Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Service SectionService Section

Technical Training Technical Training

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Good Air Conditioning Good Air Conditioning Installation PracticesInstallation Practices

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Contents

• Location of installationLocation of installation

• PipingPiping

• CleanlinessCleanliness

• ElectricalElectrical

• Refrigerant CircuitRefrigerant Circuit

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of InstallationLocation of Installation

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Ceiling too highCeiling too high

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Unit installed in an enclosed areaUnit installed in an enclosed area

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Dirty or chemically hazardous environmentDirty or chemically hazardous environment

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Avoid high electrical interference environment ( infra Avoid high electrical interference environment ( infra red bar code scanning machine, lighting with red bar code scanning machine, lighting with electronic ballast)electronic ballast)

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• No service openingNo service opening

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Duct work too shortDuct work too short

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Easy for serviceEasy for service

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Comply to installation clearanceComply to installation clearance

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Do not block the air dischargeDo not block the air discharge

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… The return air is not short cycleThe return air is not short cycle

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… To avoid strong windTo avoid strong wind

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• A proper drainage system is crucialA proper drainage system is crucial

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• A proper drainage system must be slopedA proper drainage system must be sloped

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• Beware of where it endsBeware of where it ends

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• Proper length is crucialProper length is crucial

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

PipingPiping

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Keep the piping as short as possibleKeep the piping as short as possible

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Provide oil traps if height of installation exceed 10mProvide oil traps if height of installation exceed 10m

10m

5m

Condenser

Evaporator

Condenser

Evaporator

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Insulate the pipe and insulate it separatelyInsulate the pipe and insulate it separately

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Bend the pipe using pipe bender instead of hands.Bend the pipe using pipe bender instead of hands.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Do not size up or size down the pipe (especially for Do not size up or size down the pipe (especially for heatpump model)heatpump model)

> Pipe size up - refrigerant velocity downPipe size up - refrigerant velocity down

> Pipe size up - more refrigerant needed - refrigerant Pipe size up - more refrigerant needed - refrigerant floodbackfloodback

> Pipe size up - dilution of oilPipe size up - dilution of oil

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

CleanlinessCleanliness

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Do not expose pipes or components to Do not expose pipes or components to environment over an prolong period.environment over an prolong period.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Keep moisture out of pipes or components Keep moisture out of pipes or components

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• When laying pipes through walls, end of When laying pipes through walls, end of pipes must be properly sealedpipes must be properly sealed

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• When cutting a copper pipe, use copper When cutting a copper pipe, use copper cutter instead of saw.cutter instead of saw.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Always vacuum before charge in refrigerantAlways vacuum before charge in refrigerant

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Always braze with present of nitrogenAlways braze with present of nitrogen

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

ElectricalElectrical

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Remote control wiring should be separated from Remote control wiring should be separated from power cablepower cable

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Screw must be tight at terminalsScrew must be tight at terminals

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Examine the power sourceExamine the power source

• Determine the maximum load the power source can Determine the maximum load the power source can handlehandle

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Refrigerant CircuitRefrigerant Circuit

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Refrigerant Circuit

• Proper leak checkProper leak check

• Properly charge the systemProperly charge the system

• For no pre-charge system which is using scroll For no pre-charge system which is using scroll compressor, must contain 80% charge before startcompressor, must contain 80% charge before start

• For system that using TXV, make sure the TXV is For system that using TXV, make sure the TXV is properly installedproperly installed