UTTAR PRADESH PUBLIC
WORKS DEPARTMENT
EXPRESSION OF INTEREST FOR EMPANELMENT OF
THIRD PARTY QUALITY CONTROL CONSULTANTS FOR
SIGNATURE BUILDING WORKS
AUGUST, 2013
96, M.G. Road, Lucknow226001Phone/Fax: 0522-2235624
1
-
7/29/2019 Signature Building Tor
2/27
EXPRESSION OF INTEREST FOR EMPANELMENT
OF THIRD PARTY QUALITY CONTROL
CONSULTANTS FOR SIGNATURE BUILDING
WORKS
IMPORTANT DATES
i) Sale of Application Documents: 12.08.2013(10:00 hours) to 11.09.2013 (17:00hours)
ii) Last date of receipt of queries: 22.08.2013 (15:00 hours)
iii) Date of Pre EOI meeting 26.08.2013 (12.00 hours) at address given below
iv) Last date of submission of Application: 12.09.2013 (15:00 hours)
v) Date of Opening of EOI Application: 12.09.2013 (16.00 hours)
CONTACT POINT FOR ALL CLARIFICATIONS:
CHIEF ENGINEER (BUILDINGS)
UTTAR PRADESH PUBLIC WORKS DEPARTMENT
96, M.G. Road
Lucknow 226001
Phone/Fax: 0522- 2235624.
Email:[email protected]
1
-
7/29/2019 Signature Building Tor
3/27
EXPRESSION OF INTEREST FOR EMPANELMENT
OF THIRD PARTY QUALITY CONTROL
CONSULTANTS FOR SIGNATURE BUILDING
WORKS
INDEX
Sl.No. Particular Page No.
1 IMPORTANT DATES 22 INDEX 3
3 INTRODUCTION 4
4 QUALIFICATION CRITERIA 5 - 9
5 SCOPE OF WORK 10 - 12
6 INFORMATION TO THE CONSULTANTS 12 - 16
7 ANNEXURE 17 27
1
-
7/29/2019 Signature Building Tor
4/27
EXPRESSION OF INTEREST FOR EMPANELMENT OF THIRD PARTY
QUALITY CONTROL CONSULTANTS FOR
SIGNATURE BUILDING WORKS
1. INTRODUCTION
Government of Uttar Pradesh has resolved to take up construction of Signature Buildings vide GO No-
E-8-394/Ten-2013-1074/2012, dated: 07.03.2013.Uttar Pradesh Rajkiya Nirman Nigam (UPRNN) and
Uttar Pradesh Construction and Design Services (Uttar Pradesh Jal Nigam) have been designated as
Construction Agency for Signature Buildings .The Govt. of U.P. has also decided to appoint an
efficient Third Parity Quality Control system to ensure the best possible quality standards in these
special Buildings. Third Party Quality Control Consultant would be doing quality assurance etc. and
would certify the same. Uttar Pradesh Public Work Department (UPPWD) has been entrusted with the
responsibility to invite Expression of Interest and accomplish the Empanelment of Third PartyQuality Control Consultant for Signature Building Construction works vide GO No- 560EG/23-5-13-
24EG/13, dated: 11.06.2013
2. OBJECTIVES
The main objective of appointing a Third Party Quality Control Consultant is to assist the designated
Construction Agencies and Employer in maintaining the highest quality standards with reference to
Approved manuals/BIS codes/prevailing relevant international standards/best building construction
practices by independent team of experts at various stages of construction such as (i) Pre Construction
Stage (ii) Construction stage (iii) Commissioning, trial run and testing stage (iv) Post Construction
Stage.
3. GENERAL-
3.1. Information on the Expression of Interest
In order to obtain any first-hand information on the Expression of Interest of Empanelment ofThird Party Quality Control Consultant, it is considered desirable that representative of the Consultant
Firm or Company/Recognized Educational and Research Institution with domain specialization to visit
the office of the Chief Engineer (Building)- UPPWD, 96, M.G. Road, Lucknow 226001 before the
proposal is submitted. Representatives of consultant firm/company can meet the following official for
further information, if any:-
CHIEF ENGINEER (BUILDINGS)
UTTAR PRADESH PUBLIC WORKS DEPARTMENT
96, M.G. Road
Lucknow 226001
Phone/Fax: 0522- 2235624.
Email:[email protected]
Please ensure that advance intimation regarding the visit is sent to enable/make appropriate timearrangement.
1
-
7/29/2019 Signature Building Tor
5/27
3.2. Ap p l ica t i on f eeRs5000/-(non-refundable) in the form of DD/Pay order of scheduled bank in favour ofExecutive
Engineer, Maintenance Division-1(civil ), UPPWD, Lucknow, payable at Lucknow.
4. Qualification Criteria
4.1. Structure and organization of the Firm
i. Category APublic Sector, with complete liabilities to Central or any State Government within the Union of India.
a. Central/ State public sector undertakings registered under Companies Act.
b. Autonomous research and development institutes with complete liability of local State or Central
Governments.c. Academic institutions with complete liability of local State or Central Governments, which are eligible
for professional practice as per UGC/ MoHRD norms.
ii. Category B
Private Sector, including Sole Proprietorship, Full liability partnership, limited liability partnershipentities, cooperative sector entities, registered within the Union of India.
a. Entities registered under Companies Act including Section 25, companies not included under Category
A
b. Autonomous research and development institutes not included under Category A
c. Academic institutions not included under Category A
4.2. Financial -
The Consultant must have minimum required annual turnover in any one of the last five years of
consultancy work in the field of Quality Assurance/Control Projects ofRs. 5 crores.
4.3. TECHNICAL-
Minimum Three years of experience in the field of construction supervision & quality control in
various infrastructure works.
Should have executed at least one Third party inspection assignment of a single civil construction work
having value of at least Rs. 50 crores.
4.4. Technical Personnel
The Consultant must have minimum number of full time Technical Personnel who are in the payroll of
the firm for at least one year as on 31.03.2013 with following qualifications and relevant experience.
a. Post graduate in Civil Engineering with at least 15 years of experience or Graduate in Civil
Engineering with at least 20 years of experience as on 31.03.2013- 01 Person.
b. Graduate in Business Administration with at least 20 years of experience as on 31.03.2013- 01
Person
c. Graduate in Civil Engineering with at least 10 years of experience or Diploma in civil engineering
with at least 15 years as on 31.03.2013. - 03 persons.
d. Graduate in civil /electrical/mechanical engineering with at least 05 years of experience or Diploma
in civil /electrical/mechanical engineering with at least 10 years of experience as on 31.03.2013.- 4
persons
4.5. Key Personnel Requirement
Any Quality consultant agency must include minimum following personnel in a project team. Size of
1
-
7/29/2019 Signature Building Tor
6/27
project team will vary depending upon the project size and respectively deploy supporting staff as perrequirement of project. Applicant needs to submit an undertaking accordingly
1) Team Leader/Specialist 1 No.
2) Project Formulation and Procurement Specialist- 1/2 No.
3) Senior Building Engineer 2 No.
4) Building Engineer (3 No. Civil, 1 No. Electrical and 1/4 No. Mechanical)
Note: Minimum 04 Key Personnel (Team leader/Specialist- 01 No, Senior Building Engineer
1 No, Building Engineer- 2 Nos) must be full time Employee on payroll of the firm for a
minimum of last one year as on 31.03.2013.
SL.No. Position Professional
Experience
Specific Expertise
1 Team
Leader/Specialist
Minimum 20 years of
experience as on
31.03.2013
Graduate in Civil Engineering. He would lead
the multidisciplinary team of professionals
engaged to carry out the job of third party
inspection and monitoring Building Projects,therefore, should have a clear perception of the
manner in which a quality service can be
delivered within the available time. He should
be a professional of stature who could
command the respect of the team. Post
Graduate Qualification in Structural
Engineering will be an added advantage. Must
have the experience of at least 3 years in
quality assurance /quality control or related
field as on 31.03.2013
2 Project
Formulation and
Procurement
Specialist
Minimum 15 years of
experience as on
31.03.2013
Graduate/post graduate in Civil Engineering or
Graduate /Postgraduate in Business
Administration. He should have handled in
similar capacity at least one project of similar
nature. The candidate should have a thorough
knowledge of standard Procurement
procedures, Contract management and
planning in Technical, legal and Financial
aspects etc. Higher qualification and
experience will be an added advantage.
1
-
7/29/2019 Signature Building Tor
7/27
3 Senior Building
Engineer
Minimum 10 years of
experience as on
31.03.2013
Graduate in Civil Engineering. He should have
handled in similar capacity at least one project
of similar nature and must have minimum
specific experience of 3 years in quality
assurance as on 31.03.2013. He shall be
responsible for all the aspects related to the
quality of the work and shall guide, superviseand monitor the work of the other experts in his
team.
