September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Upload: amaya-conley

Post on 15-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

September 15, 2010

Portland’s Topsoil for Vegetated Stormwater Facilities

Henry Stevens & Valerie Joachim

Page 2: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Why Does the Specification Matter ?

Page 3: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 4: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Green Infrastructure Green Streets

September 2010

900 Public and Private Facilities Constructed in the Right-of-Way

Page 5: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 6: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 7: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 8: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Standard Expectations

• Infiltration. Design assumption: 2”/hr

• Retention. Maximize field capacity

• Pollutants Management. Support immobilization & biological degradation of pollutants

• Substrate for Plants. Provide good growing conditions, in part to minimize maintenance

• Longevity. Continue to perform in the long term

• Available. Be simple to make, not expensive

Page 9: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Fines Content

WSU Research. Bench testing showed that even small amounts of clay and silt can lead to clogging.

Local History with Higher Fines Soils. There had been just a few problems in facilities with higher fines.

COP Bias Toward “Real Soil”. Staff were very concerned about the negative aspects of blends with super-low fines.

Page 10: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Compost Content

• WSU Research. Confirmed that compost is functionally valuable in a number of ways

• WA State Endorsement of Bioretention Soil Based on compost CEC at 40% by volume

• Supplies. Portland has a healthy existing market for supplies of USCC compost made from plant-derived material (yard cuttings)

• Potential Export of Nutrients. The City is tracking this issue (for flow-through systems)

Page 11: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Testing

• Complexity and Cost. The goal was to start with simple testing requirements and only increase complexity as needed.

• Frequency. The Bureau concluded it would be too burdensome to require new tests for each project or load of material

• Reasons for Keeping it Simple

Many soil vendors and builders are smaller operators with no history of testing and paperwork for soil.

The goal is to interest as many vendors as possible

Page 12: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

The Specification: The Mix

• Specification Title. SSP 1040.14.(d) Stormwater Facility Topsoil: Standard Blend

• Application. For all vegetated facilities except extreme compaction scenarios (Infiltration Blend for the Right-of-Way = Seattle Blend).

• Basic Composition. Any blend of loamy soil, sand, and compost that is 30-40% compost (by volume) and meets the other criteria

Page 13: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

The Specification: GradationGradation Analysis. The particle gradation analysis must

conform with ASTM C117/C136 (AASHTO T11/T27). The analysis shall include the following sieve sizes: 1 inch, 3/8 inch, #4, #10, #20, #40, #60, #100, #200.

Particle Sieves and % Passing Ranges1 inch 100 # 4 75 -100 # 10 40-100 # 40 15-50 # 100 5-25 # 200 5-15

Frequency. The analysis can be no older than 90 days at submittal

Page 14: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

The Specification: Gradation

• Coefficient of Uniformity (Cu*). The blend must have a Coefficient of Uniformity equal to or greater than 6 to ensure it is well graded (has a broad range of particle sizes).

* Cu = Particle size at 60% Passing/Particle size at 10% passing

Page 15: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 16: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

The Specification: Compost

• The material must be plant-derived (no manure). It’s often sold as “garden mulch”.

• The vendor must be a participant in the US Composting Council Seal of Testing Assurance Program (USCC STA).

• The compost is not “certified” ! (Check the results against the specification.)

• STA members always have a current report

Page 17: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 18: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

The Specification: Installation

• Protect the soil from contaminants

• Place in 8 inch lifts, compacted with roller

• Install plants ASAP after soil placement

• Temporary erosion control measures

• Fence the new facility to avoid compaction

• Placement not allowed in wet conditions

Page 19: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Testing and Monitoring

Page 20: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

General Comments• The specifications have resulted in fewer

installations with inadequate infiltration rates

• There are still questions about whether some installations drain too quickly

• Most vendors are out of compliance with the specification at some point (buyer beware !)

• The Bureau will continue to monitor performance as the latest generation of facilities ages.

• The Bureau may develop a separate specification for planters with rock layers.

Page 21: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Stormwater Facility Topsoil Vendor Program

Valerie JoachimEngineering Services Support Analyst

Bureau of Environmental ServicesSoil Vendor Contact & Vendor List Administrator

Page 22: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Where Henry left off….Where Henry left off….

• Did we spec something readily available in Did we spec something readily available in the local market?the local market?

• No central point of contact within BESNo central point of contact within BES

• Product supply issues & same day noticeProduct supply issues & same day notice

• Future needs: Citywide Green Street Future needs: Citywide Green Street program, on-going rehab and private program, on-going rehab and private development-driven projects.development-driven projects.

• Year-round Year-round constructionconstruction

Page 23: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Meet the Vendors

• Area vendors invited to City officesArea vendors invited to City offices• 5-year estimate = 10,000 CY on BES projects 5-year estimate = 10,000 CY on BES projects

alonealone• Intro to specification & submittal requirementsIntro to specification & submittal requirements• Discussion of required testing & paperworkDiscussion of required testing & paperwork• Need to be pro-active versus reactiveNeed to be pro-active versus reactive• Haulers interested too. Began to align Haulers interested too. Began to align

themselves with vendors & sell a complete themselves with vendors & sell a complete serviceservice

Page 24: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Submittal PaperworkSubmittal PaperworkOverall pH 3-way blendParticle Size Analysis

(per ASTHO T11/T27 or ASTM C117/C136 tests)

USCC Technical Data Sheet for compost

Two 5-gallon buckets, if directed by Owner’s Rep.

Paperwork should be no more than 90-days old from time of submittal.

Page 25: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Vendor List

•What it is & isn’t

•Updated monthly

•On the internet

•Ask for the right topsoil product!

Page 26: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 27: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Lessons LearnedLessons Learned• Central point of contact is essential for the

success of our program.

• Annual ‘refresher’ training for staff is essential.

• Continue to actively cultivate new vendors, while other vendors may fall out of the program.

• Others are piggy-backing on the SWMM Green Street details & soil construction specification. Expect the market to grow.

• Careful use of vendor list advised.

• Blending, conveyance, handling and compacting methods are key to success of soil performance.

• The soil spec is just one component in ensuring the success of a facility.

Page 28: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 29: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 30: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim
Page 31: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

Looking ForwardLooking Forward• We are still learning about the topsoil blend.We are still learning about the topsoil blend.

• Are there common Best Practices for Are there common Best Practices for conveyance, installation, and compaction?conveyance, installation, and compaction?

• Keep the management of the soil spec & vendor Keep the management of the soil spec & vendor list as simple as possible.list as simple as possible.

• Continue to cultivate new vendors / sustain Continue to cultivate new vendors / sustain existing relationshipsexisting relationships

• Opportunities to expand training to other bureaus Opportunities to expand training to other bureaus within the City / other interested partners within the City / other interested partners

Page 32: September 15, 2010 Portland’s Topsoil for Vegetated Stormwater Facilities Henry Stevens & Valerie Joachim

References:References:

2010 City of Portland2010 City of Portland Standard Construction Specifications

01040.14 & .43 “Stormwater Facility Topsoil”00415 “Vegetated Stormwater Facilities”

2008 City of Portland2008 City of Portland – Stormwater Management Manual– Stormwater Management Manual

Appendix F3 Stormwater Topsoil Vendor ListAppendix G3 Green Street ‘Typical Details’ (Revised Feb. 2010)

City of Portland – Office of TransportationCity of Portland – Office of Transportation

“Standards for Construction - Construction Documents” page (Website also houses stormwater topsoil vendor list)

Contact Info:Contact Info:

Henry StevensHenry Stevens – [email protected] of Portland / Bureau of Environmental Services1120 SW 5th Avenue, # 1000, Portland, OR 97204503.823.7863

Valerie JoachimValerie Joachim – [email protected] of Portland / Bureau of Environmental Services1120 SW 5th Avenue, #1100, Portland, OR 97204503.823.5564