SHEIKH KHALIFA BRIDGE (SAADIYAT BRIDGE PROJECT), ABU DHABI Facts Project Description Construction of Sheikh Khalifa Bridge a road and railway bridge, incl. foundation, pile caps, piers and superstructure, M+E works, 400 m ramp structure on Abu Dhabi side, road works, dredging and land reclamation (400,000 m³). Length of bridge: 1.455 m Bridge surface: 80,000 Height above ground: max. 35 m Largest span: 200 m Superstructure: Box girder Height of superstructure: approx. 3.50 m - 10.25 m Foundation: Concrete bored piles Piers: Solid piers, V-piers (Unit 2) Bearings: pot bearings Single spans: Unit 1: 8 x 55 m Unit 2: 110 m - 200 m - 135 m - 70 m - 45 m Unit 3: 50 m - 50.54 m Unit 4: 54.456 m - 55 m - 55 m - 45 m - 45 m - 55 m - 45 m Unit 5: 54.456 m - 55 m - 55 m - 45 m - 45 m - 55 m - 45 m Width between railings: Unit 1: 3 superstructures with 18.50 m Unit 2: 3 superstructures with 18.50 m Unit 3: 1 superstructure with 27.40 m - 76.45 m Unit 4: 2 superstructures with 14.60 m Unit 5: 1 superstructure with 9.40 m Unit 6: 2 superstructures with 13.05 m Different construction method: Unit 1: Incremental launching, Unit 2: Cantilevering and unit 3 - 6: Falsework City/Country Abu Dhabi / United Arab Emirates Client Tourism Development & Investment Co. (TDIC), Abu Dhabi Contract Value € 112,11 Mio. Construction Period 12/2006 - 12/2009 (36 months) .

Upload: others

Post on 13-Oct-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHEIKH KHALIFA BRIDGE (SAADIYAT BRIDGE PROJECT), ABU … · SHEIKH KHALIFA BRIDGE (SAADIYAT BRIDGE PROJECT), ABU DHABI Facts Project Description Construction of Sheikh Khalifa Bridge

SHEIKH KHALIFA BRIDGE (SAADIYATBRIDGE PROJECT), ABU DHABI

Facts Project DescriptionConstruction of Sheikh Khalifa Bridge a road and railway bridge, incl. foundation, pile caps,piers and superstructure, M+E works, 400 m ramp structure on Abu Dhabi side, roadworks, dredging and land reclamation (400,000 m³).Length of bridge: 1.455 mBridge surface: 80,000 m²Height above ground: max. 35 mLargest span: 200 mSuperstructure: Box girderHeight of superstructure: approx. 3.50 m - 10.25 mFoundation: Concrete bored pilesPiers: Solid piers, V-piers (Unit 2)Bearings: pot bearings

Single spans:Unit 1: 8 x 55 mUnit 2: 110 m - 200 m - 135 m - 70 m - 45 mUnit 3: 50 m - 50.54 mUnit 4: 54.456 m - 55 m - 55 m - 45 m - 45 m - 55 m - 45 mUnit 5: 54.456 m - 55 m - 55 m - 45 m - 45 m - 55 m - 45 m

Width between railings:Unit 1: 3 superstructures with 18.50 mUnit 2: 3 superstructures with 18.50 mUnit 3: 1 superstructure with 27.40 m - 76.45 mUnit 4: 2 superstructures with 14.60 mUnit 5: 1 superstructure with 9.40 mUnit 6: 2 superstructures with 13.05 m

Different construction method: Unit 1: Incremental launching,Unit 2: Cantilevering and unit 3 - 6: Falsework

City/Country

Abu Dhabi / United Arab Emirates

Client

Tourism Development & Investment Co.(TDIC), Abu Dhabi

Contract Value

€ 112,11 Mio.

Construction Period

12/2006 - 12/2009 (36 months)

.