simone fracasso - portfolio 2010_2012

56
PORTFOLIO SIMONEFRACASSO 20102012

Upload: simone-fracasso

Post on 19-Mar-2016

223 views

Category:

Documents


0 download

DESCRIPTION

Architecture and Urban Design Portfolio. Projects developed during my Bachelor Degree at the RomaTre university of Rome. © All rights reserved.

TRANSCRIPT

Page 1: Simone Fracasso - Portfolio 2010_2012

PORTFOLIOSIMONEFRACASSO 20102012

Page 2: Simone Fracasso - Portfolio 2010_2012
Page 3: Simone Fracasso - Portfolio 2010_2012

DES IGN

Page 4: Simone Fracasso - Portfolio 2010_2012
Page 5: Simone Fracasso - Portfolio 2010_2012

CONTROLBASICS OF TECHNICAL PHYSICS | ENERGETICAL IMPROVEMENTCONSTRUCTION STUDIO 3 | OPTIMIZATION OF A PUBLIC SCHOOL

RESTORATION STUDIO - LAB 5 | UPGRADING OF A VILLAARCHITECTURAL DRAWING | DRAWING BOOK

COMPLEXITYPLANNING STUDIO - LAB 4 | A NEW URBAN PLANNINGURBAN AND DESIGN STUDIO - LAB 6 | SOCIAL HOUSING

FREEDOM

EXTRAS

DESIGN STUDIO 2 | THE PUBLIC LIBRARY

Page 6: Simone Fracasso - Portfolio 2010_2012
Page 7: Simone Fracasso - Portfolio 2010_2012

CONTROLO P T I M I Z A T I O NIN OUR DAYS THE CONTROL OF VARIABLES OF A PROJECT IS THE MOST DEVELOPED WAY TO DESIGN. IT DERIVES DIRECTLY FROM THE SCIENTIFIC METHOD WHICH CONSIDERS A PROBLEM AT A TIME. IT ISOLATES A VARIABLE FROM THE OTHERS, DOING A CHECK LIST OF PROBLEMS AND RELATED SOLUTIONS. THERE ARE LOTS OF POSSIBLE PUR-POSES FOR CONTROLLING OF A PROJECT, FOR EXAMPLE THE COST OF REALIZATION OR THE SUS-TAINABILITY OF A BUILDING. MOREOVER THERE ARE SEVERAL KIND OF VARIABLES, THE MAIN ARE: THE THERMIC INSULATION, THE LIGHTING AND THE ACOUSTIC. WE CAN ALSO TAKE THE CONTROL OF A PROJECT AFTER ITS COMPLETION, FOR EXAMPLE OPTIMIZING THE ENERGETIC FEATURES OF AN OLD B U I L D I N G .

Page 8: Simone Fracasso - Portfolio 2010_2012

rome

N

daylight factor

model of the project

BASICSOFTECHNICAL PHYSICSSITE | OSTIA ANTICA, ROME WEST, ITALYCLIENT | PRIVATE CONTRY HOUSETASK | IMPROVEMENT OF ENERGETIC FEATURES

2010

SKC

ERCIRC

| sky component

| direct illumination | external reflected conponent

| internal reflected conponent

DI

Page 9: Simone Fracasso - Portfolio 2010_2012

thickness 465 mm

indo

or

outd

oor

thickness 370 mm

without sound-absorbing materials

empty room room filled to 1/4 room filled to 2/4

room filled to 3/4 roomful optimal timing

with sound-absorbing materials

outdoor

indoor

stratigraphy of the structure diagram of pressures

comparison between different reverberation times

0.26 W/m2K[italian legal limit: 0.28 Wm2K]

TRASMITTANCE O F ELEMENTS

0.23 W/m2K[italian legal limit: 0.24 Wm2K]

TRASMITTANCE OF ELEMENTS

ACOUSTIC ANALYSIS OF A GUEST ROOM IN THE COUNTRY

HOUSE

Page 10: Simone Fracasso - Portfolio 2010_2012

rome

N

CONSTRUCTION STUDIO SITE | FONTE NUOVA, ROME EST, ITALYCLIENT | COMUNE DI ROMA CAPITALE

®

TASK | ENERGETICAL OPTIMIZATION OF A PUBLIC SCHOOL

2011LAB3

Page 11: Simone Fracasso - Portfolio 2010_2012

A

A’ N

A - A’ sectionSOLUTIONS ADOPTED

daylight factor over the legal limit daylight factor under the legal limit1

N A T U R A L L I G H T I N G

Page 12: Simone Fracasso - Portfolio 2010_2012

functional solution

functional solution

economical solution

PROJECT’SRENDER

RAINSCREEN CLADDING

0.25 W/m2K[italian legal limit: 0.28 Wm2K]

TRASMITTANCE

194,81€/m2COST

0.28 W/m2K[italian legal limit: 0.28 Wm2K]

TRASMITTANCE

148,77€/m2COST

outer coatingventilationinsulatingstructure

inner coating

2

V E R T I C A L S T R U C T U R E

Page 13: Simone Fracasso - Portfolio 2010_2012

Nnew solar panels on the roof

t h e m o s t energetically efficient tilt’s a n g l e f o r r o m e .

PERFORMANCEENERGY CLASS OF THE BUILDING

TOTALPERFORMANCE COOLING

35°

168.3 > kWh/m2 year

168.3 < kWh/m2 year

120.8 < kWh/m2 year

90.2 < kWh/m2 year

73.3 < kWh/m2 year

53.5 < kWh/m2 year kWh/m2 year

36.7 < kWh/m2 year

22.8 < kWh/m2 year

kWh/m2 year

AA

B

C

DE

FG

34.6

kWh/m2 year73.3ITALIAN

LEGAL L I M I T

solar thermal system photovoltaic system3

E N E R G Y C E R T I F I C A T I O N

+

0.0

3000

3000

360

HEATING kWh/m2 year33.6

HOTWATER kWh/m2 year1.0

Page 14: Simone Fracasso - Portfolio 2010_2012

D E T A I L S E C T I O N

Page 15: Simone Fracasso - Portfolio 2010_2012

1 | steel flashing2 | brick (50x30cm)3 | steel anchoring4 | holed brick5 | insulating6 | concrete7 | IG8 | porphyry 9 | sand10 | entrapment11 | screed12 | terrain13 | plaster14 | girdle15 | malta 16 | marble17 | skylight18 | floor19 | entrapment20 | vapor barrier21 | screed22 | flashing23 | terracotta24 | visarm25 | HE beam26 | metal box27 | travertine28 | travertine pavers28 | pier C.A.30 | plinth31 | under foundation32 | beam33 | lattice beams and hollow34 | crossed corner35 | steel warping36 | regolation clip37 | pendino38 | false ceiling39 | floor40 | screed41 | loading dock42 | travertine threshold

D E T A I L S

Page 16: Simone Fracasso - Portfolio 2010_2012
Page 17: Simone Fracasso - Portfolio 2010_2012

FREEDOMC H A O S T H E O R YTHE CHAOS THEORY IS USED IN ARCHITECTURE WHEN WE DECIDE TO TREAT THE CREATIVE PRO-CESS OF DESIGNING A FORM LIKE A NON-LINEAR SYSTEM. IN THIS KIND OF SYSTEM WE DON’T ANAL-IZE ONE VARIABLE AT A TIME, BUT EVERYONES AT THE SAME TIME CONSIDERING ALSO THEIR INTER-ACTION. THE MAIN POINTS OF THIS THEORY ARE: THE SENSIBILITY OF THE INITIAL CONDITIONS ( FROM WHICH A LITTLE CHANGE CAN HAVE BIG CONSE-QUENCES IN THEIR DEVELOPMENT, “BATTERFLY EFFECT” ), THE UNFORESEEABILITY OF THESE SYSTEMS IN TIME AND THEIR APPARENTLY RANDOM DEVELOPMENT. AN ALTERNATIVE WAY TO DESIGN IS TO DECIDE A DEFINIED FIELD OF DEVELOPMENT FOR PROJECT’S VARIABLES, LEAVING THEM FREE TO DEVELOP IN THIS.

Page 18: Simone Fracasso - Portfolio 2010_2012

ground levelA

A’

B

B’

rome

N

B-B’ section

A-A’ section

simplified render of project

DESIGN STUDIO 2 | 2010SITE | OSTIENSE, ROME SOUTH, ITALYCLIENT | COMUNE DI ROMA CAPITALE

®

TASK | DESIGN OF A PUBLIC LIBRARY

Page 19: Simone Fracasso - Portfolio 2010_2012

| the choice of the vari-ables that determine the form in plan of the build-ing are being directed towards a geometric analysis of the urban context around the proj-ect area. the main cutting is setted on one of the corners of the lot and opens to the only part of the sky free from the encumbrance of other b u i l d i n g s .

| the central setbacks are located according to a geometric analysis of the batch that is set on a modular grid 6 x 3.

|

structural render of project

CUTTING SETBACKSMODULAR GRID

1 2

carrier septum reinforced concrete

| structure of reinforced concrete pillars and steel beams

Page 20: Simone Fracasso - Portfolio 2010_2012
Page 21: Simone Fracasso - Portfolio 2010_2012

COMPLEXITYCOMPLEX SYSTEMS THEORY

IN THE DEVELOPMENT OF MY “DESIGNING CONSCIOUSNESS” I LEARNED WHAT IS TRULY IMPORTANT. WHEN STARTING A PROJECT, WE MUSTN'T FOCUS OUR ATTENTION ON CONTROL-LING THE PROJECT’S VARIABLES OR LEAVING THEM FREE TO DEVELOP THEMSELVES. CERTAINLY, WHEN WE TRY TO CONTROL THE VARIABLES WE CONSIDER THEM ONE AT A TIME SIMPLYFING IN WRONG WAY THE COMPLEX TOPIC OF DESIGNING. ONE MUST THINK THAT A DESIGN IS A COMPLEX SYSTEM OF INTERACTIONS BETWEEN VARIABLES THAT CAN HAVE AN EFFECT DURING THE DEVELOPMENT OF A PROJECT. IN THE RESEARCH OF PROJECT’S SOLUTIONS WE HAVE TO TO FIND A COMPROMISE BETWEEN THE CONTROL AND THE FREEDOM.

Page 22: Simone Fracasso - Portfolio 2010_2012

search site

MAP OF THE CRITICAL

rome

N

PLANNING STUDIO SITE | CENTOCELLE AND PIGNETO, ROME EST, ITALYCLIENT | COMUNE DI ROMA CAPITALE

®

TASK | NEW URBAN PLANNING OF THE SITE

2012LAB4

Page 23: Simone Fracasso - Portfolio 2010_2012

ENVI-ROM- E N T

INFRASTRUCTURES

S E T T L E M E N T

derelict areas

public gardens not equipped

cultural heritage abandoned

isolated district

fragmented urban structure

blighted buildings

abandoned buildings

traffic funnel

traffic congestion

centrality congested

isolated neighborhoods

urban fracture

Page 24: Simone Fracasso - Portfolio 2010_2012

M A S T E R P L A N

infrastructures and road

private transport

highway

primary road

secondary roaddistrict road

existent to adapt new construction

existent to adapt new construction

public transport

high velocity train

regional train

metropolitan trainhigh velocity trambusunderground

interchange

- metropolitan

- urban

existent to adapt new construction

Page 25: Simone Fracasso - Portfolio 2010_2012

N

preservation ofhistorical Pigneto

areas of intervention

new AcquedottoRomano‘s park

eliminate congestionof AcquedottoTogliatti

urban regenerationof Centocelle

redesign of parks

preservation ofForte Prenestino

increase ofPigneto’s permeability

new centralityfor Serenissima

increase ofCentocelle’s permeability

ABCDEFGHI

Page 26: Simone Fracasso - Portfolio 2010_2012

public green to equipnew public green

1

REDESIGN OF PARKS N

INTERV- ENTIONS

new crossing walknew road

Page 27: Simone Fracasso - Portfolio 2010_2012

|

| mixed residential after demolition2

NEW PLANS TO IMPLEMENT

N

RECOVERY PLAN

DETAILED PLAN

commercial buildings

parking alignmentroad

road

residentialmixed residential

public greenpublic service

alignment

Page 28: Simone Fracasso - Portfolio 2010_2012

3

H Y P O T H E T I C A L V I E W

BE CAREFUL!

Buildings in this hypoteti-cal view are just a repre-sentatio of the actual building space on their respective areas, they don’t represent their real form. It will be a task of the designers define the specific architectural details.

Page 29: Simone Fracasso - Portfolio 2010_2012

N

Page 30: Simone Fracasso - Portfolio 2010_2012

URBANANDDESIGN STUDIO

N

SITE | VAL MELAINA, ROME NORTH, ITALY

rome

CLIENT | FOUNDATION FOR SOCIAL HOUSING &TASK | NEW SOCIAL HOUSING&STUDENT ACCOMMODATION

2012LAB6

ROMA TREUNIVERSITY

®

Page 31: Simone Fracasso - Portfolio 2010_2012

student’s building

massing isometricN

M A S T E R P L A N | C O N C E P T1

URBANDISINTEGRATION

GREENPERMEABILITY

RELATIONSHIP

GREENURBAN

socialresidences

Page 32: Simone Fracasso - Portfolio 2010_2012

A | sport centerB | risto artC| senior centerD | public libraryE | asylum

A

B

FUNCTIONO N T H E GROUNDF L O O R

2

N

TREATMENT ON THE GROUND

+ 47 m + 47 m

+ 46 m

+ 46 m

+ 46 m

+ 47 m+ 48 m

+ 49 m

+ 49 m

+ 46 m

+ 48 m

+ 49 m

Page 33: Simone Fracasso - Portfolio 2010_2012

creation a public living room at the urban level with alternating green rooms for specific functions on the ground floor of the building in front of.

