  • 8/9/2019 SHI3- Defect List of One Year Inspection

    1/41

    Form:

    Valid date:

    Inspected by:

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Aluminum door & accessories

    Location: Office Area

    Comment: Wooden skirting broken

    Method Reinstall

    Start:

    Item: One year Inspection

    Detail

    Sumitomo Mitsui Construction Co., Ltd

    Project: SHI3 FACTORY

    Location: M2-M3 Thang Long Industrial Park

    DEFECT LIST

    or&accessories

    Finish:

    Done by: Sumitomo Mitsui Construction Co.,ltd

    Result:

    Location: All Door Stoppers

    Comment: Wrong location, screw loosen

    Method Reinstall

    Start:

    Finish:

    Done by: Sumitomo Mitsui Construction Co.,ltd

    Result:

    Alu

    minumdo

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    2/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: All aluminum doors

    Comment: Door closer, alu frame broken

    Method Reinforcement alu frame and closer

    Start:

    Finish:

    Done by: Sumitomo Mitsui Construction Co.,ltd

    Result:

    Location: Meeting room - door

    Comment: Unnecessary stopper

    Method Take out

    Start:

    Finish:

    Done by: Sumitomo Mitsui Construction Co.,ltd

    Result:

    Location: Tool room 2- Door stopper

    Comment: Wrong location, screw loosen

    Method Reinstall

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    3/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Aluminum doors

    Comment: Door closer, alu frame broken

    Method Chang new one

    Start:

    Finish:

    Done by:

    Result:

    Location: 3D measuring room

    Comment: Door lock loosen

    Method Reinstall

    Start:

    Finish:

    Done by:

    Result:

    Steel door, shutter, gate& accessories

    - Check and repair all shutter door switch. Install

    additional steel pillar for protectiing from strongwind.

    - Check & repair and paint the steel doors.

    - Gate : Cutting concrete, change stronger motor

    (bigger capacity), change switchs.

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    4/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Shutter doors

    Comment: Switch box broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Shutter doors

    Comment: Paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Heat treatment-shutter door 8m

    Comment: Guide rail broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    5/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Die cast area

    Comment: Paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Compressor room

    no picture

    Comment: Paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Compressor room

    Comment: Paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    no picture

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    6/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Main gate

    Comment: Dangerous switch and small motor

    Method Chang new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Main gate frame

    Comment: Rust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    7/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Toillet 2

    Gypsum board ceiling and gypsum wall

    - To repair area broken

    - All gypsum board and wall must be repainted

    - Toillet door broken must be repaired

    Comment: Ceiling paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Grid Y1

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    8/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Tool room

    Comment: Crack

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: shutter door X6

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: shutter door

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish: 14th May 2009

    Done by: Sumitomo Mitsui Construction Co.,ltd

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    9/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Heat treatment area

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: 3D measuring room

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Heat treatment area

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    10/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Shipment room

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Shipment room

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Shipment room

    Comment: Gypsum wall broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    11/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Guard house -Ceiling

    Comment: Paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Grid Y21

    Comment: Groove broken

    Method Repair

    Start: .

    Finish: .

    Done by:

    Result:

    Location: Toilet 1

    Comment: Door broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    12/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Toilet 2

    Comment: Door broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Masonary work and tiling work

    Location: Canteen- Washing basin

    Comment: Tiling broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    - rea ro en must e repa re

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    13/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Entrance area

    Comment: Skirting tile broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Heat treament area

    Comment: Unnecessary steel

    Method Taking out

    Start:

    Finish:

    Done by:

    Result:

    Location: Factory- Washing basin

    Comment: Tiling broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    14/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Factory- Washing basin

    Comment: Tiling broken - Granite stone

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Factory- Washing basin

    Comment: Tiling broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Corridor to bikeshed

    Comment: Brick around column base broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    15/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Waste water treatment room

    Comment: Tank cover broken

    Method New concrete

    Start:

    Finish:

    Done by:

    Result:

    Location: Main gate

    Comment: Concrete surface broken

    Method Taking out and new concrete

    Start:

    Finish:

    Done by:

    Result:

    Location: X1 wall

    Comment: Crack

    Method Make groove

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    16/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: X1 wall

    Comment: Crack

    Method Make groove

    Start:

    Finish:

    Done by:

    Result:

    Location: PC columns and wall

    Comment: Crack happened

    MethodCutting and caulking,

    installation angle bar

    Start:

    Finish:

    Done by:

    Result:

    Emulsion paint and epoxy paint work

    - All brick wall must be repaired and repainted

    (Outside and outsite)- Broken epoxy area must be repaird and repainted

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    17/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Guard house

    Comment: Paint broekn on wall

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Main gate area

    Comment: Paint broken on brick wall

    Method Apply party and paint

    Start:

    Finish:

    Done by:

    Result:

    Location: Locker room

    Comment: External paint broken

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    18/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: 3D measuring room

    Comment: Dirty wall

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Canteen area

    Comment: Paint on electric panel

    Method Cleaning

    Start:

    Finish:

    Done by:

    Result:

    Location: Grid X1-X2,Y16-Y17

    Comment: Epoxy paint broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    19/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Grid X1-X2,Y16-Y17

    Comment: Concrete surface broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Road work, drainage system and landscape work

    Location: Guard house walkway

    Comment: Tiling broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    - ro en asp a t roa area an water stagnate area

    must be repaired

    - Manhole cover broken must be replaced

    - Big manhole cover must be divided to several

    small ones

    - Broken walkway paving block must be repaired

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    20/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Guard house walkway

    Comment: Paving block broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Walkway

    Comment: Motar broken

    Method Repair

    Start:

    Finish:

    Done by:

    Result:

    Location: Corridor to bikeshed

    Comment: Stagnate water on asphalt road

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    21/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Asphalt road - Scrap room

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - X6+

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - Cooling tower

    Comment: Asphalt level is bad

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    22/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Asphalt road - X6+

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - Front side

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - X6+

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    23/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Asphalt road - Backside

    Comment: Stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - X6+

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Asphalt road - Oil storage

    Comment: Stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    24/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Asphalt road - Diecast area

    Comment: Asphalt broken

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

    Location: Ashalt road - Transformer room

    Comment: Stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

    Location: Ashalt road - Transformer room

    Comment: Stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    25/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Ashalt road - Compressor room

    Comment: Stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

    Location: Canteen area

    Comment: Stagnate water

    Method Repairing and repainting wall

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment: Edge and cover broken

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    26/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Curb work

    Comment: Curb broken

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment: Manhole cover very heavy

    Method Divide into several parts

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment:Manhole edge broken and

    manhole cover very heavy

    Method Repairing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    27/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Drainage system

    Comment: Edge and cover broken

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment: Cover broken

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Manholes

    Comment: Cover broken

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    28/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Manholes

    Comment: Cover rust

    Method Change new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment: Hole on concrete pipe

    Method Plastering

    Start:

    Finish:

    Done by:

    Result:

    Location: Drainage system

    Comment: Manhole cover broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    29/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Entrance area

    Comment: stagnate water

    Method Repairing asphalt road

    Start:

    Finish:

    Done by:

    Result:

    Steel structure work

    Location: Canopy support

    Comment: Rust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    - e a t on c ps on t e roo must e nsta e

    completely.

    - The leakage location must be repaired

    - The rust steel structures must be repainted

    - The broken fiber glass insulation must be replaced

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    30/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Grid X1

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Diecast area

    Comment: Flasing broken

    Method Reinstall

    Start:

    Finish:

    Done by:

    Result:

    Location: Compressor room

    Comment:Water lackage &

    Fiber glass insulation broken

    Method Repairing& replace new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    31/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Compressor room

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Grid X6

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Roof monitor

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    32/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Grid X6

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Grid X6

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Shutter door 8m

    Comment: Waste piece

    Method Taking out

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    33/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Backside canopy

    Comment: Bracing rod slack

    Method Make it stra ight

    Start:

    Finish:

    Done by:

    Result:

    Location: Main gate

    Comment: Soil not plan

    Method Backfilling and leveling

    Start:

    Finish:

    Done by:

    Result:

    Location: Heat treatment area

    Comment: Fiber glass insulation broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    34/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Corridor to bikeshed

    Comment: Water leakage from downspout and gutter

    Method Reintall

    Start:

    Finish:

    Done by:

    Result:

    Location: Corridor to bikeshed

    Comment: Water leakage

    Method Reinstall flashings and sealant

    Start:

    Finish:

    Done by:

    Result:

    Location: Bike shed

    Comment: downspout broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    35/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Canopy

    Comment: Unneccessary wire

    Method Taking out

    Start:

    Finish:

    Done by:

    Result:

    Others

    Location: Heat treatment area

    Comment: Checker plate curved

    Method

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    36/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Shutter doors

    Comment: Angle bar dust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Floor expansion joint

    Comment: Sealant broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Bike shed

    Comment: Handrail steel rust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    37/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: All PC columns

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    38/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Comment: Crack between PC columns and wall

    Method Cutting, caulking, installation angle bar

    Start:

    Finish:

    Done by:

    Result:

    Location: Shutter door at corridor

    Comment: Gypsum board broken

    Method Replace new one

    Start:

    Finish:

    Done by:

    Result:

    Location: Energie area

    Comment: Steel net fence rust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    39/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Steel ladder up to roof

    Comment: Steel rust

    Method Repaint ing

    Start:

    Finish:

    Done by:

    Result:

    Location: Crack on concrete floor

    Comment: Wrong location of Joint

    Method Repair crack and make new joint

    Start:

    Finish:

    Done by:

    Result:

    Location: Crack on concrete floor

    Comment: Wrong location of Joint

    Method Repair crack and make new joint

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    40/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Canteen - Kitchen area

    Comment: Stainess grating broken

    Method Repair and reinstal l

    Start:

    Finish:

    Done by:

    Result:

    Location: Crack on concrete floor

    Comment: Wrong location of Joint

    Method Repair crack and make new joint

    Start:

    Finish:

    Done by:

    Result:

    Location: Crack on concrete floor

    Comment: Wrong location of Joint

    Method Repair crack and make new joint

    Start:

    Finish:

    Done by:

    Result:

  • 8/9/2019 SHI3- Defect List of One Year Inspection

    41/41

    Date of inspection: Jul 23th 2010

    Time of inspection: 9h30-11h30

    Picture Afer repairing

    Item: One year Inspection

    Detail

    DEFECT LIST

    Location: Corridor to bikeshed

    Comment: Water leakage

    Method Reinstall f lashings

    Start:

    Finish:

    Done by:

    Result: