sergio camuñas albizu ceo p. i. granada ii nave h1 – h2- 48530...

34
STAMPING SUPPORTING P. I. Granada II Nave H1 – H2- 48530 Ortuella – España- 0034 94 635 48 60 – [email protected] Sergio Camuñas Albizu CEO

Upload: others

Post on 20-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

STAMPING SUPPORTING

P. I. Granada II Nave H1 – H2- 48530 Ortuella – España- 0034 94 635 48 60 – [email protected]

Sergio Camuñas Albizu

CEO

Page 2: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

DESIGN AND MANUFACTURE OF TAYLOR MACHINES

PERIPHERAL DEVICES AROUND STAMPING LINES

BILLING: <3.000.000 €

EMPLOYEES : 28/30 AVERAGE ANNUAL

INSTALLATIONS : 1.500 M2 WORK AREA / 300 M2 OFFICES AREA.

WE HAVE PARTICIPATED IN PROJECTS FROM 28 COUNTRIES:

Spain, Portugal, France, United Kingdom, Netherlands, Belgium, Germany, Sweden, Poland,

Czech Republic, Italy, Romania, Russia, Morocco, Turkey, Iran, India, China, Australia,

Canada, USA, Mexico, Brazil, Argentina, South Africa, Cuba, Japan.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 3: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

At SERCAME we are specialized in the development of peripheral equipment surrounding the great

stamping cold or hot lines.

In this context, here are our line of products.

- FOL, Destacking Tables for cold and hot lines.

- Fanner Magnets & Aluminium blowing system.

- Infeed & Vision conveyors.

- EOL, Exit Conveyors for outgoing pieces. Telescopic, with parallel articulation and synchronized.

- Class A Audit and their working tables, with elevation and inclination.

- Simulators for Transfer's Grippers.

- Storehouse for Transfer's Grippers.

- SCHWARTZ oven ceramic Roller Handler. Roller Recuperation scratcher.

- Die Washing rooms (wash-rooms).

- Tables for Die Transportation over rails.

SERCAME has strived to the continuous improvement of the products that are developed for the

stamping industry.

Below we introduce a visual presentation of these product lines as well as other machinery that we

manufacture.P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 4: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

BLANCK DESTACKING SYSTEM

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 5: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

BLANCK DESTACKING SYSTEM

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 6: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

DESTACKING MAGNET SYSTEM

• CONCENTRATION OF MAGNETISM IN DESTAKER AREA.

• UPGRADING THE ERGONOMIC LOAD.

• OPERATOR CRUSHING RISK REDUCTION.

• UPGRADING IN DESTAKING CYCLE.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 7: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

7

DESTAKING FANNER MAGNETS

FEATURES• Built in Neodymium 6.

• Case built in stainless steel.

• Magnetic base what makes it portable.

• Adaptable to drilled surfaces..

• Adaptable to articulated pantograph..

• Magnetic clamp MG600 with 600 lbs. / 272 kg. strength.

ADVANTAGES• Smaller size than standard fanner magnets.

• Bigger fanner capacity.

• Higher destacking speed due the lack of resistance in exit zone.

• Higher effectivity and security due the magnetic field orientation.

• Parking position with negligible magnetic field, higher security for the

worker.

• Allows speeding up the destacking table charging process.

Neodymium Magnet High Handle SERCAME Cod.

113*123*37 mm

400 mmCentral VPIDSNE113X123H400-1ACT

Lateral VPIDSNE113X123H400-2AL

450 mmCentral VPIDSNE113X123H450-1ACT

Lateral VPIDSNE113X123H450-2AL

500 mmCentral VPIDSNE113X123H500-1ACT

Lateral VPIDSNE113X123H500-2AL

550 mmCentral VPIDSNE113X123H550-1ACT

Lateral VPIDSNE113X123H550-2AL

600 mmCentral VPIDSNE113X123H600-1ACT

Lateral VPIDSNE113X123H600-2AL

650 mmCentral VPIDSNE113X123H650-1ACT

Lateral VPIDSNE113X123H650-2AL

700 mmCentral VPIDSNE113X123H700-1ACT

Lateral VPIDSNE113X123H700-2AL

Magnetic Base Handle type SERCAME Cod.

Base to fix the

magnetMagnetic support

Liftable support VPIDSSOP-BM-EL

Liftable and articulated support VPIDSSOP-BM-EL-ART

Stainless steel support & back handle VPIDSSOP-BM-A 0001

Stainless steel support no back handle VPIDSSOP-BM--0001

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 8: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

ALUMINIUM DESTAKING SYSTEM

• ONE CONNECTION BLOWING SYSTEM.

• GRAVITY SELF DESCENDANT.

• EVEN TWO NOZZLES.

• QUICK CHANGE MAGNET TO BLOWING (vice

versa).

RENAULT DOUAI

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 9: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

INFEED CONVEYOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 10: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

INFEED CONVEYOR

GESTAMP BIZKAIA

FEATURESo DESIGNED TO BE VERSATILE.

o AFTERWARDS ADDING POSSIBILITY.

o QUICK REPARATION (1-3 minutes).

o EXTRACTION OF ANY BELT (1-3

minutes).

o TELESCOPIC SYSTEM TO COVER

EMPTY SPACE.

o INCLINATION OF VISION CONVEYOR

TO OPTIMIZE TRAYECTORIES.

o INFEED WITH FOLDED EDGES

DETECTION SYSTEM AVAILABLE.

o OIL AND PARTICLES CLEANING

SYSTEM.P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 11: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 12: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 13: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

• TELESCOPIC LENGTH SYSTEM.

• ELECTRIC MOTION WITH POSITION CONTROL.

• ADJUSTABLE SPEED.

• CONTINUOUS AND STEP-BY-STEP MOVEMENT

• PARTS COUNTING AND CONTAINERIZING HELP MODE.

• AUTOMATIC BAND DRIFT CONTROL.

• SCREEN FOR MANAGEMENT OF RECIPES.

• MANAGEMENT OF DIFFERENT CONFIGURATIONS.

• AUTOMATIC TILT

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 14: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 15: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

SEAT Barcelona 2 x 34 m.

GESTAMP AGUASCALIENTES MX.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 16: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYOR

NISSAN, SAINT PETERSBURG.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 17: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

EXIT CONVEYORVIANO ROOF control 100%

RUBI VITORIA ESP.

• 100% QUALITY CONTROL BEFORE PACKING.

• REWORKS REDUCTION TIME.

• POSITION CONTROL.

• AUTOMATIC SEPARATE STAKER OK &

REWORKS.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 18: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

HOTSTAMPING EXIT CONVEYORS

• TRANSPORTING PARTS OVER 500 ºC.

• POSITION CONTROL & PRECISION MOVEMENT.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 19: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

CONVEYORSTEP BY STEP

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 20: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

STADCO (GB) /

CIE PEMSA (MX).

• HIGH REDUCTION PRESS

PREPARATION TIME.

• PRECISION DIE POSITION.

• MANUAL X, Y MOVEMENTS , Z

ELECTRO-PNEUMATIC

• REAL POSITION FOR GRIPPERS

CONNECTION.

• MORE THAN 85% FREE TIME FOR

YOUR PRESS

• MORE ERGONOMIC AND

CONFORTABLE WORK.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

SIMULATORS FOR TRANSFER'S GRIPPERS

Page 21: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

SIMULATORS FOR TRANSFER'S GRIPPERS

STADCO (GB).

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 22: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

LOCATION: Russia (2), Spain (4), India (2), México (4).

STOREHOUSE FOR TRANSFER'S GRIPPERS

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 23: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

• CUSTOMIZED AND INDIVIDUAL POSITION.

• UNIQUE STORAGE LOCATION.

• BETTER FLOOR USABILITY .

• HIGH TILL 12.000 mm.

• EASY & SAFE FIXING GRIPPERS.

• FIABILITY, DOUBLE MOTOR SYSTEM.

• SAFETY AREA BY SCANNER SUPERVISION.

• OPTIONAL AUTOMATIC SEARCHING.

STOREHOUSE FOR TRANSFER'S GRIPPERS

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 24: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

HOT STAMPING

ROLLER EXTRACTOR

• THE WAY TO PRESERVE THE ISOLATION

• OPTIMAL FIX TO THE ROLLER IN ANY CONDITIONS (HOT

OVER 900 ºC, COLD, BROKEN…)

• DOESN'T WEAR AWAY THE OVEN'S PAINT COVER

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 25: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

• REDUCES RISK OF ACCIDENTAL BURNNIG

• DOUBLES ROLLER CHANGE PER SHIFT

• REDUCES ROLLER BREAKING

• REDUCES ERGONOMIC LOAD

• ONE WORKER LESS NEEDED

HOT STAMPING ROLLER EXTRACTOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 26: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

• LIGHTWEIGHT AND EASY TO USE

• 1000 ºC WORKING TEMPERATURE RANGE

• HEIGHT & INCLINATION REGULATION

• EASY MAGNETIC FIX TO FURNACE

HOT STAMPING ROLLER EXTRACTOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 27: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

MANUAL

ACCESSORY'S FOR

ROLLER EXTRACTION

With Bush

Without

Bush

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 28: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

LOCATION: Russia (2), Spain (Vizcaya, Palencia, Madrid), France,

Poland, India, Slovakia.

DIES WASH-ROOM

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 29: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

DIES WASH-ROOM

• SEALING OF WET AREA.

• DIRTY WATER MANAGEMENT.

• HIGH AIR RENOVATION.

• FLAT BED TRUCK ON RAILS.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 30: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

FLAT BED TRUCK ON

RAILS

BUILT TO SOPPORT FROM 5 TO

75 Tn.

MORE THAN 200 UNITS SOLD IN

4 CONTINENTS.

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 31: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

MORE THAN 1.000 UNITS

IN 4 CONTINENTS.

ROBOTS SOPPORTS

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 32: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

WELDING CABINS

MANUFACTURAS ELECTRICAS -

SCHNEIDER ELECTRIC, Mungia

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 33: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

TILL 300 mm.

COILS ADAPTOR

P. I. Granada II Nave H1 – H2- 48530 Ortuella –España- 0034 94 635 48 60 – [email protected]

Page 34: Sergio Camuñas Albizu CEO P. I. Granada II Nave H1 – H2- 48530 …sercame.com/wp-content/uploads/2019/01/SERCAME-PRESS... · 2019. 1. 30. · STAMPING SUPPORTING P. I. Granada

P. I. Granada II Nave H1-H2 - 48530 Ortuella -España-0034 94 635 48 60 - [email protected]

Sergio Camuñas Albizu. CEO

[email protected]

THANKS FOR YOUR ATTENTION