Page 1: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

SAP FORUM İSTANBUL 2014Basit Düşün Fark YaratSermaye Projesi: gelistirilmis yaşam döngüsüSpeaker Name: Dr. Marcus Zelezny (Strategic Engagement Lead)OpenText

Page 2: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 2

From vision to realityfrom costs to profit

Many stakeholders, lots of documents and data, complex overall process

Page 3: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 3

Many stakeholderscomplex interaction

OwnerInvestor

Main contractor Operator

Subcontractors Main package contractors

AuthoritiesLogistics

DocumentHandover

Page 4: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 4

The complete lifecycle

Collaboration & Engineering DM

Con

cept

ual D

esig

n

Res

earc

h an

d Fe

asib

ility

Aut

horit

y Pe

rmis

sion

Con

trac

ts

Det

aile

dD

esig

n

Con

stru

ctio

n

Proc

urem

ent

Technical Documentation

Insp

ectio

n,

Mai

nten

ance

, Rep

air

Envi

ronm

ent,

Hea

lth

& S

afet

y

Purc

hasi

ng, L

ogis

tics

Cha

nge

and

Rev

isio

n Pr

ojec

ts

Dec

omm

issi

onin

g

Com

mis

sion

ing

ECM for EPC ECM for EAMECM for PPM

ProjectDevelopment

Acquisition& Rental

Engineering

Construc-tion Operation and Maintenance

Transmittal Management

Han

dove

r, In

trod

uctio

n,

Che

ckin

g an

d A

ppro

val

Initiation Construction Operation

Page 5: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

ECM forContracts ManagementProject and Portfolio Management

initiate, analyze & select

Page 6: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 6

Business Workspaces: ContractsWeb UI

Contract Lifecycle

Contract Management Roles

Contract Data synchronized with SAP

Link to SAP Contract

Contract Type & Classification

SAP Vendor

Related SAP Purchase Orders

Related SAP Materials

Contract File

Contract Dates & ToDos

Page 7: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 7

Business Workspaces: ContractsSAP UI

Contract Workspace

Filing Structure including related Items Contract Documents for

selected Folder

Full Text Search

Page 8: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 8

Business Workspaces: ContractsExplorer and Outlook Integration

Microsoft Windows® Integration

Microsoft Outlook® IntegrationView of Contract Management Folders

Drag and Drop of mails into contract folders

Page 9: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 10

Business WorkspacePortfolio Item

Page 10: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

ECM forEngineering, Procurement and Construction

design, construct & handover

Page 11: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 12

Transmittal Management (TM)manages controlled engineering documents

Page 12: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 13

Transmittal Managementat Air Liquide / Lurgi

Solution and Benefits§Common platform for design and construction

documents§ Transmittal Management for controlled

document distribution§ 6-eye workflow for revision control

§ 1175 subfolders per project§ 6000+ documents§ 50.000+ document versions§ 4000+ documents

under revision control§ 100+ transmittals

Page 13: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 14

Transmittal Management (TM+)controlled traceable document interchange

Initial Issued for Design IFD

Issued for ReviewIFR

Issued for Construction IFC As- Built

Owner/OperatorPlant Engineers of the

originating BUsContractor

Web Self-Service

Owner/OperatorDocument Controller

Owners/Operators and Contractors are collaborating on the same platform

via Transmittal Management+

Page 14: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 15

Vault 2.0Vault 1.0

Transmittal Management (TM+)manages controlled engineering documents

1. Transmittal Request 2. Upload new documents 3. Formal Checking 4. Technical

Checking

initialFormally approved

Techn. approved

Reject and Notify with Comments

Reject and Notify with Comments

5. Check out to new transmittal

IFR Issued For Review

IFD Issuedfor design

a. Upload new documents or new versions

b. Index each document according to predefined category value lists

c. Comment your transmittal or each doc.

d. Send on docs

Checking:a. Conventions b. Document typec. Attributesd. Formal correctnesse. Consistencyf. Approve/Reject formally

Checking:a. Against technical

requirementsb. Qualityc. Liability d. Approve/Reject

technically

a. Request a new transmittal and select the contractor

b. Check out documents to the new transmittal

c. Notify contractor

a. Create a new Transmittal container

b. Set plant, contractor, state, PO# and delivery date

c. Notify contractor

Owner/OperatorPlant Engineers of the

originating BUs

ContractorWeb Self-Service

Owner/OperatorDocument Controller

Owner/OperatorDocument Controller

Owner/OperatorDocument Controller

Page 15: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 16

TM+dashboard @ owner/operator

Don’t wait – immediately proceed!

Page 16: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 17

The context menu is dependenton the document state and the user role permission

All can change attributes when a document is initial or requested

Document Controllers can formally approve when a document is requested or sent on

§ Engineers can technically approve when a document is formally approved

Page 17: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 18

Document HistoryAudit Trail of Revisions

Page 18: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 19

EPC & EAM Workspace Interaction Overview

Projects & SM / TM

Technical ObjectsPublished to multiple

technical objects

Check in and check out to

projects

Document Workspace for

each FLOC and EQUI in

SAP

1. Initial 2. IFD 5. As Built5. As Built3. IFR 4. IFC

VAULT

Page 19: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 20

SE/DE: Wind Farms

FR/DE: Refineries

DE: Facilities

US: Subsea Systems

DE: Facilities and Plants

ES: Solar Power Plants

ECM for EPCselected customers

AE: Refineries and Wells

| Overseas

QA: Facilities

Astad

Page 20: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 21

ProcurementVendor

Extended ECM workspace for vendor C.E.B. New York

Vendor KPIs based on SAP

data

Related MaterialsTransparency on all changes –

e.g. changed or new documents

Standardized filing structure include SAP- and NON-SAP documents

SAP vendor data

Page 21: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 22

ProcurementPurchase Requisition

Page 22: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 23

ProcurementRequest for Quotation

Page 23: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 24

ProcurementPurchase Order

Page 24: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

ECM forEnterprise Asset Management

operate and maintain

Page 25: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 26

EPC & EAM Workspace Interaction Overview

Projects & SM / TM

Technical ObjectsPublished to multiple

technical objects

Check in and check out to

projects

Assigned to WOs or notifications

Document Workspace for

each FLOC and EQUI in

SAP

WO or WBS creates Project Workspace

1. Initial 2. IFD 5. As Built5. As Built3. IFR 4. IFC

VAULT

Page 26: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 27

SAP PM - Management of Technical ObjectsFunctional Locations & Equipment

27

The overall structure of a plant is reflected in the hierarchy of functional locations. A functional location represents an area at which pieces of equipment can be installed. You can manage your functional location and equipment documents easily in SAP Extended ECM (xECM)Business Workspaces.

Page 27: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 28

SAP PM - Corrective MaintenanceMaintenance Notifications

28

Maintenance notifications describe the condition of a technical object or report a malfunction at a technical object and request the damage be repaired. You can manage your notification documents easily in SAP Extended ECM (xECM) Business Workspaces. In addition, in the same screen you are able to see the documents of the actual notification, of the related technical objects (functional location, equipment), and of the related maintenance orders.

Equipment

Functional Location

Maintenance Order

Page 28: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 29

SAP PM - Preventive MaintenanceMaintenance Task Lists & Maintenance Orders

29

Maintenance task lists describe a sequence of individual maintenance operations which must be performed repeatedly within a company. An operation specifies amongst others the documents required for the maintenance task. You can reference your documents easily in SAP Extended ECM (xECM) Business Workspaces for task lists. A maintenance order, which has been created based on a maintenance task list, takes over the referenced documents automatically.

Page 29: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 30

Extended ECM for SAP PMSAP PM Blueprint

30

The purpose of a blueprint is to give you a best practice for an implementation of SAP Extended ECM in a specific business context. The blueprint consists of documentation and a sample implementation.

Page 30: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 31

ECM for EAMselected customers

SE: Power Distribution Grid

DE: Refineries

DE: Paper mills

AT & DE: Distribution GridsSE: Nuclear Power Plant

BE: railways

EU: Facilities

CA: Power Distribution Grid

CA: Oil & Gas

Page 31: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved. 32

Main benefits

§ One document repository along the complete value chainReduce IT infrastructure costs; single complete version of the truth

§ Secure repository allow access of external partiesRole & permission based, auditable collaboration

§ Template based workspaces & document creationFast creation, guarantee consistency

§ Multi client capabilities: Web, Explorer, Outlook, SAP, SharePoint

§ Productized integration into SAP (PPM, PS, PM, …)Best practices available for fast implementation

§ Integration with CAD & GIS systemsAutoCAD, MicroStation; ESRI ArcGIS, others via WebServices

§ Streamline handover to avoid “surprises” (as planned / as built)Significantly reducing risks and costs

Page 32: SERMAYE PROJESİ: GELİŞTİRİLMİŞ YAŞAM DÖNGÜSÜ

© 2014 SAP AG or an SAP affiliate company. All rights reserved.

Teşekkürler – Thank You!Contact Information: