SHOPP Ten Year Plan Maintenance Five Year Plan
Michael B. Johnson State Asset Management Engineer California Transportation Commission Meeting March 2017
![Page 2: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/2.jpg)
California Streets and Highway Code (164.6)
• Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and reconstruction of the State Highway System.
• Requires Caltrans to prepare a Five Year Maintenance Plan that addresses maintenance needs on the State Highway System
• The two plans shall be submitted in January of odd numbered years and will be the basis for the departments budget request and the adoption of the fund estimate.
![Page 3: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/3.jpg)
California Government Code
• Government Code requires a “robust asset management plan” to guide the selection of projects in the SHOPP.
• The Asset Management Plan shall be consistent with Federal Law
• Performance measures and targets are approved by the CTC
![Page 4: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/4.jpg)
Federal Law - MAP-21 / FAST Act
• MAP-21/FAST Act requires the development of a Transportation Asset Management Plan (TAMP) with National Performance Measures for pavement and bridges
• The TAMP Requires the implementation of Performance Management which requires performance targets to be set using the National Measures
• The TAMP shall include the entire National Highway System
![Page 5: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/5.jpg)
Balanced rehab and
maintenance
Five Year Maintenance
Plan
MAP-21 Performance
Measures Robust Asset Management
Plan
10 Year Rehabilitation
Plan
Implement Performance Management
Aligned to Strategic
Goals
Threading the Needle
![Page 6: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/6.jpg)
Differing Commission Roles
Document Authority Delivery Timeline
Five Year Maintenance Plan Receive a Copy of Plan Jan. 31, 2017
Ten Year SHOPP Plan Review and Comment Jan. 31, 2017
Transportation Asset Management Plan
Approve performance measures, targets and TAMP
June 30, 2020
![Page 7: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/7.jpg)
Book Item Comprised of SHSMP Excerpts
• Commission Staff requested Caltrans excerpt the portions of the SHSMP related to the SHOPP Ten year Plan and Five Year Maintenance Plans
• These excerpts provide the Commission with the material necessary to address the Streets and Highway Code requirements
• Provides additional time for the Commission to approve SHOPP performance targets for the remaining SHS physical assets defined in the SHSMP
• The Department has attached the full SHSMP for the Commission
![Page 8: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/8.jpg)
SHOPP Stewardship Needs (Unescalated)
10 Year Needs (Billions) All Others
$3.2
Pavement $18.6
Bridge Health $5.5
Facilities $2.9
Culverts $2.6
Emergency $2.8
![Page 9: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/9.jpg)
120.0
100.0
80.0
60.0
40.0
20 Year Compounded Rate = 4.5%
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Highway Construction Cost Index
Escalated Need = $93.5 Billion
![Page 10: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/10.jpg)
Highway Construction Cost Index
40.0
60.0
80.0
100.0
120.0
10 Year Compounded Rate = 1 %
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Escalated Need = $76.6 Billion
![Page 11: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/11.jpg)
20 Year Best Fit Curve = 3 % 120.0
100.0
80.0
60.0
40.0 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Highway Construction Cost Index
Escalated Need = $85.8 Billion
![Page 12: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/12.jpg)
1.5
1.4
1.3
1.2
1.1
1
1 % Escalation 3 % Escalation 4.5 % Escalation
2017 2018 2019 2020 2021 2022 2023 2024 2025
Impact of Escalation on Needs Assessment
![Page 13: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/13.jpg)
System Performance
Safety 17%
Stewardship 67%
Sustainability 10%
6%
SHOPP Investment Plan- $26.6 B
![Page 14: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/14.jpg)
SHOPP Investment Highlights (10 Years)
• Pavement – Overlay over 10,000 lane miles / Rehabilitate 3,300 lane miles
• Rehabilitate/Replace over 5.3 million square feet of poor condition bridges
• Replace nearly 400,ooo feet of poor condition culverts
• Replace over 3,700 TMS elements and add over 1,600 new elements
![Page 15: SHOPP Ten Year Plan Maintenance Five Year Plan...March 2017 California Streets and Highway Code (164.6) • Requires Caltrans to prepare a Ten Year Plan for the rehabilitation and](https://reader036.vdocuments.net/reader036/viewer/2022063022/5fe9afd4df03af7088213006/html5/thumbnails/15.jpg)
Next Steps
• Request for comments (April 2017)
• Produce final plan (May 2017)
• Return to Commission for adoption of remainder of performance targets