shippers’ meeting - grtgaz · shippers meeting – 2015.01.29 important maintenances in 2014...

81
Shippers meeting 2015.01.29 Shippers’ Meeting Works January 29 th , 2015 1

Upload: others

Post on 13-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Shippers’ Meeting

Works

January 29th, 2015

1

Page 2: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

1.Overview 2014

2.North to South link availability and

visibility

3.2015 maintenance schedule

12:00 Cocktail lunch

2

Agenda

Page 3: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Overview 2014

3

Aurore Blot

[email protected]

Page 4: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Important Maintenances in 2014

Minimizing the impact of maintenance

A reliable maintenance schedule

About maintenance publication

4

Agenda

Page 5: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

2

3

1

Montoir

Dunkirk

Taisnières

Obergailbach

Oltingue

Fos

5

Important maintenances in 2014

• transit from North to South zone

• take away gas from North PIRs

• evacuate gas from Fos / supply South zone

• Taisnières H counting system

• Cuvilly interconnection

• Voisines compressor counting system

• Plateau du Vexin pipe

• Nord-Est pipe

2 major piggings

3 major repairs

3 major upgrades

Page 6: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

How?

When?

Why?

Where?

GRTgaz sometimes release capacity

As soon as GRTgaz has the information

Pipe inspection and repair

Obergailbach in August

Project planning update

Dunkirk in May

Flow configuration

(Terminal flow schedule)

North-to-South link

6

Minimizing the impact of maintenance

Page 7: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 7

A reliable maintenance schedule

Rate of firm variation capacity

February publication –VS – capacity effectively proposed

Target : 0%

A more and more reliable maintenance planification

2007 2008 2009 2010 2011 2012 2013 2014

12,3%

2,4% 2,4% 2,3%

3,5%

2,7%

1,2%

2,3%

Page 9: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

D-1 Jan. 1st of March Aug.

9S

About maintenance publication

Maintenance

Schedule Consolidated Update Guidelines

Shippers B2B Meetings

Shippers’ Meeting

Restriction updates TRANS@ctions

First Publication

WD-5 D-60 Nov.

Adjacent

Operator Consultation

Page 10: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Overview 2014

10

Aurore Blot

[email protected]

Thank you for your attention.

Page 11: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

The North to South Link Availability

2014 vs 2013

Jean-Damien LENOIR / DSG

11

Page 12: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Reminder : The North to South Capacity

One global physical capacity

depending on :

- Supply scenario

- Consumptions

- Works and maintenance

2 contractual points :

Split into

N>S link

North Atlantic storage

(in injection) = INA

12

Page 13: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

One of the priorities of the Gas System Division

North to South link availability optimisation

Study

Challenging the limits of the network

Developping optimization tools

Works Planification

Methodology

Coordination with adjacent operators

Organization

Operationnal

Maximising hourly flows on the N>S pipes

13

Page 14: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

14

Increase of the North to South link availability compared to Summer 2013

Average daily

available capacity F + I (GWh/d)

Summer

2013

Summer

2014

Delta

GWh/d %

N>S + INA 492

517 +25 +5%

N>S + INA (inc. Montoir 2013)

539 +47 +10%

JTS : + 11 GWh/d (2014 / 2013)

Page 15: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

The North to South Link Visibility

Flashback on Summer 2014

Forecast on Summer 2015

15

Page 16: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

16

What will be the value of the CTE on the N>S link during maintenance?

CMXTt 2014 = 95 TWh

Annual uncertainty range = 43 TWh

=> A difficulty for you to optimize your supply chain

CMNTt 2014 = 52 TWh

Page 17: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

3 North PIRs

high and balanced

Oltingue

low

Injection

2013

Fos « standard »

Montoir

= 0

PIR Midi

high

Link N>S

high

Provide the best forecast of the CTE on the N>S link in summer

Reminder of GRTgaz proposal (Concertation gaz - July 2013)

Shipper Survey

Mid-approval

scenario

Forecast of the daily N>S link Capacity

17

Page 18: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

18

Summer 2014 : forecast vs actual figures

Page 19: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

19

Summer 2014 : forecast vs actual figures

Average accuracy = +10%

Page 20: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

20

Summer 2014 : forecast vs actual figures

Page 21: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

21

The mid-scenario for summer 2015

3 North PIRs

balanced

Oltingue low

Injection

2014

Fos « standard »

PIR Midi

high

Link N>S

high

New : 2 supply scenarios

for Montoir

1. 0 GWh/d 2. 80 GWh/d

Page 22: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Summer 2015 forecasts

Increase of the forecasted capacity during Summer 2015 versus Summer 2014 : +11 TWh / +11%

22

Page 23: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

23

Key points

Reminder of GRTgaz contractual commitments:

The forecast of the CTE is an indicative value.

Only the CMNTt is a contractual value.

Distribution between the N>S link and the North Atlantic

storage facility based on the mean value observed over the

period 2013/2015 :

65% N>S link / 35% North Atlantic storage (injection)

Potential evolving process in case of significant and

sustainable change of the supply scheme (increase in LNG

for example)

Published specifically, simultaneously with the maintenance

schedule.

Page 24: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 24

Thank you for your attention

Any Questions....

Page 25: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Maintenance schedule 2015

25

Page 26: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 26

Sophie MENARD

Olivier PICHAYROU

Pascal FONROUGE

Fabrice CONQUES

Page 27: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

1. GRTgaz keep his objectives

2. New projects, more capacities

3. Major maintenances

4. Few maintenances postponed in 2016

5. Summer capacity availability : 2015 vs 2014

6. Available capacity in details

27

Agenda

Page 28: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 28

GRTgaz keep his objectives

Page 29: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Optimize its works schedule in cooperation

with all the adjacent operators

Manage the network safely

Maximize North to South link capacities

Plan main works between mid-April to

mid-October

Publish a reliable maintenance schedule

29

5 main objectives

Page 30: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 30

New projects, more

capacities

Page 31: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 31

Projects linked with Dunkirk LNG terminal

Hauts de France II pipe, a new entry pipe to our network

Clipon pipe, terminal

outlet

Flandres pipe, outlet to Belgium

Start of

DK LNG

01/11/2015

Relocation of odorization station

from Loon to Pitgam +

modification of Pitgam interconnexion

Page 32: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 32

Projects linked with Arc de Dierrey

New interconnexion at Cuvilly station

Modification of Dierrey interconnexion

Arc de Dierrey

Implementation of Arc de

Dierrey pipe on 01/11/2015

Page 33: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 33

Major maintenances

Page 34: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 34

Pigging and pipe repairs that impacted flows

34

1

• Hauts de France I pipe - April

2 • Centre pipe - April

3 • Berry pipe - May

4

• Hauts de France II pipe - August

Installation approval

Regulatory pigging

Page 35: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 35

And other important works …

Plateaux du Vexin pipe repairs

Taisnières H automatic machine updates

Nord Est pipe repairs

Marches du Nord Est pipe repairs

Rhône pipe repairs

Cruzy interconnexion maintenance

Vendomois pipe repairs

Page 36: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 36

Week 37 : North to South optimisation

NS + INA + ISA

DK +

TSN

TSN

Fos TIGF deliveries

Page 37: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 37

Focus on Hauts de France pipe

Loon

Pitgam

Cuvilly

11 km

174 km

Page 38: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

HdF I pigging

[ 440 GWh/d ; 515 GWh/d] HdF I pipe repairs

(between Loon – Pitgam) 70 GWh

38

Focus on Hauts de France pipe

HdF I pipe repairs (between Pitgam - Cuvilly) Ø restriction

Results

Page 39: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 39

Wk 25 - 28 : Hauts de France pipe repairs

Situation in 2014

Page 40: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 40

Wk 25 - 28 : Hauts de France pipe repairs

Situation in 2015

Page 41: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 41

Wk 25 - 28 : Hauts de France pipe repairs

Situation in 2015

with 70

GWh

Page 42: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 42

Few maintenances

postponed in 2016

Page 43: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 43

Maintenances with high restrictions

in 2015 ...

... Postponed in 2016 to have the

benefit of Arc de Dierrey capacities

Page 44: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 44

Extension of works in 2016

Pipe repairs period

shortened in 2015

Inspection and repairs postponed

in 2016

Page 45: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 45

Summer capacities

availability:

2014 vs 2015

Page 46: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 46

Comparison summer period 2014 vs 2015 Entry/Exit firm capacities at interconnection points

Available firm capacities during Summer (TWh)

Tendency

2014 2015

Dunkerque REC 107 103 -4%

Taisnières H REC 110 105 -5%

Obergailbach REC 83 96 +15%

Total 300 304 +1%

Oltingue DEL 44 45 +1%

Taisnières B REC 42 47 +12%

Page 47: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 47

Comparison summer period 2014 vs 2015 North to South link firm capacity

Available firm capacities during Summer

(TWh) Tendency

2014 2015

North to South link 52 54 +3%

Capacity maximum : 56.7 TWh

2013

40 TWh

Page 48: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 48

Comparison summer period 2014 vs 2015 Injection capacities in storages

Available firm capacities during Summer

(TWh) Tendency

2014 2015

North B DEL 24 23 -3% North-East DEL 47 47 0% North-West DEL 38 44 +15% South-East DEL 23 25 +5%

South-Atlantique DEL 43 39 -8%

North-Atlantique DEL 33 34 +2%

Total 207 211 1%

2013

149 TWh

Page 49: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 49

Comparison summer period 2014 vs 2015 Capacity emission from LNG terminals

Available Capacities during Summer

(TWh)

Tendency

2014 2015

Montoir 75 76 +1%

Fos 77 75 -2%

Total 152 150 -1%

Page 50: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 50

Available capacities

in details

Page 51: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 51

Interconnection points with

other countries .1

Page 52: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 52

Dunkirk PIR

0

100

200

300

400

500

600

Minimum Maximum

Loon stop during open hours Coordination with

GASSCO Loon stop

Hauts de France I pipe repairs 4 weeks at 70 GWh/d

Hauts de France I pipe pigging Restrictions refine with run details

Plateaux du Vexin

pipe repairs + 2nd Loon stop with

Cuvilly and

Fontenay station maintenance

Nord 2 pipe repairs postponed in 2016 Benefits : +140 GWh/d during 3 weeks

Page 53: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 53

Taisnières H PIR

0

100

200

300

400

500

600

700

Minimum Maximum

Valves tests on

EKO pipe

Taisnières H

station works

Taisnières H

compressor

automatic updates

Page 54: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 54

Obergailbach PIR

0

100

200

300

400

500

600

700

Minimum Maximum

Nord Est pipe repair

Maintenances on Voisines and Nord Est pipe valves

Works on Dierrey station for the

connection with Arc de Dierrey pipe

Page 55: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 55

Oltingue PIR

0

50

100

150

200

250

Minimum Maximum

Annual

maintenance

at Oltingue + Laneuvelotte

station works

Page 56: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 56

Taisnières B PIR

0

50

100

150

200

250

Minimum Maximum

Artois Est II pipe

repair Taisnières B

compressor works

Works on Taisnières B valves

Page 57: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 57

North to South link

.2

Page 58: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 58

North to South link – Firm capacity

0

50

100

150

200

250

300

Minimum Maximum

Berry and IDF pipe

repairs + Evry

station

maintenances

Plateaux du Vexin,

Vendomois pipe

repairs + Cherré station

maintenances

Page 59: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 59

Interconnection points with

storages .3

Page 60: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

20

40

60

80

100

120

140

160

180

0%

20%

40%

60%

80%

100%

Storengy availability (%) GRTgaz capacity (GWh/d)

60

North Atlantic PITS C

ap

acity

GW

h/d

A

va

ilib

ilit

y in

%

Safety works on Chémery Principal

+ maintenance station Céré

Berry and IDF pipe repairs + Evry station maintenances

Plateaux du Vexin, Vendomois pipe repairs + Cherré station maintenances

COORDINATION

Maintenance on Céré station

Page 61: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

50

100

150

200

0%

20%

40%

60%

80%

100%

01/04/2015 01/05/2015 01/06/2015 01/07/2015 01/08/2015 01/09/2015 01/10/2015

Storengy availability (%) GRTgaz capacity (GWh/d)

61

North West PITS C

ap

acity

GW

h/d

A

va

ilib

ilit

y in

%

COORDINATION COORDINATION

Saint Illiers maintenances

Valves tests on St Illiers outlet

Saint Illiers maintenances

Plateaux du vexin pipe repairs

Page 62: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

50

100

150

200

0%

20%

40%

60%

80%

100%

01/04/2015 01/05/2015 01/06/2015 01/07/2015 01/08/2015 01/09/2015 01/10/2015

Storengy availability (%) GRTgaz capacity (GWh/d)

62

North East PITS

Ca

pa

city G

Wh

/d A

va

ilib

ilit

y in

%

Valve maintenances on

Cerville outlet

COORDINATION

Page 63: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

50

100

150

200

0%

20%

40%

60%

80%

100%

01/04/2015 01/05/2015 01/06/2015 01/07/2015 01/08/2015 01/09/2015 01/10/2015

Storengy availability (%) GRTgaz capacity (GWh/d)

63

South Atlantic PITS C

ap

acity

GW

h/d

Ava

ilib

ilit

y in

%

Centre pipe repairs

Centre pipe pigging

COORDINATION COORDINATION

Safety works on Chémery Principal

+ maintenance station Céré

Maintenance on Céré station

Page 64: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

20

40

60

80

100

120

0%

20%

40%

60%

80%

100%

01/04/2015 01/05/2015 01/06/2015 01/07/2015 01/08/2015 01/09/2015 01/10/2015

Storengy availability (%) GRTgaz capacity (GWh/d)

