sewer system improvement program 1sepheadworks.com/wp-content/.../05/...presentation.pdf ·...
TRANSCRIPT
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.sfpuc0115i1-300-80-839.pptx
Headworks Project UpdateSEP 020 Headworks Project
1
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx 2
SEP 020 Headworks Project• Scope I – Headworks Site Preparation Project
• Scope II – Bruce Flynn Improvements
• A – BFS Improvements (Pump station upgrades)
• B – SEP 005 Sewer Work
• C – SEP 005 Southeast Lift Station
• Scope III – SEP 020 Headworks Project
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.sfpuc0115i1-300-80-839.pptx
Program Schedule
TM Package 6 – 07/14
2018
Construction NTP
Scope I
Scope III
2019 2020 2021 2022 2023
Construction Final Completion
Scope I
Construction Final Completion
Construction NTP
Scope II – Package A
Construction NTP
Scope II – Package B
Construction NTP
Scope II – Package C
Construction NTP
Scope III
Construction Final Completion
Scope II – Package C
Construction Final Completion
Scope II – Package B
Construction Final Completion
Scope II – Package A
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
• The site preparation project will
allow for influent wet weather flow
to bypass around the existing 011
headworks facility to allow for
demolition of the 011 structure.
Scope I – Headworks Site Preparation Project
4
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx 5
Scope I – Headworks Site Preparation Project
SELS*
ICS*
Packages Awarded:
• Electrical
• Demolition
• General Cleanup
• Street Sweeping
• Security
• Temporary Bypass
• Civil
• Mechanical
• Fencing (Gate on Rankin)
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.sfpuc0115i1-300-80-839.pptx
Scope I Schedule
TM Package 6 – 07/14
2018
Construction NTP
Scope I
2019 2020 2021 2022 2023
Construction Final Completion
Scope I
Construction Final Completion
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx 7
SEP 020 Headworks Project• Scope II – Bruce Flynn Improvements
• A – BFS Improvements (Pump station upgrades)
• B – SEP 005 Sewer Work
• C – SEP 005 Southeast Lift Station
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.sfpuc0115i1-300-80-839.pptx
Scope II Schedule
2018 2019 2020 2021 2022 2023
Construction Final Completion
Construction NTP
Scope II – Package A
Construction NTP
Scope II – Package B
Construction NTP
Scope II – Package C
Scope II – Package C
Construction Final Completion
Scope II – Package B
Construction Final Completion
Scope II – Package A
Bid Packages - July
Scope II – Package B
Bid Packages - January
Scope II – Package C
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
N
SEP 020 Headworks
Evans Avenue
Ran
kin
Str
eet
Qu
int
Str
eet
Bruce Flynn PS
OdorControl
Circosta
Scope II – Bruce Flynn Improvements Project
Sewer
Diversions
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
N
Qu
int
Str
eet
Scope II – Package A – BFS Improvements
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
N
Qu
int
Str
eet
Scope II – Package B – Sewer Work
• Package consists of civil
and structural work
elements to connect the
existing SELS influent
sewer line to the New SE
005 Lift Station
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
N
Scope II – Package C – SE 005 Lift Station
• Package consists of the
construction of a new lift station in
the SE plant. Work will include civil,
structural concrete,
mechanical/equipment setting,
electrical, painting/coatings, misc.
metals, etc.
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Draft for discussion purposes.sfpuc0115i1-300-80-839.pptx
• Includes the construction
of the new, reinforced
concrete, multi-story
Headworks structure, a
new odor control
structure, and new
electrical structures.
Scope III – New Headworks Facility
13
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.sfpuc0115i1-300-80-839.pptx
Scope III Schedule
2018
Scope III
2019 2020 2021 2022 2023
Construction NTP
Scope III
Construction Final Completion
Scope III
Bid Packages – 1st Wave (16 Packages) - Completed
Scope III
Bid Packages – 2nd Wave (1 Package) - Completed
Scope III
Bid Packages – 3rd Wave (13 Packages) – June
Scope III
Bid Packages – 4th Wave (9 Packages) - September
Scope III
Bid Packages – 5th Wave (9 Packages) - Spring
Scope III
Bid Packages – 6th Wave (13 Packages) - Summer
www.sepheadworks.com