session: turbine manufacturers and new technologies · session: turbine manufacturers and new...
TRANSCRIPT
Session: Turbine Manufacturers and New Technologies
Istanbul
November 2014
A.Beyer
THE VALUE CHAIN - NORDEX IS MORE THAN A TURBINE MANUFACTURER
Civil WorksElectrical
InfrastructureInstallation &
CommissioningProject Development
� Selection of location� Ownership� Optimal siting� Wind measurements� Soil survey� Noise / shade
emission� Economic viability� Grid connection� Special purpose
registration� Environmental
permitting
Hand over ServiceTurbine Delivery
permitting� Building permitting
Wind FarmSystemPlanning
Production and Technical
Implementation
Wind Farm Operations
Service and Maintenance
Project Development, Marketing, Financing
� Review customer micro-site planning
� Support customers(co-development) to receive approvals and to optimise park layouts
� Assemble WTG
� Produce selected components
� Install onsite
� Carry out initial operation
� ~3,000 turbines currently under Nordex service
� Full service contract offerings up to 15 years
� Leading company in France
� Active also in Poland, Sweden, USA and LatAm
� Offer additional services: increased demand due to new wind farm investors interested in stable cash flows
Product Development; Turbines, SCADA and Windfarm features
2TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
NORDEX MULTI MEGAWATT TURBINES –AN EVOLUTIONARY DEVELOPMENT
14 years and
more than 7,600 MW
WindpowerMonthly’s criteria:
Generation AlphaN80/2500
Generation BetaN90/2500
2000 2007 2010 2013/14
Global fleet availability in 2013 ~98 %Turbines under Nordex Service
Monthly’s criteria: � clever use of
technology innovation� product-market impact
and relevance� fitness for purpose� reliability record� grid connectivity� installation and
upkeep
3TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
Generation GammaN90/2500N100/2500N117/2400
NORDEX MULTI MEGAWATT TURBINES –AN EVOLUTIONARY DEVELOPMENT
Generation Delta
14 years and
more than 7,600 MW
Generation AlphaN80/2500
Generation BetaN90/2500
2000 2007 2010 2013/14
Generation DeltaN100/3300N117/3000N131/3000
Global fleet availability in 2013 ~98 %Turbines under Nordex Service
4TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
Generation GammaN90/2500N100/2500N117/2400
IN OPERATIONCUSTOMER PROJECT LOCATION # WT WTG TYPE Generation Σ MW Contract Type
DOST ENERJİ YUNTDAĞ Izmir, Bergama 17 N90/2500 Beta 42,5 Clean Selling
DOST ENERJİ YUNTDAĞ EXT. Izmir, Bergama 6 N90/2500 Beta 15,0 Clean SellingDOST ENERJI YUNTDAG EXT. II İzmir,Bergama 1 N100/2500 Gamma 2,5 Clean SellingDOST ENERJİ KORES İzmir, Çeşme 6 N90/2500 Beta 15,0 Clean SellingDOST ENERJİ KORES EXT. İzmir, Çeşme 1 N90/2500 Gamma 2,5 Clean Selling
BİLGİN ENERJİ BERGAMA Izmir, Bergama 36 N90/2500 Beta 90,0 Clean SellingBİLGİN ENERJİ SOMA Manisa, Soma 36 N90/2500 Beta 90,0 Clean SellingBİLGİN ENERJİ MAZI III Izmir, Bergama 12 N90/2500 Beta 30,0 Clean Selling
BURSA TEMİZ ENERJİ BANDIRMA-3 Balıkesir, Bandırma 10 N90/2500 Beta 25,0 Clean SellingENER HOLDING ENEZ Edirne, Saroz 6 N90/2500 Beta 15,0 Clean SellingEKSIM ALENTEK SUSURLUK Balıkesir, Susurluk 18 N100 (15) +N90 (3) Gamma 45,0 Clean SellingKARESİ ENERJİ AKRES Manisa, Akhisar 18 N90/2500 Beta 45,0 Turnkey
KARDEMIR BOZYAKA Izmir, Yeni Foça 5 N100/2500 Gamma 12,5 Clean SellingEKSİM HOLDİNG TOKAT Tokat 16 N100/2500 Gamma 40,0 Clean Selling
BİLGİN ENERJİ BANDIRMA EXT. Balıkesir, Bandırma 2 N90/2500 Gamma 5,0 Clean SellingCAN ENERJİ METRISTEPE Bilecik 16 N100/2500 Gamma 40,0 Turnkey
EKSİM HOLDİNG AMASYA Amasya 16 N100/2500 Gamma 40,0 Clean SellingBİLGİN ENERJİ ZEYTINELİ Izmir, Çeşme 20 N100(14)+N90(6) Gamma 50 Clean Selling
EDINCIK ENERJI EDINCIK Bandırma, Balıkesir 12 N100/2500 Gamma 30 Clean Selling
25% MARKET SHARE* – REFERENCES IN TURKEY
EDINCIK ENERJI EDINCIK Bandırma, Balıkesir 12 N100/2500 Gamma 30 Clean SellingTEKTUG ELEKTRIK SINCIK Adıyaman 11 N100/2500 Gamma 27,5 Clean SellingEKSİM HOLDİNG SUSURLUK EXTENSION Bandırma, Balıkesir 6 N100/2500 Gamma 15 Clean Selling
BOYDAK HOLDING ÇANTA Catalca, Istanbul 19 N100/2500 Gamma 47,5 Clean SellingDOST ENERJI GERES Manisa, Gelenbe 11 N90/2500 Gamma 27,5 Clean Selling
EKSİM HOLDİNG HASANBEYLI Osmaniye 20 N100/2500 Gamma 50 Clean SellingEKSİM HOLDİNG SILIVRI Silivri, Istanbul 18 N100/2500 Gamma 45 Clean Selling
AKÇA ENERJİ ALIAGA İzmir, Aliaga 4 N117/2400 Gamma 9,6 Clean Selling
343 WTG 857,1 MWUNDER CONSTRUCTION
CUSTOMER PROJECT LOCATION # WT WTG TYPE Generation Σ MW Contract Type
KARESİ ENERJİ AKRES EXTENSION Manisa, Akhisar 4 N100/2500 Gamma 10 Clean SellingBOREAS ENERJİ ENEZ EXTENSION Edirne, Saroz 2 N100/3300 Delta 6,6 Clean Selling
ABK CESME ENERJI CESME İzmir,Çeşme 6 N117/3000 Delta 18 Clean SellingDOST ENERJİ KORES EXTENSION-II İzmir,Çeşme 3 N100/2500 Gamma 7,5 Clean Selling
ERDEM HOLDING ÖDEMİŞ İzmir, Ödemiş 7 N117/3000 Delta 21 Clean SellingBIÇAKÇILAR ELEKTRİK PİTANE İzmir 2 N117/2400 Gamma 4,8 Clean Selling
SANCAK ENERJI URLA İzmir, Urla 6 N117/3000 Delta 18 Clean SellingYENI ENERJI YENİHİSAR Aydın 9 N117/2400 Gamma 21,6 Clean Selling
EDİNCİK ENERJİ EDİNCİK EXTENSION Bandirma, Balikesir 11 N117/2400 Gamma 26,4 Clean SellingERDEM HOLDING BAĞARASI Aydın, Söke 20 N117/2400 Gamma 48 Clean Selling
KARDEMİR BOZYAKA EXTENSION İzmir, Yeni Foça 2 N117/2400 Gamma 4,8 Clean SellingBURSA TEMİZ ENERJİ BANDIRMA-3 EXTENS Bandirma, Balikesir 7 N117/2400 Gamma 16,8 Clean Selling
79 WTG 203,5 MW
Total Units 422 WTG
Total Capacity 1060,6 MW
* Cummul. in MW as of end of Q3/2014TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 5
Rotor Ø
117 m
WITH THE NEW IEC I / II / III TURBINES, NORDEX OFFERSBEST FIT FOR ALL WIND SITES
N117/3000N117/2400
+30% A
EP
+25% A
EP
N131/3000
SOP 06/2015
131 m
Generation DELTA
100 m
90 m
6,0m/s 6,5m/s 7,0m/s 7,5m/s 8,0m/s 8,5m/s 9,0m/s 9,5m/s 10,0m/s
IEC 3a
Light wind
IEC 2a
Moderate wind
IEC 1a
Strong wind
N100/3300N100/2500
N90/2500
+30% A
EP
AEP
Generation GAMMA
6TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
Wind speed
Type Capacity Swept area
N90/2500 IEC 1a 2.5 MW 6,362 m2
N100/2500 IEC 2a 2.5 MW (+23%) 7,823 m2
Type Capacity Swept area
N100/3300 IEC 1a 3.3 MW 7,823 m2
Generation Gamma
Generation Delta
THE NORDEX MULTI-MEGAWATT TURBINES
SHARED & PROVEN COMPONENTS OF GAMMA AND DELTA GENERATION
N117/2400 IEC 3a 2.4 MW (+37%) 10,715 m2
N117/2400First installations since 12/2011
N117/3000 IEC 2a 3.0 MW (+37%) 10,715 m2
N131/3000 IEC 3a 3.0 MW (+26%) 13,478 m2
N117/3000First installations since 8/2013
7TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
LIGHT WEIGHT DESIGN OF NR58.5M BLADES Rotor Blade NR58.5 – KEY INNOVATION FOR PERFORMANCE INCREASE
• Structural & aerodynamic design are based on the experiences of certified in-house developments of
N80/2500 (NR37,5)
N90/2500 (NR45) N100/2500 (NR50)
• Use of carbon fiber
NR45 NR50 NR58.5
WTG Type N90 N100 N117
Length 43.8 m 48.8 m 57.3 m
Weight 10,300 kg 11,150 kg 10,500 kg
Max. Chord 3,220 mm 3,700 mm 3,496 mm
Swept area 6.362 m² 7.823 m² 10.715 m²
TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
• Use of carbon fiber composites (CFRP) in main girder of rotor blade NR58.5 and new NR65,5 is key for turbine load- and weight reduction
8
Swept area 6.362 m² 7.823 m² 10.715 m²
Bolt CircleDiameter
2,300 mm 2,300 mm 2,300 mm
Weight main girder
31% 24% 18%
Materials GRP GRP GRP and CFRP
power curveaccording „IEC 61400-12“
(Wind Consult)
NR 58.5 ROTOR BLADE (N117/2400 & N117/3000)confirmed: properties, tests and certifications
power qualityaccording „Technische Richtlinie
Teil 3 Rev./Version 22, FGW“ (Wind Consult)
noise emissionaccording „IEC 61400-11“
(GL Garad Hassan, D)
Lightning protection
Certified according to IEC 61400-24 class I.
9TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
LIGHT WEIGHT DESIGN CONCEPT OF NR58.5 / NR65.5Key Innovation for significant performance increase
• Tested blade designs NR50 / NR58.5 with proven power curves and sound power
NR50 NR58.5
Blade mass 11.150 kg 10.500 kg
Main Girders Main Girders from carbon fibrecomposites
10TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
NORDEX TURBINES POWERED BY IN-HOUSE DESIGNED BLADES
NR50(N100/2500)
NR58.5(N117/2400)(N117/3000)
AEP – Sound power - Efficiency - Time To Market
NR65.5(N117/3000)
Performance-optimized root section
� Max. chord moves further towards root to increase yield and limit loads
� Introduction of yield-optimized Nordexflat-back profiles
Sound & load-optimized tip section
� More slender outboard section to optimize load and wake properties
� Selection of proven family of profileswith superior sound power properties
Latest stage of evolution:
11TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
NORDEX TECHNOLOGY, PROVEN IN EXTENSIVE TESTING, PROTOTYPING & MEASUREMENT CAMPAIGNS
Yaw System Pitch Bearing Rotor Blade
Nordex in-house test facilities
Pitch System Dust Vibration
� Nordex makes comprehensive use of in-house test facilities for important systems
� Further testing is carried out at external test facilities of system suppliers
� Tests are complemented by numerous measurement campaigns in the field
12TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
NR 58.5 BLADE PRODUCTION IN TURKEY
PROVEN TECHNOLOGY AND STRONG PARTNER FOR LOCAL SUPPLY
Leading provider of composite solutions to thetransportation & military vehicle markets
Global Blade Manufacturer with focus on:
› Solid growth› Long term partnerships› Long term partnerships› Major industry players› Advanced technology› World-class focused factories
Track record :> 10 years experience > 14,000 blades supplied to the
strictest quality standards> 1.3 M m² global production space
USA, Mexico, China, Turkey
NR 58.5 BLADE PRODUCTION IN TURKEY
PROVEN TECHNOLOGY AND STRONG PARTNER FOR LOCAL SUPPLY
� TPI Turkey started in March of 2012
as a joint venture with Alke Construction
� Currently 1000 employees supporting 4 shifts
� ISO 9001 certified
� Nordex shop floor approval
-> ensuring identical production processes and high quality standards
as for Nordex own and all other Nordex rotor blade suppliersas for Nordex own and all other Nordex rotor blade suppliers
� 100% support at site during ramp-up phase (SQA and Production personnel)
� First N117/3000 projects with NR58.5 blades from TPI installed
Maximum feed-in tariff [US$ cent/ kWh]Feed-in tariff: 7,30
Equipment bonus (local content):
1. Blades 0,80
2. Generator , Power electronics 1,00 3. Turbine Tower 0,60
4. All of the mechanical equipment in rotor and nacelle groups (excluding 1 or 2) 1,30
Total Feed-in tariff (first 5 years to 2020) 8,70
14TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014
Strong partner to fulfill local content requirements
Conclusion: Wide product range, superior technology and high quality standards
Susurluk Wind Farm
21 x N100/2500 R80
Most popular model in Turkey 2013
(navigant research)
Competent partner with long track record and high market share
Thank you very much for your attention
Dipl.-Ing. Andreas Beyer
Senior Product Manager
Nordex Energy GmbH
Langenhorner Chaussee 600
22419 Hamburg
Email: [email protected]