective approach  to  BMP  implementation.    The  fully  developed  nature  of  the  District  with  little undeveloped land requires this type of coordinated approach, which positions the District and all of its  partners  to  be  able  to  strategically  implement  projects  as  opportunities  arise.    The  District identified “Strategic Projects” as a primary goal in its 2008 Five Year Strategic Plan:   

“CRWD  projects  will  be  strategically  selected,  designed  and  implemented  to  effectively improve  water  quality  and  efficiently  use  resources.  Being  strategic  includes  early involvement  in  the development of projects, seeking creative  funding solutions,  identifying and  implementing  innovative  water  quality  practices,  and  working  with  partners  in  the watershed  to promote  the best use of everyone’s  resources. CRWD will demonstrate  fiscal responsibility to succeed in its projects.” 

 The implementation table identifies specific projects the District would consider implementing and 

Page 155: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  120 

the  source  of  funding.    In  some  cases  the  District  will  fund  the  entire  project  and  for  others supplemental funding will be needed.  The potential partners are also listed in the table.  The Plan identifies approximately $3.8 million in outside funding, which could come from the partner entities listed or from other funding sources such as grants.  The District intends to seek funding for these projects  from the Cities and other  local government units which will benefit  from the project but will  also  pursue  outside  funding  sources  to  offset  the  expense.    Numerous  Federal  and  State funding opportunities exist to implement water quality improvement projects.   

Local Water Management Plans  Each municipality  within  the  District  is  required  to  complete  a  local  water management  plans (LWMPs) that conforms to Minnesota Statues 103B.235 and Minnesota Rules 8410.0160.  The policies and goals established by  the LWMP must be consistent with  the District's plan.   The section of the LWMP covering assessment of problems must include those issue statements in the District  plan  that  affect  the  community.    The  corrective  action  proposed  by  the  cities must  be consistent with the District plan.    In accordance with Minnesota Statues 103B and Minnesota Rules Chapter 8410.0160, cities within the Metropolitan Urban Services Area  (MUSA) will adopt LWMPs within  two years of  the BWSR's approval  of  the  last watershed management  organization  (WMO)  plan  that  affects  the  city.   All cities in the District are located within the MUSA boundary.  Cities in the District must have their LWMPs approved by the District within 24 months after  BWSR approves  the District's  plan.    According  to Minnesota  Legislative  Session  1995  Charter No.  176, LWMPs must also be submitted to the Metropolitan Council at the same time they are submitted to the  District.   Major  amendments  to  the  LWMP  should  also  be  submitted  to  the Metropolitan Council for review.  Once a plan is received, the District shall have 60 days to review the document and  to  approve  or  reject  it  (in  whole  or  in  part)  based  on  its  compliance  with  the  District's management plan.  If the District fails to complete its review within 60 days, and if the city has not agreed  to  an  extension,  the  plan  will  be  deemed  approved.    Cities  are  encouraged  to  solicit information for District input and review before they submit their plans for formal review.  After the District approves a LWMP, the city shall adopt and  implement the plan within 120 days and shall amend  its official controls accordingly within 180 days.    If a municipality  later wishes to amend  its plan,  it must submit the proposed amendment to the District for review of consistency with the District's management plan.   The District must approve or disapprove of the amendment (in whole or in part) within 60 days of its submittal.  Interim approval may be granted by the District if the District agrees with the purpose of the amendment and  if the amendment does not conflict with provisions of the District plan.  The status of  local water management plans  in each community within the District  is summarized below:    

