simulation / recon. workgroup summary for acfa8

43
ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 1 Simulation / Recon. Workgroup summary for ACFA8 The Framework for Sim./Recon. Status report Activity Report Tracking : Performance / IT config. CAL : Shower model / Perform. / PFA MUD : Full sim. Interface to LCBDS Youngjoon Kwon (Yonsei Univ.) A. Miyamoto A. Yamaguchi, E. Won, J.M. Chang, Y. Yamaguchi, S. Yamamoto, H. Ono

Upload: kaipo

Post on 16-Jan-2016

22 views

Category:

Documents


0 download

DESCRIPTION

Simulation / Recon. Workgroup summary for ACFA8. The Framework for Sim./Recon. Status report Activity Report Tracking : Performance / IT config. CAL : Shower model / Perform. / PFA MUD : Full sim. Interface to LCBDS. Youngjoon Kwon (Yonsei Univ.). A. Miyamoto. A. Yamaguchi, E. Won, - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 1

Simulation / Recon.

Workgroup summary for ACFA8

The Framework for Sim./Recon. Status report

Activity Report Tracking : Performance / IT config. CAL : Shower model / Perform. / PFA MUD : Full sim. Interface to LCBDS

Youngjoon Kwon (Yonsei Univ.)

A. Miyamoto

A. Yamaguchi,E. Won,

J.M. Chang, Y. Yamaguchi, S. Yamamoto,

H. Ono

Page 2: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 2

HY’s Charge to the ACFA8

Page 3: Simulation / Recon. Workgroup summary for ACFA8

S/W Framework & the Tools

Page 4: Simulation / Recon. Workgroup summary for ACFA8

What a good framework does …

*

* Copied from Miyamoto-san’s talk

Page 5: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 5

Page 6: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 6

QuickSim – update & performance

GLD-V2 : a new parameter file Beam pipe: r=1.5cm, Be, 25m Beam pipe & VTX layer#1 : not realistic yet TPC, CAL, etc.

Tracker performance

Page 7: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 7

QuickSim – performance

e+e- ZH jets)

a slight improv’t. over other versions,JLC2T, GLC3T

Page 8: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 8

Tools for Full Sim. / Recon.

Jupiter & Satellites

a framework based on JSF/ROOT & Geant4 7.0p1JSF – the analysis flow controller based on ROOTThe release includes event generators, QuickSim, and event display

Page 9: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 9

Jupiter Geometry

Solenoid

Hadron Calorimeter

Muon/Iron

Elemag. Calorimeter

IT VTX

Forward Cal.

QC1

TPC

initially based on GLD_v1 1.8cm, VTX+IT+TPC, 3T, etc. (not optimized yet…)

(+) new IR/VTX for 2mrad x-ing Work in progress for 20 mrad x-ing, FT, FCal, BCal

Page 10: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 10

Calorimeter Geometry

Page 11: Simulation / Recon. Workgroup summary for ACFA8

Activity Report- tracking

Page 12: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 12

Tracking Performance (A. Yamaguchi)

To set performance goals for TPC in Pt resolution IP resolution Two-track separation

Use Jupiter with a cheated version of track-finder Track-fitting by Kalman filter Hybrid track-fitting with TPC+IT+VTX, with

• Energy loss• Multiple scattering

Page 13: Simulation / Recon. Workgroup summary for ACFA8
Page 14: Simulation / Recon. Workgroup summary for ACFA8
Page 15: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 15

IP resolution

Page 16: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 16

2-track sep. study

Page 17: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 17

IT configuration (E. Won)

GLD S/W & Sim. activities in Korea Configuration options for barrel IT Endcap IT – first thoughts

Page 18: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 18

Korean activities – just started

Page 19: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 19

Theme – with or w/o IT

Page 20: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 20

Variations

Page 21: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 21

End-cap IT – first thoughts

Page 22: Simulation / Recon. Workgroup summary for ACFA8

Activity Report- CAL & MUD

Page 23: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 23

Shower Model Study (J. M. Chang)

EM shower models

Had shower models

Page 24: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 24

Compared for e-

Page 25: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 25

Compared for -

Page 26: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 26

Page 27: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 27

CAL full-sim. study (Y. Yamaguchi)

Full GLD sim, but w/ ideal geometry Every tower pointing to IP; and no crasks

Material study Performance test

EM CAL / HD CAL Test of fine-segmented, digital CAL

Page 28: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 28

EM CAL performance

Page 29: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 29

HD CAL performance

Data vs. MC?

Page 30: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 30

Fine-segmented CAL

Page 31: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 31

Performance of Digital CAL

Need: clustering algorithm for Digital CAL

Page 32: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 32

Study w/ cheated PFA (S. Yamamoto)

Cheated PFA? Why? – to assess ultimate jet-energy resolution How

Jet energy resolution study using c-PFA

CAL & tracker resolution Kink Acceptance hole?

Page 33: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 33

Page 34: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 34

Mz resolution for @ 91.187 GeV; width = 0?

Kink-treatment schemes

sigma = 2.79 w/o kink treatment

qqZ

Page 35: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 35

Det. Resolution effects

Page 36: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 36

=1.16 GeV unexplained

Page 37: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 37

MUD full-sim. study (H. Ono)

Implemented geometry & B field MUD response study Smearing & -finding under

construction

Page 38: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 38

Geometry of MUD

Active layer (10cm-thick, not segmented)

Air : Default, Gas chamber reserved Scintillator : test version

Absorber (40cm-thick) Iron (as a return yoke)

Barrel : 4 layers Endcap : 5+2(inner) layers Alternately placed barrel and

endcap layer Octagonal shape in the phi

direction Z direction

X-Y direction

Page 39: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 39

B-field mapping

“B-field direction and magnituderoughly followed Yamaoka-san’s results”

Page 40: Simulation / Recon. Workgroup summary for ACFA8

4. MUD response with CAL information

1. Observed muon signal by muon detector2. Muons passing through the CAL3. Pion leakage from CAL (punch through)

e+e-→Z→qq (2 jets) event check

Single beam () test

4. Number of muons produced in Jets or created inside of the CAL

Unfortunately, solenoid is set to air at Jupiter default.I checked the interaction length as only 7.10 (CAL)

Ignored the solenoid material in this study

Page 41: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 41

Page 42: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 42

from jets

Page 43: Simulation / Recon. Workgroup summary for ACFA8

ACFA8, July 11 - 14, 2005, Youngjoon Kwon (Yonsei Univ.) 43

Summary Since I am not a good person to make a

summary of summaries, I will quote one of the Miyamoto-san’s LCWS2005 slides

My thanks to all those who contributed to this group and gave very nice presentations!