Shell HSSE Ariba Reporting Version 1 Sept 2018 Shell is standardising the collection of Contractor HSSE reporting within Australia. Contractors will be required to report this information through Ariba every month. Below is a list of frequently asked questions from Suppliers. Appendix 1 contains a list of Ariba reporting definitions and Appendix 2 provides a guide for logging into Ariba and submitting the survey. The data you submit in the survey will be reviewed by your Contract Holder. If your question is not answered in this document please refer to your Contract Holder. Frequently Asked Questions 1. Do we provide statistics for our whole company or just for this contract eg exposure hours? Refer to Appendix 1 Shell HSSE Ariba Reporting Definitions ‘Exposure Hours’. This is not for your whole Company and does not include hours not spent on Company premises eg for supply of materials to Curtis Island these hours begin at the Marine Operations Terminal, where delivered to Onshore Supply Base the exposure hours are only the time spent at the supply base completing delivery. 2. Some of the questions we are unable to answer eg electricity consumption at supply base Yes this only applies if you operate a supply base for QGC, please leave blank or if required to submit enter N/A or 0. 3. What time period is this for? This is a monthly survey, each survey is for the previous calendar month. Surveys must be completed by the 7 th day of the month. Surveys will be locked after 21 days. 4. Do we need to complete Section 2 ‘Adopt the Applicable HSSE Performance’ questions? All questions under Section 2 ‘Adopt the Applicable HSSE Performance’ are Scope dependent, if you are unsure if these questions apply to your Scope contact your Contract Holder. If not required, please leave blank or if required to submit enter N/A or 0. 4.1. We currently use Shell vehicles on site, i.e. we do not use our own vehicles. How do you want us to respond for these components? In this circumstance this question does not apply. Please leave blank or if required to submit enter N/A or 0. 4.2. Some of the questions we are unable to answer eg electricity consumption at supply base This question only applies if you operate a supply base for QGC, please leave blank or if required to submit enter N/A or 0. 5. Is this going to be a regular submission for Shell (or a one-off)? This is a monthly survey for the rest of the Contract Term. 6. Question 2.1.1 requires an attachment for IVMS report, is there a specific format for this?

Upload: others

Post on 03-Feb-2022

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Shell HSSE Ariba Reporting

Shell HSSE Ariba Reporting

Version 1 Sept 2018

Shell is standardising the collection of Contractor HSSE reporting within Australia. Contractors will be

required to report this information through Ariba every month. Below is a list of frequently asked

questions from Suppliers. Appendix 1 contains a list of Ariba reporting definitions and Appendix 2

provides a guide for logging into Ariba and submitting the survey.

The data you submit in the survey will be reviewed by your Contract Holder. If your question is not

answered in this document please refer to your Contract Holder.

Frequently Asked Questions

1. Do we provide statistics for our whole company or just for this contract eg exposure hours? Refer to Appendix 1 Shell HSSE Ariba Reporting Definitions ‘Exposure Hours’. This is not for your whole Company and does not include hours not spent on Company premises eg for supply of materials to Curtis Island these hours begin at the Marine Operations Terminal, where delivered to Onshore Supply Base the exposure hours are only the time spent at the supply base completing delivery.

2. Some of the questions we are unable to answer eg electricity consumption at supply base Yes this only applies if you operate a supply base for QGC, please leave blank or if required to submit enter N/A or 0.

3. What time period is this for? This is a monthly survey, each survey is for the previous calendar month. Surveys must be completed by the 7th day of the month. Surveys will be locked after 21 days.

4. Do we need to complete Section 2 ‘Adopt the Applicable HSSE Performance’ questions? All questions under Section 2 ‘Adopt the Applicable HSSE Performance’ are Scope dependent, if you are unsure if these questions apply to your Scope contact your Contract Holder. If not required, please leave blank or if required to submit enter N/A or 0.

4.1. We currently use Shell vehicles on site, i.e. we do not use our own vehicles. How do you

want us to respond for these components? In this circumstance this question does not apply. Please leave blank or if required to submit enter N/A or 0.

4.2. Some of the questions we are unable to answer eg electricity consumption at supply base

This question only applies if you operate a supply base for QGC, please leave blank or if required to submit enter N/A or 0.

5. Is this going to be a regular submission for Shell (or a one-off)? This is a monthly survey for the rest of the Contract Term.

6. Question 2.1.1 requires an attachment for IVMS report, is there a specific format for this?

Page 2: Shell HSSE Ariba Reporting

Shell HSSE Ariba Reporting

Version 1 Sept 2018

Yes, please refer to Appendix 1, this must be as per Safer Together IVMS specification Appendix A for Monthly reporting. https://www.safertogether.com.au/resources/downloads/lt-ivms-standard.

7. We are a direct and sub-contractor to Shell, should we include our sub-contract statistics? No report only those statistics for your direct contract, your sub-contract hours will be captured under the direct contract reporting.

8. We supply more than one Shell Asset eg QGC Upstream and Midstream, do we combine the statistics?

Please refer to the title of the survey, unless this refers to a specific Shell asset in the title please combine all reporting.

9. We have more than one procurement contract with Shell in Australia, do we combine or enter these statistics separately? Please refer to the title of the survey, unless this refers to a specific contract in the title please combine all reporting.

Page 3: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Term Units Definition

% HV fleet overdue for routine

maintenance Percentage

Number of HVs under the contract overdue for routine maintenance, reported as a percentage of total LV

fleet under the contract.

% LV fleet overdue for routine

maintenance Percentage

Number of LVs under the contract overdue for routine maintenance, reported as a percentage of total LV

fleet under the contract.

% of Heavy Vehicle fleet compliant

with QGC requirements Percentage

Number of HVs under the contract not fully compliant with Appendix 1 of the Safer Together Heavy Vehicle

Specification, reported as a percentage of total HV fleet under the contract.

% of HV drivers with current

training completed to plan Percentage

Number of HV drivers under the contract who have completed all required training as per the Safer

Together Heavy Vehicle Specification, as a percentage of total HV drivers under the contract.

% of Light Vehicle fleet compliant

with QGC requirements Percentage

Number of LVs under the contract not fully compliant with Section 3 of the Safer Together Light Vehicle

Specification, reported as a percentage of total LV fleet under the contract.

% of LV drivers who have

completed defensive driver training Percentage

Number of LV drivers under the contract who have completed defensive driver training, as a percentage of

total LV drivers under the contract.

Access - Land Access Breach Number Through investigation it was determined that the Contractor did not comply with requirements identified in the LAARs access permit

Air Transport - Severe Safety Incident

Number Total Air Incidents including air transport facilities that result in fatality, injury, or damage to Assets with an Actual RAM3+ from aircraft flown.

Alcohol tests conducted over the reporting period

Number Alcohol tests conducted over the reporting period

Asset Damage Number An Asset is defined as a discrete element of a Business that has a monetary value. Assets include physical plant and equipment. Asset damage means the asset is required to be repaired or replaced and there is a cost implication. Assets

Drug tests conducted over the reporting period

Number Drug tests conducted over the reporting period

Page 4: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Exposure Hours hours

All hours worked by Contractor employees on Company premises and on other premises where Company management controls are in place. For vessels calculate Exposure hours on the basis of 24 hours per day in accordance with the Oil Companies International Marine Forum (OCIMF) Marine Injury Reporting Guidelines. On offshore installations and remote base camps, calculate Exposure Hours on the normal basis.

Fatality (FAT) number

Total deaths resulting from a work-related injury or occupational illnesses. Exclude: - Fatalities that are Non-Accidental Deaths; - Fatalities due to occupational illnesses that occur after employees or contractors are no longer in the service of the Company.

First Aid Case (FAC) number

Total injuries resulting in first aid case (FAC). FAC occurs when the injured contractor requires treatment using one or more of the below treatments: - Using a non-prescription medication at non-prescription strength; - Giving tetanus immunisations; - Cleaning, flushing or soaking wounds on the surface of the skin; - Using wound covering such as bandage, Band-AidTM; or gauze pad or using butterfly bandage or Steri-StripsTM ; - Using hot or cold therapy; - Using any non-rigid means of support, such as elastic bandages, wraps, non-rigid back belts, etc.; - Using temporary immobilisation devices such as splints, slings, neck collars or back boards while transporting the victims; - Drilling a fingernail or toenail to relieve pressure, or draining fluid from a blister; - Using eye patches; - Removing foreign bodies from the eye using irrigation or cotton swab; - Removing splinters or foreign material from areas other than the eye by irrigations, tweezers, cotton swab or other simple means; - Using finger guards; - Using massages; or - Drink fluid for the release of heat stress.

Harsh braking events/100 000km Number

Number of harsh braking events recorded by drivers under the contract per 100 000km driven under the

contract.

Hazard Observations/Intervention Reported

Number Total Hazard Observations/Intervention reported. Hazard Observations/Intervention Card is used to report any unplanned observations of an unsafe act or condition or positive behaviour.

Page 5: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Heavy Vehicle: NHVR Fatigue

Breaches Number

Number of instances of drivers exceeding their NHVR hours (Standard, Basic or Advanced) while

performing work for Shell Australia/QGC.

High Potential Incident (HPI) number

Total of high potential incident (HPI). HPI is an incident for which the potential Consequences are assessed as RAM severity of 4 or 5. A HPI can result from actual impact on people, asset, community and/or environment or from a Near Miss. Note Unsafe Conditions and Acts are excluded as they are not “Incidents”.

IVMS (In-Vehicle Monitoring

System)

File

Attachment

Driving performance data reported as per Safer Together IVMS specification Appendix A for Monthly

reporting. https://www.safertogether.com.au/resources/downloads/lt-ivms-standard

Kilometres (KMs) Driven Number Total number of kilometres driven for Shell Australia / QGC.

Kilometres Driven - Heavy Vehicle Kms Kms driven in heavy vehicles while undertaking work for Shell Australia/QGC

Kilometres Driven - Light Vehicle Kms Kms driven in light vehicles while undertaking work for Shell Australia/QGC

Life Saving Rule Breaches Number Breaches of the 12 Life Saving Rule (note these must be reported immediately to Company Representative);

Page 6: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Lost Time Case (LWC) number Total injuries resulting in a lost workday case (LWC). LWC occurs when the injured contractor experiences day away from work beyond the day of injury, or days away are prescribed by a physician or licensed health care practitioner.

Management Visits/Tours

Number Number of Management Visits to Company Work Site.

Page 7: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Medical Treatment Case (MTC) number

Total injuries resulting in a medical treatment case (MTC). MTC occurs when the injured contractor requires management and care as a patient to combat a disease or disorder. Medical Treatment excludes visit to physician or Licensed Health Care Professional solely for observation or counselling, diagnosis procedure (e.g. X-rays, blood tests, prescriptions used solely for diagnostic purposes) and First Aid.

Minor Motor Vehicle Incident

(MiMVI) Number

Total Minor Motor Vehicle Incidents resulting in first aid cases or property damage (excluding rollovers).

Near Miss (NM) Number An Incident that could have caused illness/injury to people, or damage to assets, damage to environment, and/or effect the community, but did not (i.e. energy was released and no actual consequence).

Person on Board Number Average number of personnel per day on site, under this contract over the reporting period

Positive Alcohol Tests Number Positive Alcohol Tests

Positive Drug Tests Number Positive Drug Tests

Reporting Period Previous calendar month.

Restricted Work Case (RWC) number

Total injuries resulting in a restricted work day case (RWC). RWC occurs when an injured contractor Is kept from performing one or more routine job function – activities the contractor performs at least once per week; is kept from working a full day – not including the day of injury/illness onset, a physician or licensed health care professional recommends either above; or When the injured contractor is assigned to job other than their normal job for part of the day.

Severe Motor Vehicle Incident

(Severe MVI)

Number Total Severe Motor Vehicle Incidents from collision and rollover that result in fatality, LWC, RWC aor MTC

injury.

Supply Base - Electricity Consumption

mwh Supply Base - Electricity Consumption

Supply Base - Water Consumption m3 Supply Base - Water Consumption

Total Recordable Case (TRC) number Total injuries resulting in a fatality, lost workday case (LWC), restricted work case (RWC) or medical treatment case (MTC).

Page 8: Shell HSSE Ariba Reporting

Appendix 1: Shell HSSE Ariba Reporting Definitions

Version 1 Sept 2018

Total Recordable Occupational Illnesses (TROI)

number Total recordable occupational illnesses (TROI). An illness is an abnormal condition or disorder other than one resulting from injury. TROI include acute and chronic illnesses caused by or contributed by exposure to environment factors associated with employment.

Water Transport - Severe Safety Incident

Number

Total Water Incidents resulting in a collision, allision or grounding resulting in damage to Asset with an Actual RAM3+. Collision is defined as an incident that involves a vessel while in transit, coming in contact with a moving object. Allision is defined as an incident that involves a vessel while in transit coming in contact with stationary object. Grounding is defined as an incident when the vessel makes contact with the seabed or bottom of a canal/shipping channel.

Workforce retention Number Number of workers leaving the contract through natural attrition.

Page 9: Shell HSSE Ariba Reporting

Copyright of Shell International

Completing Australia HSSE Supplier Performance Management (SPM) Survey – Quick Reference Guide

Apr 2018

Appendix 2

Page 10: Shell HSSE Ariba Reporting

Copyright of Shell International

SPM Overview

Page 11: Shell HSSE Ariba Reporting

Copyright of Shell International

1. What is the Shell Supplier Performance Management Survey?

• Shell will implement the Ariba Supplier Performance Management tool to monitor

and manage supplier HSSE performance.

• Shell will grant supplier users access to the Ariba network.

• Shell CP Lead will invite supplier users via email to answer survey questions about

supplier HSSE performance on a recurring basis.

Page 12: Shell HSSE Ariba Reporting

Copyright of Shell International

One-time Activity : Complete Your Account Registration

Page 13: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Receive an email from Ariba Administrator with subject “Your Ariba Login Information”

Click on “Click here” to register on the Ariba Network and access your account

Page 14: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Click on “Sign up”

Page 15: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Populate the fields and set a new password

Page 16: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Tick on checkbox and click “Submit”

Page 17: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Enter your username (in email format)and password

Page 18: Shell HSSE Ariba Reporting

Copyright of Shell International

1. First-time Logging Into The Ariba Network Your Access Registration Is Now Completed

Page 19: Shell HSSE Ariba Reporting

Copyright of Shell International

Recurring Activity : Complete Australia HSSE Supplier Performance Management (SPM) Survey

Page 20: Shell HSSE Ariba Reporting

Copyright of Shell International

1. Open email with subject “Shell Contracting & Procurement…”

Page 21: Shell HSSE Ariba Reporting

Copyright of Shell International

2. “Click Here” to access the HSSE Survey

Page 22: Shell HSSE Ariba Reporting

Copyright of Shell International

3. Enter Your Login Name and Password

Page 23: Shell HSSE Ariba Reporting

Copyright of Shell International

4. Fill Out Mandatory HSSE Performance Fields (denoted by an *)

Page 24: Shell HSSE Ariba Reporting

Copyright of Shell International

5. Fill Out Mandatory HSSE Performance Fields (denoted by an *)

Page 25: Shell HSSE Ariba Reporting

Copyright of Shell International

6. Fill Out Optional HSSE Performance Fields (without an *)

Page 26: Shell HSSE Ariba Reporting

Copyright of Shell International

7. Submit Entire Response

Page 27: Shell HSSE Ariba Reporting

Copyright of Shell International

8. Click “OK” To Submit

Page 28: Shell HSSE Ariba Reporting

Copyright of Shell International

9. Logout

Page 29: Shell HSSE Ariba Reporting

Copyright of Shell International

10. User Has Logged Out

Page 30: Shell HSSE Ariba Reporting