shuchi sinha_final portfolio 9.24.11

46
Shuchi Si n h a Portf o l i

Upload: shuchi-sinha

Post on 07-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 1/46

Shuchi Si n h a 

Portf o l i

Page 2: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 2/46

Page 3: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 3/46

Hi! My na me  i s Shuchi. T h e portf o l i h er e gi v e s a b e  f   rev  e wo  f  m y w  o  k, b o  t   i    t h e a c a d em i  and  p r ofe s i o n  l  e  vi ro  m en  . T h e 

portf o l i be  gin s t  t  k  b ou     w   o  f  m yw  o  k s, b o  t   d o n e a   t h e gr a u at e  e v  l . F o l o we d  by a  p roje c    d o n e a s a   un  r a  gu at e   e v  l . T h e   a n e w c ha p t e r gi v e s a b e  f   in i  gh   o  f   m y w  o  k  d o n e  a s a    in t e  .

Page 4: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 4/46

Page 5: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 5/46

Tbl   Cnnt 

Sudi o wr k 

Ge High Ris ..........................................1(Graua)

Bk-Hk .......................................................9(Graua)

Nain Soc Sta m....................17(Undrraua)

Intenhp s

OM 2010..................................................25 

OM 208...................................................31

OM 207...................................................35 

Page 6: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 6/46

Page 7: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 7/46

Green High Rise, ON

Page 8: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 8/463

Page 9: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 9/46

Name: Green High Rise

Location: Niagra Falls, ON, Canada

This project was a aprt of my graduate level studio. I wanted toincorporate more than photo voltaic panels on my roof. I wanted to

look at more ways of harenessing and producing energy to balance outas much possible the energy needs of high rise structure.

Concept: Venturi Effect

Site Plan

Niagra Falls (HorseShoe Falls)

Green HighRise (324 ft)

Minolta Tower(325 ft)

HiltonHotel Falls

View(581 ft)

Skylon Tower(775 ft)

4

Page 10: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 10/46

5

VIEW OFTHEFALLS

Building acting like a

“Wind Catcher” on the

windward side

Building expading viewsto the great Niagra falls

for the inhabitants

Building with varied roofs

for being used as a roof

top gardens

Page 11: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 11/46

6

Cooling floors

Wind Turbine floors

Mechanical floors

Area Programming:

Hallways & Floor services= 50-60%Public guest room/ reception/ Lounge = 4-7%Restaurants/ Bars/ hospitality= 4-8%Banquet/ Meeting room/ Conference= 10-12%

Domestic areas: Kitchen/ Stores=9-14%Administration/ Management= 1-2%Maintenance/ Repair= 4-7%Leisure/ Sports/ Shop= 12-20%

Wind interaction with building

Page 12: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 12/46

7

Use of Geothermal pipes under the floorfor heating and cooling the building

Page 13: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 13/46

8

Page 14: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 14/46

Page 15: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 15/46

Bike-Hike Mhatn , NY 

Page 16: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 16/46

11

Page 17: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 17/46

Name: Crowd-sourcing the city: Bike-Hike

Location: Manhattan, NY

This was a project done in my final semester of graduate studio. The

topic of the studio was crowd-sourcing the city, where we had to gather 

information from the crowd and give our design solution back to them.

Hence while surveying new yorkers and studying the new yorck city, ideceided to use the blanck walls of the city and design around them.

Concept: To promote bike usage and make use of unutilized spaces

12

When surveying and interviewing new yourkers, three major problems

where identifed:

a) Bike parking

b) Cars in the bike lanes

c) Pdestrian-bike crashes

The three problems was a major concern in nyc and were the top

reasons for ‘not using the bike’ in the city.

Page 18: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 18/46

13

a) Bike parking

The front elevation of the proposed bike stand using the blank walls in the city

Detailed sectionSide section

Page 19: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 19/46

14

Portability

A1 B1 C1 D 1 E1

A2 B2 C2 D 2 E2

A3 B3 C3 D 3 E3

A4 B4 C4 D 4 E4

A5 B5 C5 D 5 E5 Enter

Cancel

Credit/ Debit Card

Cash

Verify Card

Status

Insert cash

Ease of using cash, card or monthly bike parking passes

Photomontage showing the real case scenario

a) Cars in dedicated bike lanes

Bikes are installed with cameras which capture the licence plates

of the car when it detects a car in its lane for more than 4 seconds

The chronological order 

Page 20: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 20/46

15

c) Pdestrian-Bike crashes

Pavement Surface

Slot saw cut into

pavement lled

with silicon

Peizoelectric

Sensor

Epoxy

Connected to

the sensors under

the bike pads

Road Surface

Connected to

the sensors under

the pedestrian

pavement

+

V C

L

e

Co Ri

Ce

RiCo

 Two Peizoelectric sensors connected in Series

L = Inductance due to the seismic mass and inertia of the sensor

C = Inversely proportional to the mechanical elasticity of the sensor

C = Static capacitance

R = Insulation

V = Voltage

e

o

    B    i    k   e    P   a    d

    P   e    d   e   s   t   r    i   a   n    P   a   v   e   m   e   n   t

Pressure

Impact Cap

Preload Stud

Housing

Amplier

Quartz Element

Charge Collection Plate

Mounting Hole

Use of two peizo electric sensors shown in sectional-elevation

Peizo sensor electrical drawing showing its methodology

Use of two peizo electric sensor 

Page 21: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 21/46

16

 4  -  5  s

 e c o  n

 d s

1  s e c o n d 

Renderings showing the working of the peizo electric sensors to avoid the crash

When it detects the two weights on it, it lights up to warning the pedetrian of the approching bike and vice-versa

Page 22: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 22/46

Page 23: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 23/46

Nai o n  l  So c c e r St a iu ,Qa  t a r

Page 24: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 24/46

Stadia are the new cathedrals of our age, where communities come together with common purpose and depart with

memories shared and stories to tell of the legends born19

Page 25: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 25/46

Name of the project: National Soccer Stadium

Location: Doha, Qatar

Proposing Authority: Qatar Football Association

Site Area: 90 Acre

This project was done in my tenth semester of five year Architecture

degree. We had to choose our projects. I chose this, as I was alwayscurios about the spatial arrangements of the empowering stadiums.

They always facinated me due the fact that stadiums is just one single

structure and it handles people of different hierarchy. I was all the moreamused when I did my case studies and actually had a chance to see

the VIP area of the stadiums, the lavish restaurants, the Suits, etc. I putmy heart and soul into this project and I know I am capable of something

even better than this.

20

 

40%20%

40%

Player and VIP Entry

SpectatorEntry

  Media/Press

VIP/Amir

Player

VIP/Pass holdersSpectator

N

Spectators

Players

VIP/Officials

The North-South orientation of the stadium is chosen, keeping in mind

the wind direction, sun path and the hot climatic conditions of the place.

D-Ring road(from the city

to the city)

Doha Express-

way(From the city

to the

airport)

View of the site from the road

View of the road from the site

 N

Page 26: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 26/46

Spectator Parking

Ticket Counter

Spectator Entry

Practice Fields

Stadium

V.VIP Entrance

V.VIP Dedicated

Entrance

Administartive Block

VIP Exit

Media and PlayerEntry

21

Page 27: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 27/46

Spectator entry to the stadium area

only through the ticket counter

Spectator flow through entry/exit points

Entry and Exit for Players

Entry for V.VIP

Exit for V.VIP

22

Page 28: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 28/46

Ramp for V.VIPs

VIP Area

Spectator Area

Player Practice Fields

Spectator flow from Parking to the

Stadium via Ticket Counters

23

Page 29: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 29/46

Player Entry

Player Area

Coach Assembly area

Interview AreaPlayer Area

Participants Area

Spectator Circulation Zone

V.VIP Area

V.VIP Ladies Area

VIP Area

Media Cente(accessed

by dedicatedand isolated

elevator)

Level 1

Level 2

Level 3

Level 4

24

Page 30: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 30/46

Page 31: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 31/46

In t e  n s h i pSOM 2010

Page 32: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 32/46

Jeddah Cornich , KSA

27

Firm: Skidmore Ownings and Merrill, New York

Page 33: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 33/46

g

Time period: June 2010- August 2010

Projects Worked on: Al Rajhi Bank Headquarters, Riyadh, KSA

Jeddah Cornich, Jeddha, KSA

Qingdao, ChinaLG headquarters, New Jersey, USA

I interned with SOM in the year 2010 for a period of 11 weeks with the team headed by

Mr. Aybars Asci again. I worked initially on the production of renderings and producingpresentation drawings for the competition project Qingdao. I then worked on the making

of study models for Al Rajhi Bank Headqurters. Later I worked on the rederings and

presentation drwaings of Jeddah Cornich Tower. The last part of my internship was the LGheadquarters. I worked on the project from conceptual stage uptil the intial development

of the project (Site plan, parking layout and furniture arrangements).

Jeddah Cornich , KSA

28

Page 34: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 34/46

LG Headquarters, NJ

29

Page 35: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 35/46

LG Headquarters, NJ

30

Page 36: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 36/46

Page 37: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 37/46

In t e  n s h i pSOM 2008

Page 38: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 38/46

33

Al Sharaq Tower

Firm: Skidmore Ownings and Merrill, London

Time period: May 2008 June 2008

Page 39: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 39/46

Time period: May 2008- June 2008

Projects Worked on: Qatar Petroleum Complex Project

(QPCP), QatarAl Sharaq Tower, Dubai, UAE

I worked with SOM in the year 2008 for a period of 6 weeks with

the team headed by Mr. Aybars Asci again. I worked initially on thepreparation of study models of QPCP and Al Sharaq Tower, Dubai for

about two to three weeks. Later I worked on the plans and sections ofthe Al Sharaq Tower, making changes with respect to the internal walls

of individual housing units. I helped the team in preparing presentations

for the meetings.

34

Page 40: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 40/46

Page 41: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 41/46

In t e  n s h i pSOM 2007

Page 42: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 42/46

37Qatar Petroleum Complex Project

Firm: Skidmore Ownings and Merrill, London

Page 43: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 43/46

Time period: May 2007- June 2007

Projects Worked on: Qatar Petroleum Complex Project, Qatar

I worked with SOM in the year 2007 for a period of 5 weeks withthe team headed by Mr. Aybars Asci. I worked initially on thepreparation of study models for about two to two and a half weeks.

Later directly under Ms. Souraya Daouk I worked on the plans ofRecreational Center, making a few changes with respect to the

landscape around it.

Tower

Mosque

Auditorium

Offices

38

Page 44: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 44/46

Page 45: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 45/46

Shuchi Si n h a P . n . 765-606-1169s huchi.986@gm a  l .c o 

Page 46: Shuchi Sinha_Final Portfolio 9.24.11

8/4/2019 Shuchi Sinha_Final Portfolio 9.24.11

http://slidepdf.com/reader/full/shuchi-sinhafinal-portfolio-92411 46/46