simpler & faster deployment of small cell networks

16
Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning

Upload: small-cell-forum

Post on 11-Jan-2017

2.243 views

Category:

Presentations & Public Speaking


0 download

TRANSCRIPT

Page 1: Simpler & Faster Deployment of Small Cell Networks

Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning

Page 2: Simpler & Faster Deployment of Small Cell Networks

2

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

Page 3: Simpler & Faster Deployment of Small Cell Networks

3

LampSite: Innovative Solution for Indoor MBB

Busy hour

Traditional solution

MBB traffic

Busy hour

Current Situation of Indoor MBB

Unleash The Suppressed Traffic

BBU RHUB pRRU

Superiority Challenge

Larger & Flexible Capacity pRRU level Capacity Allocation. Dynamic Capacity Adjustment.

Easier Deployment Simple Architecture. Smaller & Lighter.

Accurate Design Simplify by Professional

Tool, for example:

Enhanced SON feature.

Specification Checklist / Validation Tools.

Integrated to Design Tools.

More Product Specifications

Complex Configuration

Page 4: Simpler & Faster Deployment of Small Cell Networks

4

Case1: LampSite Deployed in Stadium Scenario

Initial Period(SFN) - Cell resources saved. - Interference reduced.

Later Period(Cell splitting) - Remote expansion. - Capacity N times increased.

Cell 1

Cell 2

Cell 3

Cell 4

Cell 1 Cell 2

Cell 3

Cell 4Cell 5Cell 6

Cell 7

Cell 8

Dynamic Capacity

Description High complexity and functionality in Europe. Support nearly 15,000 spectators.

System design: 30 hours. Venue construction: 7 days.

Time cost of LampSite solution

Minsk-Arena Complex in Belarus

Page 5: Simpler & Faster Deployment of Small Cell Networks

5

Case1: Accurate Design with iBwave Tools

Interference analyze. Antenna type select.

Interference

Step 2

Quick location and routing design. Coverage confirm by simulations.

Topology check & correct.

Performance OptimizationInterference

Shaped Antenna

Directional Antenna

Step 1 Step 3

Step 4

Call completion rate 100%

HSDPA peak rate 28Mbps

PS call drop rate 0.18%

PS traffic increased to 336%

Page 6: Simpler & Faster Deployment of Small Cell Networks

6

Case2: LampSite Deployed in Hotel Scenario

BBU

pRRU

RHUBCarrier 1

Carrier 2

LTE 2CCs CA On 1 pRRU

Description The first integrated resorts in Singapore. LampSite target: 2 basement in MBS Retail area.

System design: 16 hours. Venue construction: 14 days.

Time cost of LampSite solution

Marina Bay Sands

Page 7: Simpler & Faster Deployment of Small Cell Networks

7

Basement1

Basement2

Case2: Simpler & Faster Design

Simulation: Good Coverage Performance: Excellent

Average DL speed: 239Mbps CSFB success rate: 100% VoLTE & SRVCC handover

success rate: 100%

Average RSRP -76dBm

Page 8: Simpler & Faster Deployment of Small Cell Networks

8

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

Page 9: Simpler & Faster Deployment of Small Cell Networks

WORLDWIDE STANDARDfor in-building network design and documentation

CONTINUOUS INNOVATIONadapting quickly to a dynamic and rapidly-evolving industry

TRUSTED BY 700+ CUSTOMERSin more than 87 countries

INDOOR WIRELESSPLANNING & DESIGN

FIELD-BASED SURVEYSCOLLABORATION PLATFORM

EXPERT TRAINING & CERTIFICATION

About iBwave

Page 10: Simpler & Faster Deployment of Small Cell Networks

Enabling in-building networking excellence

Feb 22, 2016SC design case studies 10

Enterprises Large venuesTransportationHospitality

Page 11: Simpler & Faster Deployment of Small Cell Networks

Product Suite

IN-BUILDINGCOLLABORATIONPLATFORM

FIELD-BASED SURVEYS &DESIGNS

TRAINING & CERTIFICATION

DATABASE OF COMPONENTS(20,000 +)

RF PLANNING AND DESIGN SOFTWARE

Feb 22, 2016 11 Feb 22, 2016SC design case studies

Page 12: Simpler & Faster Deployment of Small Cell Networks

Network architecture with automated RF calculations

Floor plans with propagation results

Small cell deployment process

Feb 22, 2016SC design case studies 12

DOCUMENT

SURVEY

Client &Site info

DESIGN

Planning& Design

MAINTAIN

MaintenanceUpgrades

BUILD

Install &Commission

Page 13: Simpler & Faster Deployment of Small Cell Networks

Design tool objectives for small cells

Feb 22, 2016SC design case studies 13

PORTABLE: Easy to carry on-site

INTUITIVE: RF expertise not required

AFFORDABLE: Accessible to all field personnel

COMPLETE & ACCURATE: Getting it right the 1st time

INTEGRATED: Complete end-to-end workflow

LOW TCOSCALING

Page 14: Simpler & Faster Deployment of Small Cell Networks

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – sports complex

14

Minsk Arena Complex, Belarus(15,000 seats)

Primary criteria: capacity

Number of small cells: 4 8

Design time: 30 hrs (50% less)

Tool: iBwave Design

Feb 22, 2016SC design case studies

Page 15: Simpler & Faster Deployment of Small Cell Networks

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – shopping mall

15

Shopping mall, Manila (240K sq ft)

Number of small cells: 8

Survey & design time: 4.5 hrs

Time savings: 5 hrs (55%)

Tool: iBwave Mobile Planner

Feb 22, 2016SC design case studies

Page 16: Simpler & Faster Deployment of Small Cell Networks

Network architecture with automated RF calculations

Floor plans with propagation results

Summary

Feb 22, 2016SC design case studies 16

• 4-step deployment process for enterprise small cells

• Key objective for design toolkit: Low TCO & ability to scale

• Design case studies: single sites to nationwide deployments

• Benefits: >50% time savings & getting it right the 1st time

• Collaboration & documentation needed for maintainability