    UTTAR PRADESH PUBLIC

    WORKS DEPARTMENT

    EXPRESSION OF INTEREST FOR EMPANELMENT OF

    THIRD PARTY QUALITY CONTROL CONSULTANTS FOR

    SIGNATURE BUILDING WORKS

    AUGUST, 2013

    96, M.G. Road, Lucknow226001Phone/Fax: 0522-2235624

    1

  • 7/29/2019 Signature Building Tor

    2/27

    EXPRESSION OF INTEREST FOR EMPANELMENT

    OF THIRD PARTY QUALITY CONTROL

    CONSULTANTS FOR SIGNATURE BUILDING

    WORKS

    IMPORTANT DATES

    i) Sale of Application Documents: 12.08.2013(10:00 hours) to 11.09.2013 (17:00hours)

    ii) Last date of receipt of queries: 22.08.2013 (15:00 hours)

    iii) Date of Pre EOI meeting 26.08.2013 (12.00 hours) at address given below

    iv) Last date of submission of Application: 12.09.2013 (15:00 hours)

    v) Date of Opening of EOI Application: 12.09.2013 (16.00 hours)

    CONTACT POINT FOR ALL CLARIFICATIONS:

    CHIEF ENGINEER (BUILDINGS)

    UTTAR PRADESH PUBLIC WORKS DEPARTMENT

    96, M.G. Road

    Lucknow 226001

    Phone/Fax: 0522- 2235624.

    Email:[email protected]

    1

  • 7/29/2019 Signature Building Tor

    3/27

    EXPRESSION OF INTEREST FOR EMPANELMENT

    OF THIRD PARTY QUALITY CONTROL

    CONSULTANTS FOR SIGNATURE BUILDING

    WORKS

    INDEX

    Sl.No. Particular Page No.

    1 IMPORTANT DATES 22 INDEX 3

    3 INTRODUCTION 4

    4 QUALIFICATION CRITERIA 5 - 9

    5 SCOPE OF WORK 10 - 12

    6 INFORMATION TO THE CONSULTANTS 12 - 16

    7 ANNEXURE 17 27

    1

  • 7/29/2019 Signature Building Tor

    4/27

    EXPRESSION OF INTEREST FOR EMPANELMENT OF THIRD PARTY

    QUALITY CONTROL CONSULTANTS FOR

    SIGNATURE BUILDING WORKS

    1. INTRODUCTION

    Government of Uttar Pradesh has resolved to take up construction of Signature Buildings vide GO No-

    E-8-394/Ten-2013-1074/2012, dated: 07.03.2013.Uttar Pradesh Rajkiya Nirman Nigam (UPRNN) and

    Uttar Pradesh Construction and Design Services (Uttar Pradesh Jal Nigam) have been designated as

    Construction Agency for Signature Buildings .The Govt. of U.P. has also decided to appoint an

    efficient Third Parity Quality Control system to ensure the best possible quality standards in these

    special Buildings. Third Party Quality Control Consultant would be doing quality assurance etc. and

    would certify the same. Uttar Pradesh Public Work Department (UPPWD) has been entrusted with the

    responsibility to invite Expression of Interest and accomplish the Empanelment of Third PartyQuality Control Consultant for Signature Building Construction works vide GO No- 560EG/23-5-13-

    24EG/13, dated: 11.06.2013

    2. OBJECTIVES

    The main objective of appointing a Third Party Quality Control Consultant is to assist the designated

    Construction Agencies and Employer in maintaining the highest quality standards with reference to

    Approved manuals/BIS codes/prevailing relevant international standards/best building construction

    practices by independent team of experts at various stages of construction such as (i) Pre Construction

    Stage (ii) Construction stage (iii) Commissioning, trial run and testing stage (iv) Post Construction

    Stage.

    3. GENERAL-

    3.1. Information on the Expression of Interest

    In order to obtain any first-hand information on the Expression of Interest of Empanelment ofThird Party Quality Control Consultant, it is considered desirable that representative of the Consultant

    Firm or Company/Recognized Educational and Research Institution with domain specialization to visit

    the office of the Chief Engineer (Building)- UPPWD, 96, M.G. Road, Lucknow 226001 before the

    proposal is submitted. Representatives of consultant firm/company can meet the following official for

    further information, if any:-

    CHIEF ENGINEER (BUILDINGS)

    UTTAR PRADESH PUBLIC WORKS DEPARTMENT

    96, M.G. Road

    Lucknow 226001

    Phone/Fax: 0522- 2235624.

    Email:[email protected]

    Please ensure that advance intimation regarding the visit is sent to enable/make appropriate timearrangement.

    1

  • 7/29/2019 Signature Building Tor

    5/27

    3.2. Ap p l ica t i on f eeRs5000/-(non-refundable) in the form of DD/Pay order of scheduled bank in favour ofExecutive

    Engineer, Maintenance Division-1(civil ), UPPWD, Lucknow, payable at Lucknow.

    4. Qualification Criteria

    4.1. Structure and organization of the Firm

    i. Category APublic Sector, with complete liabilities to Central or any State Government within the Union of India.

    a. Central/ State public sector undertakings registered under Companies Act.

    b. Autonomous research and development institutes with complete liability of local State or Central

    Governments.c. Academic institutions with complete liability of local State or Central Governments, which are eligible

    for professional practice as per UGC/ MoHRD norms.

    ii. Category B

    Private Sector, including Sole Proprietorship, Full liability partnership, limited liability partnershipentities, cooperative sector entities, registered within the Union of India.

    a. Entities registered under Companies Act including Section 25, companies not included under Category

    A

    b. Autonomous research and development institutes not included under Category A

    c. Academic institutions not included under Category A

    4.2. Financial -

    The Consultant must have minimum required annual turnover in any one of the last five years of

    consultancy work in the field of Quality Assurance/Control Projects ofRs. 5 crores.

    4.3. TECHNICAL-

    Minimum Three years of experience in the field of construction supervision & quality control in

    various infrastructure works.

    Should have executed at least one Third party inspection assignment of a single civil construction work

    having value of at least Rs. 50 crores.

    4.4. Technical Personnel

    The Consultant must have minimum number of full time Technical Personnel who are in the payroll of

    the firm for at least one year as on 31.03.2013 with following qualifications and relevant experience.

    a. Post graduate in Civil Engineering with at least 15 years of experience or Graduate in Civil

    Engineering with at least 20 years of experience as on 31.03.2013- 01 Person.

    b. Graduate in Business Administration with at least 20 years of experience as on 31.03.2013- 01

    Person

    c. Graduate in Civil Engineering with at least 10 years of experience or Diploma in civil engineering

    with at least 15 years as on 31.03.2013. - 03 persons.

    d. Graduate in civil /electrical/mechanical engineering with at least 05 years of experience or Diploma

    in civil /electrical/mechanical engineering with at least 10 years of experience as on 31.03.2013.- 4

    persons

    4.5. Key Personnel Requirement

    Any Quality consultant agency must include minimum following personnel in a project team. Size of

    1

  • 7/29/2019 Signature Building Tor

    6/27

    project team will vary depending upon the project size and respectively deploy supporting staff as perrequirement of project. Applicant needs to submit an undertaking accordingly

    1) Team Leader/Specialist 1 No.

    2) Project Formulation and Procurement Specialist- 1/2 No.

    3) Senior Building Engineer 2 No.

    4) Building Engineer (3 No. Civil, 1 No. Electrical and 1/4 No. Mechanical)

    Note: Minimum 04 Key Personnel (Team leader/Specialist- 01 No, Senior Building Engineer

    1 No, Building Engineer- 2 Nos) must be full time Employee on payroll of the firm for a

    minimum of last one year as on 31.03.2013.

    SL.No. Position Professional

    Experience

    Specific Expertise

    1 Team

    Leader/Specialist

    Minimum 20 years of

    experience as on

    31.03.2013

    Graduate in Civil Engineering. He would lead

    the multidisciplinary team of professionals

    engaged to carry out the job of third party

    inspection and monitoring Building Projects,therefore, should have a clear perception of the

    manner in which a quality service can be

    delivered within the available time. He should

    be a professional of stature who could

    command the respect of the team. Post

    Graduate Qualification in Structural

    Engineering will be an added advantage. Must

    have the experience of at least 3 years in

    quality assurance /quality control or related

    field as on 31.03.2013

    2 Project

    Formulation and

    Procurement

    Specialist

    Minimum 15 years of

    experience as on

    31.03.2013

    Graduate/post graduate in Civil Engineering or

    Graduate /Postgraduate in Business

    Administration. He should have handled in

    similar capacity at least one project of similar

    nature. The candidate should have a thorough

    knowledge of standard Procurement

    procedures, Contract management and

    planning in Technical, legal and Financial

    aspects etc. Higher qualification and

    experience will be an added advantage.

    1

  • 7/29/2019 Signature Building Tor

    7/27

    3 Senior Building

    Engineer

    Minimum 10 years of

    experience as on

    31.03.2013

    Graduate in Civil Engineering. He should have

    handled in similar capacity at least one project

    of similar nature and must have minimum

    specific experience of 3 years in quality

    assurance as on 31.03.2013. He shall be

    responsible for all the aspects related to the

    quality of the work and shall guide, superviseand monitor the work of the other experts in his

    team.

    The candidate should have a thorough

    knowledge of latest specifications pertaining to

    building works and also of other related

    publications, according to which the works are

    required to be carried out and the tests to be

    conducted to ensure quality of work. Higher

    qualification and experience will be an added

    advantage. Upper age limit shall be 55 years.

    Minimum 15 years of

    experience as on

    31.03.2013

    Diploma in Civil Engineering. He should have

    handled in similar capacity at least one project

    of similar nature and must have a minimum

    experience of 3 years in relevant field as on

    31.03.2013. He shall be responsible for all the

    aspects related to the quality of the work and

    shall guide, supervise and monitor the work of

    the other experts in his team.

    The candidate should have a thorough

    knowledge of latest specifications pertaining tobuilding works and other related publications,

    according to which the works are required to be

    carried out and the tests to be conducted to

    ensure a good quality work. Higher

    qualification and experience will be an added

    advantage. Upper age limit shall be 55 years.

    4 Building Engineer

    (Civil)

    Minimum 5 years of

    experience as on

    31.03.2013

    Graduate in Civil Engineering. He should also

    have exposure to quality assurance programs in

    new construction, maintenance/ rehabilitation

    projects using modern technology. He shall berequired at site as directed by the Designated

    Construction Agency and shall inspect and find

    out deficiencies in the building and find out

    remedial suitable measures. He must be

    familiar with modern methods of construction

    of building, design standards, technical

    specification and standard quality control

    /assurance procedure for construction of

    different components of buildings. Higher

    qualification and experience shall be an added

    advantage. Upper age limit shall be 45 years.

    Minimum 10 years of Diploma in Civil Engineering. He should also

    1

  • 7/29/2019 Signature Building Tor

    8/27

    experience as on

    31.03.2013

    have exposure to quality assurance programs in

    new construction, maintenance/rehabilitation

    projects using modern technology. He shall be

    required at site as directed by the designated

    Construction Agency and shall inspect and find

    out deficiencies in the building and find out

    suitable remedial measures. He must befamiliar with modern methods of construction

    of building, design standards, technical

    specification and standard quality control

    /assurance procedure for construction of

    different components of building. Higher

    qualification and experience shall be an added

    advantage. Upper age limit shall be 45 years

    5 Building Engineer

    (Electrical)

    Minimum 5 years of

    experience as on

    31.03.2013

    Graduate in Electrical Engineering. He should

    have exposure to quality assurance programs in

    new construction, maintenance/rehabilitationprojects using modern technology. He shall be

    required at site as directed by the designated

    Construction Agency. He must be familiar with

    modern methods of Electrical works in the all

    types of buildings/ Infrastructure Projects,

    design standards, technical specifications and

    standard quality control/assurance procedure

    for electrical works in different components of

    buildings. Higher qualification and experience

    shall be an added advantage. Upper age limit

    shall be 45 years.

    Minimum 10 years of

    experience as on

    31.03.2013

    Diploma in Electrical Engineering. He should

    have exposure to quality assurance programs in

    new construction, maintenance/rehabilitation

    projects using modern technology. He shall be

    required at site as directed by the designated

    Construction Agency. He must be familiar with

    modern methods of Electrical works in the all

    types of buildings/ Infrastructure Projects,

    design standards, technical specifications and

    standard quality control/assurance procedurefor electrical works in different components of

    buildings. Higher qualification and experience

    shall be an added advantage. Upper age limit

    shall be 45 years.6 Building Engineer

    (Mechanical)

    Minimum 5 years of

    experience as on

    31.03.2013

    Graduate in Mechanical Engineering. He should

    have exposure to quality assurance programs of

    latest relevant equipments and their

    maintenance/rehabilitation using modern

    technology. He shall be required at site as

    directed by the designated ConstructionAgency. He must be familiar with modern

    methods of Mechanical works used in all types

    1

  • 7/29/2019 Signature Building Tor

    9/27

    of buildings/Infrastructure Projects, design

    standards, technical specification and standard

    quality control/assurance procedure for

    mechanical works in different components of

    buildings. Higher qualification and experience

    shall be an added advantage. Upper age limitshall be 45 years.

    Minimum 10 years of

    experience as on

    31.03.2013

    Diploma in Mechanical Engineering. He

    should have exposure to quality assurance

    programs of latest relevant equipments and

    their maintenance/rehabilitation using modern

    technology. He shall be required at site as

    directed by the designated Construction

    Agency. He must be familiar with modern

    methods of Mechanical works used in all types

    of buildings/Infrastructure Projects, designstandards, technical specifications and standard

    quality control/assurance procedure for

    mechanical works in different components of

    buildings. Higher qualification and experience

    shall be an added advantage. Upper age limit

    shall be 45 years.

    4.6. Office/Field/Laboratory equipment facility.Consultant/firm must own minimum following assets / equipments.

    4.7. Indicative List of minimum requirement of Equipments

    1. Survey Instruments including Total Station 01 Set

    2. Sieves of all sizes i/c Sieve Shaker and Balances of required capacity. 04 Sets

    3. Compressive strength testing machine. 03 Sets

    4. Core Cutting Machine. 02 Sets

    5. Equipment for Cement Testing. 01 No.

    6. USPV (Ultra Sonic Pulse Velocity) Meter 01 No.

    7. Moisture Meter. 04 Nos.

    8. Rebound Hammer. 03 Nos.

    9. Leak Detection Equipment. 01 No

    5. Scope of Work for Quality Control Consultant

    1

  • 7/29/2019 Signature Building Tor

    10/27

    5.1 Pre Construction Stage

    1. Review and report the land requirement/ availability & other clearances to begin construction.

    2. Review and scrutinize the structural, architectural and service drawings.

    3. Review and scrutinize bid documents & bid process against the standard norms & procedure adopted byGovernment of Uttar Pradesh.

    4. Review and report on Program Implementation plan and prepare program on PERT/CPM and otherstandard Project management techniques such as MS Project/Primavera etc.

    5.2 Construction Stage

    1. Report on compliance to statutory requirements.

    2. Carry out all quality tests of materials being used, Process being adopted, test on end product withspecified frequency in order to ensure the serviceability and durability as per relevant IS Codes, NBC &other relevant norms/guidelines. To the extent possible, the field testing and sampling shall be done inthe presence of designated Agency/Contractors representatives.

    3. Examine and clear/approve the design of temporary structure and all formworks etc as per the approvedprogram and as per the requirement of the Project.

    4. Carry out documentation on quality assurance/quality control reports periodically as set out bycompetent authority.

    5. Documentation and video/photography of quality related issues including its compliances with date asand when required.

    6. Certify the quality of work on each running bill, final bill and ensure the compliance of the defects/shortcomings identified during inspection and testing of works.

    7. Consultant will issue stage clearance at different stages to contractor as specified by the competentauthority in accordance of Specifications/Standards adopted.

    8. Review the Final Bill and assist in Finalization of Contract in view of terms and conditions of the

    Contract.9. Assist designated agency in case of disputes/arbitration/court cases with contractor.

    10. Consultant shall be accountable to the statutory quality audit/investigation agencies/organizations.

    11. Review Contract monitoring and submit report periodically as set out by competent authority.

    12. Report periodically on implementation plan and identify the lapses and suggest remedy thereof.

    13. Report on compliance to directives by Regulatory bodies/Authority of Govt. of Uttar Pradesh/Localbodies.

    5.3 Commissioning, trial run and testing stage

    1. Report on Assets created.

    2. Reports on completion of projects.3. Review of Operation & maintenance (O&M) manual and other related documents etc.

    4. Assist in putting System of O&M in place

    5. Report on Training requirements of staff with regards to O&M.

    6. Reports on handing over & documentation, such as As Built drawings operational instructions andequipment manuals to the O&M etc.

    5.4 Post construction Stage

    4.7.Report on functionality & usage.

    4.8.Report on O&M of assets created including common amenities.

    4.9.Report on overall performance and sustainability of the assets created.5.5 Schedule of Inspection

    1

  • 7/29/2019 Signature Building Tor

    11/27

    Consultant will ensure his presence at site during all construction operations irrespective of day /night oroff days as per the requirement of the project. The Schedule of Inspection by Team leader/Specialistshall be developed based on the work programs adopted by UPPWD/Designated agency, which will bereviewed on a regular basis. The Consultant will adhere to this program along with frequent surprisechecks depending upon the job.

    5.6 Review and ReportsSl.No. Nature of review Timing Method of review Frequency

    (a) Pre-Construction Stage

    1 Review of drawings,specifications, bid documentand process.

    Prior to floating oftender.

    Inter departmental

    correspondences and

    official records

    Asrequired

    2 Review of site preparationand clearances to begin

    construction

    Prior to start ofconstruction

    Inter departmental

    correspondences and

    official records

    Asrequired

    3 Review of Contract

    Monitoring and PIP (ProjectImplementation Plan)

    After deployment

    of ProjectManagement

    Systems

    As per official records,

    observations/discussionswith designated agency

    As

    required

    (b) Construction Stage & Commissioning, Trial-Runs and Testing Stage

    4 Report on PIP and Physicalprogress of project

    After handing overthe site tocontractor/Firm,and regularly overthe EntireConstruction

    period

    Review of milestones asper Implementation Planand actual physical

    progress of work.

    Discussions with

    contractor/firm and

    designated Agency

    Asrequired

    5 Report on quality

    assurance system

    Inspect and carry out testcontinuously as per laiddown norms andfrequency/ discussionswith contractor/ firm and

    designated Agency

    6 Compliance to the statutory

    requirements

    Pre-Construction,during

    Construction andPost Constructionstage

    As per UPPWD

    Guidelines/requirement of

    statutory agencies/Contract document forthe project.

    Review with respect to

    relevant legislation/rules/guide lines ofregulatory / statutory

    bodies

    Asrequired

    7 Commissioning, Trial runsand Testing

    Commissioning,trial runs and

    testing Stage

    As per Records and

    discussion with

    concerned officials

    Asrequired

    (c)Post-Construction Stage

    8 Report on overall Post Construction Records and discussion As

    1

  • 7/29/2019 Signature Building Tor

    12/27

    performance of the

    asset created (project)

    Stage, until defectliability periodafter completion of

    project

    with designated agency required

    6. INFORMATION TO THE CONSULTANTS-6.1 RESPONSIBILITY OF THE DESIGNATED CONSTRUCTION AGENCY

    (a) Free but limited access essentially required for fulfilling the obligations under the contract will beprovided to peruse all the records of the project work like estimates, designs, tenders, agreements and allrelated correspondences from the concerned administrative departments of Govt. of U.P.

    (b) Free access will be provided to the project work site for carrying out inspections, testing and all relatedactivities and to the entire documents relevant to the project for carrying out all the obligations as perthe scope of the contract.

    (c) Free access will be provided to all the quality control labs of the contractor for carrying out tests and

    perusal of all records pertaining to the project.(d) Authority for direct correspondence with regulatory bodies/authority etc shall be extended as and when

    required.

    6.2 Broad evaluation criteriaThe consultants proposal will be evaluated as per following criteria:-

    Sl.

    No

    Item Criteria/

    Marks

    Max.

    Marks

    1 Methodology 5

    2 Technical Experience of Organization 60

    2.1Number of years experience as on 31.03.2013 3 years experience

    4 years experience

    5years experience

    7years experience

    Above 7years experience

    7

    9

    11

    13

    15

    15

    2.2Number of Projects in the category Integrated BuildingProjects of cost > Rs. 50 crore, executed in last 5 years as on31.03.2013

    One Project

    Two Projects s Three or more Projects

    20

    25

    30

    30

    2.3Number of Projects in the category Other InfrastructureProjects of cost > Rs. 50 crores, executed in last 5 years as on31.03.2013 (List Maximum 3 projects)

    One Project Two Projects Three or more Projects

    5

    10

    15

    15

    3 Key Personnel Marks perno

    25

    1

  • 7/29/2019 Signature Building Tor

    13/27

    3.1 1) Team Leader/Specialist 01 No.

    Post Graduate in civil engineering with 25 yearsexperience/Graduate in civil engineering with 30 yearsexperience as on 31.03.2013.

    Graduate in civil engineering with 25 years experienceas on 31.03.2013.

    Post Graduate in civil engineering with 20 yearsexperience as on 31.03.2013.

    Graduate in civil engineering with 20 years experienceas on 31.03.2013.

    8

    7

    6

    5

    8

    3.2 2) Project Formulation and Procurement Specialist. 1/2 No.

    Post Graduate with 25 years experience./Graduatewith30 years experience as on 31.03.2013.

    Post Graduate with 20 years experience/Graduate with25 years experience as on 31.03.2013.

    Post Graduate with 15 years experience/Graduate with20 years experience as on 31.03.2013.

    Graduate with 15 years experience as on 31.03.2013.

    10

    8

    7

    6

    5

    3.3 3) Senior Building Engineer 02 Nos.

    Graduate with 20 years experience/Diploma in Civilengineering with 25 years experience as on31.03.2013.

    Graduate with 15 years experience/Diploma in Civilengineering with 20 years experience as on31.03.2013.

    Graduate with 10 years experience/Diploma in Civilengineering with 15 years experience as on

    31.03.2013.

    3.50

    3.0

    2.50

    7

    3.4 4) Building Engineer (3 No. Civil, 1 No. Electrical and 1/4 No.Mechanical) - 4.25 Nos.

    Graduate with 15 years experience/Diploma in Civilengineering with 20 years experience as on31.03.2013.

    Graduate with 10 years experience/Diploma in Civilengineering with 15 years experience as on31.03.2013.

    Graduate with 5 years experience/Diploma in Civilengineering with 10 years experience as on

    31.03.2013.

    1.18

    0.90

    0.75

    5

    4 Financial Strength of the Consultant 10

    4.1Max. Annual Turnover in Last Five years (2008-09 to 2012-13) 5 Crorers

    10 Crorers

    15 Crorers

    Above 15 Crorers

    5

    7

    9

    10

    10

    Total 100

    Qualifying marks 75

    The Consultant securing marks 75% and above shall be considered forEmpanelment

    1

  • 7/29/2019 Signature Building Tor

    14/27

    6.3. The applicant shal l furnish contact particulars along with relevant Officers of the previousclientele, for which the above works have been executed, to enable UPPWD to verify the same. Theapplicant should also furnish the following:-

    (a) Successful completion certificate mentioning Start and End date of the work duly signed by the client

    organizations project in-charge / any equivalent officer not less than Executive Engineer / the

    authorized signatory, otherwise the project claimed to be executed by the applicant will not beconsidered for evaluation.

    (b) Copies of work orders / contracts from the client stating the project title, project value and the brief

    scope of work of the project.

    (c) If the applicant firm has completed projects as Joint Venture with some other firms, weightage shall

    be given as per the JV share. However if the applicant firm has executed the project as associate

    with some other firms, 25% weightage shall be given to the applicant firm for the projects

    completed under such association.

    6.4. The firm shall furnish the Curriculum Vitae of the Technical personnel as per format given at

    Annexure II. The CVs must be signed by Technical personnel and counter-signed by authorized

    representative in ink on each and every page and should not be older than three months from the date

    of submission of application. Photograph of the Technical perso nnel shall be af fixed on thei r

    respective CV. The contact address with telephone / mobile number, e-mail ID of the Technical

    personnel should also be furnished. The CVs must indicate the actual service provided by the

    Technical personnel in detail. The retainer Technical personnel, if any, shall specifically mention the

    names of other firms also in which he is associated as a retainer. A retainer will get only 60 % credit

    of that of a full time expert. A technical person associated with more than two firms shall not be

    treated as retainer and his CV will not be considered for evaluation. However Project Formulation

    and Procurement Specialist can be associated with maximum of four firms as retainer.

    6.5. Documentary proof in the form of a Certificate from the statutory auditor/ chartered accountant

    of the applicants company duly signed and stamped by the statutory auditor/chartered accountant

    needs to be submitted as proof for annual turnover as Annexure VI. Base year for determination

    of escalation shall be 2012-13 and the following enhancement/escalation factor will be used as

    under.

    Financial Year Enhancement /Escalation Factor

    2012-13 1.00

    2011-12 1.05

    2010-11 1.10

    2009-10 1.15

    2008-09 1.20

    Note: - The applicant should indicate annual turnover without accounting for the above factors.

    6.6. The Eligibility Requirement, mentioned above is for the purpose of initial screening of the

    applications only.

    6.7. The Consultant firms/ Agencies / Technical Universities or Institutions must have Registration

    number for Income Tax, Service Tax, PAN and TAN.

    6.8. The firm shall furnish its relevant experience strictly as per format given at Annexure III.

    The firm must supplement the experience claimed by furnishing the copies of certificates from

    1

  • 7/29/2019 Signature Building Tor

    15/27

    client, clearly indicating the actual service provided by the firm for that project.

    6.9. It is suggested that the firm should fill up Annexure I, vis--vis the supporting details vide

    Annexure II, III , IV, V, VI, VII & VIII and any other information with due care so as to avoid any

    ambiguity.

    6.10. In case spaces available in the Annexure- I, II , III, IV, V, VI, VII & VIII are limited to

    accommodate all the information, separate sheets may be used for the purpose so that relevant

    information submitted are sufficient, neat and legible.

    6.11. Methodology of Quality Control in Building Project work will be submitted by the Third Party

    Consultant with the application of EOI as Annexure VIII.

    6.12. The applications not complying with the above mentioned condition and found to be deficient

    in any respect, shall be summarily rejected.

    6.13. Consulting firms should note that only authenticated information should be provided in theprescribed format. Information provided by the consulting firms would be verified and if any of the

    information provided by the consultant is found incorrect / false, then it may lead to rejection of a

    firms proposal at any stage even after empanelment. Firms submitting false/incorrect information,

    or suppressing the information shall be debarred from empanelment for two years and shall not be

    eligible to participate in bidding in any project of Government of U.P.

    6.14. The applications should be submitted ONLY in HARD BOUND (Hard bound implies such binding

    between two covers through stitching or otherwise whereby it may not be possible to replace any

    paper without disturbing the document) form with all pages sequentially numbered either at the top or

    at the bottom right hand corner of each page e.g. by writing page 1 of 10 on page 1, if total pages are

    10 .All pages of the application document shall be initialed by authorized signatory of the applicant.

    It should also have an index giving pagewise information of above documents and strictly in sequence

    given in the format at Annexure I. Incomplete application or those received without hard bound,

    will summarily be rejected. Intending consultants, should submit their application for empanelment

    to the CHIEF ENGINEER (BUILDINGS), UTTAR PRADESH PUBLIC WORKS DEPARTMENT,

    96, M.G. Road, Lucknow 226001.