Page 156: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  121 

  Local Water Management Plan (LWMP) Status   Municipality  LWMP Status 

Falcon Heights  Approved October 18, 2008 Lauderdale  Approved July 9, 2008 Maplewood  Approved September 2, 2009 Roseville  Approved July 9, 2008 Saint Paul  Approved September 14, 2006  These cities will be required to revise or prepare local water management plans that conform to the District Plan and in accordance with Minnesota Statues 103B.235 and Minnesota Rules 8410.  Following BWSR approval and District Board's final adoption, the District will notify each city of the requirement to revise or prepare LWMPs that conform to this plan.  The District will send pertinent information to assist the cities, including drainage and water quality data and maps and a proposed timeline for each city to follow for LWMP review, approval and adoption.   The District's minimum requirements  coincide with  the  state  requirements,  and  the District will work with  the  cities on their LWMPs accordingly.  The  District  will  discuss  with  each  city  the  options  that  address  its  circumstances  and  will collaboratively determine the most practical approach to meeting the requirements of this plan and Minnesota  Rules  Chapter  8410.    The  District  will  work  closely  with  cities  as  needed  in  LWMP preparation, review and implementation.   The District understands  the need  to be  sensitive  to  consistency and  coordination with adjacent WMOs  in  implementation of watershed standards and projects while maintaining  the  integrity of District goals.  The District is especially interested in LWMP problems identified and corrective actions that affect District concerns stated in this plan or require District collaboration.  Furthermore, the District will work with the cities regarding financial considerations, implementation priorities and programs for plan elements of mutual concern.    The District’s requirements  for  local plan content coincide with or add on to  the requirements of Minnesota laws and rules. The District set two levels of requirements for local plans:  Level 1 – a shorter list of plan requirements for local units of government that do not wish to take over permitting authority from the District (i.e., District continues their permitting role).  Level 2 – a longer list of plan requirements for local units of government that do wish to take over all  permitting  authority  from  the  District.    If  a  local  unit  of  government  wishes  to  take  over permitting authority from the District, the local unit of government must first prepare a local water management plan, obtain District approval of  the plan, and  then adopt and enforce  stormwater management and erosion control ordinances.    In this situation, the  local water management plan needs to meet additional requirements. The detailed requirements are described below. In general, the District encourages the  local government units to use as much District data, modeling results, etc. as possible to meet these requirements.    

Page 157: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  122 

Level 1 District Requirements for Local Water Plan Content (applies to local units of government that do not wish to take over permitting authority from the District):  

1. Phase  I  or  Phase  II  NPDES  MS4  permit  communities  must  integrate  their  Stormwater Pollution  Prevention  Program  (SWPPP)  policies,  goals  and  actions  into  their  local water management plans, in accordance with MPCA requirements and schedules. Nondegradation requirements, policies, goals, and actions, must also be included, if applicable. 

 

2. Impaired waters, TMDLs, and Lake Management Plans – the local plan must include a listing of  any  impaired  waters  (as  shown  on  the MPCA’s  303(d)  list)  within  the  local  unit  of government’s  jurisdiction.  The  local  plan  must  describe  the  local  unit  of  government’s role/level of participation in preparing and implementing TMDL studies. The local plan must also  address  issues  identified  in  the District  Lake Management  Plans  prepared  for water bodies  within  the  jurisdiction  of  the  local  unit  of  government  and  implementation recommendations that involve local implementation or coordination with the District. 

 

3. The  local  plan  must  describe  the  local  unit  of  government’s  stormwater  management requirements, including erosion and sediment controls, for land alteration activities that do not require a District permit  (i.e., projects  that disturb  less  than 1 acre of  land). The  local plan  must  describe  the  local  unit  of  government’s  relevant  ordinances  or  proposed ordinances to address this. Particular attention should be paid to addressing redevelopment and reducing total suspended sediment and total phosphorus loadings from redevelopment sites. 

 

4. The local plan must describe the local unit of government’s responsibilities for maintenance, repair, etc. of “non‐District‐managed” public and private stormwater management systems. The local plan must address maintenance issues and identify the situations where the local unit  of  government  needs  to  coordinate  with  CRWD  on  maintenance  activities.  In accordance with Minnesota rules (8410.0100, Subp. 6), the District requires that local water management plans “…assess  the need  for periodic maintenance of public works,  facilities and  natural  conveyance  systems  and  specify  any  new  programs  or  revisions  to  existing programs  needed  to  accomplish  its  goals  and  objectives.”  The  local water management plans will also be required to address, at a minimum, the following maintenance issues, also taken from Minnesota rules (8410.0100, Subp.6): 

• The  need  and  frequency  for  street  sweeping  of  public  and  private  streets  and parking lots. 

• The need and  frequency  for  inspecting stormwater outfalls, skimmers, sumps, and ponds. 