C

E

D

+ 46 m + 46 m

+ 46 m

+ 47 m

+ 46 m + 46 m

+ 45 m+ 44 m

Page 34: Simone Fracasso - Portfolio 2010_2012

MUNICHREFERENCES

A - A’ section

B - B’ section

1| social housing, Otto Steidle 2| residential building, Riem

Ref

3

TYPOLOGIES OF BUILDINGS

Page 35: Simone Fracasso - Portfolio 2010_2012

third floor

Ref

N

A

A’

BB

Page 36: Simone Fracasso - Portfolio 2010_2012

DUPLEX band SIMPLEX bandSERVICE band

some apart-m e n t s a r e equipped with a false ceiling that connects them to ithe central part of the building, composed by t h e s o l a r greenhouse. this control the proper ventila-tion of all the building.

student

family 2+3

family + handicapped

BUILDING’SSTRUCTURE

VENTILATION

4

H O U S I N G T Y P O L O G I E S

14,5 mq

15,1 mq

5,9 mq

3,2 mq

2,8 mq

N

35,6 mq

24,9 mq

19,0 mq

5,8 mq

3,6 mq

3,5 mq

5,9 mq

5,9 mq

N

16,3 mq

5,8 mq

5,8 mq

2,9 mq

2,9 mq

11,9 mq

11,9 mq

14,4 mq

36,2 mq

2,0 mq5,8 mq

1,9 mq

6,7 mq

5,8 mq

18,1 mq

3,5 mq

5,8 mq

N

Page 37: Simone Fracasso - Portfolio 2010_2012

software: Autodesk-Vasari

CO2 emissions annual energy use

electricity

fuel

metric tons/yearenergy use

energy generationpotential

net CO2

5

E N E R G Y E F F I C I E N C Y

Page 38: Simone Fracasso - Portfolio 2010_2012
Page 39: Simone Fracasso - Portfolio 2010_2012

E X T R A S- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 40: Simone Fracasso - Portfolio 2010_2012

N

A - A’ section

detail

A’A’

B B’

RESTORATION STUDIO SITE | SASSONE, CIAMPINO, ITALYCLIENT | PRIVATETASK | CONSERVATION AND UPGRADING OF A VILLA

A

B

2012LAB5

Page 41: Simone Fracasso - Portfolio 2010_2012

axonometric projection axonometric projection

1 | wood loom1 | plaster2 | camera a canne3 | arriccio4 | steel centring5 | wood centring6 | lattice beams7 | enticement8 | floor

2 | camera a canne3 | arriccio4 | plaster5 | concrete form6 | tie

L A C U N A R C E I L I N G

VOLTA IN CAMERA

A CANNEA B

Page 42: Simone Fracasso - Portfolio 2010_2012

B - B’ section

detailed sectiondetailed section

detailed section

N E W R O O F I N G

Page 43: Simone Fracasso - Portfolio 2010_2012

C U T A W A Y D R A W I N G

Page 44: Simone Fracasso - Portfolio 2010_2012

arch of Titus

ARCHITECTURAL DRAWING 2010

TASK | DEVELOPMENT OF ARCHITECTURAL DRAWING SKILLS

Page 45: Simone Fracasso - Portfolio 2010_2012

markets of Trajan

Page 46: Simone Fracasso - Portfolio 2010_2012

auditorium of rome

Page 47: Simone Fracasso - Portfolio 2010_2012

menabò

Page 48: Simone Fracasso - Portfolio 2010_2012

Augusto Imperatore square

Page 49: Simone Fracasso - Portfolio 2010_2012

Fiumicino City Hall

Page 50: Simone Fracasso - Portfolio 2010_2012

Palazzo della Civiltà Italiana

Page 51: Simone Fracasso - Portfolio 2010_2012

architectural orders

Page 52: Simone Fracasso - Portfolio 2010_2012

Sant’Elia - utopian city

Page 53: Simone Fracasso - Portfolio 2010_2012

Palazzo della Civiltà Italiana

Page 54: Simone Fracasso - Portfolio 2010_2012

+

Page 55: Simone Fracasso - Portfolio 2010_2012

=

Page 56: Simone Fracasso - Portfolio 2010_2012