siemens.com/energy service experiences with the world record gas turbine sgt-8000h jens klingemann...

16
siemens.com/energy Service Experiences with the World Record Gas Turbine SGT- 8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

Upload: megan-lawson

Post on 21-Dec-2015

240 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

siemens.com/energy

Service Experiences with the World Record Gas Turbine SGT-8000HJens Klingemann

May 20, 2015 – Oman Energy and Water Conference

Page 2: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 2 Jens Klingemann

SGT-8000H Introduction

Fleet Experience / Operational Status

Service-Friendly Design

Service Tools

Summary

Agenda

Page 3: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 3 Jens Klingemann

Heavy-duty gas turbines Industrial gas turbines

SGT5-8000H

SGT5-4000F

SGT5-2000E

50 Hz 295 MW

172 MW

375 MW

SGT6-8000H

112 MW

SGT6-5000F

SGT6-2000E

50 MW

33 MW

25 MW

8 MW

7 MW

5 MW

SGT-800

SGT-700

SGT-600

SGT-500

SGT-400

SGT-300

SGT-200

SGT-100

274 MW

232 MW60 Hz

37 MWSGT-750

19 MW

14 MW

Siemens Large Scale Gas Turbines:Product Portfolio for 50 Hz and 60 Hz

Page 4: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 4 Jens Klingemann

Siemens V Design Siemens W Design

Turbine cylinder Turbine vane carrier Exit housing

Front hollow shaft Bearings Compressor cylinder

Turbine features Turbine diffuser

Single tie bolt Compr. stat. design

The SGT-8000H concept uses proven features from Siemensand (former) Westinghouse engines and introduces new technology

Secondary Air System

ULN can-annular combustion systemHarmonized

Compressor

SGT5/6-8000H engine concept is based on harmonization and new technology

Page 5: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 5 Jens Klingemann

Technical innovation as the basis of power and efficiency increase

> 60% combined cycle efficiency

Designed for >60% efficiency in combined cycleand best in class operational flexibility

4 stages of fast acting variable-pitch guide vanes (VGV) allowing

for improved part load efficiency and high load transients

Proven rotor design (Hirth serration,

central tie rod, internal cooling air passages) for world class fast (cold) start and hot restart capability

High cycling capability due to fully internally air cooled

turbine section

Evolutionary 3D blading

3D Four stage turbine with advanced materials and thermal barrier coating

HCO for reduced clearance losses

Transient protection of clearances for reduced degradation with

hydraulic clearance optimization (HCO) active clearance control

Advanced Can Annular combustion system

Performance features

Flexibility features

Page 6: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 6 Jens Klingemann

15 15

1

3

42

6

60Hz

50Hz

• Siemens has sold 62 units* worldwide so far• H-class fleet has achieved more than 2.200 starts & 131.000 EOH*

88

Global Fleet Overview of SGT-8000H

* 50Hz and 60Hz combined

Page 7: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 7 Jens Klingemann

SGT-8000H Service-Friendly Design

Defined combustor handling tool envelope (blue frame)

Utilize engine symmetry to optimize maintenance tasks

Provides multi-task environment

Does not require cover lift for Combustion Inspection

Access under engine for tooling installation

One toolkit for burner and transition assembly

Easy-to-service design features

Page 8: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 8 Jens Klingemann

Simple and efficient service conceptwith three types of inspections

Combustor Inspection

Major Inspection (Rotor in Place)

Hot Gas Path Inspection (Rotor in Place)

Page 9: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 9 Jens Klingemann

SGT-8000H Core Engine Designed for easy and fast maintenance

All rotating blades including compressor are replaceable without a rotor lift.

Row 1 Turbine Blades/Vanes/Ring Segments & Row 4 Blades can be replaced with or without cover lift.

Roll out/in capability of the turbine vane carrier enables exchange of stationary turbine hardware without rotor lift.

Roll out/in capability also allows for optional assembled spare vane carrier exchange concept which further reduces outage durations.

Page 10: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 10 Jens Klingemann

Outage Naming and Duration

* Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.)* Shift model: 6 days per week / 2 shifts per day / 10 hours per shift* It’s working days only, counted form turning gear off to turning gear on

Name GraphicDuration*

50HzDuration*

60Hz

Combustor Inspection 8 days 7 days

Hot Gas Path Inspection 21 days 21 days

Major Inspection / Outage 29 days 29 days

Major Inspection / Outage with Rotor Lift

35 days 35 days

Rotor Inspection - -

Page 11: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 11 Jens Klingemann

SGT- 8000H Service-Friendly Combustor Maintenance Concept

TLC 44 / TLC45 Single Shaft ConfigurationBenefits

No external crane or other support devices required

Easy access for Field Service personnel

Better protection of combustor components against handling issues

Pre-assembled burner system for fast installation

Optimized outage durations due to simultaneous work flow & packaging

Berlin Factory Test Installation and Container Concept

Combustor components pre-assembled prior to delivery to site!Similar baskets and similar assembly procedure for transition

Page 12: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 12 Jens Klingemann

Burner and Transition Handling Tool Test

Tool Test 10 / 2013 in Berlin, Germany

Purpose:

Dismantling and assembly of transitions and burners

Dealing with indoor environment

Designed for use of Mobile platform and support cranes

Tool 50Hz 60Hz

w/o TLC45 10 d 9 d

w/ TLC45 8 d 7 d

→ 20% reduction in Outage duration

Page 13: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 13 Jens Klingemann

SGT- 8000H Plant Platform Concept

3D Plant Design Model Power Plant Concepts with integrated Service Requirements

1. All power plant components included in the design model

2. Simulation of service activities

3. Optimization of overall power plant concept

Page 14: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 14 Jens Klingemann

SGT- 8000H Serviceability3D model supports service requirements

Destacking Service Option: upending fixture foundation installed during plant construction.

Based on the 3D model the best service concept will be developed and customized, e.g.1. Rotor Inspection can be conducted on site2. Upending fixture foundation installed during plant construction3. Lower cost and higher availability as repair possible without factory visit

Page 15: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

May 2015Page 15 Jens Klingemann

Arial 16 pt., Line spacing 1.1 lines

Fast OutagesShort outage times due to innovative service tools

Summary: SGT-8000H benefits

ServiceabilityEasy maintenance on site

CostCost reduction programs and cost benefit for customer

Experience & QualityMarket leadership @ Siemens quality, proven in >131’000* EOH

Fast OutagesShort outage times with use of innovative service tools and concepts

*status December 2014

Page 16: Siemens.com/energy Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann May 20, 2015 – Oman Energy and Water Conference

siemens.com/energy

Thank you!Jens KlingemannVice President Sales Siemens Power Generation Services Middle East & West Asia

Service Experiences with the World Record Gas Turbine SGT-8000H