SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP) LOOP SELECTION HV1+BV06+UPTO BV07 EQUIPMENT CODE HV5000L-1 BATCH NO lypo007 PRODUCT NAME Lyposuction RUN BY JET PROGRESSIVE NO. 00021 START DATE & TIME 18/07/2017 11:08:17 END DATE & TIME 18/07/2017 13:42:28 60 secs PRINT INTERVAL Notes trial Page No. 1 Of 24

Upload: others

Post on 13-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

SIP REPORT

SKID DESCRIPTION Manufacturing Skid For Solution Products

VESSEL NAME HV5000L-1

CYCLE NAME Sterilization In Place (SIP)

LOOP SELECTION HV1+BV06+UPTO BV07

EQUIPMENT CODE HV5000L-1

BATCH NO lypo007

PRODUCT NAME Lyposuction

RUN BY JET

PROGRESSIVE NO. 00021

START DATE & TIME 18/07/2017 11:08:17

END DATE & TIME 18/07/2017 13:42:28

60 secsPRINT INTERVAL

Notes trial

Page No. 1 Of 24

Page 2: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

STEAM PURGING

UNITDISPLAYSET PARAMETERS SET PARAMETERS DISPLAY UNIT

Drying Start Point

Sterilization Fail Temp.

Overshoot Temp.

bar

System High Pressure

Hot Air Temperature °C

Hot Air Drying Time mins

Cooling End Temp. °C

Drying Low Pressure bar

Drying High Pressure bar

POSITIVE PURGE CYCLE

Purge Pressure bar

DRYING CYCLE

INITIAL STEAM PULSING

Initial Heating Temperature -1

Initial Heating Temperature -2

°C

Initial Heating Temperature -3 °C

Initial Heating Temperature -4 °C

Initial Heating Temperature -5 °C

Initial Heating Pressure Rel.-1 bar

Initial Heating Pressure Rel.-2 bar

Initial Heating Pressure Rel.-3 bar

Initial Heating Pressure Rel.-4 bar

Initial Heating Pressure Rel.-5 bar

No'sHeating Pulse

Sterilization Hold Time

Steam Purging Time

REL. Pressure

Acceptable Leakage

Leak Test Pressure

Stabilization Time

Pressurization Hold Time

PRESSURE LEAK TEST

mins

bar

secs

bar

secs

LIST OF SENSORS

bar

°C

mins

°C

bar

LOCATION

VFCO temperature-HV5000L-1

TICR16

Vent filter temperature- HV5000L-1

N2 filter temperature- HV5000L-1

CP04 PCD temperature-HV5000L-1

VDCO temperature-HV5000L-1

Tank temperature-HV5000L-1

N2FCO temperature-HV5000L-1

Tank Pressure

N2S Line Pressure

TICR41

TICR40

TICR18

TICR17

TICR15

TICR14

PICR11

PICR10

TAGS

Temperature Sensor

Nitrogen Filter Temperature

Tank Pressure

Repetations

Release

Pressure Sensor

N2FT

TP

REP.

REL.

PICR

TICR

ABBREVIATIONS

°C

N2FCOT Nitrogen Filter Condensate Out Temperature

VDCOT Vessel Drain Condensate Out Temperature

VFCOT Vent Filter Condensate Out Temperature

PCDT Pump Casing Drain Temperature

VFT Vent Filter Temperature

PTLT Product Transfer Line Temperature

SR.NO.

2

3

5

6

1

4 STERILIZATION CYCLE

Min Sterilization Cycle

Sterilization Control Temp.

Sterilization Stabilization Rep.

°C

°C

No's

Sterilization Stabilization Time

Sterilization Hold Repetition No's

Sterilization Max Elaps Time bar

SR.NO.

2.00

120

30

0.11

0.50

120

100.00

105.00

110.00

NA

NA

0.50

0.40

0.30

0.25

0.20

3

121.00

123.00

2

120

2

30

0.30

118.00

130.00

3.00

3.00

130.00

15

80.00

0.50

2.00

2.00

Tank TemperatureTT

N2SP Nitrogen Sparging Pressure

TICR44 Product Line to FM1 SIPD from BV07

Page No. 2 Of 24

Page 3: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 11:08:17 19.2019.2219.3819.2322.5319.2118.720.00-0.01 19.25 JACKET DRAIN

