siemens power technologies international regional ... · •total of 32 network upgrade options...

28
Restricted © Siemens Industry, Inc. 2015 All rights reserved. Regional Transmission Planning 51 st Annual Minnesota Power Systems Conference November 10, 2015 Siemens Power Technologies International

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Regional Transmission Planning 51st Annual Minnesota Power Systems Conference

November 10, 2015

Siemens Power Technologies International

Page 2: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 2 Siemens Power Technologies International

Transmission Reforms 1992 - Present

April 2013

Key Developments

• Energy Policy Act of 1992 • Generation market opened up • FERC has new authority to

order wheeling

• Orders 888 and 889 (1996) • Transmission owners to

provide transmission open access and establish Tariffs (OATT)

Generation Deregulation

1992 to 2000

Continued Regional Transmission

Policy Development

2000 to 2010

April 2013 Order 1000 and Region-by-Region

implementation

2010 onwards

• Order 2000 (end of 1999): creation of Regional Transmission Organizations

• Order 679 (2006): FERC

incentives to stimulate transmission investment

• Order 890 (2007): requirement for open, transparent regional transmission

• Order 1000 (2011) requirements for: Regional Transmission

Planning Selection of Projects Cost allocation Elimination of Right of First

Refusal • Individual Regional Transmission

Planning entities make compliance filings

• FERC proceedings to approve filings

• Implementation

Page 3: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 3 Siemens Power Technologies International

FERC Order 1000 (FERC Order 1000, 2011)

Issued July, 2011

Drivers

• Address inadequacies of Order 890

• Establish planning and cost allocation processes for future investment

Objectives

• Reform transmission planning processes to find most efficient and cost-

effective transmission solutions

• Ensure that the costs of transmission solutions chosen to meet regional

transmission needs are allocated fairly to those who receive benefits

Three Reforms

• Transmission Planning

• Cost Allocation

• Nonincumbent Developer

Page 4: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 4 Siemens Power Technologies International

Requirements for transmission planning:

• Each public utility transmission provider must participate in a regional

transmission planning process that satisfies the transmission planning

principles of Order No. 890 and produces a regional transmission plan

• Local and regional transmission planning processes must consider

transmission needs driven by public policy requirements established by state or

federal laws or regulations

• Public utility transmission providers in each pair of neighboring transmission

planning regions must coordinate to determine if there are more efficient or

cost-effective solutions to their mutual transmission needs

FERC 1000 Reforms Planning

Page 5: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 5 Siemens Power Technologies International

Requirements for transmission cost allocation:

• Each public utility transmission provider must participate in a regional

transmission planning process that has a regional cost allocation method for

new transmission facilities selected in the regional transmission plan for

purposes of cost allocation. The method must satisfy six regional cost

allocation principles

• Public utility transmission providers in neighboring transmission planning

regions must have a common interregional cost allocation method for new

interregional transmission facilities that the regions determine to be efficient or

cost-effective. The method must satisfy six similar interregional cost allocation

principles

FERC 1000 Reforms Cost Allocation

Page 6: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 6 Siemens Power Technologies International

Requirements for transmission cost allocation:

• Public utility transmission providers must remove from tariffs and agreements

any federal right of first refusal for a transmission facility selected in a regional

transmission plan for purposes of cost allocation, subject to limitations

• Public utility transmission provider required to amend its tariff to require

reevaluation of the regional transmission plan to determine if delays in the

development of a transmission facility require evaluation of alternative

solutions, including those proposed by the incumbent, to ensure incumbent

transmission providers can meet reliability needs or service obligations

FERC 1000 Reforms Nonincumbent Developer

Page 7: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 7 Siemens Power Technologies International

Order 1000 Transmission Planning Regions

Source: www.ferc.gov/industries/electric/indus-act/trans-plan/trans-plan-map.pdf

Page 8: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 8 Siemens Power Technologies International

Competitive Bid Approach

• Transmission project identified through regional planning process

• Region selects transmission developer through competitive bidding process

• Used by CAISO, MISO, SPP

Sponsorship Approach

• Transmission need is identified through regional planning process.

• Transmission developers propose projects

• Region evaluates proposals and selects preferred solution

• Developer that proposed the preferred solution constructs, owns, and operates

project

• Used by ISO-NE, NYISO, PJM

Development of Transmission Facilities

in Regional Planning Process

Page 9: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 9 Siemens Power Technologies International

Competitive Bid Approach

• Regional transmission facilities identified through MTEP process

• RFP issued after Board approves projects

• In bid evaluation, 5 points (out of 100 possible) awarded for participating in the

planning process and submitting a solution to address the same issue

addressed by the Competitive Transmission Project

MISO Competitive Transmission Projects (MTEP15, 2015)

Source: “MTEP15,” MISO, October 14, 2015 (Draft)

Page 10: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 10 Siemens Power Technologies International

What projects qualify?

• Multi-Value Projects (MVP)

• Provide regional public policy, economic and/or reliability benefits

• Project includes facilities 100 kV and above

• Capital cost ≥ $20M

• Market Efficiency Projects (MEP)

• Reduces market congestion

• Project includes facilities 345 kV and above

• Capital cost ≥ $20M

Competitive Projects

• MTEP14

• None

• MTEP15 (pending board approval)

• Duff-Rockport-Coleman 345 kV. 43-mile line in southern IN

MISO Competitive Transmission Projects

Page 11: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 11 Siemens Power Technologies International

Competitive Bid Approach

• Detailed Project Proposals (DPP) submitted during the ITP process

• Regional transmission facilities identified through ITP process

• RFP issued after Board approves projects

• In bid evaluation, 100 point bonus (out of 1000 possible) is applied if bidder

proposed the project during the ITP process

SPP Competitive Upgrade Projects (B. Bright, 2015)

Source: B. Bright, 2015

Page 12: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 12 Siemens Power Technologies International

What projects qualify?

• Voltage > 100 kV

• Project is not a rebuild of an existing facility

• Project is not required to be in service within 3 years

Competitive Projects

• 2015 ITP10 (Bids due Nov 2)

• Walkemeyer-North Liberal 115 kV. 27-mile line in southwest KS

SPP Competitive Upgrade Projects

Page 13: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 13 Siemens Power Technologies International

Sponsorship Approach

• Need identified by NYISO or NYPSC

• NYISO solicits solutions

• NYISO evaluates solutions and selects project

What projects qualify?

• Reliability, economic, and

public policy projects.

Competitive Projects

• Western NY Public Policy

Transmission Need

(Issues Nov 1)

NYISO (J. Buechler, 2015)

Source: H. Chao, 2014

Page 14: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 14 Siemens Power Technologies International

NYPSC designated western New York congestion relief as a public policy

requirement

Increase Western NY transmission capability sufficient to:

• Obtain the full output from Niagara (2,700 MW);

• Maintain certain levels of simultaneous imports from Ontario across the

Niagara tie lines (i.e., maximize Ontario imports under normal operating

conditions and at least 1,000 MW under emergency operating conditions);

• Maximize transfers out of Zone A to the rest of the state;

• Prevent transmission security violations (thermal, voltage or stability) that

would result under normal and emergency operating conditions; and

• Maintain reliability of the transmission system with fossil-fueled generation in

Western NY out-of-service, as well as in-service.

NYISO provides developers with power flow base cases and auxiliary files

Western NY Public Policy

Transmission Need (Z. Smith, 2015)

Page 15: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 15 Siemens Power Technologies International

• Identifying regional reliability, market efficiency, and public policy needs.

• Developing solutions that are optimized to meet regional needs.

• Evaluating reliability and economic benefits of competing proposals.

• Allocation of regional project costs.

Challenges for Planning Regions and Developers

Page 16: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 16 Siemens Power Technologies International

Manitoba Hydro Transmission Expansion Studies

Manitoba Hydro Wind Synergy Study (J. Bakke, 2013)

• Performed by MISO in 2011-2013

• Evaluate if expanding transmission capacity between Manitoba and MISO

would enable greater wind participation in the MISO market

• MISO requested stakeholder input for transmission projects to study

CapX2020 Transmission Expansion Studies (CapX2020)

• CapX2020 is a joint initiative of transmission-owning utilities in Minnesota and

the surrounding region to expand the electric transmission grid to ensure

continued reliable and affordable service

• Transmission Expansion Studies undertaken to provide thoroughly studied

project(s) for inclusion in the Synergy Study

Page 17: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 17 Siemens Power Technologies International

MANitoba Transmission EXpansion (MANTEX)

• Identify cost effective transmission project to deliver new Manitoba Hydro

power into the MISO market

• CapX2020 identified target levels of incremental transfer up to 2,000 MW

Dakota Wind

• Analyze the level of additional North and South Dakota generation resources

that could be delivered to the MISO market with the additional transmission

projects identified in the MANTEX study

Upgrade Options

• CapX2020 developed 18 base projects

• Total of 32 network upgrade options created by combining base projects

• Upgrade options were evaluated for peak and off-peak system conditions in

2021 and 2026

CapX2020 Transmission Expansion Studies

Page 18: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 18 Siemens Power Technologies International

Planning Process Analyses

Simplified Power Flow

(Screening) Studies

AC Power Flow Studies

Stability Studies

Special Transient

Problems

Short Circuit Studies

Line Design Studies

Production Cost

Studies

More

Alternatives

Fewer

Alternatives

Less Detail

More Detail

Page 19: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 19 Siemens Power Technologies International

• Linearized power flow frequently used to identify feasibility of expansion plans

• Converts nonlinear ac problem into a simple, linear circuit analysis problem

• Efficient, noniterative numerical techniques used to compute an approximate

power flow solution

• Ignores reactive power flow and changes in voltage magnitudes

• Linear FCITC analysis was used to identify system overloads associated with

each target transfer level

• Power flow model created with an upgrade option

• Underlying system overloads were identified and unit costs were used to

estimate associated mitigation

• Results were compared by graphing cost (project+mitigation) versus transfer

level

Screening of Upgrade Options

Page 20: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 20 Siemens Power Technologies International

Option Screening - Cost vs Incremental Transfer

Page 21: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 21 Siemens Power Technologies International

Upgrade options selected for detailed analyses.

Steady state power flow and contingency analyses (nonlinear)

• Calculate incremental losses

• System intact and post-contingent thermal and voltage constraints

Transient stability analyses

• Determine if the system is in a stable state such that synchronism is

maintained when the system is subjected to a disturbance

Study-specific requirements

• Voltage stability

• Electromagnetic transients

• etc

Detailed Reliability Analyses of Preferred Options

Page 22: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 22 Siemens Power Technologies International

Project benefits can be used to compare transmission projects, determine if a

transmission project will be eligible for competition, identify beneficiaries for cost

allocation, etc.

Range of possible benefits (“Multi Value Project Portfolio”, 2012)

• Economic

• Production cost savings

• Load cost savings

• Operating reserves

• System planning reserve margins

• Transmission line losses

• Reduction of generator curtailments

• Qualitative and social benefits

Accounting of benefits used to calculate project benefit/cost ratio is unique to

each planning region

Economic Benefits

Page 23: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 23 Siemens Power Technologies International

Economic analysis is performed using an hourly production cost model to

simulate a security constrained economic dispatch (SCED).

Production Cost Model includes

• Transmission

• Load hourly profiles

• Wind hourly profiles

• Complete generation characteristics

• Fuel and emission prices

Simulation results include hourly generating unit statistics including production

cost, LMP forecasts, binding constraints, and branch flows.

Benefits are determined by comparing simulation results without and with the

proposed transmission project.

Economic Benefits Analysis

Page 24: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 24 Siemens Power Technologies International

• Stakeholders submitted two 500 kV projects.

• Economic analyses performed by MISO concluded that the projects showed

similar benefits across a wide range of plausible futures.

• The benefit-to-cost ratios for the East and West projects ranged from 1.70 to

3.84 across all futures using a modified production cost metric developed

specifically for the synergy study.

• Neither project qualified for cost sharing under the MISO tariff.

Manitoba Hydro Wind Synergy Study

Source: J. Bakke, 2013

Page 25: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 25 Siemens Power Technologies International

Implementation of FERC 1000 is here.

Challenges for Planning Regions

• Performing planning studies at regional level.

• Identifying regional reliability and market efficiency needs.

• Evaluating reliability and economic benefits of competing projects.

• Allocation of regional project costs.

Opportunities and Challenges for Transmission Developers

• Understanding and analyzing, in a cost-efficient manner, regional systems in

terms of transmission topology, constraints, and high benefit-to-cost projects.

• Developing solutions that are optimized to meet regional needs.

Summary

Page 26: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 26 Siemens Power Technologies International

Thank you for your attention!

Douglas Brown Senior Manager Siemens PTI Network Consulting

10900 Wayzata Boulevard Minnetonka, MN 55305

Phone: 952.607.2270

E-mail: [email protected]

Page 27: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 27 Siemens Power Technologies International

B. Bright, “FERC Order 1000: SPP Regional Overview,” presented at the

Competitive Transmission Forum hosted by The New England States Committee

on Electricity and ISO New England, Westborough, MA, 2015.

CapX2020, retrieved from http://www.capx2020.com/documents/manitoba-hydro-

power.html

Federal Energy Regulatory Commission, “Transmission Planning and Cost

Allocation by Transmission Owning and Operating Public Utilities: docket no.

RM10-23-000, Order No. 1000,” July 21, 2011.

H. Chao, “FERC Order 1000: Planning for the Right of First Refusal and Planning

for Public Policy,” presented at the 2014 IEEE Power and Energy Society

General Meeting, Washington DC, July 29, 2014.

J. Bakke et al., “Manitoba Hydro Wind Synergy Study,” MISO, 2013.

Reference List

Page 28: Siemens Power Technologies International Regional ... · •Total of 32 network upgrade options created by combining base projects •Upgrade options were evaluated for peak and off-peak

11-10-2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 28 Siemens Power Technologies International

J. Buechler, “FERC Order 1000: NYISO Regional Approach,” presented at the

Competitive Transmission Forum hosted by The New England States Committee

on Electricity and ISO New England, Westborough, MA, 2015.

“Multi Value Project Portfolio Results and Analyses,” MISO, Jan 10, 2012.

“MTEP15,” MISO, October 14, 2015 (Draft)

Z. Smith, “Public Policy Transmission Need: Western NY Sufficiency Criteria &

Baseline Results,” presented at the NYISO ESPWG / TPAS, August 27, 2015.

Reference List