setelah ku 13 - complete.pdf

Upload: bagus

Post on 06-Jul-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    1/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 1

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

     NoneLoad Diversity Factor:

    DesignGeneration Category (1):

    2015Loading Category (3):

    Load Flow Analysis

    Electrical Transient Analyzer Program

     Number of Buses:

     Number of Branches:

     1 0 418 419

     164 0 0 251 0 3 418

    TotalLoadV-Control

    XFMR2 TotalTie PDImpedanceLine/CableReactor XFMR3

    Swing

    Maximum No. of Iteration:

    System Frequency:

    Unit System:

    Project Filename:

    Output Filename:

    Precision of Solution:

    Method of Solution:  Newton-Raphson Method

    99

    0.0001000

    50.00 Hz

    Metric

    P Abang

    D:\Kuliah\DATA MAGANG\Update Semester II 2015\SELESAI\16. Penyulang

    Abang\Setelah KU 13.lfr 

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    2/104

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    3/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 3

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Bus Input Data

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus1 1 0.0150.000 100.0

    Bus2 1 0.020.000 100.0

    Bus3 1 0.020.000 100.0

    Bus4 1 0.020.000 100.0

    Bus5 1 0.020.000 100.0

    Bus6 1 0.00.400 100.0 0.076 0.047 0.019 0.012

    Bus7 1 0.020.000 100.0

    Bus8 1 0.00.400 100.0 0.021 0.013 0.005 0.003

    Bus9 1 0.020.000 100.0

    Bus10 1 0.020.000 100.0

    Bus11 1 0.020.000 100.0

    Bus12 1 0.020.000 100.0

    Bus13 1 0.00.400 100.0 0.047 0.029 0.012 0.007

    Bus15 1 0.020.000 100.0

    Bus16 1 0.00.400 100.0 0.055 0.034 0.014 0.009

    Bus17 1 0.020.000 100.0

    Bus18 1 0.020.000 100.0

    Bus19 1 0.020.000 100.0

    Bus20 1 0.00.400 100.0 0.038 0.024 0.010 0.006

    Bus21 1 0.020.000 100.0

    Bus22 1 0.020.000 100.0

    Bus23 1 0.00.400 100.0 0.027 0.017 0.007 0.004

    Bus24 1 0.020.000 100.0

    Bus25 1 0.00.400 100.0 0.027 0.017 0.007 0.004

    Bus26 1 0.020.000 100.0

    Bus27 1 0.020.000 100.0

    Bus28 1 0.00.400 100.0 0.034 0.021 0.008 0.005

    Bus29 1 0.020.000 100.0

    Bus30 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus31 1 0.020.000 100.0

    Bus32 1 0.020.000 100.0

    Bus33 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus34 1 0.00.400 100.0 0.039 0.024 0.010 0.006

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    4/104

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    5/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 5

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus70 1 0.00.400 100.0 0.027 0.016 0.007 0.004

    Bus71 1 0.020.000 100.0

    Bus72 1 0.00.400 100.0 0.076 0.047 0.019 0.012

    Bus73 1 0.020.000 100.0

    Bus74 1 0.00.400 100.0 0.048 0.030 0.012 0.007

    Bus75 1 0.020.000 100.0

    Bus76 1 0.00.400 100.0 0.020 0.013 0.005 0.003

    Bus77 1 0.020.000 100.0

    Bus78 1 0.00.400 100.0 0.013 0.008 0.003 0.002

    Bus79 1 0.00.400 100.0 0.046 0.028 0.011 0.007

    Bus80 1 0.020.000 100.0

    Bus81 1 0.020.000 100.0

    Bus82 1 0.00.400 100.0 0.043 0.027 0.011 0.007

    Bus83 1 0.020.000 100.0

    Bus84 1 0.00.400 100.0 0.026 0.016 0.007 0.004

    Bus85 1 0.020.000 100.0

    Bus86 1 0.020.000 100.0

    Bus87 1 0.020.000 100.0

    Bus88 1 0.00.400 100.0 0.057 0.035 0.014 0.009

    Bus89 1 0.020.000 100.0

    Bus90 1 0.00.400 100.0 0.042 0.026 0.011 0.007

    Bus91 1 0.020.000 100.0

    Bus92 1 0.00.400 100.0 0.030 0.019 0.008 0.005

    Bus93 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus94 1 0.020.000 100.0

    Bus95 1 0.020.000 100.0

    Bus96 1 0.00.400 100.0 0.014 0.008 0.003 0.002

    Bus97 1 0.020.000 100.0

    Bus98 1 0.00.400 100.0 0.036 0.023 0.009 0.006

    Bus99 1 0.020.000 100.0

    Bus100 1 0.020.000 100.0

    Bus101 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus102 1 0.00.400 100.0 0.016 0.010 0.004 0.002

    Bus103 1 0.00.400 100.0 0.009 0.005 0.002 0.001

    Bus104 1 0.020.000 100.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    6/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 6

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus105 1 0.00.400 100.0 0.019 0.012 0.005 0.003

    Bus106 1 0.020.000 100.0

    Bus107 1 0.020.000 100.0

    Bus108 1 0.020.000 100.0

    Bus109 1 0.020.000 100.0

    Bus110 1 0.00.400 100.0 0.014 0.009 0.003 0.002

    Bus111 1 0.020.000 100.0

    Bus112 1 0.00.400 100.0 0.012 0.007 0.003 0.002

    Bus113 1 0.020.000 100.0

    Bus114 1 0.020.000 100.0

    Bus115 1 0.00.400 100.0 0.006 0.003 0.001 0.001

    Bus116 1 0.00.400 100.0 0.009 0.006 0.002 0.001

    Bus117 1 0.020.000 100.0

    Bus118 1 0.00.400 100.0 0.006 0.004 0.002 0.001

    Bus119 1 0.020.000 100.0

    Bus120 1 0.020.000 100.0

    Bus121 1 0.020.000 100.0

    Bus122 1 0.020.000 100.0

    Bus123 1 0.020.000 100.0

    Bus124 1 0.00.400 100.0 0.028 0.017 0.007 0.004

    Bus125 1 0.020.000 100.0

    Bus126 1 0.00.400 100.0 0.015 0.010 0.004 0.002

    Bus127 1 0.020.000 100.0

    Bus128 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus129 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus130 1 0.020.000 100.0

    Bus131 1 0.00.400 100.0 0.047 0.029 0.012 0.007

    Bus132 1 0.020.000 100.0

    Bus133 1 0.020.000 100.0

    Bus134 1 0.00.400 100.0 0.009 0.005 0.002 0.001

    Bus135 1 0.00.400 100.0 0.058 0.036 0.015 0.009

    Bus136 1 0.00.400 100.0 0.046 0.028 0.011 0.007

    Bus137 1 0.020.000 100.0

    Bus138 1 0.020.000 100.0

    Bus139 1 0.00.400 100.0 0.039 0.024 0.010 0.006

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    7/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 7

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus140 1 0.00.400 100.0 0.028 0.018 0.007 0.004

    Bus141 1 0.020.000 100.0

    Bus142 1 0.020.000 100.0

    Bus143 1 0.020.000 100.0

    Bus144 1 0.00.400 100.0 0.022 0.014 0.005 0.003

    Bus145 1 0.020.000 100.0

    Bus146 1 0.00.400 100.0 0.004 0.002

    Bus147 1 0.020.000 100.0

    Bus148 1 0.020.000 100.0

    Bus149 1 0.00.400 100.0 0.010 0.006 0.003 0.002

    Bus150 1 0.00.400 100.0 0.012 0.007 0.003 0.002

    Bus151 1 0.020.000 100.0

    Bus152 1 0.020.000 100.0

    Bus153 1 0.00.400 100.0 0.010 0.006 0.003 0.002

    Bus154 1 0.020.000 100.0

    Bus155 1 0.020.000 100.0

    Bus156 1 0.00.400 100.0 0.013 0.008 0.003 0.002

    Bus157 1 0.00.400 100.0 0.009 0.006 0.002 0.001

    Bus158 1 0.020.000 100.0

    Bus159 1 0.020.000 100.0

    Bus160 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus161 1 0.020.000 100.0

    Bus162 1 0.020.000 100.0

    Bus163 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus164 1 0.020.000 100.0

    Bus165 1 0.00.400 100.0 0.013 0.008 0.003 0.002

    Bus166 1 0.020.000 100.0

    Bus167 1 0.020.000 100.0

    Bus168 1 0.020.000 100.0

    Bus169 1 0.00.400 100.0 0.016 0.010 0.004 0.003

    Bus170 1 0.020.000 100.0

    Bus171 1 0.020.000 100.0

    Bus172 1 0.020.000 100.0

    Bus173 1 0.020.000 100.0

    Bus174 1 0.00.400 100.0 0.003 0.002

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    8/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 8

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus175 1 0.020.000 100.0

    Bus176 1 0.020.000 100.0

    Bus177 1 0.020.000 100.0

    Bus178 1 0.020.000 100.0

    Bus179 1 0.00.400 100.0 0.014 0.009 0.004 0.002

    Bus180 1 0.00.400 100.0 0.003 0.002

    Bus181 1 0.020.000 100.0

    Bus182 1 0.00.400 100.0 0.070 0.043 0.017 0.011

    Bus183 1 0.020.000 100.0

    Bus184 1 0.00.400 100.0 0.038 0.024 0.010 0.006

    Bus185 1 0.020.000 100.0

    Bus186 1 0.00.400 100.0 0.011 0.007 0.003 0.002

    Bus187 1 0.020.000 100.0

    Bus188 1 0.020.000 100.0

    Bus189 1 0.00.400 100.0 0.024 0.015 0.006 0.004

    Bus190 1 0.020.000 100.0

    Bus191 1 0.020.000 100.0

    Bus192 1 0.00.400 100.0 0.010 0.006 0.003 0.002

    Bus193 1 0.00.400 100.0 0.014 0.008 0.003 0.002

    Bus194 1 0.020.000 100.0

    Bus195 1 0.020.000 100.0

    Bus196 1 0.020.000 100.0

    Bus197 1 0.00.400 100.0 0.019 0.012 0.005 0.003

    Bus198 1 0.020.000 100.0

    Bus199 1 0.020.000 100.0

    Bus200 1 0.00.400 100.0 0.076 0.047 0.019 0.012

    Bus201 1 0.020.000 100.0

    Bus203 1 0.00.400 100.0 0.043 0.027 0.011 0.007

    Bus204 1 0.020.000 100.0

    Bus205 1 0.00.400 100.0 0.071 0.044 0.018 0.011

    Bus206 1 0.020.000 100.0

    Bus207 1 0.00.400 100.0 0.020 0.012 0.005 0.003

    Bus208 1 0.020.000 100.0

    Bus209 1 0.020.000 100.0

    Bus210 1 0.00.400 100.0 0.024 0.015 0.006 0.004

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    9/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 9

