SIP Development Process Overview
For Hickory Transportation Partners
Requirements, Scenarios and Timelines
Laura Boothe, NCDAQ
Mike Abraczinskas, NCDAQ
Eddie Dancausse, FHWA
February 8, 2005
![Page 2: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/2.jpg)
Outline• Background on PM2.5 standard• General PM2.5 timeline• What’s a SIP?• Scenarios
– Redesignation/Maintenance SIP Requirementsvs.
– Attainment Demonstration SIP Requirements
![Page 3: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/3.jpg)
Background
• Annual PM2.5 standard– If a monitored design value is > 15.0 µg/m3,
that monitor is violating the annual standard– The design value is defined as:
• Annual mean concentration, averaged over 3 years
![Page 4: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/4.jpg)
Human Hair (70 µm diameter)
Hair cross section (70 m)
PM2.5
(2.5 µm)PM10
(10µm) M. Lipsett, California Office of Environmental Health Hazard Assessment
A complex mixture of extremely small particles and liquid droplets
Particulate Matter: What is It?
![Page 5: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/5.jpg)
Public Health Risks Are Significant
Particles are linked to:• Premature death from heart and lung disease• Aggravation of heart and lung diseases
– Hospital admissions – Doctor and ER visits – Medication use– School and work absences
• And possibly to– Lung cancer deaths– Infant mortality– Developmental problems in children, such as
low birth weight
![Page 6: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/6.jpg)
![Page 7: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/7.jpg)
Primary Particles(Directly Emitted)
Secondary Particles(From Precursor Gases)
Elemental Carbon
OtherCrustal Ammonium
Nitrate
NOx
AmmoniumSulfate
SO2
SecondaryOrganics
VOC
Ammonia
Crustal
June 2000 / tgp
Condensed Organics
![Page 8: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/8.jpg)
North Carolina Areas Designated Nonattainment for PM2.5 (EPA 12/17/04)
![Page 9: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/9.jpg)
Hickory PM2.5 Design Values
Monitor
Hickory
County
Catawba
01-03
15.5
![Page 10: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/10.jpg)
PM2.5 Nonattainment Timeline
• Immediate (April 5, 2005)– New source review
• One year– Transportation conformity
• Three years– State Implementation Plan (SIP) –
attainment demonstration• Five years (or as expeditiously as practicable)
– Attain standard (Hickory & Triad)
![Page 11: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/11.jpg)
PM2.5 Nonattainment TimelineDefinitions for Hickory Area
Effective date =
Transportation conformity date =
SIP submittal date =
Attainment date =
Data used to determine attainment =
(Modeling) Attainment year =
Redesignation base years =
Maintenance years =
April 5, 2005April 5, 2006April 5, 2008April 5, 2010*2007-20092009*2005 or 2006TBD
* Or as early as possible
![Page 12: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/12.jpg)
State Implementation Plan (SIP)
• Need a “SIP submittal” to EPA within three years– Attainment Demonstration that details the State’s plan
to bring the area into attainment of the Federal standard
• Significant emission controls are already underway– Clean Smokestacks Act– Vehicle emissions testing– Ultra-Low sulfur fuels– Cleaner Engines
![Page 13: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/13.jpg)
2 Scenarios are possible
• Redesignation/Maintenance SIP
• Attainment Demonstration SIP
![Page 14: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/14.jpg)
Scenario Overviews
• Redesignation/Maintenance SIP– If area attains standard prior to attainment
demonstration submittal date (April 5, 2008)– Package containing emissions estimates for the year
the area came into attainment and maintenance years– Requires data for the year the area came into
attainment and maintenance years
• Attainment Demonstration SIP– Submittal 3 years after effective date (April 5, 2008)– Based on comprehensive modeling– Requires data for only the attainment year (2009)
![Page 15: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/15.jpg)
Redesignation/Maintenance SIPProcess Overview
• Area attains standard (2005 or 2006)– Develop emissions inventory for the year area attains
standard– Develop maintenance emissions inventories for at
least 10 years beyond redesignation approval• Determined through Inter-Agency Consultation Process
– Develop interim/maintenance emissions inventories • 3 to 5 year increments
– Compare maintenance emissions to attaining year’s emissions
• Maintenance emissions must be lower than attaining year’s emissions… If not, control strategies must be developed
– Or use modeling
![Page 16: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/16.jpg)
Redesignation/Maintenance SIPProcess Overview
• Develop draft SIP package– Emissions comparisons– Motor Vehicle Emissions Budgets– Contingency measures
• Take draft SIP to public hearing– 30 day comment period
• Submit to EPA anytime prior to April 2008• Update plan 8 years after redesignation
– Must examine additional 10 years beyond final maintenance year in redesignation package
![Page 17: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/17.jpg)
Redesignation/Maintenance SIPExample Timeline
• End of 2005 -> examine PM2.5 data– If the area attains
• 2005 and maintenance years (e.g. 2007, 2010, 2013, 2016) data needed for emissions estimates/comparisons
– VMT and speeds
• Contingency measures– NCDAQ define triggers and follow-up actions.
