SINTEF ICT 1
SINTEFs Internal Management System
Structure and organizing
Bente Wiggen, 2011-04-08
SINTEF ICT
Procedure A1-yy
Activity A3
Activity A2
2
Structure
Main processes
Sub-process A
Activity A1
Procedure A1-xx
Sub-process B C D
……
Help, checklists, tipsand
Level 1
Level 2
Level 3
Level 4
SINTEF ICT 3
Internal Management System
Core process
Mangement process
Support process
SINTEF ICT 4
Sales and project execution - level 2
Project roles
SINTEF ICT 5
Level 3 - example
The procedures is subdivided into regurimentes and help/tips.
SINTEF ICT 6
The internal management system:• Is process-oriented• Shall meet the requirements in ISO 9001 and ISO 14001• Applies to all activities carried out within the SINTEF
Group• Contains requirements which are minimum• Each research division is permitted to establish its
own procedures related to areas not includes in the overall internal managemenet system or procedures which are stricter than those established centrally.
• Is accessible to all employees via the intranet, including any local supplements.
Summary
SINTEF ICT 7
Organizing
Group QA Manager
QA Manager in earch Research
divisions *
*
****
**
*
SINTEF ICT 8
• The forum is made up of the Quality Assurance Managers from each of the research divisions/research companies, together with the Group Quality Assurance Manager. The Group QA Manager chairs the forum.
• The forum shall ensure that the internal management system is appropriate, effective, user-friendly and that it complies with relevant standards.
• The forum shall assist towards achieving best practice throughout the Group by means of experience transfer and the enhancement of skills and expertise.
• We have monthly meetings.
SINTEFs Quality Forum