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus211 1 0.020.000 100.0

    Bus212 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus213 1 0.020.000 100.0

    Bus214 1 0.020.000 100.0

    Bus215 1 0.020.000 100.0

    Bus216 1 0.020.000 100.0

    Bus217 1 0.020.000 100.0

    Bus218 1 0.00.400 100.0 0.049 0.031 0.012 0.008

    Bus219 1 0.00.400 100.0 0.013 0.008 0.003 0.002

    Bus220 1 0.020.000 100.0

    Bus221 1 0.020.000 100.0

    Bus222 1 0.00.400 100.0 0.025 0.016 0.006 0.004

    Bus223 1 0.020.000 100.0

    Bus224 1 0.020.000 100.0

    Bus225 1 0.00.400 100.0 0.012 0.008 0.003 0.002

    Bus226 1 0.020.000 100.0

    Bus227 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus228 1 0.020.000 100.0

    Bus229 1 0.00.400 100.0 0.018 0.011 0.004 0.003

    Bus230 1 0.020.000 100.0

    Bus231 1 0.020.000 100.0

    Bus232 1 0.020.000 100.0

    Bus233 1 0.00.400 100.0 0.010 0.006 0.003 0.002

    Bus234 1 0.020.000 100.0

    Bus235 1 0.020.000 100.0

    Bus236 1 0.020.000 100.0

    Bus237 1 0.020.000 100.0

    Bus238 1 0.00.400 100.0 0.006 0.004 0.001 0.001

    Bus239 1 0.020.000 100.0

    Bus240 1 0.020.000 100.0

    Bus241 1 0.020.000 100.0

    Bus242 1 0.00.400 100.0 0.030 0.019 0.008 0.005

    Bus243 1 0.020.000 100.0

    Bus244 1 0.020.000 100.0

    Bus245 1 0.00.400 100.0 0.045 0.028 0.011 0.007

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    10/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 10

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus246 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus247 1 0.020.000 100.0

    Bus248 1 0.020.000 100.0

    Bus249 1 0.020.000 100.0

    Bus250 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus251 1 0.020.000 100.0

    Bus252 1 0.00.400 100.0 0.008 0.005 0.002 0.001

    Bus253 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus254 1 0.020.000 100.0

    Bus255 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus256 1 0.020.000 100.0

    Bus257 1 0.020.000 100.0

    Bus258 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus259 1 0.020.000 100.0

    Bus260 1 0.020.000 100.0

    Bus261 1 0.00.400 100.0 0.004 0.002 0.001 0.001

    Bus262 1 0.020.000 100.0

    Bus263 1 0.00.400 100.0 0.004 0.002

    Bus264 1 0.020.000 100.0

    Bus265 1 0.00.400 100.0 0.053 0.033 0.013 0.008

    Bus266 1 0.020.000 100.0

    Bus267 1 0.00.400 100.0 0.025 0.015 0.006 0.004

    Bus268 1 0.020.000 100.0

    Bus269 1 0.020.000 100.0

    Bus270 1 0.020.000 100.0

    Bus271 1 0.00.400 100.0 0.042 0.026 0.010 0.006

    Bus272 1 0.020.000 100.0

    Bus273 1 0.00.400 100.0 0.009 0.006 0.002 0.001

    Bus274 1 0.00.400 100.0 0.022 0.014 0.005 0.003

    Bus275 1 0.020.000 100.0

    Bus276 1 0.020.000 100.0

    Bus277 1 0.020.000 100.0

    Bus278 1 0.00.400 100.0 0.052 0.032 0.013 0.008

    Bus279 1 0.020.000 100.0

    Bus280 1 0.00.400 100.0 0.035 0.022 0.009 0.005

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    11/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 11

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus281 1 0.020.000 100.0

    Bus282 1 0.020.000 100.0

    Bus283 1 0.00.400 100.0 0.033 0.021 0.008 0.005

    Bus284 1 0.020.000 100.0

    Bus285 1 0.00.400 100.0 0.024 0.015 0.006 0.004

    Bus286 1 0.020.000 100.0

    Bus287 1 0.00.400 100.0 0.017 0.011 0.004 0.003

    Bus288 1 0.020.000 100.0

    Bus289 1 0.020.000 100.0

    Bus290 1 0.020.000 100.0

    Bus291 1 0.00.400 100.0 0.046 0.029 0.012 0.007

    Bus292 1 0.020.000 100.0

    Bus293 1 0.020.000 100.0

    Bus294 1 0.00.400 100.0 0.034 0.021 0.009 0.005

    Bus296 1 0.020.000 100.0

    Bus297 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus298 1 0.020.000 100.0

    Bus299 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus300 1 0.020.000 100.0

    Bus301 1 0.020.000 100.0

    Bus302 1 0.00.400 100.0 0.016 0.010 0.004 0.003

    Bus303 1 0.020.000 100.0

    Bus304 1 0.020.000 100.0

    Bus305 1 0.00.400 100.0 0.004 0.002

    Bus306 1 0.020.000 100.0

    Bus307 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus308 1 0.00.400 100.0 0.042 0.026 0.010 0.006

    Bus309 1 0.020.000 100.0

    Bus310 1 0.020.000 100.0

    Bus311 1 0.020.000 100.0

    Bus312 1 0.020.000 100.0

    Bus313 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus314 1 0.020.000 100.0

    Bus315 1 0.020.000 100.0

    Bus316 1 0.020.000 100.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    12/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 12

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus317 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus319 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus320 1 0.020.000 100.0

    Bus321 1 0.00.400 100.0 0.024 0.015 0.006 0.004

    Bus322 1 0.020.000 100.0

    Bus323 1 0.020.000 100.0

    Bus324 1 0.00.400 100.0 0.008 0.005 0.002 0.001

    Bus325 1 0.020.000 100.0

    Bus326 1 0.020.000 100.0

    Bus327 1 0.00.400 100.0 0.024 0.015 0.006 0.004

    Bus328 1 0.00.400 100.0 0.006 0.004 0.002 0.001

    Bus329 1 0.020.000 100.0

    Bus330 1 0.020.000 100.0

    Bus331 1 0.020.000 100.0

    Bus332 1 0.00.400 100.0 0.017 0.010 0.004 0.003

    Bus333 1 0.020.000 100.0

    Bus334 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus335 1 0.00.400 100.0 0.057 0.035 0.014 0.009

    Bus336 1 0.00.400 100.0 0.002 0.001

    Bus337 1 0.020.000 100.0

    Bus338 1 0.00.400 100.0 0.030 0.019 0.008 0.005

    Bus339 1 0.020.000 100.0

    Bus340 1 0.00.400 100.0 0.005 0.003 0.001 0.001

    Bus341 1 0.020.000 100.0

    Bus342 1 0.020.000 100.0

    Bus343 1 0.020.000 100.0

    Bus344 1 0.020.000 100.0

    Bus345 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus346 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus347 1 0.020.000 100.0

    Bus348 1 0.020.000 100.0

    Bus349 1 0.020.000 100.0

    Bus350 1 0.020.000 100.0

    Bus351 1 0.020.000 100.0

    Bus352 1 0.00.400 100.0 0.007 0.004 0.002 0.001

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    13/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 13

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus353 1 0.020.000 100.0

    Bus354 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus355 1 0.020.000 100.0

    Bus356 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus357 1 0.020.000 100.0

    Bus358 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus359 1 0.020.000 100.0

    Bus360 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus361 1 0.020.000 100.0

    Bus362 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus363 1 0.020.000 100.0

    Bus364 1 0.020.000 100.0

    Bus365 1 0.00.400 100.0 0.016 0.010 0.004 0.002

    Bus366 1 0.020.000 100.0

    Bus367 1 0.020.000 100.0

    Bus368 1 0.00.400 100.0 0.034 0.021 0.008 0.005

    Bus369 1 0.020.000 100.0

    Bus370 1 0.020.000 100.0

    Bus371 1 0.00.400 100.0 0.004 0.002

    Bus372 1 0.00.400 100.0 0.006 0.004 0.001 0.001

    Bus373 1 0.020.000 100.0

    Bus374 1 0.020.000 100.0

    Bus375 1 0.00.400 100.0 0.046 0.028 0.011 0.007

    Bus376 1 0.020.000 100.0

    Bus377 1 0.00.400 100.0 0.049 0.031 0.012 0.008

    Bus378 1 0.020.000 100.0

    Bus379 1 0.020.000 100.0

    Bus380 1 0.00.400 100.0 0.049 0.031 0.012 0.008

    Bus381 1 0.020.000 100.0

    Bus382 1 0.020.000 100.0

    Bus383 1 0.020.000 100.0

    Bus384 1 0.020.000 100.0

    Bus385 1 0.00.400 100.0 0.012 0.008 0.003 0.002

    Bus386 1 0.00.400 100.0 0.024 0.015 0.006 0.004

    Bus387 1 0.020.000 100.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    14/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 14

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Bus388 1 0.00.400 100.0 0.015 0.009 0.004 0.002

    Bus389 1 0.020.000 100.0

    Bus390 1 0.00.400 100.0 0.070 0.043 0.017 0.011

    Bus391 1 0.020.000 100.0

    Bus392 1 0.020.000 100.0

    Bus393 1 0.00.400 100.0 0.046 0.028 0.011 0.007

    Bus394 1 0.020.000 100.0

    Bus395 1 0.020.000 100.0

    Bus396 1 0.020.000 100.0

    Bus397 1 0.00.400 100.0 0.019 0.012 0.005 0.003

    Bus398 1 0.020.000 100.0

    Bus399 1 0.00.400 100.0 0.030 0.019 0.008 0.005

    Bus400 1 0.020.000 100.0

    Bus401 1 0.020.000 100.0

    Bus402 1 0.020.000 100.0

    Bus403 1 0.00.400 100.0 0.028 0.017 0.007 0.004

    Bus404 1 0.020.000 100.0

    Bus405 1 0.020.000 100.0

    Bus406 1 0.00.400 100.0

    Bus407 1 0.020.000 100.0

    Bus408 1 0.020.000 100.0

    Bus409 1 0.00.400 100.0 0.028 0.017 0.007 0.004

    Bus410 1 0.020.000 100.0

    Bus411 1 0.00.400 100.0 0.056 0.035 0.014 0.009

    Bus412 1 0.020.000 100.0

    Bus413 1 0.00.400 100.0 0.030 0.019 0.008 0.005

    Bus414 1 0.020.000 100.0

    Bus415 1 0.020.000 100.0

    Bus416 1 0.00.400 100.0 0.007 0.004 0.002 0.001

    Bus417 1 0.00.400 100.0 0.006 0.003 0.001 0.001

    Bus418 1 0.020.000 100.0

    Bus419 1 0.00.400 100.0 0.046 0.028 0.011 0.007

    Bus420 1 0.020.000 100.0

    Line7~ 0.020.000 100.0

    Line23~ 0.020.000 100.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    15/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 15

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    Mvar MWMvarMWMvar MWMvar MWAng.% Mag.kVID

    Load

    Line55~ 0.020.000 100.0

     0.6322.528 1.020Total Number of Buses:  419  4.078 0.000 0.000 0.000 0.000

    ID kV

    Generation Bus

    Sub-sysType

    Voltage

     % Mag. Angle MW Mvar Max Min

    Generation Mvar Limits

    % PF

    Bus1 1Swing 0.0150.000 100.0

     0.000 0.000

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    16/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 16

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Line/Cable Input Data

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Cable1 20NCUS3 300 32.0 1 0.076207 0.092700750.0

    Cable2 20OALS1 150 1290.0 1 0.226301 0.300200750.0

    Cable3 20NALS3 150 95.0 1 0.252504 0.106000 0.0000786750.0

    Cable4 20OALS1 150 143.0 1 0.226301 0.300200750.0

    Cable5 20NALS3 150 437.0 1 0.252504 0.106000 0.0000786750.0

    Cable6 20OALS1 150 1254.0 1 0.226301 0.300200750.0

    Cable7 20NCUS3 300 1603.0 1 0.076207 0.092700750.0

    Cable8 20NCUS3 300 230.0 1 0.076207 0.092700750.0

    Cable9 20NALS3 150 496.0 1 0.252504 0.106000 0.0000786750.0

    Cable10 20NALS3 150 375.0 1 0.252504 0.106000 0.0000786750.0

    Cable11 20NALS3 150 250.0 1 0.252504 0.106000 0.0000786750.0

    Cable12 20NALS3 150 230.0 1 0.252504 0.106000 0.0000786750.0

    Line1 157. 930.0 1 0.251546 0.341418 0.0000039750.0

    Line2 157. 55.0 1 0.251546 0.341418 0.0000039750.0

    Line3 157. 978.0 1 0.251546 0.341418 0.0000039750.0

    Line4 157. 1319.0 1 0.251546 0.341418 0.0000039750.0

    Line5 157. 166.0 1 0.251546 0.341418 0.0000039750.0

    Line6 157. 1418.0 1 0.251546 0.341418 0.0000039750.0

    Line8 157. 191.0 1 0.251546 0.341418 0.0000039750.0

    Line10 157. 238.0 1 0.251546 0.341418 0.0000039750.0

    Line11 157. 115.0 1 0.251546 0.341418 0.0000039750.0

    Line12 157. 880.0 1 0.251546 0.341418 0.0000039750.0

    Line13 157. 465.0 1 0.251546 0.341418 0.0000039750.0

    Line14 157. 1373.0 1 0.251546 0.341418 0.0000039750.0

    Line15 157. 514.0 1 0.251546 0.341418 0.0000039750.0

    Line16 157. 851.0 1 0.251546 0.341418 0.0000039750.0

    Line17 157. 648.0 1 0.251546 0.341418 0.0000039750.0

    Line18 157. 1362.0 1 0.251546 0.341418 0.0000039750.0

    Line19 157. 195.0 1 0.251546 0.341418 0.0000039750.0

    Line20 157. 2340.0 1 0.251546 0.341418 0.0000039750.0

    Line21 157. 397.0 1 0.251546 0.341418 0.0000039750.0

    Line22 157. 1035.0 1 0.251546 0.341418 0.0000039750.0

    Line24 157. 1322.0 1 0.251546 0.341418 0.0000039750.0

    Line25 157. 100.0 1 0.251546 0.341418 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    17/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 17

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line26 157. 100.0 1 0.251546 0.341418 0.0000039750.0

    Line27 157. 190.0 1 0.251546 0.341418 0.0000039750.0

    Line28 157. 100.0 1 0.251546 0.341418 0.0000039750.0

    Line29 157. 155.0 1 0.251546 0.341418 0.0000039750.0

    Line30 157. 195.0 1 0.251546 0.341418 0.0000039750.0

    Line31 157. 986.0 1 0.251546 0.341418 0.0000039750.0

    Line32 147. 502.0 1 0.269542 0.364101 0.0000039750.0

    Line33 157. 97.0 1 0.251546 0.341418 0.0000039750.0

    Line34 157. 855.0 1 0.251546 0.341418 0.0000039750.0

    Line35 157. 581.0 1 0.251546 0.341418 0.0000039750.0

    Line36 157. 775.0 1 0.251546 0.341418 0.0000039750.0

    Line37 157. 289.0 1 0.251546 0.341418 0.0000039750.0

    Line38 157. 655.0 1 0.251546 0.341418 0.0000039750.0

    Line39 157. 989.0 1 0.251546 0.341418 0.0000039750.0

    Line40 157. 554.0 1 0.251546 0.341418 0.0000039750.0

    Line41 157. 1939.0 1 0.251546 0.341418 0.0000039750.0

    Line42 157. 1970.0 1 0.251546 0.341418 0.0000039750.0

    Line43 157. 628.0 1 0.251546 0.341418 0.0000039750.0

    Line44 157. 65.0 1 0.251546 0.341418 0.0000039750.0

    Line45 157. 374.0 1 0.251546 0.341418 0.0000039750.0

    Line46 157. 734.0 1 0.251546 0.341418 0.0000039750.0

    Line47 157. 607.0 1 0.251546 0.341418 0.0000039750.0

    Line48 157. 722.0 1 0.251546 0.341418 0.0000039750.0

    Line49 157. 742.0 1 0.251546 0.341418 0.0000039750.0

    Line50 157. 190.0 1 0.251546 0.341418 0.0000039750.0

    Line51 157. 719.0 1 0.251546 0.341418 0.0000039750.0

    Line52 157. 197.0 1 0.251546 0.341418 0.0000039750.0

    Line53 157. 664.0 1 0.251546 0.341418 0.0000039750.0

    Line54 157. 30.0 1 0.251546 0.341418 0.0000039750.0

    Line56 157. 637.0 1 0.251546 0.341418 0.0000039750.0

    Line57 157. 1654.0 1 0.251546 0.341418 0.0000039750.0

    Line58 157. 206.0 1 0.251546 0.341418 0.0000039750.0

    Line59 157. 88.0 1 0.251546 0.341418 0.0000039750.0

    Line60 157. 412.0 1 0.251546 0.341418 0.0000039750.0

    Line61 157. 1878.0 1 0.251546 0.341418 0.0000039750.0

    Line62 157. 90.0 1 0.251546 0.341418 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    18/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 18

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line63 157. 255.0 1 0.251546 0.341418 0.0000039750.0

    Line64 157. 289.0 1 0.251546 0.341418 0.0000039750.0

    Line65 157. 276.0 1 0.251546 0.341418 0.0000039750.0

    Line66 147. 514.0 1 0.269542 0.364101 0.0000039750.0

    Line67 157. 203.0 1 0.251546 0.341418 0.0000039750.0

    Line68 157. 984.0 1 0.251546 0.341418 0.0000039750.0

    Line69 157. 367.0 1 0.251546 0.341418 0.0000039750.0

    Line70 157. 289.0 1 0.251546 0.341418 0.0000039750.0

    Line71 157. 100.0 1 0.251546 0.341418 0.0000039750.0

    Line72 157. 3487.0 1 0.251546 0.341418 0.0000039750.0

    Line73 157. 386.0 1 0.251546 0.341418 0.0000039750.0

    Line74 157. 1556.0 1 0.251546 0.341418 0.0000039750.0

    Line75 157. 252.0 1 0.251546 0.341418 0.0000039750.0

    Line76 157. 558.0 1 0.251546 0.341418 0.0000039750.0

    Line77 157. 153.0 1 0.251546 0.341418 0.0000039750.0

    Line78 157. 2346.0 1 0.251546 0.341418 0.0000039750.0

    Line79 157. 1853.0 1 0.251546 0.341418 0.0000039750.0

    Line80 157. 30.0 1 0.251546 0.341418 0.0000039750.0

    Line81 157. 715.0 1 0.251546 0.341418 0.0000039750.0

    Line82 157. 711.0 1 0.251546 0.341418 0.0000039750.0

    Line83 157. 711.0 1 0.251546 0.341418 0.0000039750.0

    Line84 157. 711.0 1 0.251546 0.341418 0.0000039750.0

    Line85 157. 711.0 1 0.251546 0.341418 0.0000039750.0

    Line86 157. 711.0 1 0.251546 0.341418 0.0000039750.0

    Line87 157. 1337.0 1 0.251546 0.341418 0.0000039750.0

    Line88 157. 386.0 1 0.251546 0.341418 0.0000039750.0

    Line89 157. 353.0 1 0.251546 0.341418 0.0000039750.0

    Line90 157. 413.0 1 0.251546 0.341418 0.0000039750.0

    Line91 147. 1661.0 1 0.269542 0.364101 0.0000039750.0

    Line92 147. 303.0 1 0.269542 0.364101 0.0000039750.0

    Line93 147. 452.0 1 0.269542 0.364101 0.0000039750.0

    Line94 147. 1008.0 1 0.269542 0.364101 0.0000039750.0

    Line95 147. 1746.0 1 0.269542 0.364101 0.0000039750.0

    Line96 147. 39.0 1 0.269542 0.364101 0.0000039750.0

    Line97 147. 2000.0 1 0.269542 0.364101 0.0000039750.0

    Line98 157. 711.0 1 0.251546 0.341418 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    19/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 19