64

South East PITS

Ca

pa

city G

Wh

/d

Ava

ilib

ilit

y in

%

Cabriès Manosque pipe

repairs

Security tests on Manosque storage

COORDINATION

Page 65: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

20

40

60

80

100

120

0%

20%

40%

60%

80%

100%

01/04/2015 01/05/2015 01/06/2015 01/07/2015 01/08/2015 01/09/2015 01/10/2015 01/11/2015

Storengy availability (%) GRTgaz capacity (GWh/d)

65

North B PITS C

ap

acity

GW

h/d

Ava

ilib

ilit

y in

%

COORDINATION COORDINATION

Works to prepare Santerre future pipe implementation

Page 66: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 66

Filling of North Atlantic Storage Group

0%

20%

40%

60%

80%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

%V

U

Injection in Nord Atlantique

Maximum tunnel of storengy

Minimum tunnel of storengy

Filling with works, gates constraints and ferm GRTgaz capacities

Gates

Page 67: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 67

Filling of North West Storage Group

0%

20%

40%

60%

80%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

%V

U

Injection in Nord Ouest

Minimum tunnel of Storengy

Maximum tunnel of storengy

Filling with works and gates constraints

Gates

Page 68: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 68

Filling of North East Storage Group

0%

20%

40%

60%

80%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

%V

U

Injection in Nord Est

Minimum tunnel of Storengy

Maximum tunnel of Storengy

Filling with works and gates constraints

Gates

Page 69: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 69

Filling of South Atlantic Storage Group

0%

20%

40%

60%

80%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

%V

U

Injection in Sud Atlantique

Mini tunnel storengy

Maxi tunnel storengy

Filling with works & gates constraints

Gates

Page 70: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 70

Filling of South East Storage Group

0%

20%

40%

60%

80%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

%V

U

Injection in Sud Est

Minimum tunnel of storengy

Maximum tunnel of storengy

Filling with works and gates constraints

Gates

Page 71: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 71

Filling of North B Storage Group

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

15/2 6/4 26/5 15/7 3/9 23/10 12/12

% V

U

Filling of Nord B storage group

Minimum tunnel of Storengy

Maximum tunnel of Storengy

Filling with works and gates constraints

Gates

Page 72: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 72

Interconnection points with

LNG terminals .4

Page 73: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

0

100

200

300

400

500

600

700

GRTgaz Elengy

73

Fos PITTM

Cruzy shutdown + Saint Martin station maintenance

Controls security

COORDINATION COORDINATION

Power supply RTE 63kV

ORV inspection

Rhône pipe repairs and compressor

maintenances

Page 74: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 74

Montoir PITTM

0

100

200

300

400

500

600

Elengy GRTgaz

Loire pipe repairs

COORDINATION

COORDINATION West pumps (HP, LP, water)

COORDINATION

Modification on Montoir outlet pipes

LNG safety draining system

Valves tests on Montoir outlet pipes

East pumps (HP, LP, water)

Water pipeline

Page 75: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting - 2015.01.29 75

Modifications with TRS

creation .5

Page 76: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

No more restrictions on Midi PIR

CRE décision : impact new trading region south

zone (TRS) instead of North to South link

Spain delivery (Pirineos)

Storage injection (Lussagnet)

Exchange between TIGF and GRTgaz of their own capacity available at Cruzy and Castillon

Possible impacts on Fos LNG terminal

76

Modifications in few words

Page 77: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 77

Which works impact Cruzy or Castillon ?

Impacts on

Castillon

flows

Impacts on

Cruzy

flows

Page 78: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 78

Example

0 GWh/d instead of 150 GWh/d

• Restrictions on Fos

• Restrictions on Midi

2014

• Restrictions on Fos

• Restrictions on Pirineos & Lussagnet

2015

Rhône pipe repairs +

Bégude station maintenance

Page 79: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29 79

Pirineos capacity restrictions because of GRTgaz maintenances

0

5

10

15

20

25

0

1000

2000

3000

4000

5000

6000

No

mb

re d

e jo

urs

de m

ain

ten

an

ce s

ur

le m

ois

Cap

acit

é m

en

su

elle (

GW

h)

Capacités au VIP PIRINEOS

Page 80: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

If PIR Midi have been still in application in 2015

80

Less flow restrictions in 2015

Available firm capacities during Summer

(TWh) Tendency

2014 2015

Midi : Grtgaz -> TIGF 70 73 +4%

Page 81: Shippers’ Meeting - GRTgaz · Shippers meeting – 2015.01.29 Important Maintenances in 2014 Minimizing the impact of maintenance A reliable maintenance schedule About maintenance

Shippers meeting – 2015.01.29

Thank you for your attention

81

Sophie MENARD

Olivier PICHAYROU

Pascal FONROUGE Fabrice CONQUES