    6.15. The UP PWD reserves the right to reject any or all applications without assigning any reason. After

    evaluation, a panel of consultants will be formed depending on the capacity and experience of

    the consultants and the same will be communicated to all concerned departments and PSUs of

    Government of U.P. to draw upon, as and when necessary, for purpose of obtaining offers forparticular projects.

    6.16. Notwithstanding the formation of these panels, the UP PWD may go in for separate

    empanelment for specific assignments, if it so decides.

    6.17. The applicant shall not be considered for empanelment if the applicant is debarred /blacklisted at the

    time of submission of the application in the UPPWD. The applicant shall submit litigation

    history/undertaking on non-judicial stamp paper duly notarized to the effect that the applicant has not

    been debarred or blacklisted by UPPWD or any other government agency at Annexure -VII.

    6.18. If the applicant after empanelment changes its name, they may seek for incorporation of the change ofname in the empanelled list with full documentary proof.

    6.19. Consulting Firms having certificate towards accreditation from NABCB of QCI (National

    1

  • 7/29/2019 Signature Building Tor

    16/27

    Accreditation Board for Certification Bodies of Quality Council of India) may have extra weightage.

    Similarly, consulting firms having empanelment in any state /central agencies of India may also have

    extra weightage.

    6.20. The Consultant should be ready to work in any region of the state of Uttar Pradesh and ensure to

    establish site office and laboratory including supporting staff at site of work.

    6.21. TIME FRAME/Duration of Consultancy

    Duration of Third Party Quality Control Consultant shall be from Preconstruction stage to the expiry of

    defect liability period of Project.

    6.22. PERIOD OF EMPANELMENT

    The empanelment would be for a period ofthree years and can be extended up to two more years on an

    yearly basis by the Engineer-in-Chief (Rural Roads), Uttar Pradesh Public Works Department.

    6.23. TERMINATION OF EMPANELMENT:

    Engineer in- Chief (Rural Roads), Uttar Pradesh Public Works Department, if at any stage, on the basis of

    performance and compliance of terms and conditions of the contract by the Consultant, finds that theConsultant has not performed satisfactorily, or if in his view, the Consultant has failed to safeguard theinterest of Government of Uttar Pradesh, he may, terminate the Empanelment of the Consultant on therecommendation of Chief Engineer (Building), after due consideration.

    6.24. FINANCIAL OFFER:

    @ 1.50% (one point five percent) of the estimated cost of work / project.

    Note: All remuneration is inclusive of all taxes

    Yours faithfully,

    CHIEF ENGINEER (BUILDINGS)

    UTTAR PRADESH PUBLIC WORKS DEPARTMENT

    En cl: Ann exu re I, II, III, IV, V, VI, VII & VIII.

    1

  • 7/29/2019 Signature Building Tor

    17/27

    Ann exu re I

    DETAILS OF ORGANIZATION

    (Note : In case of Consortium, this form is to be furnished not only by the lead member

    applying for the EOI, but also furnish separately for each member of consortium,who would be associated withthis project work, ifapplicable)

    Sl.

    No.

    Particulars Details

    1 Name & Address of the applicant

    a TelephoneNos. Land Line :

    Cell Phone :

    b E Mail ID

    c Fax

    d URL of website (ifany)

    2 Pl. Mention whether EOI is submitted by a

    Firm/ Company/ Consortium

    3 Year of establishment and commencement of

    business

    4 Certificate towards accreditation from NABCB of

    QCI (National Accreditation Board for

    Certification Bodies of Quality Council of

    India

    (attach the photocopy of the NABCB

    accreditation certificate5 Legal status of the applicant(attach copies of registration of the

    Firm/Company)

    (In case of consortium, also furnish the

    confirmation by the Consortium members

    authorizing the Lead

    Member to sign on behalf ofthe

    Consortium)

    6 Details of Board of Directors/Partners /Key

    Officials

    7 Designation of individuals authorized to act for

    the organization.

    1

  • 7/29/2019 Signature Building Tor

    18/27

    8 Total No. of professional staff (In house)

    9 Has the applicant or any constituent partner

    in case of partnership firm, ever been

    debarred / black listed for competing in any

    or anization at an time? If so, ive details10 Has the applicant or any constituent partner

    in case of partnership firm, ever been

    convicted by a court of law? If so, give

    details.11 In which field of Consultancy the applicant

    has specialization & interest.

    12 Any other information considered

    necessary but not included above.

    13 Address of local office in Uttar Pradesh, ifany.

    (Add separate sheets if spaceprovid ed is not sufficient)

    Signature of Applicant:

    Name ofSignatory:

    Designation:

    (Seal)

  • 7/29/2019 Signature Building Tor

    19/27

    Ann exu re II

    Infor m at i on of Equipments/So f t wares/ Technical /Key Pr of e ssionals

    Expression of Interest to be empanelled as Third Party Inspection of

    Signature Building Construction works

    A) Equipments (for Quality Control)

    B) List of Softwares (for Quality Control)

    C) Technical Professionals: Qualification and Experience

    Sl. Name Qualification Experience

    1

    2

    3

    4

    5

    6

    7

    8

    9

  • 7/29/2019 Signature Building Tor

    20/27

    D) Key Professionals: Qualification and Experience

    Sl. Name Qualification Experience1

    2

    3

    4

    5

    6

    7

    8

    9

    (Add separate sheets if spaceprovid ed is not sufficient)

    Yours faithfully,

    Signature ofApplicant:

    Name ofSignatory:

    Designation:

    Seal

  • 7/29/2019 Signature Building Tor

    21/27

    Annexu re III

    Brief Bi o Data of Technical /Key Professionals

    (This form to be furnished by the Technical/Key professionals separately thosewho wouldbe associated with this projectwork)

    Nameoftheconsultant:

    Professionalqualification:

    Date of Birth:

    Years with Firm:

    Nationality:

    Membership in Professional Societies:

    DetailedTasktobeassignedinthisproject:

    Key Qualifications:

    [Give an outline of staff members experience and training relevant to responsibility

    in context of assignment. Describe degree of responsibility held by staff member on

    relevantprevious assignment and give dates and location. Use up to half apage.]

    Education:

    [Summarize college/university and other speci alized education of staff

    member, giving names of schools, dates attended and degree(s) obtained. Use up

    to a quarter page.]

    Employment Record:

    [Starting with present position, list in reverse order every employment held. List all

    positions held by staff member since graduation, giving dates, name(s) of employing

    organization(s), title of positions held and location of assignments. For experience in

    last ten years, also give type of activities performed and client references,

    wherever appropriate. Use up to three quarter of apage]

    Languages:

    [Indicate proficiency in speaking, reading and writing of English language:

    excellent, good, fair, orpoor.]

  • 7/29/2019 Signature Building Tor

    22/27

    Certification:

    I, the undersigned, certify that to the best of my knowledge and belief, these bio

    data correctly describe my qualifications, my experience and me.

    Signature of the Consultant

    Date:

  • 7/29/2019 Signature Building Tor

    23/27

    WORK EXPERIENCE (Comple t ed Projects)(Add separate sheets if spaceprovided is not sufficient)

    An n e xur eI V

    Sl. * Name and

    Address of

    Client (from

    which work

    orders received)

    Name of

    Project

    Period of

    Consultancy

    From

    To

    Brief

    scope of

    work

    Cost of

    Consultancy

    (Rs.)

    Cost of the

    Project

    (Rs.)

    Remarks

    1 2 3 4 5 6 7 8

    * Furnish the photocopies of the work orders/contracts in support of the information provided above

    Signature ofApplicant:

    Name ofSignatory:

    Designation:(Seal)

  • 7/29/2019 Signature Building Tor

    24/27

    A n n e x ur eV

    W O RK E X PE R IEN C E ( ONGOING

    P R O J ECTS)Add separate sheets if spaceprovid ed is not

    sufficient)

    Sl. * Name and

    Address of

    Client (from

    which work

    Name of

    Project

    Period of

    Consultancy

    From

    To

    Brief

    scope of

    work

    Cost of

    Consultancy

    (Rs.)

    Cost of the

    Project

    (Rs.)

    Remarks

    1 2 3 4 5 6 7 8

    * Furnish the photocopies of the work orders/contracts in support of the information provided above

    Signature ofApplicant:

    Name ofSignatory:

    Designation:(Seal)

    A n n e x ur eVI

    FINANCIAL STATEMENT OF CONSULTANCY WORK

    IN THE FIELD OF QUALITY ASSURANCE/CONTROL WORKS

    Add separate sheets if space provided is not sufficient)

  • 7/29/2019 Signature Building Tor

    25/27

    Signature of Applicant: Signature of C.A.

    Name of Signatory:

    Designation:

    (Seal) (Seal)

    Sl. Financial Year Annual turnover of

    Consultancy work

    Account details showing

    Net Profit Figure

    Remarks

    1 2 3 4 5

    1 2012-13

    2 2011-12

    3 2010-11

    4 2009-10

    5 2008-09

  • 7/29/2019 Signature Building Tor

    26/27

    An n e x u r e VII

    UNDERTAKING REGARDING NON-DEBARREMNENT/BLACKLISTING/DETAILS OF

    LITIGATION HISTORY

    An n e x u r e VIII

    METHODOLOGY

  • 7/29/2019 Signature Building Tor

    27/27