  • Evolution of Multi-Stage Fracturing with Ball Drop Systems

    Presentedby,CamStempfleC.E.T.

    CompletionsEngineeringTechnologist

  • 4Where is the Canadian Bakken?

    -The Bakken extends throughout the Western Canadian Sedimentary Basin and Williston Basin

  • 5Penn West in the Bakken

    Penn West is currently located in 2 regions of the Bakken formation

    Saskatoon

    Regina

    Kindersley

    West Central Saskatchewan

    South East Saskatchewan

  • 6West Central Saskatchewan

    -25 horizontal wells drilled to date-Reservoir Quality

    - Permeability: 3-12 mD- Porosity: 30-35%- API: 10

    -Depths: 5,600 MD (2600 TVD)-Intermediate Casing: 8.625-Horizontal Legs: 2,300-Liner System: 5.5 slotted liner -No stimulation attempted to date

  • 7West Central Saskatchewan

    Typical Completion Method:-Run to TD with coil tubing and displace out Aphron mud / sand-Run pump to surface equipment until initial inflow stabilizes-Equip well with progressive cavity pump-Wells completed in 4 days

  • 8South East Saskatchewan

    -14 wells drilled to date-Reservoir Quality

    - Permeability: 3-20mD- Porosity: 15%- API: 40

    -Depths: 8,850 MD (3,600 TVD)-Intermediate Casing: 7-Horizontal Legs: 5,000

  • 9South East Saskatchewan

    Liner Systems: - PackersPlus StackFrac - Baker Hughes Frac-Point - Xtreme Oil Tools Iso-Pak

    -The number of stages has varied from 11 all the way up to 21-All 3 system has shown benefits with a few issues along the way

  • 10

    Open Hole Liner Systems

    PackersPlus Stack-Frac4 systems installed to date-Sizes: 4.5-Number of Stages: 11-Ball Sizes: 1.0 and increasing up to 3.5 -Pump Rates: 6.2 bbl/min-Proppant: 2,000 lbs of 50/140 sand and 20,000 lbs of

    20/40 sand-Fluid: 3,460 bbl (315 bbl/stage)-Fluid System: Borate Crosslinked Produced Water

  • 11

    Open Hole Liner Systems

    PackersPlus Stack-Frac System

  • 12

    Open Hole Liner Systems

    PackersPlus Stack-FracSuccesses:

    - 1ST ball drop system used by Penn West in the Bakken - 39 of 44 stages were fractured successfully

    Issues:- Ports not shifting open- Ports being set at incorrect depths

  • 13

    Open Hole Liner Systems

    Baker Hughes Frac-Point8 systems installed to date-Sizes: 4.5-Number of Stages: 11-21-Ball Sizes: 1.125 and increasing up to 3.650 -Pump Rates: 5.0 6.2 bbl/min-Proppant: 2,000 lbs of 50/140 sand and 20,000 lbs of

    20/40 sand -Fluid: 4,500 bbl (282 bbl/stage)-Fluid System: Borate Crosslinked Produced Water

  • 14

    Open Hole Liner Systems

    Baker Hughes Frac-Point System

  • 15

    Open Hole Liner Systems

    Baker Hughes Frac-PointSuccesses:

    - Allowed us to increase our frac density with up to 21 stages- 102 of 115 stages were successfully fractured

    Issues:- Sleeves not opening at expected pressure

    - Balls breaking when being seated

  • 16

    Open Hole Liner Systems

    Xtreme Oil Tools Iso-Pak2 systems installed to date on re-entry wells-Sizes: 3.5-Number of Stages: 11 and 15-Ball Sizes: 1 and increasing up to 3.5 -Pump Rates: 6.2 bbl/min-Proppant: 2,000 lbs of 50/140 sand and 20,000 lbs of

    20/40 sand-Fluid: 3,770 bbl (290 bbl/stage)-Fluid System: Borate Crosslinked Produced Water

  • 17

    Open Hole Liner Systems

    Xtreme Oil Tools Iso-Pak System

  • 18

    Open Hole Liner Systems

    Xtreme Oil Tools Iso-PakSuccesses:

    - Fullbore ID after drill out of ball seats

    - 25 of 26 stages were fractured successfully

    Issues:

    - Sleeves not shifting open

  • 19

    Conclusion

    - By evolving, Penn West was able to increase frac density while saving money-Each system had problems with shifting open sleeves-Experienced service company employees are very important to the success of the job

    -Future developments are moving towards full drift systems

  • Questions?

    Slide Number 1Where is the Canadian Bakken?Penn West in the BakkenWest Central SaskatchewanWest Central SaskatchewanSouth East SaskatchewanSouth East SaskatchewanOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsOpen Hole Liner SystemsConclusionSlide Number 20