sigve hamilton aspelund cv linkedin 072015

21
Page1 Sigve Hamilton Aspelund Entrepreneur open for any relevant opportuny [email protected] Summary Norwegian senior managing petroleum engineering team leader (29.01.76) with onshore & offshore work experience (8 years) in the oil and gas exploration and production industry since 2001. Having developed excellent consulting experience across Norway and International, I am now looking for a permanent position within a relevant field. My broad experience includes geo modeling and simulation, special core analysis, sedimentology and supervision of well drilling, increased oil production, enhanced oil production, water and gas injection, artificial lift (Gas lift), artificial lift selection, well completion/ work over operations, offshore production engineering operations (FPSO/IPF/WHP), reservoir petroleum engineering, quality, health, safety and environment and project risk advising, managed underbalanced pressure drilling, fracturing, team leading/ H2S reservoir simulation business development, geopolitics, oil and gas management, distribution and rig inspection, offshore structure design and subsea maintenance and inspection. It has been gained through working for major Oil & Gas companies including Mellitha oil and gas (Libya), CCED (Oman), KazMunaiGaz Exploration Production (Kazakhstan), CNOOC (China), JSC Ontustik Munaigaz, Neftserviceholding LTD, OJSC Surgutneftegas, Gazprom Mining Orenburg Ltd, BelNIPIneft “Belorusneft” (Russia), Cairn (UK), Vanco (USA), KPOC (Petronas (Malaysia) + ConocoPhillips (USA) + Shell (Holland)), NNPC (Shell (Holland), Agip (Italy), ExxonMobil & ChevronTexaco (USA)), BP (UK), ENI (Italy), Total (France), Shell (Holland), Talisman (Canada), Norsk Hydro (Norway) and Statoil (Norway). Additional experience as resource coordinator and have achieved management onshore and offshore personell and data, increased oil production in exploration and production industry, organized and held courses and team buildings. Specialties Risk advising (Subsea) Production enhancement & optimization of surface and subsurface operations Quality, Health, Safety & Environment engineering (Drilling) Integrated operations Marketing & business development Exploration geoscience (Geology, geomodeling and drilling) Reservoir engineering: Increased Oil production and petrophysics Alliance creator: Team building Technologist: Information Technology Oral presentations: Teaching and presentation Realist: Mathematics, physics and technology Experience General Manager at Aspelund Consulting Energy Offshore Development International & National October 2014 - Present (10 months) Course instructor: Offshore structure design. Location: Kuala Lumpur, Malaysia Client: Mellitha Oil & Gas (Libya/ OPEC). Client decline to pay: Clearly a freud. Do not do business with Mellitha. The attendees did not listen to presentation and are a risk for HSE working environment. I strongly recommended not to

Category:

Career


1 download

TRANSCRIPT

Page1

Sigve Hamilton AspelundEntrepreneur open for any relevant opportuny

[email protected]

Summary

Norwegian senior managing petroleum engineering team leader (29.01.76) with onshore & offshore work

experience (8 years) in the oil and gas exploration and production industry since 2001. Having developed

excellent consulting experience across Norway and International, I am now looking for a permanent position

within a relevant field. My broad experience includes geo modeling and simulation, special core analysis,

sedimentology and supervision of well drilling, increased oil production, enhanced oil production, water and

gas injection, artificial lift (Gas lift), artificial lift selection, well completion/ work over operations, offshore

production engineering operations (FPSO/IPF/WHP), reservoir petroleum engineering, quality, health, safety

and environment and project risk advising, managed underbalanced pressure drilling, fracturing, team leading/

H2S reservoir simulation business development, geopolitics, oil and gas management, distribution and rig

inspection, offshore structure design and subsea maintenance and inspection. It has been gained through

working for major Oil & Gas companies including Mellitha oil and gas (Libya), CCED (Oman), KazMunaiGaz

Exploration Production (Kazakhstan), CNOOC (China), JSC Ontustik Munaigaz, Neftserviceholding LTD,

OJSC Surgutneftegas, Gazprom Mining Orenburg Ltd, BelNIPIneft “Belorusneft” (Russia), Cairn (UK),

Vanco (USA), KPOC (Petronas (Malaysia) + ConocoPhillips (USA) + Shell (Holland)), NNPC (Shell

(Holland), Agip (Italy), ExxonMobil & ChevronTexaco (USA)), BP (UK), ENI (Italy), Total (France), Shell

(Holland), Talisman (Canada), Norsk Hydro (Norway) and Statoil (Norway). Additional experience as resource

coordinator and have achieved management onshore and offshore personell and data, increased oil production

in exploration and production industry, organized and held courses and team buildings.

Specialties

Risk advising (Subsea) Production enhancement & optimization of surface and subsurface operations Quality,

Health, Safety & Environment engineering (Drilling) Integrated operations Marketing & business development

Exploration geoscience (Geology, geomodeling and drilling) Reservoir engineering: Increased Oil production

and petrophysics Alliance creator: Team building Technologist: Information Technology Oral presentations:

Teaching and presentation Realist: Mathematics, physics and technology

ExperienceGeneral Manager at Aspelund Consulting Energy Offshore Development International & NationalOctober 2014 - Present (10 months)

Course instructor: Offshore structure design. Location: Kuala Lumpur, Malaysia Client: Mellitha Oil & Gas

(Libya/ OPEC). Client decline to pay: Clearly a freud. Do not do business with Mellitha. The attendees

did not listen to presentation and are a risk for HSE working environment. I strongly recommended not to

Page2

work with Mellitha Oil & Gas. Course instructor: Inspection & Maintenance of Subsea Pipelines Location:

Kuala Lumpur, Malaysia Client: Mellitha Oil & Gas (Libya /OPEC)) via Define Management consultancy

and training (Abu Dhabi, UAE). Client decline to pay: Clearly a freud. Do not do business with Mellitha.

Engineer: Rig inspection course. Location: Kuala Lumpur, Malaysia Client: CCED (Oman) via APEX /

Dubai, UAE) Professor: Global geo political Oil & gas management & Distribution. Location: Astana,

Kazakhstan Clients: Presidents Chancery, KazMunaiGaz Exploration Production, KazHLU JSC, Sberbank of

Russia & Samgau consulting at KAZGUU Business school /Kazakhstan Business University via University

of Business and International Studies Geneva & London Graded answers to exam at Jakarta, Indonesia:

1. Mention six important geo political events that had impact on the oil price? 2. Describe the geo political

event that had major effect on the oil price? 3. What major oil production event had a major effect on the

oil price that caused the last financial crisis in 2008 and what was the effect of the financial crisis on oil

consumption? 4. What effect has global oil production, export and consumption on the oil price? 5. What

effect has fracturing on production future, oil price and US oil import? 6. Describe shale oil 7. Describe shale

gas 8. Describe coal bed methane gas 9. Describe tight gas 10. What effect has distribution to oil and gas

price: oil and gas pipe lines and tankers? Developed an Exploration & Production course: Iraq (OPEC) via

Global Energy Talent: Cancelled. Clearly a freud.

