shakespeare north, prescot...location: prescot client: knowsley mbc value: £17.5m completion:...
TRANSCRIPT
LOCATION: PRESCOT
CLIENT: KNOWSLEY MBC
VALUE: £17.5M
COMPLETION: ONGOING
SERVICE: ARCHITECTURE, LANDSCAPE
SECTOR: ARTS & CULTURE, EDUCATION
CONTRACTOR: KIER
LANDSCAPE: AUSTIN-SMITH:LORD
STRUCTURES: MOTT MACDONALD
SERVICES: AECOM
COST CONSULTANT: AECOM
Shakespeare North, Prescot
The location in Prescot celebrates the long association of the Earls of Derby estate at Knowsley Hall with Shakespeare and theatre. The building is set in the conservation area at the heart of the town which includes a fine Jacobean church. It is the flagship for a network of regeneration initiatives for the town.
Inclusive design is at the heart of the design concept. Graeae are a key stakeholder who “boldly place D/deaf and disabled actors centre stage challenging preconceptions”.
Sustainability has been developed using the Breeam template and best practice to create a highly energy efficient and green building.
Shakespeare North is the recreation of the Jacobean Cockpit in Court theatre. Based on an Inigo Jones design the first Theatre Royal was contemporary with the Globe. The 350 seat theatre forms the centrepiece of a contemporary new landmark building which will also be a visitor attraction, the home for a MA course in Shakespearean theatre and a community facility in a shared environment.
The theatre can transform from its authentic historical mode to a contemporary theatre with full lighting grid, the option to allow daylight in and connection with an outdoor performance garden. Facilities include an exhibition space, foyers, bar, bistro, rehearsal spaces, community space, back of house theatre facilities, offices, social learning and seminar spaces.
SHAKESPEARE NORTH, PRESCOT
D
7
5
E F G H J K L M
10130
B
9
20130
3
1
CL
CL
12 m²
Changing Places WC/ First Aid RoomG059 m²
Family RoomG07
18 m²
Stair 2G46
23 m²
Stair 1G45
9 m²
Lift 2G44
1:23
18 m²
Male Public ToiletsG35
36 m²
Group DressingRoom 2
G26
41 m²
Group DressingRoom 1
G24
16 m²
Electrical SubstationG21
39 m²
G12
Kitchen
5 m²
Accessible WCG10
4 m²
Box Office StoreG09
8 m²
Box OfficeInformation
G08
222 m²
Foyer 1G03
127 m²
G11
Cafe/Restaurant
5 m²
Staff Locker RoomG17
4 m²
Cleaner's Cup'dG06
8 m²
Stair 3G47
21 m²
WardrobeG25
7 m²
Security OfficeG18
28 m²
Lift LobbyG19
4 m²
Female WC LobbyG36 4 m²
Male WC LobbyG34
20131
2
36 m²
Female Public ToiletsG37
10131
10132
20132
6
4
A C
5 m²
Entrance LobbyG02
8
43 m²
Switch RoomG22
22 m²
Comms RoomG23
20 m²
Stage Door EntranceG20
3 m
²
Cir
cula
tion
G16
10 m
²
Publ
ic C
ircu
latio
nG
41
6 m
²
Publ
ic C
ircu
latio
nG
40
10 m
²
Publ
ic C
ircu
latio
nG
396
m²
Publ
ic C
ircu
latio
nG
38
5 m²
ShowerG28
2 m²
ShowerG29
5 m²
Acc. ShowerG30
Entrance/Exit toPerformance Garden
Secure GardenEntrance
Storage
Moving clear water atGF
Work stationsRetail Area
Stage Door Entrance/Exhibition get in
Cafe' Patio
Performance stage
SecondaryEntrance
Main Entrance
Actors Entrance
DG
/10
DG
/09
DG
/07
DG/49
DG/11
DG
/13
DG/04
CWD/01
CWD/02
DG
/43
DG/40
DG
/41
DG
/39
DG/44
DG
/45
DG/46
DG/38
DG/48
DG
/47
DE/
04
DG/23
DG/17
DG
/15
DG
/16
DG
/21
DG
/20
DG
/22
DG
/50
DG
/24
DG
/14
DG
/27
DryRiser
Electrical
DryRiser
7 m²
CirculationG42
5 m²
Lift 1G43
Electrical
DG
/28
DG/51
DG
/25
DG
/18
27 m²
BOH CirculationG33
DG
/08
DG
/05
DG/0319 m²
Main Entrance LobbyG01
33 m²
Fire Fighting LobbyG04
DG/26
DG/32
6 m²
Lift Motor RoomG48
DE/05
DE/02
DE/
01
DE/03
DG
/30
64 m²
Mech Plant RoomG27
150 m²
Exhibition SpaceE04
4 m²
Acc. ShowerG31
7 m²
StoreE05
41 m²
Exhibition Space AccessE01
13 m²
Box Office Manager OfficeE02
16 m²
Escape RampE06
10133
20133
CWD/03
DG
/02
DG
/01
DG/42
DG
/31
Was
hing
Mac
hine
s
5 m²
Accessible WCG32
1 m²
Riser 09
1 m²
Riser 04
1 m²
Kitchen El. Dis. Cd.G51
DG
/29
DG
/52
DG/19
DG
/37
DG
/36
DG
/35
DG/33
DG
/34
DG
/53
4 m²
WCG52
DG/06
2 m²
LobbyE07
2 m²
SafeE08
DE/06
DE/
07
Please note this General Arrangement drawing is generated from the project3D Revit Model. The model will be used for 3D Co-ordination as the schemeprogresses.
All drawings are to be read in conjunction with:
- General Arrangement Floor Plans, Sections & Elevations- Landscape Layouts- Planning Drawings- Room Data Sheets- Finishes Layouts
For civil, carriageway and highway information, refer to design andspecification by Mott MacDonald (Highways & Civil Engineer)
For structural information, refer to design andspecification by Mott MacDonald (Structural Engineer)
For mechanical, electrical and plumbing services information, refer todesign and specification by AECOM (MEP Engineer)
For Fire Engineering Report, refer to proposals by AECOM (Fire Engineer)
For Acoustic proposals refer to drawings & reports by ARUP(Acoustic Engineer)
For Theatre design proposals refer to drawings & reports by ARUP(Theatre Designers)
Layout as shown - based on Helm Architecture planning layouts &Surveys Systems drawing 10932B:200:1:1
GENERAL NOTES
All dimensions and areas should be checked on site prior to fabrication ofany elements and construction works. any discrepancies in settings outdimensions to be highlighted to Architect prior to construction.
Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit
Austin-Smith:Lord LLPArchitects Designers PlannersLandscape ArchitectsPort Of Liverpool BuildingPier Head, LiverpoolL3 1BYt +44 (0)151 227 1083.e [email protected]
DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP
This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362
Project
Description
Job No. Drawing No. Revision
Date
Drawn
Scale @ A1
Status
R -ASL-00- - -A-
1 : 100
Shakespeare North
Ground Floor Plan - GA
916020 GFP1.1
MF
Issue Date
0110S0
DR916020
1 : 100Ground Floor Plan - GA
Rev Description Drwn/Chkd Date Issued
Refer to Helm Architects Finishes Drawingsfor further details of Landscape Design
Refer to Helm Architects Finishes Drawingsfor further details of Landscape Design
DRAFT
21/03/18
We are design co-ordinators and contract administrators working alongside concept architects, Helm Architecture, experts in the architectural history of theatre design.
Kier have been appointed as the principal contractor via the North West Construction Hub for a two stage traditional form of contract. Construction is due to complete in Autumn 2020.