UKOOA Offshore Maintenance Management Workshop
Performance Standards Assurance in Shell UK Offshore Installations
Thurs 27th May 2004
Colin LeightonProject Lead
Shell Exploration & Production
Summary
A simple and transparent process to provide daily indication of the status of safety critical elements.
The performance standard assurance process is being implemented on Shell North Sea platforms. It uses the standard maintenance management functionality in SAP PM to capture the results of tests of safety critical element suitability, and track equipment defects that have the potential to impair the required functions.
It also enables real time status reports of compliance with performance standards.
2
Shell Exploration & Production
MAH
Identification
Performance Standards
SAP PM
Incorporate PS acceptance criteria into SAP PM routines.
Installation Team Monitor results, manage risk
Report results
On shore. Review trends and take corrective action
Revisions to Performance Standards
Equipment Performance Assurance – Linking Installation Risk and Integrity Management with risk mapping and Safety Case.
HSE/Safety Case
Assessment of Major
HazardsShort Term
Long Term
Integrity Management, Incorporating Performance Standards Assurance
Revisions to Hardware Design
Identification of Major Hazards
HAZID/HAZOP
3
Shell Exploration & Production
Basis of the process
1.Simple Performance Standards to document:
•The functionality required of safety critical equipment to meet the installation hazard analysis
•The performance to be measured and acceptance criteria required to demonstrate ongoing functionality.
• Simple equipment checks rather than design checks e.g. is it working rather than lumens output.
•Risk mitigation measures required when functionality is impaired.
2.
Maintenance and Inspection Routines in SAP PM which include:
•Electronic reference to the corresponding performance standard.
•Format to capture the Pass or Fail status of safety critical equipment as measured against the performance standard acceptance criteria.
4
Shell Exploration & Production
Risk Management
Area of reduced safety, (Increased risk) some barriers are not functional.When in this area PSAP lists remedial measures that need to be put in place to return to Green area
Safe OperatingEnvelope
Direction ofIncreasing Risk
•The Performance Standards maintains installation in the Green Zone. (Acceptable risk) •Not meeting Performance Standard results in increased risk thus moving the installation out of the Green Zone.•Risk Mitigation Measures brings the Platform back into the Green Zone 5
Shell Exploration & Production
Benefits of the approach
There are a number of benefits from the approach, these include:
•Awareness and knowledge
–Awareness and understanding by operations and maintenance personnel of performance standards and the functions required of safety critical equipment is increased
–Involvement of operations and maintenance personnel in the assessment of suitability achieves greater engagement with platform risk management.
•Safety Critical Element status visibility:
–Safety Critical Element suitability is indicated directly from SAP PM reports.
–The integrity status of the installation is more widely available.
✓
✓
✓
✓6
Shell Exploration & Production
Performance Standard structure
Risk Mitigation Text:Measurable Acceptance Criteria Text:
PS-E002
Risk Mitigation Text:Measurable Acceptance Criteria Text:
PS-E001 (Unique Ref)
Function: Text (Functional requirement of SCE)
Safety Critical Element Title
Goal: Text (High level goal consistent with hazards assessment.)
Maintenance, Inspection and Test results (Pass or Fail) are reported against the performance standard reference number.
The unique reference number in the performance standard is created in SAP PM asset register.
The Pass/Fail performance standard acceptance criteria is repeated in the SAP PM Maintenance work order.
7
Shell Exploration & Production
Performance Standard example – Fire and Gas Detection
Risk Mitigation Text:Heat DetectionPS-F001-05
Risk Mitigation Text:Alarm TestPS-F001-05
Risk Mitigation Text:Flame DetectionPS-F001-03
Risk Mitigation Text:H2S DetectionPS-F001-04
Risk Mitigation Text:Smoke DetectionPS-F001-02
Risk Mitigation Text:Aspirated Gas DetectionPS-F001-05
Risk Mitigation Text:Flammable Gas DetectionPS-F001-01
Function: Text (Functional requirement of SCE)
Safety Critical Element – Fire & Gas Detection
Goal: Text (High level goal consistent with hazards assessment.)
8
Shell Exploration & Production
Performance Standard Fire & Gas Test Results
0
20
40
60
80
100
120
140
Flam. G
as D
etSm
oke D
etFla
me Det
H2S D
etAlar
msHea
t Det
Aspira
ted G
as D
etOil M
ist Det
TR In
let -
Smok
e
Gas In
Serv
Wate
rTR
Inlet
- Fla
meTR
Inlet
- Gas
CO Det
TR In
let -
H2S
Test Type
Num
ber
of te
sts
PASSFAILFAF
Illustrative Data
9
Shell Exploration & Production
Performance Standard Fire & Gas Test Results
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Flam. G
as D
etSm
oke D
etFla
me Det
H2S D
etAlar
msHea
t Det
Aspira
ted G
as D
etOil M
ist Det
TR In
let -
Smok
e
Gas In
Serv
Wate
rTR
Inlet
- Fla
meTR
Inlet
- Gas
CO Det
TR In
let -
H2S
Test Type
Num
ber
of T
ests
PASSFAILFAF
10
Shell Exploration & Production
0
100
200
300
400
500
600
700
800
A B C D E F G H I J K L M N P
Installation
Num
ber
of T
ests
PASSFAILFAF
Performance Standard Test Results – All InstallationsInstallations
Data can be taken directly
from SAP PM in this format
11
Shell Exploration & Production
Performance Standard Test Results – All Installations
0%
20%
40%
60%
80%
100%
A B C D E F G H I J K L M N P
Installation
Num
ber
of T
ests
PASSFAILFAF
12
Shell Exploration & Production
Conclusions
•Process
–Visibility of the performance standard related work has increased.
–Test history of Safety Critical Elements has much greater visibility.
–SCE status has clarity
The implementation of the Performance Standard Assurance Process is as much about people as it is about processes, the observations so far are:
•People
–There are many more discussions around performance standards and safety critical equipment
–Conformance to the new process is gradual, however, non conformance is also very visible so feedback can be rapid and direct.
–This is a change in approach and some teams align quicker than others, but the simplicity caters for simple communications.
13