sf7df8f+} ljzjljbfno w'lnv]n tser (skill based training ... · cu.m. 3 earthwork in excavation...
TRANSCRIPT
sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic
Rehabilitation) Jbf/f ejg lgdf{0f sfo{sf] nfuL sf]6]zg cfJxfg ;DalGw ;"rgf
o; sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic
Rehabilitation Project Jbf/f ejg lgdf{0f sfo{sf nflu /fd]5fk l:yt dGyln g=kf= j8f g+ ! sf]
s'8x/df lgdf{0f x'g] ;fd'bflos tflnd xnsf] nflu tkl;ndf pNn]v ul/P cg';f/sf n=O{ tof/ ul/ of]
;"rgf k|sf;zt ul/Psf] 5 . OR5's kmd{x?n] pNn]vLt n=O{ cg';f/ s] slt d"Nodf ug{ u/fpg ;Sg] xf], ;f]
sf] lznalGb k|:tfj of] ;"rgf k|sflzt ePsf] ldltn] ^ lbg leq sfof{no v'nf /x]sf] sfof{no ;do leq
cfOk'Ug] ul/ k|:tfj btf{ ug{ of] ;'rgf k|sflzt ul/Psf] 5 .
/lhi6« f/
sf7df08f} ljZjljBfno
;+ks{
sf7df8f+} ljZjljBffno, w'lnv]n, sfe|]
kf]= a=g+= ^@%)
kmf]gM )!! ^^!#((
km\ofS;M )!! ^^!$$#
E-mail: [email protected]
Bill of Quantity
Project : Construction of KUBIC community hall at Manthali,Ramechhap
S.N. Description of Work
Qty
Unit
Rate Rs.
Quantity
Remarks
in figure
in Words
A General works
1 site clearence before and after construction with surface
dressing
1.00 LS
B EARTH WORKS
2
Earthwork in excavation to develop the site before starting
the construction work using the dozer and other means of
equipment alo by the labourer if required as per instuction
all complete
50.00
cu.m.
3
Earthwork in excavation in hard/boulder mix soils in
foundation including 10m hauling distance and 1.5 m. lift
all complete.
13.68
cu.m.
4
Earth filling in 150 mm thick layer, watering, ramming
including supply of filling materials within 10 m distance
all complete.
15.41
cu.m.
C STONE WORKS
-
5 Dry stone soling in foundation and floor including sand
filling in joints, leveling, watering etc. all complete.
1.27
cu.m.
D BRICK WORKS
-
6
Good quality local chimney made Brickwork in 1:4 C/S
mortar up to ground floor in perfect line level finishe
including wetting the bricks, racking the joints and curing
the work for at least 7 days all complete.
25.43
cu.m.
E P.C.C. & R.C.C. WORKS
-
7
Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved quality of
cement and sand and crushed stone aggregate including
mixing, laying, curing etc all complete in approval of site
engineer.
1.70
cu.m.
8
Plain cement Concrete (PCC) in 1:2:4 ratio for
foundations, flooring and walls with approved quality of
cement and sand and crushed stone aggregate including
mixing, laying, curing etc all complete in approval of site
engineer.
1.28
cu.m.
9
Plain cement Concrete (PCC) for RCC works (1:1.5:3) for
sill/lintels/stitch band with approved quality of cement and
sand and crushed stone aggregate including mixing, laying,
curing etc all complete in approval of site engineer.
3.61
cu.m.
10
Reinforcement bar of fe 415/500 grade including
straightening, cleaning, cutting, binding & fixing in
position with annealed tying binding wire as per drawing,
design & instruction all complete.
0.30
mt
11
Formwork, shuttering, centering with plywood with pipe
for necessary propping, scaffolding, staging, supporting
inclusive of wedging and cutting holes for utilization till
the support if fully unyielding net.
26.29
sqm
F FLOORING & FINISHING WORKS
-
12
12.5mm thick cement sand plaster in (1:4) ratio on wall of
good finish including racking the joint, wetting of surfaces
& curing the work all complete.
143.20
sqm
13
3 mm thick cement sand punning (1:1) on floor, skriting,
dado etc, including mixing laying and rubbing with steel
trowel to a hard, smooth and shining surface and curing all
complete.
25.69
sqm
G DOOR & WINDOWS
-
14
Well-seasoned salwood chaukhats for fixed/openable
door/windows with good finish of approved quality
including fixing in position with necessary M.S. hold fasts
as per drawing and instruction all complete.
0.18
cu.m.
15
Supplying and fitting Readymade Teak wood Doors,
(Seasoned and Poisoned treated, one side teak and other
side water proof ply fitting) with all necessary hardware all
complete.
3.67
sqm
16
Making and fitting fixing 38 x75mm sal wood Glazed
window shutter with 5mm Glass all necessary hardware
fitting all complete.
3.31
sqm
H PAINTING WORKS
-
17
Coloring with two coat washable distemper paint with one
coat primer to give uniform coloring after rendering the
surface all complete.
74.97
sqm
18
2 coats of readymade enamel paint of approved color over
1 coats of primer Painting over properly sanded wooden
surface all complete
5.70
sqm
19
2 coats of weather coat (Apex) paint of approved color with
one coat primer Painting over properly cleaned surface all
complete
68.23
sqm
I METAL WORKS
-
20
Supplying,fabricating,fitting of 3x20mm size M.S. grill
with red oxide paint as per design and instruction all
complete.
3.31
sq.m
L ROOFING WORKS
-
21 C.G.I. Works
-
(i) 0.41mm thick C.G.I. sheet cover
54.05 Sq.m
(ii) 0.5 mm thick C.G.I. plane sheet ridge cover
7.55 rm
(iii) 0.5 mm thick C.G.I. plane sheet in gabble portion
11.16 sq.m
-
22 Wood works in roof using locally available woods
0.28 cu.m
TOTAL OF CIVIL WORKS