• The  adequacy  of maintenance  programs  for  stormwater  facilities  and water  level control structures owned by both the city and private parties. 

• The need  for other maintenance programs as considered necessary  (e.g., cleaning catch basins, trash racks, etc.). 

 

5. The  local plan must describe  local  flood  control and water quality  issues  (including  those issues discussed  in  the District Plan), and  the  local unit of government’s  responsibility  for addressing these local issues. 

 

6. The  local  plan must  include  an  implementation  program  (including  funding methods)  to address all of the items listed above. 

 

7. The  local  plan must  describe  the  local  unit  of  government’s  spill  containment  clean‐up plans. 

 

Page 158: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  123 

Level 2 District Requirements for Local Water Plan Content (applies to local units of government that do wish to take over all permitting authority): In addition to the requirements listed for Level 1, the following additional requirements apply: 

1. The local plan must describe existing and proposed physical environment and land use – the city’s  latest  comprehensive  land  use  plan  and  maps,  along  with  information  from  the District, can be used to meet much of this requirement. The  local plan must  include maps showing the DNR public waters, the District ‐inventoried wetlands, and the District wetland classifications.  This  description must  include  a  groundwater  section, which  could  include information  identifying  infiltration  areas,  wellhead  protection  areas,  geologic  features, groundwater  sensitivity,  groundwater  dependent  natural  resources,  and  groundwater recharge/discharge  areas.  The  local  plans  should  also  include  references  to  completed groundwater studies that affect the City. 

 

2. The  local  plan  must  include  drainage  areas,  and  the  volumes,  rates,  and  paths  of stormwater runoff. Local units of government are encouraged to use the District modeling data or otherwise available from the District to help meet this requirement. The following criteria apply: 

• Design storms and storm durations shall conform to the District standards. • The preliminary size of future pipes or channels must be identified. • Determination of allowable runoff rates • Any minor watersheds within those identified in the District Plan must be identified. • Waterway locations must be identified. • A storm sewer system map must be provided, if available. • The local plan must demonstrate that its hydrology conforms to the hydrology in the 

District Plan.  

3. The  local  plan  must  identify  storage  sites  not  identified  in  the  District  Plan,  including wetlands. The following criteria apply: 

• Storage volumes must be provided. • Normal water level elevations and flood elevations must be provided. • Outflow rates must be provided.  

4. The  local  plan  must  describe  the  local  unit  of  government’s  regulations  and  specific regulatory provisions  in place or that need to be developed to satisfy and  incorporate the District standards and District rules and regulations, as revised. 

 

5. The  local plan must acknowledge and describe the respective roles of the District and the local  unit  of  government  in managing  the  water  quality  of  the  District‐managed  water bodies.   

 

6. The  local  plan  must  identify  the  local  unit  of  government’s  goals,  objectives,  policies, standards and guidelines pertaining to water resource management. 

 7. The local plan must set forth an implementation program, including a description of official 

controls and, as appropriate, a capital improvement program and funding methods.  

8. The local plan must describe the local unit of government’s permitting process (or proposed process) for land and wetland alteration work.  This description should include outlining the process for: 

• Reviewing development proposals and permit applications • Review of preconstruction plans • Coordinating permit requests with other simultaneous reviewers • Coordinating timelines with other permitting agencies 

Page 159: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  124 

 

9. The local plan must identify the status of septic systems (if any) and describe the regulatory tools  in place,  including  local enforcement of existing  local  septic  system ordinances, and whether  ordinances  are  in  conformance  with  the  MPCA  7080  Rules  and  Metropolitan Council requirements. 

