siemens - power generation power plants
DESCRIPTION
Siemens Power Generation Power PlantsTRANSCRIPT
© Siemens AG 2009Energy Sector
Combined Cycle Power Plants
back
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 2 © Siemens AG 2009
■ Steam Power Plants
Key factors for competitiveness
Personnel costs
Power output Efficiency Availability Project lead time
Investment volume
Maintenance
Consumables Insurance
Electricity price Fuel price
Debt / equity ratio Load regime
Taxes
Interest rate
Payment schedule
Our goal is to optimize key factors that are within our sphere of influence - Standardization addresses all of these
Operating costs FinancialsPlant performance
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 3 © Siemens AG 2009
■ Steam Power Plants
The reference power plant – Solving your power puzzle with proven modular base design and options to meet your needs
The Siemens reference power plant concept is an innovative synthesis of standardization and flexibility. The combination of a pre-engineered design with modular add-ons provides the ideal basis for a successful project. This approach helps to keep life-cycle costs low while providing the flexibility to meet individual plant needs.
HRSG type,e.g. BENSON
or Drum
Servicepackages
Back-upfuel
Base design
Watertreatmentsystems
Gridconnection
Coolingvariants
Modular base design
Customer-specific options
(examples)
Site-specificoptions
(examples)
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 4 © Siemens AG 2009
■ Steam Power Plants
Advantages of reference power plant
Advantages of an integrated reference power plant program
Lead time reduction
Availability and plant efficiency increase
High operational flexibility
Optimized operations and service effort
Detailed information to support project conceptual / permitting phase
Standardized components
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 5 © Siemens AG 2009
■ Steam Power Plants
Lead time reduction
Reference power plant designs facilitate implementation due to:
Pre-configured modular components
Schedule-driven project planning and management
The use of experienced proven suppliers and equipment
Highly trained personnel
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 6 © Siemens AG 2009
■ Steam Power Plants
Reference power plant program scopeoptimization – Single Shaft
Modularization with options for flexibilitystandardization to reduce risk and project schedule
SCC Power Island
System integration / Optimized operability
Power Train equipment performance / delivery
SCC Turnkey
Total EPC plant wrap
• SST-PAC w/o condenser
• Steam turbine incl. auxiliaries w/o piping
• Generator incl. auxiliaries
• SSS Clutch
• ST electrical and I&C
• Options
§ HRSG§ Condenser incl. air removal
system§ Boiler feed pumps§ Condensate pumps§ Critical valves§ Fuel pre-heater with filter,
metering station etc.§ Power Island controls§ Options
§SCC Power Block
SCC Power Train
§ SGT-PAC § SCC Power Train
SCC Power Block
Replication of standardized components
§SCC Power Island
• Detailed design of Turbine building, foundation and structures
• HVAC inside Power Block area• Cranes inside turbine building• Water/ Steam cycle• Cooling water system with wet
cooling tower and circulating water pumps
• Service- and closed cooling water system
• Electrical equipment• Power Block controls• Fire Fighting inside Power Block• Options
• Additional fuel supply systems and cooling systems
• Water treatment• Raw water system• Waste water system• Tanks• Additional
- buildings/structures - cranes/hoists - fire protection/fighting - plant piping/valves - electrical plant
• Erection/Commissioning• Further options
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 7 © Siemens AG 2009
■ Steam Power Plants
Reference power plant program scopeoptimization – Multi Shaft
Modularization with options for flexibilityStandardization to enhance implementation of project schedule
§ Condenser incl. air removal system
§ Boiler feed pumps§ Condensate pumps§ Critical valves§ Fuel pre-heater with filter,
metering station etc.§ Power Island controls§ Options
• Buildings/structures• Cranes and HVAC (Turbine hall)• Plant Cooling systems• Water treatment• Raw water system• Waste water system• Tanks• Plant piping/valves• Electrical equipment• Plant control system• Additional fire protection/fighting• Erection/Commissioning• Further Options
SCC Thermal Equipment
§ SCC Thermal Equipment §SCC Power Island§ SGT-PAC
System integration / Optimized operability
Cycle optimization / Performance wrap
Total EPC plant wrap
SCC Power Island SCC Turnkey
• SST-PAC w/o condenser• Steam turbine incl.
auxiliaries w/o piping• Generator incl.
