septic tank process&design

16
OTHER TREATMENT PROCESSES Other processes include: Septic tank Imhoff tank Ponds Lagoons Ditches

Upload: msrimurali

Post on 19-May-2015

5.440 views

Category:

Technology


9 download

TRANSCRIPT

Page 1: Septic tank process&design

OTHER TREATMENT PROCESSES

Other processes include:Septic tankImhoff tank PondsLagoonsDitches

Page 2: Septic tank process&design

TREAT SEWAGE SO THAT I T I S MADE HARMLESS.

Page 3: Septic tank process&design

SEPTIC TANKProcess:

Horizontal continuous flow bed tank (with longer detention time)

Extended sedimentation tank 12-36 hours detentionClosed tank – Anaerobic

decomposition of settled sludgeThree purposes

SedimentationDigestion tankStorage of digested sludge

Page 4: Septic tank process&design
Page 5: Septic tank process&design
Page 6: Septic tank process&design

Digestion - Evolution of gases – gas ventCleaning/ Removing digested sludge – once in a

year (6 months to 2 years) Thus Two processes-Sedimentation and

Anaerobic Sludge digestion

Construction details: Long, continuous flow tank of RCC and sides

water proof.Facility for gas vent through vent pipe.Bottom (slope) to facilitate pumping of sludge.Manhole with for removal of sludgeInlet and outlet, Tee’s will be providedSometimes baffles to reduce disturbances.

Page 7: Septic tank process&design

Septage:Effluent from septic tank disposalSoak pit/ Cess pool

A closed circular or rectangular pit through which effluent will be soaked or absorbed into the surrounding soil

Two- Filled or Empty typeUnder drain /absorption /dispersion trenches.

3-4 distributions@2m spacing, L shall not be more than30cm

Page 8: Septic tank process&design
Page 9: Septic tank process&design

Design criteria(Septic Tank): Quantity of sludge -30 l/capita/ years -

Sludge storage Depth - 1.2 – 1.8 mLength: Breadth - 2-4 timesMin width - 120cmOutlet ~ in let level difference = 5-7.5 or up

to 15 cmDetention time = 24 hoursFree board: 30cm

Page 10: Septic tank process&design

Design criteria for absorption system:Calculation of Total subsurface soil area

required for soak pits/ dispersion trenchesLq = 130/√t

t- standard percolation rate for the soil min/cm

Lq-Maximum rate of effluent application in Lpd/m2 of leaching surface

Total trench area required = Total flow per day/ Lq

Page 11: Septic tank process&design

COMPONENTS OF A SEPTIC SYSTEM

Septic TankDistribution Box

Leach Line

Page 12: Septic tank process&design

Problem:Design a septic tank for the hostels of

the Engineering college: Number of Hostels = 3Students / Hostel= 200Water supply = 120 lpcdAssume Detention period 24 hours and

Sludge volume = 30l/cap/year

Page 13: Septic tank process&design

Solution: Design for one hostel:Waste water = 200x120x80/100 = 19.2 m3

Let us assume that sludge withdrawal once in a year

Volume required for sludge storage for one year = 200x30 = 6000l= 6m3

Capacity of septic tank = 25.2 m3

Assuming a depth of 1.8 m , Area = 25.2/1.8=14 m2

3B2 = 14m2, B2 = 14/3, B = 2.16 say 2.20m

Length = 6.60m

Page 14: Septic tank process&design

Dimension = 6.6x2.2x2.1m (1.8m+0.3m free board)

26.16m3 > 25.2 m3

Assuming 1.5m depth, Area = 16.8 m2

3B2= 16.8, B= 2.36 say 2.4 m Provide 7.2x2.4x1.8m septic tank

Page 15: Septic tank process&design

Design of absorption system: Lq = 130/√tSay t=20min/cmLq = 130√20 = 29lpd/m2

Area required = 200x120x0.8/29 = 662m2

L = 30mW=1m

Page 16: Septic tank process&design

TREAT SEWAGE SO THAT I T I S MADE HARMLESS.

DI SPOSE OF SEWAGE (MAKE I T GO AWAY)