Session 1Performance Scheme : are we on the right track ?
Moderator : Peter GriffithsChairman of the Performance Review Body
![Page 2: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/2.jpg)
Session 1
Keynote speakers
• Paul Schwach, Deputy DGCA, France• Kay Kratky, Lufthansa Board Member
Round table panelists
• Matthew Baldwin, Director Aviation and International Transport Affairs, EC• Frank Brenner, DFS, Member of the PRB• John Hanlon, ELFAA Secretary General• Jacek Krawczyk, Member of the European Economic and Social Committee• Tom Regan, Irish CAA, NSA Coordination Platform Performance WB Chairman
![Page 3: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/3.jpg)
Session 1
Overall Context
• Will the EU-wide targets for Reference Period 2012-2014 and the related national/FAB targets be challenging enough to change ATM?
• The target setting for the Reference Period 2015-2019 should make the system stronger. How far should it go?
• How to better link the performance scheme with other SES initiatives such as FABs and SESAR deployment?
• What about human factors? How could they be addressed?
![Page 4: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/4.jpg)
Session 1
Summary of Discussion points
• Will the EU-wide targets for Reference Period 2012-2014 and the related national/FAB targets be challenging enough to change ATM?
• The target setting for the Reference Period 2015-2019 should make the system stronger. How far should it go?
• How to better link the performance scheme with other SES initiatives such as FABs and SESAR deployment?
• What about human factors? How could they be addressed?
![Page 5: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/5.jpg)
Performance Context
![Page 6: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/6.jpg)
Original Proposals from PRB Sept 2010
SafetyDuring RP1, States to monitor and publish the followingSafety KPIs:1) Effectiveness of safety management;2) Application of severity classification;2.1) Separation minima infringements;2.2) Runway incursions;2.3) ATM special technical events;3) Implementation of Just Culture.PRB to work closely with EASA in developing SafetyKPIs and arrangements for the monitoring of safety.
![Page 7: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/7.jpg)
0,0
0,3
0,5
0,8
1,0
1,3
1,5
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
0.5 min.
Current capacity planning
Current EUROCONTROL target
En route ATFM delay per flight (min.)
Actual baseline
EU-wide target
3,0%
3,5%
4,0%
4,5%
5,0%
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
-0.75% points
vs. 2009
Actual baseline
Current enhancement plans (-0.6% points vs. 2009)
EU-wide target
% of horizontal en route extension
40
45
50
55
60
65
70
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014€ 51
States' submissions to June 2010 Enlarged Committee
EU-wide target
€ per service unit (€ 2009)
Actual baseline
Original Proposals from PRB Sept 2010
![Page 8: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/8.jpg)
€59
€64 €62 €61€59
€58€56
€26
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Euro
per
serv
ice u
nit (
2009 p
rices)
Determined unit rate (State plans June 2010) -3.0% annual decrease in determined unit rate 2009-2014
High level political objective for 2020
expressed in en-route costs per SU
RP1
If a -3.0% annual decrease in determined unit rate is achieved between
2009 and 2014 then a -11.6% annual decrease would be required to achieve the high level political objective in 2020
Proposed target vs. political objective
![Page 9: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/9.jpg)
Key Note SpeakersPaul SchwachDirecteur du Transport AérienAdjoint au Directeur général de l'aviation civileKay KratkyMember of the Lufthansa German Airlines BoardFrankfurt & Flight Operations
![Page 10: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/10.jpg)
Direction générale de l’Aviation civile
Limassol – October 11th, 2012Single European Sky Conference
Performance schemeViewed from NSA France
by Paul SCHWACH,Deputy director general of civil aviation
Director for Air Transport
![Page 11: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/11.jpg)
1111Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201211
Where did we come from
Until 2009 air navigation charges were set on a pure cost-recovery principle Criticized for not providing incentives for performance Featuring a corrective mechanism that was contra-
cyclic No « quality » targets
As early as end of 2009, in anticipation of EU regulation SES2, the Government adopted a decree which created a NSA for performance: DTA installed a performance scheme stopped the corrective mechanisms
![Page 12: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/12.jpg)
1212Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201212
Baisse significative du trafic depuis fin 2008Steering air navigation performance
DTA was already regulator for airport charges: the performance scheme for DSNA looked like the « Contrat de regulation Economique » for ADP
DTA is not in charge of setting the targets, but to guarantee that performance is correctly planned and assessed, and that the consultation process is achieved
Two more specific interventions:
• Setting the traffic forecast
• Finding a compromise on return of equity
Coordinated performance plans on national and FABEC level
A discussion on capacity at FABEC level
![Page 13: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/13.jpg)
1313Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 2012
DGCA (BE)
BFS (DE)
DTA (FR)
DGCA (LU)
DGCA (NL)
FOCA (CH)
Belgocontrol (BE)
DFS (DE)
DSNA (FR)
MUAC
LVNL (NL)
skyguide (CH)
DSNA (FR)
Regulation
AccountabilityJoint
Accountability
Joint Regulation
National Performance Plan 2012-2014:- En route target:
- Cost-Efficiency
- Terminal:
- SAF, CAP, Cost-efficiency (DUR)
- Additional Indicators (SAF, CAP)
FABEC Performance Plan 2012-2014 :- En route targets:
SAF, CAP, ENV
Addit'l Indicators: CAP, ENV, Consolidated DUR , MME
(Complementing)
Performance at National and FABEC level
![Page 14: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/14.jpg)
1414Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201214
What should be achieved in RP1 (en-route)
FABEC Performance plan Capacity :
0.5 minute / « en-route » flight delay in year 2014
Environment :Route extension down 5% (2014 / 2011)
National Performance plan Safety:
Additional quantified safety targets
Cost Efficiency :En route unit costs : -7% (2014 / 2011) in real
terms
Capacity:Additional en-route indicators
![Page 15: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/15.jpg)
1515Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201215
Baisse significative du trafic depuis fin 2008Some thoughts about cost-efficiency
Cost efficiency measured by determined unit rates depends on costs and traffic: UR=COSTS/TRAFFIC
When traffic is weak, cost-efficiency is difficult to improve because staff charges cannot react to traffic variations in the short term
The public status of DSNA puts a lot on pressure on cost-efficiency when the State Budget is under tension
The risk to cut investments
Are the EU targets an aspirational goal or a collective commitment ?
![Page 16: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/16.jpg)
1616Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201216
Some suggestions for drawing the way forward
A real assessment of RP1 before setting RP2
If EU targets are not just aspirational goals, but must become a collective commitment, make them realistic, based on achievable actions by ANSPs
Take into account investment separately
Rethink of incentives (bonus/malus) for some KPIs
EU guidance on RoE
Terminal charges could be a priority for delivering cost-efficiency in the short term, with airlines cooperation
![Page 17: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/17.jpg)
1717Direction généralede l'Aviation civile
Single European Sky Conference – Limassol October 11th, 201217
Conclusion
The SES2 regulation on performance has been implemented
The ANSPs are under tension
The performance needs a cooperation between ANSPs et Air carriers, but also with staff
The current performance trend is achievable in a long term period, with also periods of highly increasing traffic
A gap above this trend should be expected from FAB and SESAR
![Page 18: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/18.jpg)
Direction générale de l’Aviation civile
Thank you for your attention
![Page 19: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/19.jpg)
Where are we today
![Page 20: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/20.jpg)
Environment
3,86%
3,33%
4,08%
![Page 21: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/21.jpg)
Examples - Flight Efficiency challenge
Reduction in route length:
City pair Brussels - Milano Malpensa
New route in green (march 2012)
Reduction in difference between flight
planned route and best available
route
Difference between red and green or
blue/green
CP EBBR_LIMC Real planning
(Sunday 8th April 2012)
IFPU2 Away Day
![Page 22: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/22.jpg)
Capacity
0,680,7 0,6 0,5
![Page 23: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/23.jpg)
Capacity Target(Actual vs. Plan)
(January - August 2012)
1,11
0,37
0,12
0,04
0,00
-0,0
2
-0,0
2
-0,0
3
-0,0
4
-0,0
7
-0,1
1
-0,1
4
-0,1
4
-0,1
4
-0,1
6
-0,2
1
-0,2
9
-0,3
0
-0,3
0
-0,3
1
-0,4
2
-0,7
0
-0,9
9
-1,50
-1,00
-0,50
0,00
0,50
1,00
1,50
Cyp
rus
No
rway
Po
rtu
gal
Co
nti
nen
tal
Est
on
ia
Ro
man
ia
Lat
via
Mal
ta
Fin
lan
d
Lit
hu
ania
Irel
and
Bu
lgar
ia
Ital
y
FA
BE
C
Cze
ch R
epu
bli
c
DK
-SE
FA
B
Un
ited
Kin
gd
om
Sp
ain
Hu
ng
ary
Slo
vak
Rep
ub
lic
Slo
ven
ia
Po
lan
d
Au
stri
a
Gre
ece
![Page 24: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/24.jpg)
Debate PanelistsMatthew. Baldwin, Director Aviation and International Transport Affairs, ECFrank. Brenner, DFS, Member of the PRB John. Hanlon, ELFAA Secretary General Jacek. Krawczyk, Member of the European Economic and Social Committee Tom. Regan, Irish CAA, NSA Coordination Platform Performance WG Chairman
![Page 25: Session 1 Performance Scheme : are we on the right track ? Moderator : Peter Griffiths Chairman of the Performance Review Body](https://reader036.vdocuments.net/reader036/viewer/2022062408/56649ea25503460f94ba62e3/html5/thumbnails/25.jpg)
Debate