session: operation strategies - energy exchange...energy exchange: federal sustainability for the...

10
Rhode Island Convention Center • Providence, Rhode Island DoD Installation Operations Strategies Session: Operation Strategies Mr. Stacey K. Hirata U. S. Army Corps of Engineers August 10, 2016

Upload: others

Post on 27-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Rhode Island Convention Center • Providence, Rhode Island

DoD Installation Operations Strategies

Session: Operation Strategies

Mr. Stacey K. HirataU. S. Army Corps of Engineers

August 10, 2016

Energy Exchange: Federal Sustainability for the Next Decade

Installation Master Planning

2

• Holistic structure to achieve resilient, sustainable, energy efficient installations 

• UFC 2‐100‐01 ‐ 10 strategies for sustainability

• Recent DoD guidance:  • UFC compliant master plan by 1 Oct 2018• Installation Energy Plan(IEP) by Mar 2019

• Resilient infrastructure solutions with connected utility and multi‐modal transportation networks; reduced, compact footprints; and repurposing of buildings

Ft. Belvoir Mixed Use Development saves energy with compact development and less reliance on automobiles

Energy Exchange: Federal Sustainability for the Next Decade

Metering Program 

3

• Energy Policy Act of 2005 (EPAct 2005) 

• Energy Independence and Security Act of 2007 (EISA 2007)

• Office of the Under Secretary of Defense, Acquisition, Technology and Logistics  (OUSD (AT&L)) – Advance Meters (16 April 2013):

– 60% Individual facilities– 85% Component level by end of FY 2020

• Secretary of the Army – Advance Meters (4 Jun2014):– 60% Individual facilities– 85% Installation level by end of  FY2020

Energy Exchange: Federal Sustainability for the Next Decade

Demand Response

4

• Program to motivate changes in electric use by end‐use customers in response to changes in the price of electricity

• Provides monetary incentive to induce lower electricity use at times of high market prices or when grid reliability is at risk.

Energy Exchange: Federal Sustainability for the Next Decade

Direct Funded Military Construction

• Sustainable Design ‐ LEED Silver (required) or better (at no additional cost)

• Criteria and Guidance  – UFC 1‐200‐02– ASHRAE

• ECIP‐Energy Conservation Investment       Program– part of the MILCON program. – projects greater than $750K– Can’t be used for repair, maintenance,        

or environmental remediation work.

5

Energy Exchange: Federal Sustainability for the Next Decade

Third Party Financing 

6

• ESPCs ‐ Energy Savings Performance Contracting • UESC ‐ Utilities Energy Services Contracting • ESCO ‐ Energy Service Companies (ESCO)  &  

Utility Companies• Energy Conservation Measures (ECMs) where 

economically feasible .

President’s Performance Contracting Challenge requires implementing 

$4 Billion in performance contracting in the Federal Sector 

through 2016 

Energy Exchange: Federal Sustainability for the Next Decade

Energy Security & Energy Resilience

• Existing Infrastructure

• Microgrids– Enabling technologies– SPIDERS‐DoD Program 

• Energy Storage and                                          Generation

7

Energy Exchange: Federal Sustainability for the Next Decade

Army’s Office of Energy Initiatives (OEI)

8

The Art of the Deal

Real Estate

Business /Project Development

Technical & Engineering

Procurement

• OEI serves as the central management office for partneringwith Army installations to implement cost‐effective, large‐scale, renewable energy projects, leveraging private sector financing.

• Projects equal to or greater than 10MW

• Resourced to perform project evaluation and validation  for acquisition

• Will use existing DoD land‐use and third‐party financing authorities

Energy Exchange: Federal Sustainability for the Next Decade

• Army’s Energy Security and Sustainability (ES2) Strategy is one example of DoD Installation Operations Strategies

• Army’s ES2:– Inform Decisions– Optimize Use– Assure Access– Build Resiliency– Drive Innovation

9

Army’s Energy Security and Sustainability (ES2) Strategy 

Rhode Island Convention Center • Providence, Rhode Island

DoD Installation Operations Strategies

Session: Operation Strategies

Mr. Stacey K. HirataU. S. Army Corps of Engineers

August 10, 2016