Annual Evaluation of Plan Implementation The District will perform an annual  inventory and outcome assessment for District activities either underway or  completed  in  the preceding  year.   The District will use  the PRAP  level  II Review as provided by the Board of Water and Soil Resources and included as Appendix J.    Additionally, the District will perform a more detailed evaluation of each of the goals contained  in this Plan.  The purpose of the evaluation will be to determine the level of progress achieved on each of the District’s stated goals, and  is therefore structured around those goals.   This evaluation will provide  important  insight  about  District  priorities  and  focus  areas,  and  will  guide  budgeting decisions for the subsequent year.  For  each  goal,  three  categories  of  data  on  progress  will  be  considered:  quantitative  impacts, qualitative  results,  and  quantitative  results.    See Appendix  J  for  the  evaluation  form.      In many cases,  the  scope of District goals and  the  complexity of  the affected  systems make  it difficult  to quantitatively measure the results of District activities, although ideally this would be the best way to  determine  the District’s  progress  on  its mission.    Sometimes,  the  best  information  indicating progress  (or  lack  thereof)  may  be  qualitative  or  anecdotal  in  nature.    Regardless  of  what information on outcomes is available, it is always possible (and useful) to quantitatively document what  actions were  performed.    At  the  very  least  this  provides  a measure  of  the  level  or  effort expended in the service of a particular goal.  Finally, following documentation of the actions and the quantitative and qualitative assessments of progress, an annual  internal survey will be performed,  in which  individual members of  the Board and  staff assign a numerical  score  (e.g.,  from 1‐10)  to each Goal, based on  their knowledge and experience  of District  activities  and watershed  issues  (see Appendix  J).  Survey  results would  be summarized as part of the annual evaluation process. This relatively simple tool would allow a wide range  of  understanding  to  be  factored  into  the  assessment,  providing  another  important perspective on District progress.  Amendments to Plan This Watershed Management Plan will be in effect from 2011 through 2020.  During that time it is anticipated that the Plan will need to be amended.  All amendments to the plan will adhere to the review process provided in Minnesota Statutes, section 103B.231, subdivision 11, except when the proposed amendments constitute minor amendments and:   

A.    The District has held  a public meeting  to explain  the  amendments and published  a  legal notice of the meeting twice, at least seven days and 14 days before the date of the meeting; 

B.   The District has sent copies of the amendments to the affected  local units of government, the Metropolitan Council, and the state review agencies for review and comment; and 

C.   The BWSR has either agreed that the amendments are minor or failed to act within 45 days of receipt of the amendments. 

Page 160: September 1, 2010 Capitol Region Watershed District · The Capitol Region Watershed District 2010 Watershed Management Plan was developed with the participation of numerous people

CRWD 2010 Watershed Management Plan ‐ 9/1/2010  125 

 Amendments to the Plans capital improvement program will be considered to be minor plan amendments if the following conditions are met:  

A.   The original plan set forth the capital improvements but not to the degree needed to meet the definition of "capital improvement program" as provided in Minnesota Statutes, section 103B.205, subdivision 3; and  

B.   The affected county or counties have approved the capital improvement in its revised, more detailed form. 

 Unless the entire document is reprinted, all amendments adopted by the District will be printed in the form of replacement pages for the plan, each page of which will:  

A.  On draft amendments being considered, show deleted text as stricken and new text as underlined; 

B.  Be renumbered as appropriate; and C.  Include the effective date of the amendment. 

 The District will maintain a distribution list of agencies and individuals who have received a copy of the plan and will distribute copies of amendments within 30 days of adoption.  The District will consider sending drafts of proposal amendments to all plan review authorities to seek their comments before establishing a hearing date or commencing the formal review process.  Internal Process for Plan Amendments The District has developed a subwatershed based planning process for managing water resources in the  District  in  a  systematic  manner.    The  subwatershed  planning  process  utilizes  a  strong stakeholder  involvement process.   Partners such as  local governmental entities, non‐profit groups and community members are  involved from the very onset of the planning process to help define issues and identify the proposed analysis.  The core of the subwatershed planning process involves detailed  hydrologic  and water  quality  analysis  of  the  given  area  and  identification  of  proposed structural  and  non‐structural  improvement  aimed  at  improving  the  water  resource  of  interest.  Regular meetings are held with stakeholders throughout the process to solicit input on the findings of the analysis and on the proposed improvements.    The District intends to use the subwatershed planning process as the method to achieve compliance with the public notification process requirements of the plan amendment process.  The District will expand  the  stakeholder  group  involved  with  the  subwatershed  plan  to  include  those  entities identified  in the plan amendment process and will build  in a public hearing  into the process.   The intent is to streamline the plan amendment process and to eliminate duplication of effort.