Petroleum engineering team leader at Oil Plus LtdJuly 2014 - September 2014 (3 months)

Business development proposal: Reservoir simulation: H2S analysis with CMG STAR (Geochemistry/ HSE)

Petroleum engineering team leader consultant at Aspelund Consulting Energy Offshore DevelopmentInternational & NationalAugust 2009 - June 2014 (4 years 11 months)

• Senior production engineer: Digital oilfield planning. Preparations to operate Rumaila in Iraq (OPEC).

Project was cancelled. Client: BP via NES Global Talent. Location: Dubai, UAE: Clearly a freud. • Advisor:

Well Intervention Services. Client: Coleman research • Course director: Managed pressure drilling systems.

Multilateral wells. Coiled tubing underbalanced drilling. Client: Russian oil & gas companies via Capital

Business Events. Stavanger • Course director: Well control: Drilling, HSE and Risk. Client: CNOOC via

Petromentor. Aberdeen, UK • Project risk advisor & engineer. Client: FMC Technologies. CLOV and

GIRRI Total Angola (OPEC) and FEED West of Shetland. Total via IDEA. Kongsberg • Chair man: Doing

more with drilling data. Client: Finding petroleum. Stavanger • Course director: Geomodeling: Production,

geology, reservoir simulation, drilling and HSE. Client: NNPC (Nigeria/ OPEC) via Petroconsult. London,

UK • Petroleum engineer advisor: RCC. Stavanger • Course director: Introduction to oil & gas industry.

Client: Kebabangan Petroleum Operating Company/ ARN. Kuala Lumpur, Malaysia. • Offshore safety

related to computer interfaces and information presentation: People and the digital oilfield Client: Finding

petroleum. Stavanger • Offhore HSE-presentation at the seminar: Bringing businesses from east and west

together Client: TransEuropean Centre. Stavanger • Petroleum engineer advisor: Client: Gerson Lehrman

Group. New York, USA • Lectured. Clients: SOTS & Akademiet. Stavanger & Sandnes

14 recommendations available upon request

Page3

Project risk advisor at Aspelund Consulting & Energy Offshore Development International NationalNovember 2012 - March 2013 (5 months)

Risk engineer in the pre-engineering FMC organization with projects outside Angola and Shetland Risk

advisor at the Subsea field developments CLOV: Cravo, Lirio, Orquidea and Violeta discoveries and GIRRI:

Rosa and Girassol fields operated by Total (Angola/ OPEC) The essential purpose of risk management

in projects and tenders are to improve project and tender performance via the systematic and iterative

process designed to identify, analyze, evaluate, and treat project related risk elements. Risk elements are

compiled, recorded and managed throughout the tender period and project life cycle. • Establishment of

project risk management plan in accordance to company project risk management process • Establishment

and maintenance of a risk register based on risk analysis done in tender phase (if available), lessons learned

and project risk assessment methodology • Ensuring that projects work according to company global risk

management process for projects • Facilitate risk meetings and co-ordinate risk responses • Monitor and

control that the risk strategies are implemented in a timely manner • Coordinate and participate in risk

evaluation, development of mitigation plans, monitor, summarize and report risk status • Compile record and

follow up risks out of tolerance level in the risk register • Create a project risk management close out report

• Support projects or tenders with risk analysis (quantification and /or bowtie) upon request • Report updates

and improvements for process, methodology and tools as a result of feedback from the organization and / or

changes in external conditions, to the local process owner • Provide input to internal and external monthly

reporting. Internal risk status reporting consisting of aggregated risk status from projects, project portfolio

and/ or tender work Via IDEA Consultants certified engineering consulting company which mainly provides

services within: Machine-, Mechanical and Process industry Electronic- IT and Software

Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International &NationalMarch 2012 - April 2012 (2 months)

Presentations: - Oil and gas industry & life cycle - Structural/ design - Piping/ layout - Procurement -

Materials/ corrosion Employee training: - Mechanical/ drilling - Process - Electronics & telecom/ HVAC

- Petroleum engineering; Drilling, production & reservoir - QHSE Resource coordinator: Nominating/

managing applicants & relevant candidates to available positions: Engineering & management: - Interface

coordinator - Petroleum engineering - Electro instrument & telecom/ HVAC - Technical safety, HSE/ HSEQ/

Quality/ QA/QC - Structural design - Process - Piping/ layout -- Subsea marine operations - Procurement

- Mechanical/ drilling - Materials/ Corrosion - Document/ LCI - Planning - Cost engineer Evaluating

candidates curriculum vitae Software: Itris Client: RC Consultants is a leading provider of engineering

consultancy services for the oil and gas industry on the Norwegian continental shelf.

Quality, Health, Safety & Environment engineer at Ocean RigJune 2011 - November 2011 (6 months)

Procedures & Technical description review/revision Engineer at Corcovado (Drilling ship) Operator:

Cairn Well: Attamik 2. Location: Greenland - Risk assessment - Work permit system and Safe Job

Analysis - Care card system - Focusing on drilling safety: Bit type, drilling parameters, well control/volume

Page4

control, kick prevention, hole cleaning, mud data & DDR. - Software: STAR, Mintra & Empreda -

Care philosophy, procedures and procedure exam Investigated market for best available technology for

”dashboard” system solutions for HSE. Well control project for Petroleumstilsynet (PTIL) Technical

contact with customer relations management system (CRM) and Fast Track project implementation vendor

Data management & generel management Organized two care for safety seminars and held Care Card

presentations with offshore safety officers from Leiv Eiriksson, Eirik Raude, Olympia, Corcovado, Poseidon

and Mykonos and onshore QHSE department at Hummeren hotel in Tananger with team building (Gocart

racing at Stavanger carting) Safety officer at Olympia (Drilling ship) Client: Vanco Well: Dzata 2A

Location: Ghana Technical contact with information technology vendor and operational performance

management and reporting system vendor Project lead: Annual procedure revision/ review IADC

data reporting KPI reporting General QHSE engineering and risk management Software: Star Mintra

administrator Empreda Ocean Rig is an international offshore drilling contractor providing oilfield services

for offshore oil and gas exploration, development and production drilling. I can confirm that we worked well

together when Sigve was on board with us. We had some conversations, and he were more than willingly

to help me out in any questions related to HSEQ/QA, that i had. He appeard to be an professional in his

profession, and had much experience within the oil business, not only necessarly related to HSEQ/QA. Best

regards Raymond Øren Electrical section leader

Consultant at Aspelund Consulting Energy Offshore Development International & NationalAugust 2010 - November 2010 (4 months)

Teaching: Mathematics, physics and chemistry Client: Akademiet Videregående skole The Academy

operates in three segments: We are both a private high school with state aid, one candidate school and a

nettstuide.

Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International &NationalAugust 2009 - December 2009 (5 months)

Management: Held courses for up to 100 students • Production technique 1 & 2 • Drilling technology •

Geology and formation evaluation • Health, Safety and Environment for the oil industry • Well control •

Drilling fluids • Operating and control systems • Mathematics • Chemistry prosess • Alternative energy

Consulting students at PetroChallenge Norway 2009 @ University of Stavanger Managing event expedition

to Weatherford oil field base in Forus Leading students expeditions at oil museum in Stavanger and Ullrigg

@ International Research Institute of Stavanger Client: Stavanger Offshore Technical College (SOTS) is

a publicly maintained leading educational facility in upper-secondary and technical college studies. The

College has an annual student body of about 500 students at further education level, employs a highly

qualified teaching staff, and has state-of-the-art equipment and modern facilities to meet the educational

needs of students. The main objective of the College is to be at the forefront in providing education in

offshore drilling.

Production Engineer consultant at Oilfield Technology Group

Page5

November 2008 - July 2009 (9 months)

Production engineer consultant. Client: StatoilHydro (Grane) Responsible for: • Production engineering

• Well testing and analysis using SAP. Displaying results in Oil Field Manager. • Production analysis

with Flow Manager • P&I plan • Production optimizing with GORM Sub sea technology development

team work Hazid meeting Snorre project. Client: GDF Fabricom Project leader: Analyzing drilling waste

management market for SWATH The OTG Group is providing services, competence and products to the

global petroleum industry. Our core services are Field Operations, Drilling & Well Management, HSE

& Offshore Safety Management, Emergency Preparedness, Project and Risk Management, Engineering

Support, Software Products and Software Development. Reference: Johannes Waarseth-Junge CEO 3R

Innovation

1 recommendation available upon request

Production Engineer at Talisman EnergyMarch 2007 - October 2008 (1 year 8 months)

Production engineering: Project leader: Responsible for improving oil production at Varg Sub project

leading: Subsurface within integrated operations (TENAS operation project) Production supervising with

PI process book designing and real time allocation programming with PI excel Responsible for: • Annual

and monthly reports • Well allocation including production analysis • Well testing and well test analysis •

Weekly production & injection planning and morning meetings with the communication tool GoToMeeting •

Real time production analysis with PI process book • Production optimizing with Prosper and GAP Planning

well operations: • Mechanical operations: Increased oil production from 600 Sm3/d to 1200Sm3/d in a well

by increase reservoir pressure by increasing water injection and changing the choke and reduce the pressure

drop, stabilized 2 slugging wells by changing gas lift valves (Stabilized total production) • PLT, Water

shut of and perforations (Increased oil production from 100 Sm3/d to 250 Sm3/d). • Production optimizing

including field visits offshore at Petrojarl Varg and Varg A • Event organizing: Organized presentations

and a seminar • Production forecasting • Technical contact with vendors Development Varg is an oil

field to the south of Sleipner Øst in the central part of the North Sea. The field has been developed with

the production vessel, “Petrojarl Varg”, which has integrated oil storage connected to the wellhead facility

Varg A. Reservoir The reservoir is in Upper Jurassic sandstones at a depth of approximately 2 700 metres.

The structure is segmented and includes several isolated compartments with varying reservoir properties.

Recovery strategy Recovery takes place by pressure maintenance using water and gas injection. The smaller

structures are produced by pressure depletion. All the wells are producing with gas lift.

3 recommendations available upon request

Consultant from IOR Chemco at Badger ExplorerJanuary 2007 - February 2007 (2 months)

Consultant: Project within petrophysics and geology. Data collection and data base development. The

Badger Explorer is a revolutionary method to obtain subsurface data for oil&gas exploration, mapping of

hydrocarbon resources and long-term surveillance.The Badger Explorer drills and buries underground,

carrying a unique package of logging and monitoring sensors, at a substantially lower risk, cost and

Page6

complexity of utilising an expensive drilling rig. The tool penetrates the sea bed and the subsurface by

using a mechanical drill bit driven by an electrical motor to loosen and crush the formation ahead of the

tool. The crushed formation is transported through the device and deposited in the void behind the tool. The

tool carries an electrical cable, which is spooled up inside the unit, connected to the surface and powers the

electrical motors. The same cable is used for continous transfer of data back to the surface.

Reservoir engineer at IOR ChemcoJanuary 2006 - February 2007 (1 year 2 months)

Analyzing of the world marked (High water cut reservoirs and sand producing reservoirs) Consultant at

Badger Explorer. Representation at ONS Reporting (Inteligel progress at IRIS) to Norwegian Research

Council, Total, Statoil and Norsk Hydro Screening of Espoir operated by Canadian Natural Recourses

05-11.06 Project research: at International Researh Institute of Stavanger • Field manager: mGel reservoir

stimulation for increased oil recovery at Gullfaks C including: Quality assurance of treatment, photographing

onsite and reporting • Application to ONS innovation award (Was nominated to the award) • Articles

published at OTC (Offshore & Energy) and ONS (Scandinavian oil and gas magazine) • Representation at

IOR 2006 in Tulsa Oklahoma (SPE) • PowerPoint designing for sales meetings and reporting • Presentation

for potential customers in Aberdeen • Contact developing (Gained 15 business meetings with oil companies

such as Maersk oil, Venture production, CNR international, Amerada Hess in Aberdeen and Talisman-

Energy in Stavanger over a short period) • Marked analyzing of the British shelf (High water cut sand

reservoirs) • Screening of projects including well log investigation and reservoir evaluation: Brage (Norsk

Hydro), Gullfaks (Statoil) Improved Oil Recovery Chemical Company - a new IOR Chemical Solution

Provider - a start up based on Best of Breed from The International Research Institute of Stavanger (IRIS -

former Rogaland Research, RF) extensive research history in the field - based in Stavanger - the oil capital

in Norway

1 recommendation available upon request

Consultant from IOR Chemco at International research institute of StavangerMay 2006 - November 2006 (7 months)

Project research: Optimisation of IOR Chemco`s mSand technology (chemicals for sand consolidation):

Petrophystical measurements: PV, permeability, porosity and RRFw Article: Forskning: http://

www.forskning.no/artikler/2005/november/1132741898.83 IRIS - International Research Institute of

Stavanger - is a recognised research institute with high focus on applied research, equally owned by the

University of Stavanger and the regional foundation Rogalandsforskning. IRIS was established in 2006,

as a result of a technical re-structuring of the ownership of Rogaland Research. Rogaland Research was

established in 1973, and the continuation of its activities in IRIS provides IRIS with a long and proud

history right from the start. Research activities started in the area of social science, but quickly developed to

include petroleum. Today IRIS remains an independent research institute with research and research-related

activities in petroleum, new energy, marine environment, biotechnology and social science and business

development.

Page7

Mudlogger geologist at GeoservicesJanuary 2003 - December 2005 (3 years)

• Functioning as Dataoperator/ Secure safe well drilling • Well monitoring: Pit volume control and

gas control • Maintaining sensors and repairing equipment • Reporting of geology • Geology: Catching

samples, lithology analyze, cuttings and cavings description and calcimetry analysis and core handling •

Logistics: Sending equipment and samples onshore When working for Geoservices I was working indirectly

for Lars Johan Skjold (Statoil) many times. When he was coming to our working area he asked me for the

answer to the geological interpretation. He also told me that the best geologists were engineers because

we described what we could see. The geologists were describing what they thought they could see. Arie

Romer wrote the following about me: Sigve has executed his work tasks to our full satisfaction and therefore

we give him the best recommendations. Geoservices is the industry leader in mud logging, focusing on

drilling support and formation evaluation. Decision-ready information about well status is helping to drill

better wells more efficiently. Timely and more accurate information on reservoir fluid composition and

lithology is detecting pay zones that would otherwise be missed, assisting well placement, revealing reservoir

connectivity and compartmentalization, and guiding critical decisions. Drilling Support Obtain improved

quality and higher level of analysis of surface data including drilling speed, vibrations, hole cleaning, and

early kick detection to enhance safety and optimize drilling operations. Formation Evaluation Services

Use analysis of rock cuttings and gas in the drilling mud for understanding formation geology, efficient

hydrocarbon detection under all conditions including in deepwater and harsh environments, downhole fluid

characterization, early information on reservoir fluid composition, lithology logs, and isotope logging.

Reference Kristina Merethe Rigland Discipline Leader Reservoir Geology and Petrophysics at Statoil

1 recommendation available upon request

ML geologist consultant from Geoservices at BP2005 - November 2005 (less than a year)

Geology evaluation and supervision when drilling the wells: Ula (7/12-A-5 B & 7/12-A-05B-T2) Ula

(Norwegian: Ulafeltet) is an offshore oil field located in the southern Norwegian section of North Sea along

with Gyda, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's

main areas of exploration and production activity. The Ula field was discovered in 1976 and came online in

October 1986. It contains confirmed 69.98 million m3 of oil and 2.5 million of NGL. Ownership BP is the

operator of the field with 80% of interest in the project. BP's partner DONG Energy holds 20% of interest.

DONG Energy increased its initial share of 5% to 20% by acquiring Svenska Petroleum's complete share of

15% for $130 million in 2008. Production Ula is located in approximately 70 m (230 ft) of water. The main

reservoir stands at 3,345 m (10,974 ft) in the Upper Jurassic Ula Formation. The field has three conventional

steel facilities with production, drilling, living quarters. It has 7 production and 2 water injection wells.

Current production at Ula field is 10,000 bbl/d. The existing gas process plant was recently extended with a

new module, turbin and compressor and has been operative since 2008. The gas from Blane field is injected

into the Ula reservoir for production. The gas produced at Ula field is re-injected into the field for increased

recovery as well. The field is expected to be abandoned in 2028. The produced oil is then transported by a

Page8

pipeline to Ekofisk oil field and on to Teesside for refining. In 2009, Aker Solutions was awarded a contract

to tieback Ula field to Oselvar field. The work is expected to commence in 2011. Once complete, the oil

from DONG-operated Oselvar field which is 24 kilometres (15 mi) from Ula will be pumped to facilities at

Ula for processing.

ML geologist consultant from Geoservices at BP2005 - November 2005 (less than a year)

Geology evaluation and supervision when drilling the wells: Vallhall IP (2/8-G-10 T3 & 2/8-G-11-T4/

TS) Development Valhall is an oil field located in 70 metres of water. The field was originally developed

with three facilities, but has now 8 platforms. The Valhall complex consists today of six separate steel

platforms for quarters, drilling, wellheads, production, water injection, combined process- and hotel platform

respectively. These platforms are bridge-connected. In addition the field has two unmanned flank platforms,

one in the south and one in the north, both around 6 kilometers from the field center. The Drilling Platform

(DP) Situated between QP and PCP. It has 30 well slots, waste injection and a drilling rig. The platform

started its activity on 17 December 1981, at that time with the first covered derrick. The derrick and drilling

foundation were removed during summer 2009 and a separate program for plug and abandonment is under

development. The Production Platform (PCP) The final shut in of the platform took place late July 2012

and the production now takes place on the new process and hotel platform The original PCP platform was

built to process 168,000 barrels of oil and 350 million cubic feet of gas per day. The platform is 65 meters

high and weighs 21,000 tons. The oil production is piped to 2/4-J at the Ekofisk Center and goes to Teesside

in England. The gas is transported directly via Norpipe pipeline to Emden in Germany. The platform also

processes oil and gas that comes from Hod. The Wellhead Platform (WP) Installed in April 1996 and first

oil production started in June the same year. WP has 19 well slots. Total cost, including drilling of the wells,

is approx. 1,5 billion NOK.

ML Geologist consultant from Geoservices at Norsk Hydro2005 - October 2005 (less than a year)

Wellbore history Well 6605/8-1 is an exploration well on a Late Cretaceous Lysing prospect situated on the

western flank of the Fles North rotated fault block structure in the Vøring Basin outside Mid Norway. The

primary objective was to test the presence of movable hydrocarbons in the Lysing prospect. A secondary

objective was to investigate the reservoir potential of the Nise Formation Operations and results Wildcat well

6605/8-1 was spudded in 838 m water depth with the semi-submersible installation Transocean Leader on

14 June 2005 and drilled to TD at 4513 m in Late Turonian sediments of the Lange Formation. Operations

went without significant technical problems. No shallow gas or shallow water flow was observed. The well

was drilled with spud mud down to 2500 m and with KCl/Polymer/Glydril mud from 2500 m to TD. The

well penetrated the main target at 4184 m, a 70 m thick Lysing Formation deep-water turbidite sand of Early

Coniacian age. Gas was recorded from 4180 m. There were two gas zones separated by a water zone. The

upper zone had gas down to a free water level inferred at 4221 m (4193 m TVD MSL). The lower gas zone,

at 4253 m, was very thin and was approximately 20 bar overpressured compared to the upper zone. Gas

Page9

shows were also encountered in Early Campanian Nise siltstone at 3064 m and a deeper Lysing sandstone

unit at 4354 m. One 9 m long core was taken in the interval 4190-4199 m in the upper Lysing reservoir. It

contained sandstones interbedded with thin mudstone layers. MDT fluid samples were taken at 4230.55 m

(water), 4231.4 m (water), 4209.4 m (gas), 4211.86m (gas), and at 4253.5 m (gas which gave a dark brown/

black liquid when flashed). An MDT run in cased hole after the DST and almost 3 weeks after the last mud

circulation gave a maximum temperature of 146 deg C at 4230 m. This was believed to be close to the true

formation temperature. The well was perm. abandoned 22 October as a gas discovery.

ML geologist consultant from Geoservices at StatoilApril 2003 - September 2005 (2 years 6 months)

Geology evaluation and supervision when drilling the wells: Deep Sea Trym (24/10-M-3BH) Stena Don

(6608/10-B-4BH) West Alpha (6506/11-P-3 H) Kristin field: Gas/condensate producer Kristin platform was

installed in the field in March 2005, and production from the field started on 3.11.2005. Today, 12 wells in

production. Full production was reached in 2007 with a daily production rate of approx. 18 million Sm3 gas

and condensate daily rate of approx. 17000 Sm3

ML geologist consultant from Geoservices at StatoilApril 2003 - September 2005 (2 years 6 months)

Geology evaluation and supervision when drilling the wells: Snorre B (34/4-I-1H cuttings injection

& 34/4-K-7 H water injector) Snorre is an oil platform in Block 34/4 on the Snorre field in the North

Sea. The platform was built by Aker Stord and started production in June 2001. Snorre B is an integral

semisubmersible drilling, production and accommodation platform, located about seven kilometers north of

Snorre A. The produced oil is transported by pipeline to Statfjord B for storage and export. Some of the gas

is reinjected into the reservoir, while the rest is piped to the Prime Pipe system via Snorre A. The platform

was originally operated by the Norwegian Hydro and now operated by Statoil.

ML geologist consultant from Geoservices at StatoilApril 2003 - September 2005 (2 years 6 months)

Geology evaluation and supervision when drilling the wells: Transocean Searcher (6506/12-Q-2H (Åsgard))

Åsgard is located in the Norwegian Sea, about 200 kilometers from the coast of Norway and 50 kilometers

south of Heidrun. Åsgard A vessel was in position 8 February 1999 and to start oil production 19 May.

Åsgard B is a semi-submersible facility that treats gas and condensate. It came on stream 1 October 2000.

Åsgard C is a storage vessel for condensate related to the field. Åsgard consists of Midgard, Smørbukk

and Smørrbukk South. In addition, gas fields Mikkel and Yttergryta linked to the infrastructure in Åsgard.

Midgard is located in blocks 6507/11 and 6407/2. Smørrbukk and Smørrbukk South is located in block

6506/11. Saga proven Midgard in 1981. Statoil found Smørrbukk in 1984 and Smørrbukk South in 1985. In

1995 the rights to the field coordinated in a new structure with Statoil as operator. The largest development

on the Norwegian Continental Shelf Overall Åsgard among the largest developments on the Norwegian

continental shelf with its 56 production and injection wells in 17 templates. The water depth in the area is

240-310 meters.

Page10

ML geologist consultant from Geoservices at StatoilApril 2003 - September 2005 (2 years 6 months)

Geology evaluation and supervision when drilling the well: West Navigator (6507-3-4) Wellbore history:

General Well 6507/3-4 is located on the Alve structure, which is a horst, located in the north central part

of block 6507/3 on the Dønna Terrace. The main objective of this appraisal well was to prove down flank

oil resources in the Middle Jurassic sandstones of the Garn and upper Not Formations. The secondary

objective was to prove oil in the Ile Formation. Operations and results Well was spudded with the vessel

West Navigator on 14 March 2004 and drilled to TD at 4092 m in the Early Jurassic Åre Formation. The

well was drilled with seawater and bentonite down to 1250 m, with KCl/polymer/glycol from 1250 m

to 2300 m, and with oil based mud (Paratherm) from 2300 m to TD. A shallow gas warning class 1 was

given for the interval between 950 to 1370 m, based on gas peaks observed in well 6507/3-1. A pilot hole

was drilled down to 1250 m. No shallow gas was observed. The well penetrated the reservoir below the

hydrocarbon-water contact in the Garn, Not and Ile Formations. Top Garn Formation was encountered

7 m below prognosis. Moveable hydrocarbons were not proven, only shows throughout the Garn and

Not Formations and discontinuous weak to moderate shows in the Ile, Ror, and Tilje Formations from

3805 m to 4000 m. Two cores were cut in the Garn, Not and Ile Formations and nine MDT water samples

were collected in Garn, Ile and Tilje Formations. The Garn sample from 3726 m contained approx 2 dl of

hydrocarbon fluid, which proved to be mud filtrate (base oil) with some dissolved residual oil from the

formation. The well was permanently abandoned on 30 April 2004 as a dry well with shows Testing No drill

stem test was performed

ML geologist consultant from Geoservices at StatoilApril 2003 - September 2005 (2 years 6 months)

Geology evaluation and supervision when drilling the well: 34/11-A-11 Kvitebjørn Development Kvitebjørn

is a gas condensate field located in the eastern part of the Tampen area, in the northern part of the North

Sea. Water depth in the area is about 190 metres. The field is developed with an integrated accommodation,

drilling and processing facility with a steel jacket. An amended PDO for Kvitebjørn was approved in

December 2006. Reservoir The main reservoir consists of Middle Jurassic sandstones of the Brent Group.

Discoveries have also been made in the Cook- and Statfjord Formations. The reservoir lies at a depth of

approximately 4 000 metres and initially had high temperature and high pressure. The reservoir quality is

good. Recovery strategy The field is recovered by pressure depletion. Transport Rich gas is transported

through a dedicated pipeline to Kollsnes, while condensate is transported in a pipeline tied to the Troll Oil

Pipeline II for onward transport to Mongstad. Status Drilling on Kvitebjørn is challenging due to depleted

reservoir pressure. A new infill well was drilled in 2012 and a second is being drilled in 2013. Development

of the east flank of the field is being considered. Gas pre-compression will be installed on the platform, with

start-up in December 2013. Modifications are being made to prepare for tie-in of the Valemon field in 2014.

ML geologist consultant at StatoilApril 2003 - September 2005 (2 years 6 months)

Page11

Transocean Searcher (15/9-E-3H, 15-9-E-1H, 15/9-E-4H (Sleipner)) Sleipner A (15/9-A-23 A, 15/9-A-19

& 15/9-A19T2) The Sleipner gas field is a natural gas field in the North Sea, about 250 kilometres (160 mi)

west of Stavanger, Norway. Two parts of the field are in production, Sleipner West (proven in 1974), and

Sleipner East (1981).The field produces natural gas and light oil condensates from sandstone structures about

2,500 metres (8,200 ft) below sea level. It is operated by Statoil. The field is named after the steed Sleipnir in

Norse mythology. Reference: Egil Kai Elde VP HSE Statoil

ML geologist consultant at StatoilMarch 2003 - September 2005 (2 years 7 months)

Borgland Dolphin (34/10-F-2 Y1H (Gullfaks sør)): Oil producer Deep Sea Trym (34/10-4-2H (Gullfaks sør))

Gullfaks Sør is located just south of Gullfaks in the northern part of the North Sea. The field is developed

with a total of 12 subsea templates tied back to the Gullfaks A and Gullfaks C Gullfaks Sør is developed

in two phases. PDO for Phase 1 included the extraction of oil and condensate from the 34/10-2 Gullfaks

South, 34/10-17 and 34/10-37 Rimfaks Gullveig. PDO for Phase 2 was approved in June 1998 and included

production of gas from the Brent Group in the Gullfaks Sør deposit.

ML geologist consultant from Geoservices at Talisman Energy2004 - 2004 (less than a year)

Geology evaluation and supervision when drilling the wells: Gyda oil and gas field (2/1-A16 AY1 & 2/1-A16

AY1/T2) Gyda is an offshore oil field located in the southern Norwegian section of North Sea along with

Ula, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's main

areas of exploration and production activity. The Gyda field was discovered in 1980 and started producing

on June 21, 1990. The field contains confirmed 39.6 million m3 of oil and 6.6 billion cubic meter of natural

gas. Ownership: Talisman Energy is the operator of the field with 61% of interest in the project. The full

share was bought by Talisman Energy in 2003 from the previous operator, BP for $82 million.[3] Partners

of Talisman Energy, DONG Energy and Norske AEDC AS (NAEDC),owned by Arabian Oil Company

(AOC), hold 34% and 5% interest in the project, respectively. holds 34%. Capital spending on Gyda was

expected to be $131 million. Production: Gyda is located in approximately 66 m (217 ft) of water. The main

reservoir stands at 4,000 m (13,000 ft) in the Upper Jurassic Ula Formation. The field has one conventional

steel facility with production, drilling, living quarters. Gyda currently produces an average of 10,000 bbl/d

(1,600 m3/d). The field also produces excessive amount of water making the oil production stable. Due to the

difficulties, the production license was extended to 2018. Several new wells are currently being drilled. The

produced oil is transported by a pipeline to Ekofisk oil field and on to Teesside for refining.

ML geologist consultant from Geoservices at ENI2004 - 2004 (less than a year)

Geology evaluation and supervision when drilling the well: Ocean Vanguard (6406/1-3 (Erlend)) The

drilling rig Ocean Vanguard had to spend almost the entire winter Vestbase. After of runs of an anchor

chain last December had the rig immediate needs for repairs. Mishap occurred during drilling for Eni well

6406/1-3 in Norwegian Sea. But never so bad that it is not good for anything. The immediate improvements

Page12

gave the local industry projects for 12 -NOK 15 million, according Vestbase. Ocean Vanguard went to the

field to pick up BOP and riser in end of February and returned for further improvements. The total turnover

on Vestbase for both sojourns estimated at 20 - NOK 25 million. The rig will shortly publish on behalf of

the group. Drilling HSE evaluation: The rig experienced a gain in the active pit. The mudlogger and data

engineer suspected a kick and warned drill floor.

ML geologist consultant from Geoservices at Total E&P2003 - 2003 (less than a year)

Geology evaluation and supervision when drilling the wells: Scarabeo 6 (25/5-C-1H) Total S.A. is a French

multinational integrated oil and gas company and one of the six "Supermajor" oil companies in the world.

Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production

to power generation, transportation, refining, petroleum product marketing, and international crude oil and

product trading. Total is also a large-scale chemicals manufacturer. The company has its head office in the

Tour Total in the La Défense district in Courbevoie, West of Paris.

ML geologist consultant from Geoservices at Shell2003 - 2003 (less than a year)

Geology evaluation and supervision when drilling the wells: Deep Sea Trym (6407/9-E-2H) Draugen

oil producer Draugen has the most produced approx. 225,000 barrels of oil a day. When the field was

developed, there was a planned average production of approx. 90,000 barrels a day, but the oil reservoir

and the platform proved to be able to produce more. Oil is produced from a total of 11 wells, of which 6

are platform wells and 5 subsea wells. The produced oil is stored in the seven storage cells in the bottom of

the concrete shaft. Crude oil is loaded via a floating loading buoy, about 3 kilometers east of the platform.

Facts: Location: West of Kristiansund Block Number: 6407/9 Operator: Norwegian Shell Licenses: Shell

(26.2%), Chevron Norway (7.56%), BP Norway (18.36%), Petoro (47.88%) Discovered date: 07/09/1984

Reservoir Depth 1650 Produsjonsstart: October 1993 Draugen gas exports The 10th October 2000 started

exports of gas from Draugenfield. Draugenfield exports about. 1.5 Sm3 gas per day via a dedicated 78

km pipeline of 16 "(inch) attached to Åsgard Transport pipeline. Ever since the start of oil production on

Draugen there have been efforts to increase and prolong the production. Yarn West is a site entirely west

of the Draugenfield containing approx. 7.5 million Sm3 of recoverable oil reserves. To map the area was

made extensive use of 4D seismic (4-dimensional). This has given very valuable information about the field

and how the oil moves in the field. At the same time 4D sesmikk information on where new wells should be

placed. A / S Norwegian Shell is continuously working to create the most value of the reserves in Draugen.

This benefits both the owners and the community. Therefore, considering one continuous drilling of new

wells to access the pockets of hydrocarbons that can be produced by the existing wells.

Laboratory Engineer at Reslab2002 - 2002 (less than a year)

Page13

Special Core Analysis: Measurement of petrophysical data: Permeability, porosity and capillary pressure/

resistivity curves Reslab is a provider of fluid and core analysis to Oil & Gas-companies, sold to

Weatherford, Inc.

Geoscientist consultant at RoxarSeptember 2001 - 2002 (1 year)

Reservoir Modelling: System helpdesk (RMS 6.2) at Oslo office/ Technical contact with customers Software

error localization: Importing Eclipse grid files for inspection in RMS 7.0 and general bug hunting in new

applications in the software at Stavanger office Roxar ASA is an international technology company in the

oil and gas sector. The company's technology helps to improve the extraction of petroleum resources and

reduced field development expenses. Owner is currently Emerson Electric Company.

1 recommendation available upon request

Menig at Royal Norwegian NavyJuly 1997 - June 1998 (1 year)

Security guard @ NATO base RSD Ulsnes, Hundvåg - My leader Roger Hesjedal wrote the following words

about me: The soldier is an particularly positive person, very cooperative, dutiful, and have performed his

tasks in a very satisfactory way, and I would strongly recommend Sigve Aspelund to future employers.

Naval diving school Håkonsvern @ Bergen - The best candidate @ admission and my leader told me that I

was one of the toughest of the divers. Menig at Harald Hårfagre navy base @ Stavanger

Courses Project risk advisorAspelund Consulting & Energy Offshore DevelopmentInternational NationalIntroduction to subsea technology: System overview inproductionSubsea technology: Production control systemsSubsea Technology: Processing IntroductionIntroduction to subsea technology: Completion/WorkoverStandardization courseSubsea: Front End EngineeringTeamcenter: Review and approveSubsea technology: Introduction to MPSIntroduction to subsea technology: Connection systemIntroduction to subsea technology: Control systemsDocument review: Introduction to NDT & MRBField development: Subsea technology productionsystems

Page14

Introduction to Subsea technology: Foundations &structures

Petroleum engineering team leader consultantAspelund Consulting Energy Offshore DevelopmentInternational & NationalSales and service & Business presentation strategy

Mudlogger geologistGeoservicesMud logging training courseHelicopter evacuation and Statoil internal courseOffshore work permit and safe job analysis coursePrimary & secondary well control and kick sheet courseHSE training course and Basic safety and emergencyand evacuation course for Ula/ValhallData engineerH2S course

Production EngineerTalisman EnergyMbal, Prosper & GAP & Gas lift coursePI process book & PI excelOil Field ManagerF.A.S.T. Fekete RTA

Geoscientist consultantRoxarRMS, reservoir modelling system, introductionRMS, reservoir modelling system, streamlinesRMS, reservoir modelling system, simulation gridRMS, reservoir modelling system, heterogeneityPresentation Technique

Quality, Health, Safety & Environment engineerOcean RigOffshore safety course 2011 (Refresh from coursestaken in 2007 & 2003)

Page15

Reservoir engineerIOR ChemcoWater shut off – Randy Seright, SPE IOR06 TulsaOklahoma

LanguagesEnglish (Native or bilingual proficiency)Norwegian (Native or bilingual proficiency)German (Professional working proficiency)Danish (Full professional proficiency)Swedish (Full professional proficiency)

Skills & ExpertisePetroleumPetroleum EngineeringOil/GasOffshore DrillingDrillingGasUpstreamEnergyOnshoreReservoir EngineeringCompletionReservoir ManagementManagementNew Business DevelopmentPipelinesGeologyBusiness DevelopmentSubsea EngineeringField DevelopmentOil & Gas IndustryGeophysicsEngineeringSales ManagementPetroleum GeologyReservoir SimulationLeadershipPressure

Page16

Well TestingTeachingEarth ScienceRisk ManagementPetrophysicsInspectionFormation EvaluationNatural GasLoggingStimulationTechnical PresentationsHAZOPPetrochemicalEclipseProsperSedimentologyQHSETechnical Project LeadershipFPSOProduction EngineeringWell ControlGAPOil & Gas

EducationUniversitetet i Stavanger (UiS)Post-qualifying education, Reservoir engineering, 2003 - 2003

Universitetet i StavangerM.Sc. Petroleum Engineering, Petroleum engineering with applied science programme. Master of science

(Lorenz strange attractors), 1998 - 2001

FalkenSequrity guard, Sequrity, 2000 - 2000

University of Bergen (UiB)Examen philosophicum (2.6) (Grades in paranthesis 1.0 is the best), 1998 - 1998

Håkonsvern dykker og froskemanskoleNaval diving, 1997 - 1997

Norges teknisk-naturvitenskapelige universitet (NTNU)Candidatus Magisterii(B. Sc.), Mathematics Physics, 1995 - 1997

Bryne videregående skoleAllmennfag med fordypning i matematikk og fysikk, 1992 - 1995Activities and Societies: Tillitsvalgt 1992-1995University of Stavanger (UiS)Business Administration - MBA, master, 2015

Page17

InterestsListening to music: Van der Graaf Generator, King Crimson, Pink Floyd, Led Zeppelin (top quartet). Sports:

Soccer (Bryne FK)

Page18

Sigve Hamilton AspelundEntrepreneur open for any relevant opportuny

[email protected]

21 people have recommended Sigve Hamilton

"Sigve gave an excellent talk at our conference 'people and the digital oilfield' in Stavanger on October 20th

2011, about how systems can best be designed for safety. The talk is online at http://www.youtube.com/

watch?v=Ja3x2l94SpI"

— Karl Jeffery, Conference producer, Finding Petroleum, was with another company when working withSigve Hamilton at Aspelund Consulting & Energy Offshore Development International National

"I have had the pleasure of knowing Sigve Hamilton for the past 5 years Sigve Hamilton is not only a smart

and ambitious person but also an inspiring employee. Hard working, customer-service oriented, multi -skilled

and well educated expert. Wise, loyal, intelligent and open minded Quality, Health, Safety & Environment

engineer engineer always ready to put all his energy and stamina to get the job done. For Sigve Hamilton the

job is always the most important thing to do."

— Anantha Narayanan, was Sigve Hamilton's client

"“I have known Sigve for more one years now and from what I have experienced & through seeing his work,

his behavior toward fellow colleagues and professional way he presents himself, I can only recommend him

to the highest degree. Hard working with a thirst for success but not at any price. Anyone wishing to work

with Sigve can rest assured that ... he is one of the good guys. Good luck to him in All he does. I would

welcome him on my team anytime."

— Jvtur Tur, Worldwide Products Distribution Network - Consumer Discount Purchasing - Retail andWholesale, Global Consumer Network, worked with Sigve Hamilton at Aspelund Consulting & EnergyOffshore Development International National

"Sigve is a detailed and incisive manager with great entrepreneurial talents. An engineer with extensive

experience in the petroleum industry it is always instructive to work with him."

— William Downey, MS JD, Founder & Director of Consulting, W J Downey & Associates, waswith another company when working with Sigve Hamilton at Aspelund Consulting & Energy OffshoreDevelopment International National

Page19

"Sigve is a truly self motivated high performer who can bring a wide ranging skillset to virtually any

company in the oil and gas industry. I've relied multiple times on his knowledge and insights of the

Norwegian sector in particular. I've seen Sigve use his spare time to pass his knowledge along to up and

coming energy industry professionals. Sigve has the skills to make a fast transition into many positions, and

any learning curve will be minimized due to his experience and academic background. Regards, John Savage"

— John Savage, Account Manager, Halliburton, was with another company when working with SigveHamilton at Aspelund Consulting & Energy Offshore Development International National

"I enjoyed very much to meet Sigve. I believe he will represent a great value to almost any business."

— Geir Ullenes, Bedriftsrådgiver Rekruttering & Omstilling, Proffice AS, was a consultant or contractor toSigve Hamilton at Aspelund Consulting & Energy Offshore Development International National

"Sigve is one of my favorite followers and friends in Lkdn. He understands that I try to supply valuable

information no matter that it is unsolicited from him. But, if we are connected and I can not send him some

selected by me content, and I do not get any information from him, then why we should be connected? He

acts on the contrary to others that never send anything, further refuse to say thanks for info signals and ask

not getting anything from me, but they do not want to break the connection with me at the same time.. hard to

understand! Undoubtelly, Sigve get the key to issues very fast and he will be a good partner to work!"

— Jorge C. Palma, CEO, Founder, Port Engineering Consulting Group, worked directly with SigveHamilton at Aspelund Consulting & Energy Offshore Development International National

"Sigve is a visionary, a true patriarch of progress. In the time I've known him and worked with him, his

exemplary actions towards helping others is a testament to his person. I highly recommend him for any

endeavor, he is truly a one of a kind and an asset to any organization he represents. There is no can't in Sigve,

he always seems to find a way to make things happen. Cheers and kudos to you Sigve!"

— Junior Sanchez {LION}, CEO/President of New York Chapter, All Of Us Or None, was with anothercompany when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore DevelopmentInternational National

"SIGVE is having lots of contacts world wide and has very good Man- Management. skills.He is multi

talented person with fair knowledge of Oil industry, Software Industry & HR Recruitment industry.It is good

to know him. Venkatesh"

— Venkatesh Annadevara, BDM Domestic & International Business, SIRGRACE Technologies, waswith another company when working with Sigve Hamilton at Aspelund Consulting & Energy OffshoreDevelopment International National

"Sigve is a person par excellence with a perfect blend of HIGH EQ AND IQ,with exceptional leadership

skills and great sensitivity.He has high business acumen and a meticulous approach,a combination which

Page20

enables a person to achieve good results in a short span of time with Accuracy and precision both.It was a

pleasure to know him personally and professionally-A Golden treasure for any company."

— Shankarnarayan Ramakrishnan, Management Consultant, I-Point Consulting Services Pvt Ltd, waswith another company when working with Sigve Hamilton at Aspelund Consulting & Energy OffshoreDevelopment International National

"If I see linkedin benefits, sigve appears to be one of them. He is very vibrant & proactive ;always available.

I benefitted myself with his advising, consulting & teaching & he also helped me in uderstanding Linkedin &

its usage. He is very creative person & it seems to me that his brain machine is meant to generat ideas. what a

talented & knowledgeable person is he. When I met him I was working at NTSA Saudi Arabia as Consultant.

You name a thing & the next moment it is done...Thanks Sigve to be my partner & friend."

— Farasat Saeed, Regional Project Reporting Executive, Telenor Pakistan, was with another companywhen working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development InternationalNational

"Creative and intelligent with an excellent scientific bent, Sigve is also totally focused in his approach to

work and pleasant to deal with."

— Nirmal Sachdeva, was Sigve Hamilton's client

"Sigve is a multi experienced engineer with very solid experience in many aspects related to oil and gas

industry. He really likes to socialize with other people and also has eagerness to learn new things. I would

appreciate the chance to work with Sigve now and in the future."

— Agung Ertanto, Reservoir Engineer, StatoilHydro, was with another company when working with SigveHamilton at Aspelund Petroleum Consulting

"Sigve has the capabilities of a 'business giant'. He is steadfast and dedicated to whatever he chooses to

do...he strives for excellence..."

— Nadira Haniff, Worldwide Independent Distributor, Xango LLC, worked with Sigve Hamilton at Xango

"I had the pleasure of having Sigve as one of my engineers in OTG. Sometimes simply endorsing people

gives not the full picture of their skills. As of beeing Sigves project manager, having a personallity like him

in the team is of incredible value. One of the projects where a new technological development from scratch,

and having Sigve`s analytical mindset, and systematically work in the team made a huge contribution to the

development. If i should do such a project again, Sigve would be one of the first i would take to the team to

make sure it is realized on time and quality."

— Johannes Waarseth-Junge, project manager/ consultant, Oilfield Technology Group, managed SigveHamilton at Oilfield Technology Group

Page21

"Sigve Hamilton is a hard worker, proactive and eager to learn. He can solve the problem at under pressure"

— David Tobing, PE Team Leader, BP Indonesia, was with another company when working with SigveHamilton at Talisman-Energy

"I worked with Sigve Hamilton in enhancing the production of oil wells through gas lift. He was very

acommendating and knowledgeable of this subject area. He is very focused and knows his reservoirs. His

friendly attitude made him really easy to work with. I would welcome the opportunity to work with him in the

future."

— Lloyd Ragnar Burnett, Sr. Sales and Operations Adv., Petroleum Technology Company, worked directlywith Sigve Hamilton at Talisman-Energy

"Sigve has a very aproachable personality and pays great attention to details in work. Always prompt to assist

colleagues and willing to put in the extra milel to get things done. I wish him well in his new undertakings."

— Lee Chih Chiang, Snr Completion / Integrity Engineer, Talisman Energy, worked with Sigve Hamilton atTalisman-Energy

"I enjoyed interacting with Sigve when he had his office at IRIS while working for IOR Chemco."

— Sigmund Stokka, Research Director, IRIS, was with another company when working with SigveHamilton at IOR Chemco

"Sigve Hamilton is very enthusiastic, and creative about how to improve work results."

— Lars Johan Skjold, Staff Geologist, Statoil, managed Sigve Hamilton indirectly at Geoservices

"Sigve and I worked together at Roxar within the Software Solutions Business Unit, where he formed part of

the Geoconsultancy Team that I was responsible for placing out on Consultancy Tasks with Clients. He was

always a hard worker, who was keen to learn. I wish him all the best for his future career development."

— Neil Quentin Smith (Ph.D), Software Sales Manager Scandinavia, Roxar, managed Sigve Hamiltonindirectly at Roxar

Contact Sigve Hamilton on LinkedIn