Virginia-Highland Sidewalks February 13, 2012

Upload: christian-washington

Post on 27-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Virginia-HighlandSidewalks

February 13, 2012

Page 2: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

A large number of sidewalks in need of repair◦ Damage from right-of-way trees = City

responsibility◦ Damage from property trees = Property owner

responsibility◦ Worn out pavers, sewer and other issues =

Property owner responsibility (generally) Minimal City budget, minimal City staffing

result in no proactive initiatives, limited reactive resources

Issues:

Page 3: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Report issues to DPW on line or through PEDS ([email protected] or www.peds.org)

Possible involvement of Parks regarding trees Receive inspection within 72 hours, unless tree

involvement Receive price quote thereafter

◦ Standard 50 foot sidewalk costs about $1000, which may be partially paid by the City depending on tree damage

Property owner contracts with the City and pays the City for repair

Inefficient because repairs are not bundled Wait

City Processes:

Page 4: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

To privately contract sidewalk repair, City requires:◦ A large bond◦ Architect or Engineer stamped drawings◦ Complete building permit process (hours in City Hall)

We contacted 11 contractors and NONE were willing to undertake sidewalk repair for a homeowner unless part of a major construction project. They can’t cover the cost of taking the sidewalk through the City for the $1000 standard sidewalk price.

Alternatives:

Page 5: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

VHCA had a 50% cost matching program of up to $500 for sidewalk replacement

There were few takers (less than 20 in 3 years)

Some of those funded were doing sidewalks anyway

The worst sidewalks – those the VHCA would target – did not necessarily get repaired

Program was discontinued Is there a better way?

History:

Page 6: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

1. Identify bad spots on Virginia and North Highland1. Committee evaluation by address with photos2. Open request to neighborhood got a good response

2. Identify property owners from tax records and White Pages (done)

3. Provide information about the process to property owners (started)

4. Ask property owners individually to initiate repairs with the City (started)

5. Ask the Board for funding to incent repairs 6. Track the process with property owners so the

City gets to these repairs

Current Initiative I: Major StreetsOvercome barriers – Incent action

Page 7: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Identify a few blocks to bundle for repairs Select the bundle using clear criteria

◦ Larger streets first – traffic light controlled◦ Through streets with probably pedestrian traffic◦ High proportion of broken sidewalks

Prepare information for property owners about the process (draft in progress)

Current Initiative 2: Bundling Overcome barriers – Incent action

Page 8: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Sidewalk committee set criteria and identified broken sidewalks on several potential bundles

Sidewalk committee put out a public request to identify bad sections and combined the work of the committee and public input for a total of about 100 sidewalk segments

Sidewalk committee selected St. Charles and Barnett near St. Charles as the first bundle (hopefully more bundles will follow)

To receive the list, together with photos, email [email protected]

Bundling Status:

Page 9: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Alex Wan hosted a conference call with the Committee and agreed to talk to DPW about a bundled inspection with a committee member

Next steps depend on the City’s willingness to work on a bundle with us◦ If yes, we get pricing for each property in the bundle

from the City and offer to work with each homeowner individually to get the bundle assembled

◦ If no, we contact each homeowner and ask them to start the process with the City, track the process with them, and encourage the City to notice the opportunity to save money by bundling construction

Bundling Next Steps:

Page 10: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Most of the sidewalks at issue have some right-of-way tree involvement and therefore at least partial City funding

As the bundle takes shape, VHCA will work on a program to pay a share of the property owner’s portion of the cost

Shared 3-ways, not necessarily evenly, the property owner potentially gets a $1000 improvement for $500 or less if they participate in the bundle

Propose funding incentives this to the Board when the structure of the funding is defined. However, the Board is tracking the Committee’s progress

A formal funding request is planned and will have to be approved prior to committing any funds

VHCA Incentives:

Page 11: Sidewalks February 13, 2012.  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property

Fix the worst primary artery sidewalks Fix a first bundle of sidewalks in the

community Structure a program that we can repeat Get more sidewalks fixed Get the most for VHCA sidewalk dollars

Goals: