Page 1: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

Sheet Pile Retaining Walls

Design and Construction in Brown Fields Environment

1

Level Crossing Removal Project 1

Burke Road, North Road, McKinnon Road and Centre Road

27 November 2017

8th Australian Small Bridges Conference 2017

Page 2: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

4 LEVEL CROSSINGS• Burke Road / Gardiner Station• North Road / Ormond Station• McKinnon Road / McKinnon Station• Centre Road / Bentleigh Station

ALLIANCE PARTNERS• VicRoads / Level Crossing Removal Authority• John Holland• MTM• PTV• KBR

TIME FRAME• Design commenced – May 2015• Burke Road bridge & main occupation complete in Jan 2016• North, McKinnon, Centre Road bridges complete • Main occupation occurred in June/July 2016• Ormond, McKinnon & Bentleigh stations opened in August 2016

2

LEVEL CROSSING REMOVAL PROJECT 1

Page 3: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

3

INTRODUCTION

1. Level Crossing Removal Project 1 – Project Background

2. Working in the Rail Environment – Online vs Offline Construction

3. Retention Solutions

4. Sheet Piled Walls

5. Versatile design

6. Coordination of Design and Construction Teams

7. Conclusion – Connecting Communities

Page 4: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

4

Use Where

• The new horizontal rail

alignment closely follows the

existing

• Concerns over visual, noise and

disruptions

ONLINE CONSTRUCTION – NORTH, MCKINNON AND CENTRE ROAD

Characteristics

• The main occupation is longer

and has critical construction

activities

• De-risk the main occupation by

minimising the occupation

works

Page 5: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

5

Construction features

• Retention walls built ‘on’ existing alignment consisting of predominately

Continuous Flight Auger (CFA) and Sheet piles.

• CFA piles used except where geometric/environmental constraints dictate

• Sheet piling - utilising the GIKEN ‘silent-piler’

• Props used to minimise pile size

• Piling facilitates main occupation excavation

• Bridges constructed on existing level crossings

• Challenge of a high ground water table

ONLINE CONSTRUCTION – NORTH, MCKINNON AND CENTRE ROAD

Page 6: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

6

Use Where

• The rail line can be diverted

onto the new alignment i.e.

Requires a larger rail corridor to

work

• Major construction occurs

adjacent the existing rail line

OFFLINE CONSTRUCTION – BURKE ROAD

Characteristics

• Avoids long occupations

• Critical construction activities

can occur without the time

pressure of an occupation

Page 7: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

NORTH, MCKINNON, CENTRE ALIGNMENT PLAN

7

ORMOND

McKINNON CENTRE

Page 8: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

Efficient Selection

Considerations:

• Cost

• Methodology

• Geometry

• Environmental (Vibration/Noise)

8

RETENTION SOLUTIONS

Types

Retention system comprised of:

• Post and panel

• Shotcrete/Soil Nail

• Sheet pile

• Continuous flight auger piles

INC

REA

SIN

G D

EPTH

Page 9: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

9

RETENTION SOLUTIONS

Page 10: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

10

RETENTION SOLUTIONS – POST & PANEL

Features

• Low excavation depths

• Small diameter piles w steel and pre-

cast panels

• Lower cost

Used predominantly between batter

slopes and heavier systems and, at

interfaces.

Page 11: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

11

RETENTION SOLUTIONS – SHOTCRETE / SOIL NAIL

Features

• Suitable geotechnical present (up to 7m)

• Good speed of construction

• Anchored and non-anchored

• Lower cost

Page 12: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

12

RETENTION SOLUTIONS – CFA/Bored Piles

Features

• Deep excavation

• Poor Soils

• Axial capacity

• Optimisation of pile

spacing/reinforcement

• High Cost

Used in conjunction with soil anchors

and permanent props for increasing

depth.

Page 13: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

INCLUDE PHOTOS

13

RETENTION SOLUTIONS – SHEET PILE

Features

• Moderate to deep excavation

• Small structural thickness

• Variety of profiles available

• Moderate cost

- Live rail environment

- Existing services

- Operational roads

Corrosion and stray current

Page 14: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

14

RETENTION SOLUTIONS – SHEET PILE

Types:

• Z Section

• U Section

Page 15: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

15

RETENTION SOLUTIONS – SHEET PILE

Wall Heights:

• Free standing up to 4.5m height

• Propped up to 6.0m height

Temporary Prop

• Propped up to 7.0m height

Permanent Anchors

• Propped and composite 7.5m height (special case)

Temporary Prop

Composite Concrete Infill

Propping System:• Base slab

• Temporary props

• Permanent anchors

Page 16: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

16

RETENTION SOLUTIONS – SHEET PILE

Page 17: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

17

RETENTION SOLUTIONS – SHEET PILE

Page 18: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

18

RETENTION SOLUTIONS – SHEET PILE

Page 19: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

19

RETENTION SOLUTIONS – SHEET PILE

Page 20: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

20

GIKEN & HIGH RESONATORPiling Methods:• GIKEN ‘silent-piler’ using a push method (less noise and vibration)

Page 21: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

21

GIKEN & HIGH RESONATOR

• High frequency sheet pile driver avoiding damage from hammering vibrations

Page 22: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

• 1750 diameter drain at Bentleigh designed as a ‘Siphon’

22

EXISTING CONDITIONSMAJOR SERVICES REALIGNMENTS

Page 23: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

23

Bentleigh Bathtub Wall

Page 24: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

24

Bentleigh Bathtub Wall

Page 25: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

25

VERSATILE DESIGN

Sheet pile infills

• Collision requirement

• Base slab uplift

• Increase strength of sheets

for deflection

Page 26: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

26

VERSATILE DESIGN

Page 27: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

27

VERSATILE DESIGN

Overhead structures

• Structures kept within the rail corridor

• Avoid site welding where possible

• Non-uniform sheet piles required a

flexible attachment detail

• Two details: top mount and face mount.

Page 28: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

28

COORDINATION OF DESIGN AND CONSTRUCTION TEAMS

• Achieving practical design through

close interaction between design and

construction teams

• Civil, structural and geotechnical

design support on site from early

stages.

• 7 day per week support during major

occupations

• 24 hour design support in 12 hour shifts

during critical construction phase

Page 29: Sheet Pile Retaining Walls Design and Construction in ...€¦ · Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 1 Level Crossing Removal Project 1

29

CONCLUSION

• Travel times reduced

• Safety increased

• Completed on schedule

• Connected the communities either

side of the rail at Glen Iris, Ormond,

McKinnon and Bentleigh

• Successful project