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line99 147. 186.0 1 0.269542 0.364101 0.0000039750.0

    Line100 147. 187.0 1 0.269542 0.364101 0.0000039750.0

    Line101 147. 187.0 1 0.269542 0.364101 0.0000039750.0

    Line102 147. 566.0 1 0.269542 0.364101 0.0000039750.0

    Line103 147. 111.0 1 0.269542 0.364101 0.0000039750.0

    Line104 147. 1847.0 1 0.269542 0.364101 0.0000039750.0

    Line105 93.3 928.0 1 0.425209 0.358862 0.0000037750.0

    Line106 147. 2149.0 1 0.269542 0.364101 0.0000039750.0

    Line107 147. 2342.0 1 0.269542 0.364101 0.0000039750.0

    Line108 147. 2794.0 1 0.269542 0.364101 0.0000039750.0

    Line109 147. 566.0 1 0.269542 0.364101 0.0000039750.0

    Line110 147. 566.0 1 0.269542 0.364101 0.0000039750.0

    Line111 147. 2184.0 1 0.269542 0.364101 0.0000039750.0

    Line112 93.3 566.0 1 0.425209 0.358862 0.0000037750.0

    Line113 147. 521.0 1 0.269542 0.364101 0.0000039750.0

    Line114 147. 1597.0 1 0.269542 0.364101 0.0000039750.0

    Line115 147. 2376.0 1 0.269542 0.364101 0.0000039750.0

    Line116 147. 100.0 1 0.269542 0.364101 0.0000039750.0

    Line117 147. 315.0 1 0.269542 0.364101 0.0000039750.0

    Line118 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line119 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line120 147. 55.0 1 0.269542 0.364101 0.0000039750.0

    Line121 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line122 147. 163.0 1 0.269542 0.364101 0.0000039750.0

    Line123 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line124 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line125 147. 163.0 1 0.269542 0.364101 0.0000039750.0

    Line126 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line127 157. 867.0 1 0.251546 0.341418 0.0000039750.0

    Line128 147. 2374.0 1 0.269542 0.364101 0.0000039750.0

    Line129 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line130 147. 248.0 1 0.269542 0.364101 0.0000039750.0

    Line131 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line132 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line133 147. 1197.0 1 0.269542 0.364101 0.0000039750.0

    Line134 147. 500.0 1 0.269542 0.364101 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    20/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 20

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line135 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line136 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line137 157. 200.0 1 0.251546 0.341418 0.0000039750.0

    Line138 147. 88.0 1 0.269542 0.364101 0.0000039750.0

    Line139 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line140 147. 292.0 1 0.269542 0.364101 0.0000039750.0

    Line141 147. 3371.0 1 0.269542 0.364101 0.0000039750.0

    Line142 147. 1063.0 1 0.269542 0.364101 0.0000039750.0

    Line143 147. 268.0 1 0.269542 0.364101 0.0000039750.0

    Line144 147. 300.0 1 0.269542 0.364101 0.0000039750.0

    Line145 147. 581.0 1 0.269542 0.364101 0.0000039750.0

    Line146 147. 1548.0 1 0.269542 0.364101 0.0000039750.0

    Line147 147. 286.0 1 0.269542 0.364101 0.0000039750.0

    Line148 147. 2117.0 1 0.269542 0.364101 0.0000039750.0

    Line149 147. 1685.0 1 0.269542 0.364101 0.0000039750.0

    Line150 147. 2117.0 1 0.269542 0.364101 0.0000039750.0

    Line151 147. 47.0 1 0.269542 0.364101 0.0000039750.0

    Line152 147. 696.0 1 0.269542 0.364101 0.0000039750.0

    Line153 147. 746.0 1 0.269542 0.364101 0.0000039750.0

    Line154 147. 1920.0 1 0.269542 0.364101 0.0000039750.0

    Line155 157. 200.0 1 0.251546 0.341418 0.0000039750.0

    Line156 157. 200.0 1 0.251546 0.341418 0.0000039750.0

    Line157 147. 230.0 1 0.269542 0.364101 0.0000039750.0

    Line158 147. 1548.0 1 0.269542 0.364101 0.0000039750.0

    Line159 157. 125.0 1 0.251546 0.341418 0.0000039750.0

    Line160 157. 125.0 1 0.251546 0.341418 0.0000039750.0

    Line161 147. 470.0 1 0.269542 0.364101 0.0000039750.0

    Line162 147. 727.0 1 0.269542 0.364101 0.0000039750.0

    Line163 157. 125.0 1 0.251546 0.341418 0.0000039750.0

    Line164 147. 125.0 1 0.269542 0.364101 0.0000039750.0

    Line165 157. 152.0 1 0.251546 0.341418 0.0000039750.0

    Line166 147. 2882.0 1 0.269542 0.364101 0.0000039750.0

    Line167 147. 52.0 1 0.269542 0.364101 0.0000039750.0

    Line168 147. 1873.0 1 0.269542 0.364101 0.0000039750.0

    Line169 157. 158.0 1 0.251546 0.341418 0.0000039750.0

    Line170 147. 1184.0 1 0.269542 0.364101 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    21/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 21

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line171 157. 85.0 1 0.251546 0.341418 0.0000039750.0

    Line172 157. 768.0 1 0.251546 0.341418 0.0000039750.0

    Line173 157. 125.0 1 0.251546 0.341418 0.0000039750.0

    Line175 157. 220.0 1 0.251546 0.341418 0.0000039750.0

    Line176 147. 1685.0 1 0.269542 0.364101 0.0000039750.0

    Line177 147. 2582.0 1 0.269542 0.364101 0.0000039750.0

    Line178 157. 1440.0 1 0.251546 0.341418 0.0000039750.0

    Line179 157. 715.0 1 0.251546 0.341418 0.0000039750.0

    Line180 147. 585.0 1 0.269542 0.364101 0.0000039750.0

    Line181 147. 1590.0 1 0.269542 0.364101 0.0000039750.0

    Line182 157. 554.0 1 0.251546 0.341418 0.0000039750.0

    Line183 157. 297.0 1 0.251546 0.341418 0.0000039750.0

    Line184 147. 817.0 1 0.269542 0.364101 0.0000039750.0

    Line185 147. 1554.0 1 0.269542 0.364101 0.0000039750.0

    Line186 157. 168.0 1 0.251546 0.341418 0.0000039750.0

    Line187 147. 287.0 1 0.269542 0.364101 0.0000039750.0

    Line188 157. 391.0 1 0.251546 0.341418 0.0000039750.0

    Line189 147. 155.0 1 0.269542 0.364101 0.0000039750.0

    Line190 157. 700.0 1 0.251546 0.341418 0.0000039750.0

    Line191 157. 597.0 1 0.251546 0.341418 0.0000039750.0

    Line192 157. 1734.0 1 0.251546 0.341418 0.0000039750.0

    Line193 147. 731.0 1 0.269542 0.364101 0.0000039750.0

    Line194 147. 1873.0 1 0.269542 0.364101 0.0000039750.0

    Line195 157. 2107.0 1 0.251546 0.341418 0.0000039750.0

    Line196 147. 1601.0 1 0.269542 0.364101 0.0000039750.0

    Line197 157. 1034.0 1 0.251546 0.341418 0.0000039750.0

    Line198 147. 1217.0 1 0.269542 0.364101 0.0000039750.0

    Line199 157. 595.0 1 0.251546 0.341418 0.0000039750.0

    Line200 157. 1869.0 1 0.251546 0.341418 0.0000039750.0

    Line201 147. 1965.0 1 0.269542 0.364101 0.0000039750.0

    Line202 157. 1455.0 1 0.251546 0.341418 0.0000039750.0

    Line203 147. 978.0 1 0.269542 0.364101 0.0000039750.0

    Line204 157. 225.0 1 0.251546 0.341418 0.0000039750.0

    Line205 147. 2129.0 1 0.269542 0.364101 0.0000039750.0

    Line206 157. 718.0 1 0.251546 0.341418 0.0000039750.0

    Line207 147. 586.0 1 0.269542 0.364101 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    22/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 22

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line209 147. 473.0 1 0.269542 0.364101 0.0000039750.0

    Line210 157. 409.0 1 0.251546 0.341418 0.0000039750.0

    Line211 147. 43.0 1 0.269542 0.364101 0.0000039750.0

    Line212 147. 1191.0 1 0.269542 0.364101 0.0000039750.0

    Line213 147. 2180.0 1 0.269542 0.364101 0.0000039750.0

    Line214 147. 1615.0 1 0.269542 0.364101 0.0000039750.0

    Line215 147. 255.0 1 0.269542 0.364101 0.0000039750.0

    Line216 147. 246.0 1 0.269542 0.364101 0.0000039750.0

    Line217 147. 405.0 1 0.269542 0.364101 0.0000039750.0

    Line218 147. 1181.0 1 0.269542 0.364101 0.0000039750.0

    Line219 147. 450.0 1 0.269542 0.364101 0.0000039750.0

    Line220 147. 675.0 1 0.269542 0.364101 0.0000039750.0

    Line221 147. 65.0 1 0.269542 0.364101 0.0000039750.0

    Line222 147. 3255.0 1 0.269542 0.364101 0.0000039750.0

    Line223 147. 1597.0 1 0.269542 0.364101 0.0000039750.0

    Line224 147. 1548.0 1 0.269542 0.364101 0.0000039750.0

    Line225 147. 625.0 1 0.269542 0.364101 0.0000039750.0

    Line226 147. 405.0 1 0.269542 0.364101 0.0000039750.0

    Line227 147. 50.0 1 0.269542 0.364101 0.0000039750.0

    Line228 147. 500.0 1 0.269542 0.364101 0.0000039750.0

    Line229 147. 315.0 1 0.269542 0.364101 0.0000039750.0

    Line230 147. 1063.0 1 0.269542 0.364101 0.0000039750.0

    Line231 147. 268.0 1 0.269542 0.364101 0.0000039750.0

    Line232 157. 330.0 1 0.251546 0.341418 0.0000039750.0

    Line233 157. 1033.0 1 0.251546 0.341418 0.0000039750.0

    Line234 147. 731.0 1 0.269542 0.364101 0.0000039750.0

    Line235 147. 425.0 1 0.269542 0.364101 0.0000039750.0

    Line236 157. 330.0 1 0.251546 0.341418 0.0000039750.0

    Line237 157. 2544.0 1 0.251546 0.341418 0.0000039750.0

    Line238 157. 640.0 1 0.251546 0.341418 0.0000039750.0

    Line239 157. 816.0 1 0.251546 0.341418 0.0000039750.0

    Line241 147. 783.0 1 0.269542 0.364101 0.0000039750.0

    Line242 147. 710.0 1 0.269542 0.364101 0.0000039750.0

    Line243 157. 1378.0 1 0.251546 0.341418 0.0000039750.0

    Line7 157. 39.0 1 0.251546 0.341418 0.0000039750.0

    Line23 157. 397.0 1 0.251546 0.341418 0.0000039750.0

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    23/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 23

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID Library Size T (°C)

    Line/Cable

    Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

    Adj. (m) #/Phase% Tol.

    Length

    YR X

    Line55 157. 159.0 1 0.251546 0.341418 0.0000039750.0

    Line / Cable resistances are listed at the specified temperatures.

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    24/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 24

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

     2-Winding Transformer Input Data

    ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Phase

    AB0001 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0002 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0003 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0004 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0005 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0006 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0007 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0008 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0009 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0011 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0012 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0013 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0015 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0016 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    AB0017 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0018 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    AB0019 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0021 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0025 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0029 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0031 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0032 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0034 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    AB0041 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0042 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0043 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0044 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0045 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0049 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0051 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0052 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0054 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    AB0059 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0061 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    25/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 25

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Phase

    AB0062 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0064 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0065 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0069 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0072 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    AB0073 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    AB0075 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0076 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0077 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0078 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0079 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0081 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0082 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0083 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0085 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0086 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    AB0087 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0089 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    AB0093 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KM0016 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KM0028 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KM0113 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KN0127 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KN0149 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0001 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0002 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    KU0003 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0004 4.00 3.09 0 000 0 0.0004.00003-Phase

    Dyn0.160 20.000 0.400

    KU0005 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0006 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0007 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0008 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0009 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0011 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0012 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0013 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    26/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 26

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Phase

    KU0014 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0015 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0016 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0017 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0018 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0019 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0021 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn1.000 20.000 0.400

    KU0022 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0023 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0024 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0025 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0026 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0027 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0028 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0029 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0031 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0032 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0033 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn2.000 20.000 0.400

    KU0034 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0035 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0036 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0037 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    KU0038 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0039 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0042 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0043 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0044 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0045 4.00 3.09 0 000 0 0.0004.00003-Phase

    Dyn0.050 20.000 0.400

    KU0046 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0047 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0048 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0049 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0051 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0052 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    KU0053 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0054 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    27/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 27

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Phase

    KU0055 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0056 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0057 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0058 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0059 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0061 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0062 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0063 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0064 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0065 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0066 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0067 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0068 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.200 20.000 0.400

    KU0069 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0071 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0072 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0073 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0074 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    KU0075 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0076 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0077 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0078 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0079 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0083 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0084 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0085 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0086 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0087 4.00 2.47 0 000 0 0.0004.00003-Phase

    Dyn0.100 20.000 0.400

    KU0088 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0089 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0092 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0093 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0094 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    KU0095 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0096 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0097 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    28/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 28

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    Phase

    KU0098 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0099 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0101 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0102 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0103 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0104 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0105 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0106 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0107 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0108 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.050 20.000 0.400

    KU0109 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0111 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0112 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0113 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    KU0114 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0115 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0116 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.250 20.000 0.400

    KU0118 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0121 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.100 20.000 0.400

    KU0123 4.00 3.09 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    KU0124 4.00 2.47 0 000 0 0.0004.00003-Phase Dyn0.160 20.000 0.400

    T2 GI Amlapura 10.00 23.70 0 2.50000 0 0.00010.00003-Phase Dyn30.000 150.000 20.000

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    29/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 29

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    Branch Connections

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    AB0001 Bus27 769.76 2378.55 2500.00Bus282W XFMR 

    AB0002 Bus43 1231.61 3805.67 4000.00Bus442W XFMR 

    AB0003 Bus12 769.76 2378.55 2500.00Bus132W XFMR 

    AB0004 Bus52 2463.22 7611.34 8000.00Bus462W XFMR 

    AB0005 Bus53 2463.22 7611.34 8000.00Bus542W XFMR 

    AB0006 Bus58 2463.22 7611.34 8000.00Bus592W XFMR 

    AB0007 Bus60 2463.22 7611.34 8000.00Bus612W XFMR 

    AB0008 Bus310 1231.61 3805.67 4000.00Bus502W XFMR 

    AB0009 Bus19 1231.61 3805.67 4000.00Bus202W XFMR 

    AB0011 Bus22 1231.61 3805.67 4000.00Bus232W XFMR 

    AB0012 Bus81 2463.22 7611.34 8000.00Bus782W XFMR 

    AB0013 Bus91 769.76 2378.55 2500.00Bus902W XFMR 

    AB0015 Bus9 1231.61 3805.67 4000.00Bus82W XFMR 

    AB0016 Bus87 615.80 1902.84 2000.00Bus882W XFMR 

    AB0017 Bus24 2463.22 7611.34 8000.00Bus252W XFMR 

    AB0018 Bus83 615.80 1902.84 2000.00Bus822W XFMR 

    AB0019 Bus69 1231.61 3805.67 4000.00Bus702W XFMR 

    AB0021 Bus37 769.76 2378.55 2500.00Bus382W XFMR 

    AB0025 Bus99 1231.61 3805.67 4000.00Bus982W XFMR 

    AB0029 Bus64 769.76 2378.55 2500.00Bus632W XFMR 

    AB0031 Bus95 2463.22 7611.34 8000.00Bus962W XFMR 

    AB0032 Bus108 2463.22 7611.34 8000.00Bus1052W XFMR 

    AB0034 Bus15 492.64 1522.27 1600.00Bus162W XFMR 

    AB0041 Bus342 769.76 2378.55 2500.00Bus932W XFMR 

    AB0042 Bus77 1231.61 3805.67 4000.00Bus762W XFMR 

    AB0043 Bus85 1231.61 3805.67 4000.00Bus842W XFMR 

    AB0044 Bus113 2463.22 7611.34 8000.00Bus1122W XFMR 

    AB0045 Bus75 1231.61 3805.67 4000.00Bus742W XFMR 

    AB0049 Bus66 2463.22 7611.34 8000.00Bus652W XFMR 

    AB0051 Bus68 2463.22 7611.34 8000.00Bus672W XFMR 

    AB0052 Bus29 2463.22 7611.34 8000.00Bus302W XFMR 

    AB0054 Bus80 615.80 1902.84 2000.00Bus792W XFMR 

    AB0059 Bus104 1231.61 3805.67 4000.00Bus1022W XFMR 

    AB0061 Bus325 1231.61 3805.67 4000.00Bus562W XFMR 

    AB0062 Bus40 1231.61 3805.67 4000.00Bus412W XFMR 

    AB0064 Bus355 3002.16 7415.33 8000.00Bus3542W XFMR 

    AB0065 Bus111 2463.22 7611.34 8000.00Bus1102W XFMR 

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    30/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 30

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    AB0069 Bus32 1501.08 3707.66 4000.00Bus332W XFMR 

    AB0072 Bus45 492.64 1522.27 1600.00Bus1012W XFMR 

    AB0073 Bus337 769.76 2378.55 2500.00Bus3352W XFMR 

    AB0075 Bus306 1231.61 3805.67 4000.00Bus3022W XFMR 

    AB0076 Bus49 3002.16 7415.33 8000.00Bus362W XFMR 

    AB0077 Bus361 1501.08 3707.66 4000.00Bus3602W XFMR 

    AB0078 Bus331 1501.08 3707.66 4000.00Bus3322W XFMR 

    AB0079 Bus366 3002.16 7415.33 8000.00Bus3652W XFMR 

    AB0081 Bus359 1501.08 3707.66 4000.00Bus3582W XFMR 

    AB0082 Bus369 1501.08 3707.66 4000.00Bus3682W XFMR 

    AB0083 Bus349 3002.16 7415.33 8000.00Bus3452W XFMR 

    AB0085 Bus329 3002.16 7415.33 8000.00Bus3272W XFMR 

    AB0086 Bus322 3002.16 7415.33 8000.00Bus3212W XFMR 

    AB0087 Bus363 1501.08 3707.66 4000.00Bus3622W XFMR 

    AB0089 Bus396 1231.61 3805.67 4000.00Bus2032W XFMR 

    AB0093 Bus412 769.76 2378.55 2500.00Bus4112W XFMR 

    KM0016 Bus7 769.76 2378.55 2500.00Bus62W XFMR 

    KM0028 Bus35 1501.08 3707.66 4000.00Bus342W XFMR 

    KM0113 Bus235 769.76 2378.55 2500.00Bus722W XFMR 

    KN0127 Bus373 2463.22 7611.34 8000.00Bus3722W XFMR 

    KN0149 Bus171 3002.16 7415.33 8000.00Bus1282W XFMR 

    KU0001 Bus183 769.76 2378.55 2500.00Bus1822W XFMR 

    KU0002 Bus199 615.80 1902.84 2000.00Bus2002W XFMR 

    KU0003 Bus221 769.76 2378.55 2500.00Bus2222W XFMR 

    KU0004 Bus292 769.76 2378.55 2500.00Bus2912W XFMR 

    KU0005 Bus241 1231.61 3805.67 4000.00Bus2422W XFMR 

    KU0006 Bus178 2463.22 7611.34 8000.00Bus1792W XFMR 

    KU0007 Bus217 769.76 2378.55 2500.00Bus2182W XFMR 

    KU0008 Bus142 769.76 2378.55 2500.00Bus1392W XFMR 

    KU0009 Bus132 769.76 2378.55 2500.00Bus1312W XFMR 

    KU0011 Bus133 769.76 2378.55 2500.00Bus1342W XFMR 

    KU0012 Bus226 1231.61 3805.67 4000.00Bus2272W XFMR 

    KU0013 Bus138 769.76 2378.55 2500.00Bus1352W XFMR 

    KU0014 Bus282 1231.61 3805.67 4000.00Bus2832W XFMR 

    KU0015 Bus48 2463.22 7611.34 8000.00Bus2742W XFMR 

    KU0016 Bus268 1231.61 3805.67 4000.00Bus2672W XFMR 

    KU0017 Bus248 1231.61 3805.67 4000.00Bus2452W XFMR 

    KU0018 Bus264 769.76 2378.55 2500.00Bus2652W XFMR 

    KU0019 Bus277 769.76 2378.55 2500.00Bus2782W XFMR 

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    31/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 31

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    KU0021 Bus161 123.16 380.57 400.00Bus1602W XFMR 

    KU0022 Bus236 2463.22 7611.34 8000.00Bus2332W XFMR 

    KU0023 Bus256 2463.22 7611.34 8000.00Bus2552W XFMR 

    KU0024 Bus224 2463.22 7611.34 8000.00Bus2252W XFMR 

    KU0025 Bus190 1231.61 3805.67 4000.00Bus1892W XFMR 

    KU0026 Bus145 1231.61 3805.67 4000.00Bus1442W XFMR 

    KU0027 Bus148 2463.22 7611.34 8000.00Bus1492W XFMR 

    KU0028 Bus155 2463.22 7611.34 8000.00Bus1562W XFMR 

    KU0029 Bus117 2463.22 7611.34 8000.00Bus1162W XFMR 

    KU0031 Bus137 769.76 2378.55 2500.00Bus1362W XFMR 

    KU0032 Bus293 1231.61 3805.67 4000.00Bus2942W XFMR 

    KU0033 Bus164 61.58 190.28 200.00Bus1632W XFMR 

    KU0034 Bus249 2463.22 7611.34 8000.00Bus2502W XFMR 

    KU0035 Bus228 1231.61 3805.67 4000.00Bus2292W XFMR 

    KU0036 Bus279 1231.61 3805.67 4000.00Bus2802W XFMR 

    KU0037 Bus185 615.80 1902.84 2000.00Bus1842W XFMR 

    KU0038 Bus173 2463.22 7611.34 8000.00Bus1692W XFMR 

    KU0039 Bus270 1231.61 3805.67 4000.00Bus2712W XFMR 

    KU0042 Bus247 2463.22 7611.34 8000.00Bus2462W XFMR 

    KU0043 Bus284 1231.61 3805.67 4000.00Bus2852W XFMR 

    KU0044 Bus166 2463.22 7611.34 8000.00Bus1652W XFMR 

    KU0045 Bus130 2463.22 7611.34 8000.00Bus1292W XFMR 

    KU0046 Bus127 2463.22 7611.34 8000.00Bus1262W XFMR 

    KU0047 Bus123 1231.61 3805.67 4000.00Bus1242W XFMR 

    KU0048 Bus239 2463.22 7611.34 8000.00Bus2382W XFMR 

    KU0049 Bus176 2463.22 7611.34 8000.00Bus1742W XFMR 

    KU0051 Bus152 2463.22 7611.34 8000.00Bus1532W XFMR 

    KU0052 Bus141 615.80 1902.84 2000.00Bus1402W XFMR 

    KU0053 Bus158 2463.22 7611.34 8000.00Bus1572W XFMR 

    KU0054 Bus276 2463.22 7611.34 8000.00Bus2732W XFMR 

    KU0055 Bus251 2463.22 7611.34 8000.00Bus2522W XFMR 

    KU0056 Bus257 2463.22 7611.34 8000.00Bus2582W XFMR 

    KU0057 Bus326 3002.16 7415.33 8000.00Bus2612W XFMR 

    KU0058 Bus330 3002.16 7415.33 8000.00Bus3282W XFMR 

    KU0059 Bus198 769.76 2378.55 2500.00Bus1972W XFMR 

    KU0061 Bus208 1231.61 3805.67 4000.00Bus2072W XFMR 

    KU0062 Bus215 3002.16 7415.33 8000.00Bus1932W XFMR 

    KU0063 Bus194 2463.22 7611.34 8000.00Bus1922W XFMR 

    KU0064 Bus181 2463.22 7611.34 8000.00Bus1802W XFMR 

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    32/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 32

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    KU0065 Bus147 2463.22 7611.34 8000.00Bus1462W XFMR 

    KU0066 Bus288 2463.22 7611.34 8000.00Bus2872W XFMR 

    KU0067 Bus187 2463.22 7611.34 8000.00Bus1862W XFMR 

    KU0068 Bus204 615.80 1902.84 2000.00Bus2052W XFMR 

    KU0069 Bus209 1231.61 3805.67 4000.00Bus2102W XFMR 

    KU0071 Bus220 1231.61 3805.67 4000.00Bus2192W XFMR 

    KU0072 Bus122 2463.22 7611.34 8000.00Bus1152W XFMR 

    KU0073 Bus119 2463.22 7611.34 8000.00Bus1182W XFMR 

    KU0074 Bus374 492.64 1522.27 1600.00Bus3752W XFMR 

    KU0075 Bus309 769.76 2378.55 2500.00Bus3082W XFMR 

    KU0076 Bus383 1501.08 3707.66 4000.00Bus3802W XFMR 

    KU0077 Bus106 3002.16 7415.33 8000.00Bus1032W XFMR 

    KU0078 Bus170 3002.16 7415.33 8000.00Bus1502W XFMR 

    KU0079 Bus304 1501.08 3707.66 4000.00Bus3072W XFMR 

    KU0083 Bus262 3002.16 7415.33 8000.00Bus3362W XFMR 

    KU0084 Bus341 3002.16 7415.33 8000.00Bus3402W XFMR 

    KU0085 Bus348 2463.22 7611.34 8000.00Bus2632W XFMR 

    KU0086 Bus323 3002.16 7415.33 8000.00Bus3242W XFMR 

    KU0087 Bus384 1501.08 3707.66 4000.00Bus3852W XFMR 

    KU0088 Bus387 1231.61 3805.67 4000.00Bus3862W XFMR 

    KU0089 Bus389 2463.22 7611.34 8000.00Bus3882W XFMR 

    KU0092 Bus394 1231.61 3805.67 4000.00Bus3932W XFMR 

    KU0093 Bus303 769.76 2378.55 2500.00Bus3052W XFMR 

    KU0094 Bus398 492.64 1522.27 1600.00Bus3972W XFMR 

    KU0095 Bus370 1501.08 3707.66 4000.00Bus3712W XFMR 

    KU0096 Bus298 1501.08 3707.66 4000.00Bus2972W XFMR 

    KU0097 Bus311 1501.08 3707.66 4000.00Bus3172W XFMR 

    KU0098 Bus357 1501.08 3707.66 4000.00Bus3562W XFMR 

    KU0099 Bus314 938.17 2317.29 2500.00Bus3132W XFMR 

    KU0101 Bus300 769.76 2378.55 2500.00Bus2992W XFMR 

    KU0102 Bus347 3002.16 7415.33 8000.00Bus3462W XFMR 

    KU0103 Bus353 3002.16 7415.33 8000.00Bus3522W XFMR 

    KU0104 Bus320 3002.16 7415.33 8000.00Bus3192W XFMR 

    KU0105 Bus232 1501.08 3707.66 4000.00Bus2122W XFMR 

    KU0106 Bus418 2463.22 7611.34 8000.00Bus4172W XFMR 

    KU0107 Bus254 1501.08 3707.66 4000.00Bus2532W XFMR 

    KU0108 Bus333 3002.16 7415.33 8000.00Bus3342W XFMR 

    KU0109 Bus94 1231.61 3805.67 4000.00Bus922W XFMR 

    KU0111 Bus392 1501.08 3707.66 4000.00Bus3902W XFMR 

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    33/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 33

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    KU0112 Bus410 1231.61 3805.67 4000.00Bus4092W XFMR 

    KU0113 Bus378 492.64 1522.27 1600.00Bus3772W XFMR 

    KU0114 Bus400 1231.61 3805.67 4000.00Bus3992W XFMR 

    KU0115 Bus109 769.76 2378.55 2500.00Bus3382W XFMR 

    KU0116 Bus404 492.64 1522.27 1600.00Bus4032W XFMR 

    KU0118 Bus407 769.76 2378.55 2500.00Bus4062W XFMR 

    KU0121 Bus414 1231.61 3805.67 4000.00Bus4132W XFMR 

    KU0123 Bus420 769.76 2378.55 2500.00Bus4192W XFMR 

    KU0124 Bus415 938.17 2317.29 2500.00Bus4162W XFMR 

    T2 GI Amlapura Bus1 1.44 34.14 34.17Bus22W XFMR 

    Cable1 Bus2 0.06 0.07 0.10Bus3Cable

    Cable2 Bus3 7.30 9.68 12.12Bus4Cable

    Cable3 Bus51 0.60 0.25 0.65 0 .0029868Bus310Cable

    Cable4 Bus309 0.81 1.07 1.34Bus314Cable

    Cable5 Bus312 2.76 1.16 2.99 0 .0137393Bus315Cable

    Cable6 Bus316 7.09 9.41 11.79Bus320Cable

    Cable7 Bus350 3.05 3.71 4.81Bus353Cable

    Cable8 Bus243 0.44 0.53 0.69Bus298Cable

    Cable9 Bus315 3.13 1.31 3.40 0 .0155942Bus325Cable

    Cable10 Bus367 2.37 0.99 2.57 0.0117900Bus369Cable

    Cable11 Bus391 1.58 0.66 1.71 0.0078600Bus392Cable

    Cable12 Bus420 1.45 0.61 1.57 0.0072312Bus137Cable

    Line1 Bus4 5.85 7.94 9.86 0.0014500Bus5Line

    Line2 Bus5 0.35 0.47 0.58 0.0000858Bus107Line

    Line3 Bus235 6.15 8.35 10.37 0 .0015248Bus7Line

    Line4 Bus7 8.29 11.26 13.98 0 .0020565Bus9Line

    Line5 Bus9 1.04 1.42 1.76 0.0002588Bus10Line

    Line6 Bus10 8.92 12.10 15.03 0 .0022109Bus11Line

    Line8 Bus11 1.20 1.63 2.02 0.0002978Bus12Line

    Line10 Bus17 1.50 2.03 2.52 0.0003711Bus15Line

    Line11 Bus11 0.72 0.98 1.22 0 .0001793Bus17Line

    Line12 Bus17 5.53 7.51 9.33 0 .0013720Bus18Line

    Line13 Bus18 2.92 3.97 4.93 0 .0007250Bus21Line

    Line14 Bus21 8.63 11.72 14.56 0.0021407Bus19Line

    Line15 Bus19 3.23 4.39 5.45 0 .0008014Bus22Line

    Line16 Bus21 5.35 7.26 9.02 0 .0013268Bus26Line

    Line17 Bus26 4.08 5.53 6.87 0 .0010103Bus24Line

    Line18 Bus24 8.57 11.63 14.44 0.0021235Bus367Line

    Line19 Bus27 1.23 1.66 2.07 0 .0003040Bus31Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    34/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 34

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line20 Bus31 14.72 19.97 24.81 0.0036484Bus29Line

    Line21 Bus31 2.50 3.39 4.21 0 .0006190Bus32Line

    Line22 Bus32 6.51 8.83 10.97 0 .0016137Bus35Line

    Line24 Bus55 8.31 11.28 14.02 0.0020612Bus49Line

    Line25 Bus18 0.63 0.85 1.06 0 .0001559Bus39Line

    Line26 Bus39 0.63 0.85 1.06 0 .0001559Bus37Line

    Line27 Bus37 1.19 1.62 2.01 0 .0002962Bus42Line

    Line28 Bus42 0.63 0.85 1.06 0 .0001559Bus40Line

    Line29 Bus281 0.97 1.32 1.64 0 .0002417Bus43Line

    Line30 Bus43 1.23 1.66 2.07 0 .0003040Bus47Line

    Line31 Bus47 6.20 8.42 10.45 0 .0015373Bus51Line

    Line32 Bus94 3.38 4.57 5.69 0 .0007772Bus244Line

    Line33 Bus51 0.61 0.83 1.03 0 .0001512Bus52Line

    Line34 Bus52 5.38 7.30 9.06 0 .0013331Bus53Line

    Line35 Bus53 3.65 4.96 6.16 0 .0009059Bus312Line

    Line36 Bus47 4.87 6.61 8.22 0 .0012083Bus331Line

    Line37 Bus57 1.82 2.47 3.06 0 .0004506Bus58Line

    Line38 Bus58 4.12 5.59 6.94 0 .0010212Bus60Line

    Line39 Bus60 6.22 8.44 10.49 0 .0015420Bus62Line

    Line40 Bus62 3.48 4.73 5.87 0 .0008638Bus64Line

    Line41 Bus62 12.19 16.55 20.56 0.0030232Bus66Line

    Line42 Bus66 12.39 16.81 20.89 0.0030715Bus68Line

    Line43 Bus57 3.95 5.36 6.66 0 .0009791Bus69Line

    Line44 Bus69 0.41 0.55 0.69 0 .0001013Bus71Line

    Line45 Bus107 2.35 3.19 3.97 0 .0005831Bus235Line

    Line46 Bus71 4.62 6.27 7.78 0.0011444Bus75Line

    Line47 Bus71 3.82 5.18 6.44 0 .0009464Bus77Line

    Line48 Bus77 4.54 6.16 7.65 0.0011257Bus81Line

    Line49 Bus81 4.67 6.33 7.87 0.0011569Bus80Line

    Line50 Bus381 1.19 1.62 2.01 0 .0002962Bus83Line

    Line51 Bus83 4.52 6.14 7.62 0.0011210Bus86Line

    Line52 Bus86 1.24 1.68 2.09 0 .0003072Bus85Line

    Line53 Bus85 4.18 5.67 7.04 0 .0010353Bus87Line

    Line54 Bus87 0.19 0.26 0.32 0 .0000468Bus89Line

    Line56 Bus89 4.01 5.44 6.75 0 .0009932Bus337Line

    Line57 Bus339 10.40 14.12 17.54 0.0025788Bus91Line

    Line58 Bus91 1.30 1.76 2.18 0 .0003212Bus344Line

    Line59 Bus339 0.55 0.75 0.93 0 .0001372Bus97Line

    Line60 Bus97 2.59 3.52 4.37 0 .0006424Bus95Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    35/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 35

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line61 Bus97 11.81 16.03 19.91 0.0029281Bus99Line

    Line62 Bus99 0.57 0.77 0.95 0 .0001403Bus100Line

    Line63 Bus108 1.60 2.18 2.70 0 .0003976Bus45Line

    Line64 Bus100 1.82 2.47 3.06 0 .0004506Bus104Line

    Line65 Bus104 1.74 2.36 2.93 0 .0004303Bus364Line

    Line66 Bus216 3.46 4.68 5.82 0 .0007958Bus48Line

    Line67 Bus364 1.28 1.73 2.15 0 .0003165Bus108Line

    Line68 Bus100 6.19 8.40 10.43 0.0015342Bus55Line

    Line69 Bus111 2.31 3.13 3.89 0 .0005722Bus113Line

    Line70 Bus113 1.82 2.47 3.06 0 .0004506Bus114Line

    Line71 Bus114 0.63 0.85 1.06 0 .0001559Bus121Line

    Line72 Bus121 21.93 29.76 36.97 0.0054367Bus117Line

    Line73 Bus117 2.43 3.29 4.09 0 .0006018Bus120Line

    Line74 Bus120 9.79 13.28 16.50 0.0024260Bus119Line

    Line75 Bus120 1.58 2.15 2.67 0 .0003929Bus122Line

    Line76 Bus121 3.51 4.76 5.92 0 .0008700Bus123Line

    Line77 Bus123 0.96 1.31 1.62 0 .0002385Bus402Line

    Line78 Bus130 14.75 20.02 24.87 0.0036577Bus127Line

    Line79 Bus125 11.65 15.82 19.65 0.0028891Bus130Line

    Line80 Bus125 0.19 0.26 0.32 0 .0000468Bus132Line

    Line81 Bus132 4.50 6.10 7.58 0.0011148Bus133Line

    Line82 Bus133 4.47 6.07 7.54 0.0011085Bus138Line

    Line83 Bus138 4.47 6.07 7.54 0.0011085Bus137Line

    Line84 Bus309 4.47 6.07 7.54 0.0011085Bus142Line

    Line85 Bus143 4.47 6.07 7.54 0.0011085Bus141Line

    Line86 Bus142 4.47 6.07 7.54 0.0011085Bus143Line

    Line87 Bus143 8.41 11.41 14.17 0.0020846Bus145Line

    Line88 Bus145 2.43 3.29 4.09 0 .0006018Bus148Line

    Line89 Bus148 2.22 3.01 3.74 0 .0005504Bus151Line

    Line90 Bus191 2.60 3.53 4.38 0 .0006439Bus293Line

    Line91 Bus151 11.19 15.12 18.81 0.0025716Bus152Line

    Line92 Bus151 2.04 2.76 3.43 0 .0004691Bus154Line

    Line93 Bus154 3.05 4.11 5.12 0 .0006998Bus147Line

    Line94 Bus154 6.79 9.18 11.42 0.0015606Bus155Line

    Line95 Bus159 11.77 15.89 19.77 0.0027032Bus158Line

    Line96 Bus155 0.26 0.35 0.44 0 .0000604Bus159Line

    Line97 Bus216 13.48 18.21 22.65 0.0030964Bus106Line

    Line98 Bus141 4.47 6.07 7.54 0.0011085Bus162Line

    Line99 Bus162 1.25 1.69 2.11 0.0002880Bus161Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    36/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 36

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line100 Bus161 1.26 1.70 2.12 0.0002895Bus164Line

    Line101 Bus164 1.26 1.70 2.12 0.0002895Bus167Line

    Line102 Bus167 3.81 5.15 6.41 0.0008763Bus166Line

    Line103 Bus166 0.75 1.01 1.26 0.0001719Bus376Line

    Line104 Bus172 12.45 16.81 20.92 0.0028596Bus173Line

    Line105 Bus168 9.86 8.33 12.91 0.0013661Bus177Line

    Line106 Bus175 14.48 19.56 24.34 0.0033271Bus176Line

    Line107 Bus177 15.78 21.32 26.52 0.0036259Bus178Line

    Line108 Bus173 18.83 25.43 31.64 0.0043257Bus181Line

    Line109 Bus168 3.81 5.15 6.41 0.0008763Bus183Line

    Line110 Bus183 3.81 5.15 6.41 0.0008763Bus391Line

    Line111 Bus185 14.72 19.88 24.73 0.0033813Bus187Line

    Line112 Bus185 6.02 5.08 7.87 0.0008332Bus188Line

    Line113 Bus195 3.51 4.74 5.90 0.0008066Bus194Line

    Line114 Bus195 10.76 14.54 18.09 0.0024725Bus190Line

    Line115 Bus188 16.01 21.63 26.91 0.0036786Bus195Line

    Line116 Bus188 0.67 0.91 1.13 0.0001548Bus196Line

    Line117 Bus196 2.12 2.87 3.57 0.0004877Bus198Line

    Line118 Bus196 3.37 4.55 5.66 0.0007741Bus408Line

    Line119 Bus199 3.37 4.55 5.66 0.0007741Bus405Line

    Line120 Bus405 0.37 0.50 0.62 0.0000852Bus201Line

    Line121 Bus405 3.37 4.55 5.66 0.0007741Bus206Line

    Line122 Bus206 1.10 1.48 1.85 0.0002524Bus204Line

    Line123 Bus206 3.37 4.55 5.66 0.0007741Bus208Line

    Line124 Bus208 3.37 4.55 5.66 0.0007741Bus211Line

    Line125 Bus211 1.10 1.48 1.85 0.0002524Bus209Line

    Line126 Bus211 3.37 4.55 5.66 0.0007741Bus214Line

    Line127 Bus42 5.45 7.40 9.19 0 .0013518Bus281Line

    Line128 Bus191 16.00 21.61 26.89 0.0036755Bus171Line

    Line129 Bus214 3.37 4.55 5.66 0.0007741Bus217Line

    Line130 Bus382 1.67 2.26 2.81 0.0003840Bus220Line

    Line131 Bus220 3.37 4.55 5.66 0.0007741Bus221Line

    Line132 Bus221 3.37 4.55 5.66 0.0007741Bus223Line

    Line133 Bus223 8.07 10.90 13.56 0.0018532Bus224Line

    Line134 Bus223 3.37 4.55 5.66 0.0007741Bus226Line

    Line135 Bus226 3.37 4.55 5.66 0.0007741Bus228Line

    Line136 Bus228 3.37 4.55 5.66 0.0007741Bus230Line

    Line137 Bus230 1.26 1.71 2.12 0.0003118Bus231Line

    Line138 Bus231 0.59 0.80 1.00 0.0001362Bus234Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    37/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 37

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line139 Bus234 3.37 4.55 5.66 0.0007741Bus240Line

    Line140 Bus240 1.97 2.66 3.31 0.0004521Bus304Line

    Line141 Bus303 22.72 30.68 38.18 0.0052191Bus239Line

    Line142 Bus240 7.16 9.68 12.04 0.0016458Bus401Line

    Line143 Bus243 1.81 2.44 3.04 0.0004149Bus241Line

    Line144 Bus414 2.02 2.73 3.40 0.0004645Bus94Line

    Line145 Bus244 3.92 5.29 6.58 0.0008995Bus248Line

    Line146 Bus248 10.43 14.09 17.53 0.0023966Bus247Line

    Line147 Bus316 1.93 2.60 3.24 0.0004428Bus249Line

    Line148 Bus249 14.27 19.27 23.98 0.0032776Bus251Line

    Line149 Bus106 11.35 15.34 19.08 0.0026088Bus170Line

    Line150 Bus251 14.27 19.27 23.98 0.0032776Bus256Line

    Line151 Bus256 0.32 0.43 0.53 0.0000728Bus259Line

    Line152 Bus259 4.69 6.34 7.88 0.0010776Bus257Line

    Line153 Bus259 5.03 6.79 8.45 0.0011550Bus260Line

    Line154 Bus260 12.94 17.48 21.74 0.0029726Bus262Line

    Line155 Bus231 1.26 1.71 2.12 0.0003118Bus264Line

    Line156 Bus264 1.26 1.71 2.12 0.0003118Bus266Line

    Line157 Bus266 1.55 2.09 2.60 0.0003561Bus269Line

    Line158 Bus269 10.43 14.09 17.53 0.0023966Bus268Line

    Line159 Bus266 0.79 1.07 1.33 0.0001949Bus270Line

    Line160 Bus270 0.79 1.07 1.33 0.0001949Bus272Line

    Line161 Bus272 3.17 4.28 5.32 0.0007277Bus276Line

    Line162 Bus276 4.90 6.62 8.23 0.0011256Bus216Line

    Line163 Bus272 0.79 1.07 1.33 0.0001949Bus277Line

    Line164 Bus277 0.84 1.14 1.42 0.0001935Bus279Line

    Line165 Bus279 0.96 1.30 1.61 0.0002370Bus237Line

    Line166 Bus73 19.42 26.23 32.64 0.0044620Bus282Line

    Line167 Bus282 0.35 0.47 0.59 0.0000805Bus286Line

    Line168 Bus286 12.62 17.05 21.21 0.0028998Bus284Line

    Line169 Bus237 0.99 1.35 1.68 0.0002463Bus290Line

    Line170 Bus289 7.98 10.78 13.41 0.0018331Bus288Line

    Line171 Bus213 0.53 0.73 0.90 0.0001325Bus292Line

    Line172 Bus292 4.83 6.56 8.14 0.0011974Bus191Line

    Line173 Bus293 0.79 1.07 1.33 0.0001949Bus296Line

    Line175 Bus306 1.38 1.88 2.33 0.0003430Bus281Line

    Line176 Bus170 11.35 15.34 19.08 0.0026088Bus215Line

    Line177 Bus73 17.40 23.50 29.24 0.0039975Bus232Line

    Line178 Bus322 9.06 12.29 15.27 0.0022452Bus315Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    38/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 38

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line179 Bus275 4.50 6.10 7.58 0.0011148Bus213Line

    Line180 Bus304 3.94 5.32 6.63 0.0009057Bus311Line

    Line181 Bus415 10.71 14.47 18.01 0.0024617Bus254Line

    Line182 Bus329 3.48 4.73 5.87 0.0008638Bus325Line

    Line183 Bus290 1.87 2.54 3.15 0.0004631Bus275Line

    Line184 Bus311 5.51 7.44 9.25 0.0012649Bus236Line

    Line185 Bus236 10.47 14.15 17.60 0.0024059Bus301Line

    Line186 Bus331 1.06 1.43 1.78 0.0002619Bus57Line

    Line187 Bus301 1.93 2.61 3.25 0.0004443Bus300Line

    Line188 Bus337 2.46 3.34 4.15 0.0006096Bus339Line

    Line189 Bus301 1.04 1.41 1.76 0.0002400Bus303Line

    Line190 Bus412 4.40 5.97 7.42 0.0010914Bus342Line

    Line191 Bus137 3.75 5.10 6.33 0.0009308Bus309Line

    Line192 Bus349 10.90 14.80 18.38 0.0027035Bus344Line

    Line193 Bus244 4.93 6.65 8.28 0.0011318Bus109Line

    Line194 Bus257 12.62 17.05 21.21 0.0028998Bus323Line

    Line195 Bus342 13.25 17.98 22.34 0.0032851Bus351Line

    Line196 Bus260 10.79 14.57 18.13 0.0024787Bus326Line

    Line197 Bus351 6.50 8.83 10.96 0.0016121Bus359Line

    Line198 Bus326 8.20 11.08 13.78 0.0018842Bus330Line

    Line199 Bus355 3.74 5.08 6.31 0.0009277Bus351Line

    Line200 Bus359 11.75 15.95 19.82 0.0029140Bus361Line

    Line201 Bus330 13.24 17.89 22.25 0.0030423Bus333Line

    Line202 Bus361 9.15 12.42 15.43 0.0022685Bus363Line

    Line203 Bus262 6.59 8.90 11.08 0.0015142Bus343Line

    Line204 Bus55 1.41 1.92 2.39 0 .0003508Bus111Line

    Line205 Bus343 14.35 19.38 24.11 0.0032962Bus347Line

    Line206 Bus364 4.52 6.13 7.61 0.0011195Bus366Line

    Line207 Bus343 3.95 5.33 6.64 0.0009073Bus341Line

    Line209 Bus347 3.19 4.31 5.36 0.0007323Bus350Line

    Line210 Bus367 2.57 3.49 4.34 0.0006377Bus27Line

    Line211 Bus350 0.29 0.39 0.49 0.0000666Bus348Line

    Line212 Bus239 8.03 10.84 13.49 0.0018439Bus370Line

    Line213 Bus237 14.69 19.84 24.69 0.0033751Bus357Line

    Line214 Bus370 10.88 14.70 18.29 0.0025004Bus373Line

    Line215 Bus357 1.72 2.32 2.89 0.0003948Bus73Line

    Line216 Bus376 1.66 2.24 2.79 0.0003809Bus168Line

    Line217 Bus374 2.73 3.69 4.59 0.0006270Bus376Line

    Line218 Bus217 7.96 10.75 13.38 0.0018285Bus379Line

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    39/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 39

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

     Y

    Line219 Bus379 3.03 4.10 5.10 0.0006967Bus378Line

    Line220 Bus382 4.55 6.14 7.64 0.0010451Bus383Line

    Line221 Bus379 0.44 0.59 0.74 0.0001006Bus382Line

    Line222 Bus224 21.93 29.63 36.86 0.0050395Bus384Line

    Line223 Bus190 10.76 14.54 18.09 0.0024725Bus387Line

    Line224 Bus247 10.43 14.09 17.53 0.0023966Bus389Line

    Line225 Bus391 4.21 5.69 7.08 0.0009676Bus395Line

    Line226 Bus394 2.73 3.69 4.59 0.0006270Bus395Line

    Line227 Bus395 0.34 0.46 0.57 0.0000774Bus185Line

    Line228 Bus408 3.37 4.55 5.66 0.0007741Bus199Line

    Line229 Bus188 2.12 2.87 3.57 0.0004877Bus398Line

    Line230 Bus400 7.16 9.68 12.04 0.0016458Bus243Line

    Line231 Bus401 1.81 2.44 3.04 0.0004149Bus400Line

    Line232 Bus125 2.08 2.82 3.50 0.0005145Bus410Line

    Line233 Bus404 6.50 8.82 10.95 0.0016106Bus402Line

    Line234 Bus109 4.93 6.65 8.28 0.0011318Bus316Line

    Line235 Bus201 2.86 3.87 4.81 0.0006580Bus407Line

    Line236 Bus410 2.08 2.82 3.50 0.0005145Bus402Line

    Line237 Bus71 16.00 21.71 26.97 0.0039664Bus381Line

    Line238 Bus381 4.02 5.46 6.79 0.0009978Bus396Line

    Line239 Bus344 5.13 6.96 8.65 0.0012723Bus412Line

    Line241 Bus241 5.28 7.13 8.87 0.0012123Bus414Line

    Line242 Bus275 4.78 6.46 8.04 0.0010992Bus415Line

    Line243 Bus122 8.67 11.76 14.61 0.0021485Bus418Line

    Line7 Bus12 0.25 0.33 0.41 0.0000608Line7~Line

    Line23 Bus35 2.50 3.39 4.21 0 .0006190Line23~Line

    Line55 Bus89 1.00 1.36 1.69 0 .0002479Line55~Line

    Fuse17 Bus177 Bus172Tie Fuse

    Fuse18 Bus178 Bus175Tie Fuse

    Fuse29 Bus290 Bus289Tie Fuse

  • 8/18/2019 Setelah KU 13 - Complete.pdf

    40/104

    Location:

    Engineer:Study Case:  Tahun 2015

    12.6.0H

    Page: 40

    SN:

    Filename: P Abang

    Project:  ETAP

    Contract:  

    Date: 02-17-2016 

    Revision: Base

    Config.:  Normal

    LOAD FLOW REPORT

    Bus

    ID kV

    Voltage

    Ang.% Mag.

     Generation

    MW Mvar  

    Load

    MW Mvar  

    Load Flow

    MW Mvar AmpID %PF

    XFMR 

    %Tap

    Bus1*  150.000 0.0100.000 3.5745.362 Bus2 5.362 3.574 24.8 83.20 0

    Bus2 20.000 -1.0101.219 Bus3 5.356 3.435 181.5 84.20 0 0 0

     2.500Bus1 -5.356 -3.435 181.5 84.2

    Bus3 20.000 -1.0101.2