auxiliaries
• ST electrical and I&C§ HRSG§ Options
SCC SGT PAC
Performance/Delivery
• Gas turbines for fuel gas incl. auxiliaries
• Air intake / exhaust system
• Fuel gas system- skids- connecting pipes
• Gas turbine generators incl. auxiliaries
• Fire protection GT• GT electrical and I&C• Options
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 8 © Siemens AG 2009
■ Steam Power Plants
Reference power plants – Combined cycle plant portfolio
50 Hz: SCC5-4000F 2x1
60 Hz: SCC6-5000F 1x1 Flex-Plant™10
SCC6-5000F 1x1 Flex-Plant™30
SCC6-5000F 2x1 Flex-Plant™30
50 Hz: SCC5-1000F 1SSCC5-4000F 1S
Single Shaft
Multi Shaft
Comprehensive solutions
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 9 © Siemens AG 2009
■ Steam Power Plants
SCC5-4000F 1S (SST5-3000) for warm climate conditions
Gas turbine: SGT5-4000F
Steam turbine: SST5-3000
Generator: SGen5-2000H
ISO
Power: 416 MW
Efficiency: 58.2%
Ambient conditions:
15°C (59°F), 1013 mbar, 60% humidity
Condenser pressure: 50 mbar (1.5” HgA)
HRSG: 3P-RH, horizontal type
Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C1810 psi/1050°F, 435 psi/1022°F, 72.5 psi/455°F
Cold end: Cooling tower, induced draft, 8 cells
(ACC and once-through cooling options)
Fuel system: Natural gas with preheating/fuel oil backup (option)
Pump redundancies:
Condensate: 2x 100% Circulating water: 2x 50%
Feedwater: 2x 100% Closed cooling water: 2x 100%
Service cooling water: 1x 100%
Major components Design dataPerformance (net)
Design features
Comprehensive solutions
50 Hz- SCC5-4000F 1S
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 10 © Siemens AG 2009
■ Steam Power Plants
Ambient conditions:
10°C (50°F), 1013 mbar, 77% humidity
Condenser pressure: 25 mbar (0.7” HgA)
SCC5-4000F 1S (SST5-5000) for cold climate conditions
HRSG: 3P-RH, horizontal arrangement
Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F
Cold end: Once-through cooling
Fuel system: Natural gas with preheating/fuel oil backup (option)
Pump redundancies:
Condensate: 2x 100% or 1x 100% Circulating water: 2x 50%
Feedwater: 2x 100% or 1x 100% Closed cooling water: 2x 100%
Service cooling water: 1x 100%
Gas turbine: SGT5-4000F
Steam turbine: SST5-5000
Generator: SGen5-2000H
Design ISO
Power: 427 MW 416 MW
Efficiency: 58.7 % 58.2%
Design features
Major components Design dataPerformance (net)
Comprehensive solutions
50 Hz
- SCC5-4000F 1S (SST5-5000)
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 11 © Siemens AG 2009
■ Steam Power Plants
Ambient conditions:
32°C (90°F), 1013 mbar, 80% humidity
Condenser pressure: 100 mbar (3.0” HgA)
SCC5-4000F 2x1
HRSG: 3P-RH, horizontal arrangement
Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F
Cold end: Cooling tower, induced draft
(ACC and once-through cooling options)
Fuel system: Natural gas with preheating/fuel oil backup (option)
Pump redundancies:
Condensate: 3x 50% or 2x 50%Circulating water:2x 50%
Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100%
Service cooling water: 1x 100%
Gas turbine: SGT5-4000F
Steam turbine: SST5-5000
Generator: SGen5-1000A
ISO
Power: 832 MW
Efficiency: 58.2%
Design featuresDesign features
Major components Design dataPerformance (net)50 Hz
Comprehensive solutions
- SCC5-4000F 2x1
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 12 © Siemens AG 2009
■ Steam Power Plants
Ambient conditions:59 °F (15°C), 1013 mbar, 60% humidity Condenser pressure: 1.5” HgA (50 mbar)
SCC6-5000F 2x1 Flex-Plant™30
HRSG: 3P-RH, horizontal arrangement
Steam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F 128 bar/565°C, 26 bar/565°C, 3.8 bar/282°C
Cold end: Cooling tower, induced draft
Fuel system: Natural gas with preheating/fuel oil backup (option)
Pump redundancies:
Condensate: 3x 50% or 2x 50%Circulating water:2x 50%
Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100%
Service cooling water: 2x 100%
Condenser: Wet surface/2-pass/nondivided water box
Gas turbine: SGT6-5000F
Steam turbine: SST-5000
Generator: SGen6-1000A
ISO
Power: 590 MW
Efficiency: 57.2%
Design features
Major components Design dataPerformance (net)
Comprehensive solutions
60 Hz- SCC6-5000F 2x1
Flex-Plant™30
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 13 © Siemens AG 2009
■ Steam Power Plants
Ambient conditions:85 °F (29°C), 1013 mbar, 60% humidity Condenser pressure: 30.5” HgA (1.034 bar)
SCC6-5000F 1x1 Flex-Plant™30
HRSG: 3P-RH, horizontal arrangementSteam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F
128 bar/565°C, 26 bar/565°C, 3.8 bar/282°CCold end: Cooling tower, induced draft
Fuel system: Natural gas / fuel oil backup
(option)Pump redundancies:
Condensate: 1x 100% or 2x 100%Circulating water: 2x 50% Feedwater: 1x 100% or 2x 100% Closed cooling water: 2x 100%
Service cooling water: 2x 100%
Condenser: Wet surface/2-pass/nondivided water box
Gas turbine: SGT6-5000F
Steam turbine: SST-900
Generator: SGen6-1000A
ISO
Power: 295 MW
Efficiency: 57%
Design features
Major components Design dataPerformance (net)