• Set motor vehicle emissions budgets– Consultation process… What years?– Safety margins?
• Public hearing• Request expeditious redesignation back to
attainment/maintenance– Redesignation could be final as early as summer 2006
– Conformity due 18 months after approval of Redesignation SIP
![Page 18: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/18.jpg)
Redesignation/Maintenance SIPExample Timeline
• End of 2005 -> examine PM2.5 data– If the area does not attain
• Must start modeled attainment demonstration
• Review 2006 PM2.5 data– Possibly start redesignation package
![Page 19: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/19.jpg)
Redesignation/Maintenance SIPRequirements of transportation partners
• VMT and speeds for attaining year and maintenance years
• Participate in stakeholder meetings• Provide input on additional strategies (if
needed) and contingency measures• Decision on how Motor Vehicle Emissions
Budgets are set• Review package during public comment period
![Page 20: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/20.jpg)
Attainment Demonstration SIPProcess Overview
• Modeling Attainment year = 2009– Attainment date April 5, 2010
• Develop emissions inventory– 2002 inventories– 2009 attainment year inventory
• Comprehensive modeling for 2002 and 2009– Modeling full year– Must pass the USEPA modeled attainment test– If not, additional control strategies must be
developed and modeled
![Page 21: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/21.jpg)
Attainment Demonstration SIPProcess Overview
• Clean Air Act requirement for Basic areas – Reasonable Available Control Measures (RACM)
• Develop draft SIP package– Motor Vehicle Emissions Budgets for attainment year– Contingency measures
• Take draft SIP to public hearing– 30 day comment period
• Submit to EPA by April 2008
![Page 22: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/22.jpg)
Attainment Demonstration SIPExample Timeline
• Base year modeling underway– Collected (in 2004) VMT and speed data for
2002
• Future year modeling will start Spring ‘05– 2009 VMT and speed data needed– Have needs of RACM been met?
• Awaiting further guidance from USEPA
• Future year emissions and air quality modeling
![Page 23: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/23.jpg)
Attainment Demonstration SIPExample Timeline
• Must pass the USEPA modeled attainment test– If not, additional control strategies must be
developed and modeled
• Develop draft SIP package– Motor Vehicle Emissions Budgets for attainment year– Contingency measures
• Take draft SIP to public hearing– 30 day comment period
• Submit to EPA by April 2008
![Page 24: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/24.jpg)
Attainment Demonstration SIPRequirements of transportation partners
• VMT and speeds for modeled attainment year• Participate in stakeholder meetings
– Technical update meetings– RACM development– Provide input on additional strategies (if needed) and
contingency measures– Decision on how Motor Vehicle Emissions Budgets
are set
• Review package during public comment period
![Page 25: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/25.jpg)
VMT and Speeds
• Attainment Demonstration (2009)– March 2005
• Redesignation (2005/2006 & maintenance years)
– October 2005 or October 2006
![Page 26: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/26.jpg)
Stakeholder Meetings
• NCDAQ will host periodic technical updates on process
– Spring and Fall 2005 at minimum
• NCDAQ will host consultation meeting(s) on control strategy development (if needed) and contingency measures
• RACM (if needed)
Will announce @ SICM meetings
![Page 27: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/27.jpg)
Review of SIP Package
• 30-45 days once package is made public
• Will announce @ SICM meetings
![Page 28: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/28.jpg)
New Standards?
• EPA has reviewed the PM2.5 standards– EPA Staff Paper - Draft out for comment
• 15 µg/m3 annual standard • 25-35 µg/m3 - 24-hr standard (99th percentile)
Or• 12-14 µg/m3 annual standard • 35-40 µg/m3 - 24-hr standard (99th percentile)
![Page 29: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/29.jpg)
New Standards?
Fine Particulate (tentative schedule)• October 2004 Criteria Document• December 2005 EPA proposes New Standard• September 2006 EPA Finalizes New Standard• September 2008 EPA Promulgates• September 2011 States Submit SIPs
![Page 30: SIP Development Process Overview For Hickory Transportation Partners Requirements, Scenarios and Timelines Laura Boothe, NCDAQ Mike Abraczinskas, NCDAQ](https://reader035.vdocuments.net/reader035/viewer/2022062417/551563cc55034685568b5c1c/html5/thumbnails/30.jpg)
Questions/Commentshttp://ncair.org
Laura Boothe, Chief of Attainment [email protected]
Mike Abraczinskas, Environmental Engineer [email protected]
Eddie Dancausse, Air Quality Specialist919-856-4330 [email protected]