The candidate should have a thorough
knowledge of latest specifications pertaining to
building works and also of other related
publications, according to which the works are
required to be carried out and the tests to be
conducted to ensure quality of work. Higher
qualification and experience will be an added
advantage. Upper age limit shall be 55 years.
Minimum 15 years of
experience as on
31.03.2013
Diploma in Civil Engineering. He should have
handled in similar capacity at least one project
of similar nature and must have a minimum
experience of 3 years in relevant field as on
31.03.2013. He shall be responsible for all the
aspects related to the quality of the work and
shall guide, supervise and monitor the work of
the other experts in his team.
The candidate should have a thorough
knowledge of latest specifications pertaining tobuilding works and other related publications,
according to which the works are required to be
carried out and the tests to be conducted to
ensure a good quality work. Higher
qualification and experience will be an added
advantage. Upper age limit shall be 55 years.
4 Building Engineer
(Civil)
Minimum 5 years of
experience as on
31.03.2013
Graduate in Civil Engineering. He should also
have exposure to quality assurance programs in
new construction, maintenance/ rehabilitation
projects using modern technology. He shall berequired at site as directed by the Designated
Construction Agency and shall inspect and find
out deficiencies in the building and find out
remedial suitable measures. He must be
familiar with modern methods of construction
of building, design standards, technical
specification and standard quality control
/assurance procedure for construction of
different components of buildings. Higher
qualification and experience shall be an added
advantage. Upper age limit shall be 45 years.
Minimum 10 years of Diploma in Civil Engineering. He should also
1
-
7/29/2019 Signature Building Tor
8/27
experience as on
31.03.2013
have exposure to quality assurance programs in
new construction, maintenance/rehabilitation
projects using modern technology. He shall be
required at site as directed by the designated
Construction Agency and shall inspect and find
out deficiencies in the building and find out
suitable remedial measures. He must befamiliar with modern methods of construction
of building, design standards, technical
specification and standard quality control
/assurance procedure for construction of
different components of building. Higher
qualification and experience shall be an added
advantage. Upper age limit shall be 45 years
5 Building Engineer
(Electrical)
Minimum 5 years of
experience as on
31.03.2013
Graduate in Electrical Engineering. He should
have exposure to quality assurance programs in
new construction, maintenance/rehabilitationprojects using modern technology. He shall be
required at site as directed by the designated
Construction Agency. He must be familiar with
modern methods of Electrical works in the all
types of buildings/ Infrastructure Projects,
design standards, technical specifications and
standard quality control/assurance procedure
for electrical works in different components of
buildings. Higher qualification and experience
shall be an added advantage. Upper age limit
shall be 45 years.
Minimum 10 years of
experience as on
31.03.2013
Diploma in Electrical Engineering. He should
have exposure to quality assurance programs in
new construction, maintenance/rehabilitation
projects using modern technology. He shall be
required at site as directed by the designated
Construction Agency. He must be familiar with
modern methods of Electrical works in the all
types of buildings/ Infrastructure Projects,
design standards, technical specifications and
standard quality control/assurance procedurefor electrical works in different components of
buildings. Higher qualification and experience
shall be an added advantage. Upper age limit
shall be 45 years.6 Building Engineer
(Mechanical)
Minimum 5 years of
experience as on
31.03.2013
Graduate in Mechanical Engineering. He should
have exposure to quality assurance programs of
latest relevant equipments and their
maintenance/rehabilitation using modern
technology. He shall be required at site as
directed by the designated ConstructionAgency. He must be familiar with modern
methods of Mechanical works used in all types
1
-
7/29/2019 Signature Building Tor
9/27
of buildings/Infrastructure Projects, design
standards, technical specification and standard
quality control/assurance procedure for
mechanical works in different components of
buildings. Higher qualification and experience
shall be an added advantage. Upper age limitshall be 45 years.
Minimum 10 years of
experience as on
31.03.2013
Diploma in Mechanical Engineering. He
should have exposure to quality assurance
programs of latest relevant equipments and
their maintenance/rehabilitation using modern
technology. He shall be required at site as
directed by the designated Construction
Agency. He must be familiar with modern
methods of Mechanical works used in all types
of buildings/Infrastructure Projects, designstandards, technical specifications and standard
quality control/assurance procedure for
mechanical works in different components of
buildings. Higher qualification and experience
shall be an added advantage. Upper age limit
shall be 45 years.
4.6. Office/Field/Laboratory equipment facility.Consultant/firm must own minimum following assets / equipments.
4.7. Indicative List of minimum requirement of Equipments
1. Survey Instruments including Total Station 01 Set
2. Sieves of all sizes i/c Sieve Shaker and Balances of required capacity. 04 Sets
3. Compressive strength testing machine. 03 Sets
4. Core Cutting Machine. 02 Sets
5. Equipment for Cement Testing. 01 No.
6. USPV (Ultra Sonic Pulse Velocity) Meter 01 No.
7. Moisture Meter. 04 Nos.
8. Rebound Hammer. 03 Nos.
9. Leak Detection Equipment. 01 No
5. Scope of Work for Quality Control Consultant
1
-
7/29/2019 Signature Building Tor
10/27
5.1 Pre Construction Stage
1. Review and report the land requirement/ availability & other clearances to begin construction.
2. Review and scrutinize the structural, architectural and service drawings.
3. Review and scrutinize bid documents & bid process against the standard norms & procedure adopted byGovernment of Uttar Pradesh.
4. Review and report on Program Implementation plan and prepare program on PERT/CPM and otherstandard Project management techniques such as MS Project/Primavera etc.
5.2 Construction Stage
1. Report on compliance to statutory requirements.
2. Carry out all quality tests of materials being used, Process being adopted, test on end product withspecified frequency in order to ensure the serviceability and durability as per relevant IS Codes, NBC &other relevant norms/guidelines. To the extent possible, the field testing and sampling shall be done inthe presence of designated Agency/Contractors representatives.
3. Examine and clear/approve the design of temporary structure and all formworks etc as per the approvedprogram and as per the requirement of the Project.
4. Carry out documentation on quality assurance/quality control reports periodically as set out bycompetent authority.
5. Documentation and video/photography of quality related issues including its compliances with date asand when required.
6. Certify the quality of work on each running bill, final bill and ensure the compliance of the defects/shortcomings identified during inspection and testing of works.
7. Consultant will issue stage clearance at different stages to contractor as specified by the competentauthority in accordance of Specifications/Standards adopted.
8. Review the Final Bill and assist in Finalization of Contract in view of terms and conditions of the
Contract.9. Assist designated agency in case of disputes/arbitration/court cases with contractor.
10. Consultant shall be accountable to the statutory quality audit/investigation agencies/organizations.
11. Review Contract monitoring and submit report periodically as set out by competent authority.
12. Report periodically on implementation plan and identify the lapses and suggest remedy thereof.
13. Report on compliance to directives by Regulatory bodies/Authority of Govt. of Uttar Pradesh/Localbodies.
5.3 Commissioning, trial run and testing stage
1. Report on Assets created.
2. Reports on completion of projects.3. Review of Operation & maintenance (O&M) manual and other related documents etc.
4. Assist in putting System of O&M in place
5. Report on Training requirements of staff with regards to O&M.
6. Reports on handing over & documentation, such as As Built drawings operational instructions andequipment manuals to the O&M etc.
5.4 Post construction Stage
4.7.Report on functionality & usage.
4.8.Report on O&M of assets created including common amenities.
4.9.Report on overall performance and sustainability of the assets created.5.5 Schedule of Inspection
1
-
7/29/2019 Signature Building Tor
11/27
Consultant will ensure his presence at site during all construction operations irrespective of day /night oroff days as per the requirement of the project. The Schedule of Inspection by Team leader/Specialistshall be developed based on the work programs adopted by UPPWD/Designated agency, which will bereviewed on a regular basis. The Consultant will adhere to this program along with frequent surprisechecks depending upon the job.
5.6 Review and ReportsSl.No. Nature of review Timing Method of review Frequency
(a) Pre-Construction Stage
1 Review of drawings,specifications, bid documentand process.
Prior to floating oftender.
Inter departmental
correspondences and
official records
Asrequired
2 Review of site preparationand clearances to begin
construction
Prior to start ofconstruction
Inter departmental
correspondences and
official records
Asrequired
3 Review of Contract
Monitoring and PIP (ProjectImplementation Plan)
After deployment
of ProjectManagement
Systems
As per official records,
observations/discussionswith designated agency
As
required
(b) Construction Stage & Commissioning, Trial-Runs and Testing Stage
4 Report on PIP and Physicalprogress of project
After handing overthe site tocontractor/Firm,and regularly overthe EntireConstruction
period
Review of milestones asper Implementation Planand actual physical
progress of work.
Discussions with
contractor/firm and
designated Agency
Asrequired
5 Report on quality
assurance system
Inspect and carry out testcontinuously as per laiddown norms andfrequency/ discussionswith contractor/ firm and
designated Agency
6 Compliance to the statutory
requirements
Pre-Construction,during
Construction andPost Constructionstage
As per UPPWD
Guidelines/requirement of
statutory agencies/Contract document forthe project.
Review with respect to
relevant legislation/rules/guide lines ofregulatory / statutory
bodies
Asrequired
7 Commissioning, Trial runsand Testing
Commissioning,trial runs and
testing Stage
As per Records and
discussion with
concerned officials
Asrequired
(c)Post-Construction Stage
8 Report on overall Post Construction Records and discussion As
1
-
7/29/2019 Signature Building Tor
12/27
performance of the
asset created (project)
Stage, until defectliability periodafter completion of
project
with designated agency required
6. INFORMATION TO THE CONSULTANTS-6.1 RESPONSIBILITY OF THE DESIGNATED CONSTRUCTION AGENCY
(a) Free but limited access essentially required for fulfilling the obligations under the contract will beprovided to peruse all the records of the project work like estimates, designs, tenders, agreements and allrelated correspondences from the concerned administrative departments of Govt. of U.P.
(b) Free access will be provided to the project work site for carrying out inspections, testing and all relatedactivities and to the entire documents relevant to the project for carrying out all the obligations as perthe scope of the contract.
(c) Free access will be provided to all the quality control labs of the contractor for carrying out tests and
perusal of all records pertaining to the project.(d) Authority for direct correspondence with regulatory bodies/authority etc shall be extended as and when
required.
6.2 Broad evaluation criteriaThe consultants proposal will be evaluated as per following criteria:-
Sl.
No
Item Criteria/
Marks
Max.
Marks
1 Methodology 5
2 Technical Experience of Organization 60
2.1Number of years experience as on 31.03.2013 3 years experience
4 years experience
5years experience
7years experience
Above 7years experience
7
9
11
13
15
15
2.2Number of Projects in the category Integrated BuildingProjects of cost > Rs. 50 crore, executed in last 5 years as on31.03.2013
One Project
Two Projects s Three or more Projects
20
25
30
30
2.3Number of Projects in the category Other InfrastructureProjects of cost > Rs. 50 crores, executed in last 5 years as on31.03.2013 (List Maximum 3 projects)
One Project Two Projects Three or more Projects
5
10
15
15
3 Key Personnel Marks perno
25
1
-
7/29/2019 Signature Building Tor
13/27
3.1 1) Team Leader/Specialist 01 No.
Post Graduate in civil engineering with 25 yearsexperience/Graduate in civil engineering with 30 yearsexperience as on 31.03.2013.
Graduate in civil engineering with 25 years experienceas on 31.03.2013.
Post Graduate in civil engineering with 20 yearsexperience as on 31.03.2013.
Graduate in civil engineering with 20 years experienceas on 31.03.2013.
8
7
6
5
8
3.2 2) Project Formulation and Procurement Specialist. 1/2 No.
Post Graduate with 25 years experience./Graduatewith30 years experience as on 31.03.2013.
Post Graduate with 20 years experience/Graduate with25 years experience as on 31.03.2013.
Post Graduate with 15 years experience/Graduate with20 years experience as on 31.03.2013.
Graduate with 15 years experience as on 31.03.2013.
10
8
7
6
5
3.3 3) Senior Building Engineer 02 Nos.
Graduate with 20 years experience/Diploma in Civilengineering with 25 years experience as on31.03.2013.
Graduate with 15 years experience/Diploma in Civilengineering with 20 years experience as on31.03.2013.
Graduate with 10 years experience/Diploma in Civilengineering with 15 years experience as on
31.03.2013.
3.50
3.0
2.50
7
3.4 4) Building Engineer (3 No. Civil, 1 No. Electrical and 1/4 No.Mechanical) - 4.25 Nos.
Graduate with 15 years experience/Diploma in Civilengineering with 20 years experience as on31.03.2013.
Graduate with 10 years experience/Diploma in Civilengineering with 15 years experience as on31.03.2013.
Graduate with 5 years experience/Diploma in Civilengineering with 10 years experience as on
31.03.2013.
1.18
0.90
0.75
5
4 Financial Strength of the Consultant 10
4.1Max. Annual Turnover in Last Five years (2008-09 to 2012-13) 5 Crorers
10 Crorers
15 Crorers
Above 15 Crorers
5
7
9
10
10
Total 100
Qualifying marks 75
The Consultant securing marks 75% and above shall be considered forEmpanelment
1
-
7/29/2019 Signature Building Tor
14/27
6.3. The applicant shal l furnish contact particulars along with relevant Officers of the previousclientele, for which the above works have been executed, to enable UPPWD to verify the same. Theapplicant should also furnish the following:-
(a) Successful completion certificate mentioning Start and End date of the work duly signed by the client
organizations project in-charge / any equivalent officer not less than Executive Engineer / the
authorized signatory, otherwise the project claimed to be executed by the applicant will not beconsidered for evaluation.
(b) Copies of work orders / contracts from the client stating the project title, project value and the brief
scope of work of the project.
(c) If the applicant firm has completed projects as Joint Venture with some other firms, weightage shall
be given as per the JV share. However if the applicant firm has executed the project as associate
with some other firms, 25% weightage shall be given to the applicant firm for the projects
completed under such association.
6.4. The firm shall furnish the Curriculum Vitae of the Technical personnel as per format given at
Annexure II. The CVs must be signed by Technical personnel and counter-signed by authorized
representative in ink on each and every page and should not be older than three months from the date
of submission of application. Photograph of the Technical perso nnel shall be af fixed on thei r
respective CV. The contact address with telephone / mobile number, e-mail ID of the Technical
personnel should also be furnished. The CVs must indicate the actual service provided by the
Technical personnel in detail. The retainer Technical personnel, if any, shall specifically mention the
names of other firms also in which he is associated as a retainer. A retainer will get only 60 % credit
of that of a full time expert. A technical person associated with more than two firms shall not be
treated as retainer and his CV will not be considered for evaluation. However Project Formulation
and Procurement Specialist can be associated with maximum of four firms as retainer.
6.5. Documentary proof in the form of a Certificate from the statutory auditor/ chartered accountant
of the applicants company duly signed and stamped by the statutory auditor/chartered accountant
needs to be submitted as proof for annual turnover as Annexure VI. Base year for determination
of escalation shall be 2012-13 and the following enhancement/escalation factor will be used as
under.
Financial Year Enhancement /Escalation Factor
2012-13 1.00
2011-12 1.05
2010-11 1.10
2009-10 1.15
2008-09 1.20
Note: - The applicant should indicate annual turnover without accounting for the above factors.
6.6. The Eligibility Requirement, mentioned above is for the purpose of initial screening of the
applications only.
6.7. The Consultant firms/ Agencies / Technical Universities or Institutions must have Registration
number for Income Tax, Service Tax, PAN and TAN.
6.8. The firm shall furnish its relevant experience strictly as per format given at Annexure III.
The firm must supplement the experience claimed by furnishing the copies of certificates from
1
-
7/29/2019 Signature Building Tor
15/27
client, clearly indicating the actual service provided by the firm for that project.
6.9. It is suggested that the firm should fill up Annexure I, vis--vis the supporting details vide
Annexure II, III , IV, V, VI, VII & VIII and any other information with due care so as to avoid any
ambiguity.
6.10. In case spaces available in the Annexure- I, II , III, IV, V, VI, VII & VIII are limited to
accommodate all the information, separate sheets may be used for the purpose so that relevant
information submitted are sufficient, neat and legible.
6.11. Methodology of Quality Control in Building Project work will be submitted by the Third Party
Consultant with the application of EOI as Annexure VIII.
6.12. The applications not complying with the above mentioned condition and found to be deficient
in any respect, shall be summarily rejected.
6.13. Consulting firms should note that only authenticated information should be provided in theprescribed format. Information provided by the consulting firms would be verified and if any of the
information provided by the consultant is found incorrect / false, then it may lead to rejection of a
firms proposal at any stage even after empanelment. Firms submitting false/incorrect information,
or suppressing the information shall be debarred from empanelment for two years and shall not be
eligible to participate in bidding in any project of Government of U.P.
6.14. The applications should be submitted ONLY in HARD BOUND (Hard bound implies such binding
between two covers through stitching or otherwise whereby it may not be possible to replace any
paper without disturbing the document) form with all pages sequentially numbered either at the top or
at the bottom right hand corner of each page e.g. by writing page 1 of 10 on page 1, if total pages are
10 .All pages of the application document shall be initialed by authorized signatory of the applicant.
It should also have an index giving pagewise information of above documents and strictly in sequence
given in the format at Annexure I. Incomplete application or those received without hard bound,
will summarily be rejected. Intending consultants, should submit their application for empanelment
to the CHIEF ENGINEER (BUILDINGS), UTTAR PRADESH PUBLIC WORKS DEPARTMENT,
96, M.G. Road, Lucknow 226001.
6.15. The UP PWD reserves the right to reject any or all applications without assigning any reason. After
evaluation, a panel of consultants will be formed depending on the capacity and experience of
the consultants and the same will be communicated to all concerned departments and PSUs of
Government of U.P. to draw upon, as and when necessary, for purpose of obtaining offers forparticular projects.
6.16. Notwithstanding the formation of these panels, the UP PWD may go in for separate
empanelment for specific assignments, if it so decides.
6.17. The applicant shall not be considered for empanelment if the applicant is debarred /blacklisted at the
time of submission of the application in the UPPWD. The applicant shall submit litigation
history/undertaking on non-judicial stamp paper duly notarized to the effect that the applicant has not
been debarred or blacklisted by UPPWD or any other government agency at Annexure -VII.
6.18. If the applicant after empanelment changes its name, they may seek for incorporation of the change ofname in the empanelled list with full documentary proof.
6.19. Consulting Firms having certificate towards accreditation from NABCB of QCI (National
1
-
7/29/2019 Signature Building Tor
16/27
Accreditation Board for Certification Bodies of Quality Council of India) may have extra weightage.
Similarly, consulting firms having empanelment in any state /central agencies of India may also have
extra weightage.
6.20. The Consultant should be ready to work in any region of the state of Uttar Pradesh and ensure to
establish site office and laboratory including supporting staff at site of work.
6.21. TIME FRAME/Duration of Consultancy
Duration of Third Party Quality Control Consultant shall be from Preconstruction stage to the expiry of
defect liability period of Project.
6.22. PERIOD OF EMPANELMENT
The empanelment would be for a period ofthree years and can be extended up to two more years on an
yearly basis by the Engineer-in-Chief (Rural Roads), Uttar Pradesh Public Works Department.
6.23. TERMINATION OF EMPANELMENT:
Engineer in- Chief (Rural Roads), Uttar Pradesh Public Works Department, if at any stage, on the basis of
performance and compliance of terms and conditions of the contract by the Consultant, finds that theConsultant has not performed satisfactorily, or if in his view, the Consultant has failed to safeguard theinterest of Government of Uttar Pradesh, he may, terminate the Empanelment of the Consultant on therecommendation of Chief Engineer (Building), after due consideration.
6.24. FINANCIAL OFFER:
@ 1.50% (one point five percent) of the estimated cost of work / project.
Note: All remuneration is inclusive of all taxes
Yours faithfully,
CHIEF ENGINEER (BUILDINGS)
UTTAR PRADESH PUBLIC WORKS DEPARTMENT
En cl: Ann exu re I, II, III, IV, V, VI, VII & VIII.
1
-
7/29/2019 Signature Building Tor
17/27
Ann exu re I
DETAILS OF ORGANIZATION
(Note : In case of Consortium, this form is to be furnished not only by the lead member
applying for the EOI, but also furnish separately for each member of consortium,who would be associated withthis project work, ifapplicable)
Sl.
No.
Particulars Details
1 Name & Address of the applicant
a TelephoneNos. Land Line :
Cell Phone :
b E Mail ID
c Fax
d URL of website (ifany)
2 Pl. Mention whether EOI is submitted by a
Firm/ Company/ Consortium
3 Year of establishment and commencement of
business
4 Certificate towards accreditation from NABCB of
QCI (National Accreditation Board for
Certification Bodies of Quality Council of
India
(attach the photocopy of the NABCB
accreditation certificate5 Legal status of the applicant(attach copies of registration of the
Firm/Company)
(In case of consortium, also furnish the
confirmation by the Consortium members
authorizing the Lead
Member to sign on behalf ofthe
Consortium)
6 Details of Board of Directors/Partners /Key
Officials
7 Designation of individuals authorized to act for
the organization.
1
-
7/29/2019 Signature Building Tor
18/27
8 Total No. of professional staff (In house)
9 Has the applicant or any constituent partner
in case of partnership firm, ever been
debarred / black listed for competing in any
or anization at an time? If so, ive details10 Has the applicant or any constituent partner
in case of partnership firm, ever been
convicted by a court of law? If so, give
details.11 In which field of Consultancy the applicant
has specialization & interest.
12 Any other information considered
necessary but not included above.
13 Address of local office in Uttar Pradesh, ifany.
(Add separate sheets if spaceprovid ed is not sufficient)
Signature of Applicant:
Name ofSignatory:
Designation:
(Seal)
-
7/29/2019 Signature Building Tor
19/27
Ann exu re II
Infor m at i on of Equipments/So f t wares/ Technical /Key Pr of e ssionals
Expression of Interest to be empanelled as Third Party Inspection of
Signature Building Construction works
A) Equipments (for Quality Control)
B) List of Softwares (for Quality Control)
C) Technical Professionals: Qualification and Experience
Sl. Name Qualification Experience
1
2
3
4
5
6
7
8
9
-
7/29/2019 Signature Building Tor
20/27
D) Key Professionals: Qualification and Experience
Sl. Name Qualification Experience1
2
3
4
5
6
7
8
9
(Add separate sheets if spaceprovid ed is not sufficient)
Yours faithfully,
Signature ofApplicant:
Name ofSignatory:
Designation:
Seal
-
7/29/2019 Signature Building Tor
21/27
Annexu re III
Brief Bi o Data of Technical /Key Professionals
(This form to be furnished by the Technical/Key professionals separately thosewho wouldbe associated with this projectwork)
Nameoftheconsultant:
Professionalqualification:
Date of Birth:
Years with Firm:
Nationality:
Membership in Professional Societies:
DetailedTasktobeassignedinthisproject:
Key Qualifications:
[Give an outline of staff members experience and training relevant to responsibility
in context of assignment. Describe degree of responsibility held by staff member on
relevantprevious assignment and give dates and location. Use up to half apage.]
Education:
[Summarize college/university and other speci alized education of staff
member, giving names of schools, dates attended and degree(s) obtained. Use up
to a quarter page.]
Employment Record:
[Starting with present position, list in reverse order every employment held. List all
positions held by staff member since graduation, giving dates, name(s) of employing
organization(s), title of positions held and location of assignments. For experience in
last ten years, also give type of activities performed and client references,
wherever appropriate. Use up to three quarter of apage]
Languages:
[Indicate proficiency in speaking, reading and writing of English language:
excellent, good, fair, orpoor.]
-
7/29/2019 Signature Building Tor
22/27
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these bio
data correctly describe my qualifications, my experience and me.
Signature of the Consultant
Date:
-
7/29/2019 Signature Building Tor
23/27
WORK EXPERIENCE (Comple t ed Projects)(Add separate sheets if spaceprovided is not sufficient)
An n e xur eI V
Sl. * Name and
Address of
Client (from
which work
orders received)
Name of
Project
Period of
Consultancy
From
To
Brief
scope of
work
Cost of
Consultancy
(Rs.)
Cost of the
Project
(Rs.)
Remarks
1 2 3 4 5 6 7 8
* Furnish the photocopies of the work orders/contracts in support of the information provided above
Signature ofApplicant:
Name ofSignatory:
Designation:(Seal)
-
7/29/2019 Signature Building Tor
24/27
A n n e x ur eV
W O RK E X PE R IEN C E ( ONGOING
P R O J ECTS)Add separate sheets if spaceprovid ed is not
sufficient)
Sl. * Name and
Address of
Client (from
which work
Name of
Project
Period of
Consultancy
From
To
Brief
scope of
work
Cost of
Consultancy
(Rs.)
Cost of the
Project
(Rs.)
Remarks
1 2 3 4 5 6 7 8
* Furnish the photocopies of the work orders/contracts in support of the information provided above
Signature ofApplicant:
Name ofSignatory:
Designation:(Seal)
A n n e x ur eVI
FINANCIAL STATEMENT OF CONSULTANCY WORK
IN THE FIELD OF QUALITY ASSURANCE/CONTROL WORKS
Add separate sheets if space provided is not sufficient)
-
7/29/2019 Signature Building Tor
25/27
Signature of Applicant: Signature of C.A.
Name of Signatory:
Designation:
(Seal) (Seal)
Sl. Financial Year Annual turnover of
Consultancy work
Account details showing
Net Profit Figure
Remarks
1 2 3 4 5
1 2012-13
2 2011-12
3 2010-11
4 2009-10
5 2008-09
-
7/29/2019 Signature Building Tor
26/27
An n e x u r e VII
UNDERTAKING REGARDING NON-DEBARREMNENT/BLACKLISTING/DETAILS OF
LITIGATION HISTORY
An n e x u r e VIII
METHODOLOGY
-
7/29/2019 Signature Building Tor
27/27