- SCC6-5000F 1x1 Flex-Plant™30
Comprehensive solutions
60 Hz
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 14 © Siemens AG 2009
■ Steam Power Plants
Ambient conditions:1013 mbar, 60% humidity Condenser pressure: 30.5” HgA (1.034 bar)
SCC6-5000F 1x1 Flex-Plant™10
HRSG: 1P, non-reheat, horizontal arrangement
Steam parameters: 1450 psi / 930°F (100 bar / 500°C)
Cold end: Fin-fan condenser
Fuel system: Natural gas / fuel oil backup
(option)Pump redundancies:
Condensate: 1x 100% or 2x 100%
Feedwater: 1x 100% or 2x 100%
SCR: Conventional SCR
Gas turbine: SGT6-5000F
Steam turbine: SST-800
Generator: SGen6-1000A
85°F
Power: 250 MW
Efficiency: 48%
Design features
Major components Design dataPerformance (net)
- SCC6-5000F 1x1Flex-Plant™10
Comprehensive solutions
60 Hz
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 15 © Siemens AG 2009
■ Steam Power Plants
Economic benefits for fast start-up plants
Higher profit through usage of high price markets
Additional earnings through new products in liberalized markets
Lower start-up costs
Market environmentAncillary servicesOperating benefits
Fuel savings
Higher efficiency
Less emissions
Flexible operation
Capacity payments
KWh price for ancillary Energy
Spinning reserve credits
Uncertain Markets
Seasonal electricity demand
Developing wind energy
Fast start-up capability enhances your plant profitability
Fast start-up development
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 16 © Siemens AG 2009
■ Steam Power Plants
Reference power plants with fast-start technology
Challenges: HRSG pressure ramp rate capability Steam turbine ramp rate capability Piping warm up time Steam Chemistry Steam turbine back pressure limitations
Findings: Plants designed for exclusive base load
operation had excessive start times due to equipment restrictions
Plant start-up time reduction development
10
20
30
40
50
60
70
80
90
100
Solutions: Develop integrated plant technology to
increase operating flexibility and fast-start capability
Fast start-up development
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 17 © Siemens AG 2009
■ Steam Power Plants
Integrated plant technology for fast-start capabilities
An integration of proven technologies
ST stress controller
High-capacity Desuperheater
BENSON once through in HP section
Auxiliary Boiler
Optimize GT load ramp
Condensate polishing
plant
Automated drains and vents
Funnel Damper
Fast start-up development
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 18 © Siemens AG 2009
■ Steam Power Plants
SCC6-5000F 1x1 Flex-Plant™10
Benefits Include:
Integration of proven technology and components Application of the high reliability of the SGT6-5000F Combined cycle performance for peaking application Fast ramp of the gas turbine (150MW in 10 Minutes) Improved start-up efficiency Very low start-up emissions Very low water consumption
Fast start-up development
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 19 © Siemens AG 2009
■ Steam Power Plants
Ribatejo EDP, Portugal
Commercial operation in spring 2004
and 2006
Net output 1,180 MW
3x Single Shaft CC 1S.V94.3A
Proven and reliable50 Hz
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 20 © Siemens AG 2009
■ Steam Power Plants
Panglima Power Sdn, Malaysia
Commercial operation in spring 2004
Net output 720 MW
Multi Shaft CC 2.V94.3A
50 HzProven and reliable
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 21 © Siemens AG 2009
■ Steam Power Plants
Shuweihat, Abu Dhabi, United Arab Emirates
Commercial operation insummer 2004
Net output 1,500 MW
Multi Shaft CC 5.V94.3A + 2 steam turbineswith sea water desalination
For more information click here Video
50 HzProven and reliable
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 22 © Siemens AG 2009
■ Steam Power Plants
Santa Rita 1-4, San Lorenzo 1-2, Philippines
Commercial operation in 2000 and 2002
Net output 1,500 MW
6x Single Shaft CC 1S.V84.3A
The most fuel flexible plant worldwide. Fuels: Natural Gas, Distillate, Naphtha, Condensate, Mixtures
60 Hz
Proven and reliable
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 23 © Siemens AG 2009
■ Steam Power Plants
Merida, Mexico
Commercial operation in 2000
Net output 480 MW
Multi Shaft CC 2.W501F
Proven and reliable
60 Hz
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 24 © Siemens AG 2009
■ Steam Power Plants
Ironwood, Pennsylvania
Commercial operation in 2001
Net output 700 MW
Multi Shaft CC 2.W501G
Proven and reliable
60 Hz
■ References 60 Hz
■ References 50 Hz
Combined Cycle Power Plants
Comprehensive solutions
50 Hz- SCC5-4000F 1S
- SCC5-4000F 1S (SST5-5000)
- SCC5-4000F 2x1
60 Hz
Proven and reliable
- SCC6-5000F 2x1 Flex-Plant™30
50 Hz60 Hz
Fast start-up development
- SCC6-5000F 1x1 Flex-Plant™30
Combined Cycle Power Plants
- SCC6-5000F 1x1Flex-Plant™10
Energy SectorSlide 25 © Siemens AG 2009
■ Steam Power Plants
Lakeside, Utah
Commercial operation in 2007
Net output 560 MW
Multi Shaft CC 2.SCC6-5000F
Proven and reliable
60 Hz