Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1 6383 Erpfendorf / AUSTRIA 0043 5352 77007 www.aignerwaerme.com. Austrian Biomass Heating Systems produced and distributed in North America. Biomass heating. Electricity . Boiler . ORC. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/1.jpg)
1
Since 1993
Consultancy firm for renewable energy
Sepp Aigner MBA
Hundsbichl 1 6383 Erpfendorf / AUSTRIA
0043 5352 77007 www.aignerwaerme.com
![Page 2: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/2.jpg)
2
Austrian Biomass Heating Systems
produced and distributed
in North America
![Page 3: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/3.jpg)
3
Biomass heating
Boiler Fuel ORC
Electricity
![Page 4: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/4.jpg)
4
Wood from windbreak – almost worthless for industrial use - but very valuable as heating fuel
1 m³ windbreakage wood
= 200 litre heating oil
![Page 5: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/5.jpg)
5
The motivation for buying a biomass heating is the short pay back time
Basic conditions
Consumption 10.000 liter/yearof heating oil
Costs of heating oil 0,60 € per liter
Investment for € 18.000woodchip heating
Pay back time ~ 5 years
Consumption 125 m³ / yearof woodchips
Costs of woodchips € 16 / m³
-
2.000
4.000
6.000
8.000
10.000
12.000
14.000
€ 6.000
€ 2.000
€ 4.000
![Page 6: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/6.jpg)
6
How is business in Austria ?
New installed pellet and woodchip heatings in AustriaSource: LK LowerAustria
0
2000
4000
6000
8000
10000
12000
14000
16000
Pellet s
Woodchips
![Page 7: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/7.jpg)
7
Total energy consumption in TWh
29.863
2.354 2.607307
-
5.000
10.000
15.000
20.000
25.000
30.000
35.000
USA Canada Germany Austria
Producers ofwoodchip heatings
~ 30~ 5? ?
![Page 8: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/8.jpg)
8
Total energy consumption in TWh
29.863
2.354 2.607307
-
5.000
10.000
15.000
20.000
25.000
30.000
35.000
USA Canada Germany Austria
New installed pellet and woodchip heatings in AustriaSource: LK LowerAustria
0
2000
4000
6000
8000
10000
12000
14000
16000
Pellet s
Woodchips
![Page 9: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/9.jpg)
9
In Austria produced Biomass heatingsSource: LK LowerAustria
0
5.000
10.000
15.000
20.000
25.000
30.000
35.000
40.000
45.000
50.000
Export
Domest ic
We are heading for a major production gap!
Production Gap
Capacity
Tend
ency
of de
mand i
n Eur
ope
Delivery time = several months
![Page 10: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/10.jpg)
10
Why are Austrian producers hesitating to export to North America?
Even longer delivery times at the home market
Different law system
Different standards (ASME, CSA ...)
![Page 11: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/11.jpg)
11
How to distribute?
Establish a huge network of partners.
Use free capacities in automotiv industry.
Who should produce?
What´s the business idea?
Bring the Austrian biomass technology to NAand spread it out from there all over the world.
![Page 12: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/12.jpg)
12
What am I looking for in Canada?
Partners for the network
![Page 13: Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1](https://reader036.vdocuments.net/reader036/viewer/2022070503/56816304550346895dd37e4e/html5/thumbnails/13.jpg)
13
Thank you for your attention
Sepp Aigner MBA