CYCLE

JACKET DRAIN

18/07/2017 11:09:17 19.2419.3019.3919.2522.5119.2418.770.00-0.01 19.25 JACKET DRAIN

CYCLE

JACKET DRAIN

18/07/2017 11:10:17 19.3419.3619.3919.2622.5019.2718.780.020.02 19.26 PRESSURE LEAK

TEST

PRESSURISE

18/07/2017 11:11:17 19.3719.4319.4519.2823.6519.3018.800.910.92 19.28 PRESSURE LEAK

TEST

PRESSURISE

18/07/2017 11:12:17 19.4719.5019.4119.3025.9319.3518.841.741.74 19.29 PRESSURE LEAK

TEST

PRESSURISE

18/07/2017 11:13:17 19.5119.5219.4819.3227.6119.3418.871.911.91 19.32 PRESSURE LEAK

TEST

STABILIZE

18/07/2017 11:14:17 19.5419.5619.5219.3327.9219.3818.881.851.85 19.34 PRESSURE LEAK

TEST

CYCLE PAUSE

18/07/2017 11:15:17 19.5819.5419.5219.3627.6319.4118.931.821.85 19.36 PRESSURE LEAK

TEST

CYCLE PAUSE

18/07/2017 11:16:17 19.6419.6919.5519.3827.2319.4418.971.801.79 19.37 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:17:17 19.6819.6919.5819.4026.7919.4819.001.791.78 19.40 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:18:17 19.7519.7419.6219.4226.4119.5219.041.781.77 19.41 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:19:17 19.7919.7719.6519.4526.0819.5519.081.771.77 19.42 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:20:17 19.8619.8319.6519.4625.8019.5819.141.771.76 19.43 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:21:17 19.9219.9119.6919.4825.5819.5919.161.771.76 19.46 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:22:17 20.0119.9719.6919.5025.3719.6119.211.761.76 19.46 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:23:17 20.0519.9819.7619.5225.1819.6919.241.761.75 19.48 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:24:17 20.1520.0419.7619.5325.0319.6919.281.761.75 19.49 PRESSURE LEAK

TEST

PRESSURE HOLD

Page No. 3 Of 24

Page 4: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 11:25:17 20.1620.0819.7619.5524.9019.7219.311.761.75 19.51 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:26:17 20.1920.1519.7619.5724.7819.7919.351.761.75 19.52 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:27:17 20.2720.2119.7919.5724.6919.7719.381.761.75 19.52 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:28:17 20.3220.2519.8219.6024.6019.7919.381.751.75 19.54 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:29:17 20.3620.2519.8319.6124.5119.8019.411.751.75 19.55 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:30:17 20.4320.2919.8519.6324.4319.8619.481.751.74 19.56 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:31:17 20.4320.3519.8619.6524.3619.8519.481.751.74 19.58 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:32:17 20.4920.4219.8619.6524.3019.8519.521.751.74 19.59 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:33:17 20.5620.4319.9119.6824.2519.8919.521.751.74 19.61 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:34:17 20.5420.4619.9219.6924.2119.9219.551.751.74 19.63 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:35:17 20.6120.5019.9219.7224.1619.9619.591.751.74 19.64 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:36:17 20.6320.5619.9419.7324.1119.9919.621.741.74 19.66 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:37:17 20.7020.5919.9719.7524.0820.0019.691.741.74 19.69 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:38:17 20.7320.6320.0019.7724.0420.0319.721.741.73 19.70 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:39:17 20.7420.6520.0319.8024.0120.0619.751.741.73 19.72 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:40:17 20.8020.7020.0619.8223.9820.1319.761.741.73 19.75 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:41:17 20.8420.7220.0719.8423.9520.1319.791.741.73 19.75 PRESSURE LEAK

TEST

PRESSURE HOLD

Page No. 4 Of 24

Page 5: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 11:42:17 20.8720.7620.1019.8823.9320.1719.821.741.73 19.78 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:43:17 20.8820.7820.1019.8823.9020.2019.861.741.73 19.79 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:44:17 20.9420.8320.1619.9123.8920.2319.931.741.73 19.82 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:45:17 20.9820.8720.2019.9323.8720.2619.941.731.73 19.84 PRESSURE LEAK

TEST

PRESSURE HOLD

18/07/2017 11:46:17 20.9620.8720.1720.1923.8420.2619.971.621.59 19.68 PRESSURE LEAK

TEST

RELEASE

PRESSURE

18/07/2017 11:47:17 16.7416.0919.0515.7222.3419.1419.140.030.03 19.34 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:48:17 18.2417.7919.3416.5020.0619.3519.320.000.00 19.45 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:49:17 18.8918.6319.5217.4419.2519.5119.480.00-0.01 19.55 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:50:17 19.2619.0819.6517.8119.1319.5819.550.000.00 19.60 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:51:17 19.6119.4319.6917.9619.2819.6519.620.00-0.01 19.63 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:52:17 19.8319.7019.7618.2119.5419.7519.730.00-0.01 19.65 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:53:17 20.0519.9419.7918.3819.7919.7619.750.00-0.01 19.67 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:54:17 20.1920.1219.8318.5720.0719.8219.790.00-0.01 19.69 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:55:17 20.3620.2819.8318.7320.3119.8519.820.00-0.01 19.68 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:56:17 20.4920.4319.8318.8720.5219.9219.860.00-0.01 19.70 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:57:17 20.6020.5219.8618.9820.7119.9219.910.00-0.01 19.71 STEAM PURGING STEAM PURGING

ON

18/07/2017 11:58:17 20.7120.5919.8919.0420.8619.9719.930.00-0.01 19.72 STEAM PURGING STEAM PURGING

ON

Page No. 5 Of 24

Page 6: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 11:59:17 20.8020.7019.9219.1220.9920.0019.950.00-0.01 19.73 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:00:17 20.8720.7619.9019.1721.1220.0319.960.00-0.01 19.74 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:01:17 20.9320.8319.9219.2121.2320.0619.960.00-0.01 19.75 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:02:17 21.0020.9019.9619.2921.3120.0620.000.00-0.01 19.75 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:03:17 21.0520.9019.9618.6021.4520.1020.030.010.01 19.77 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:04:17 21.0820.9620.0018.5022.3120.1220.030.330.33 19.78 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:05:17 21.1520.9720.0018.9624.0320.1320.040.380.38 19.79 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:06:17 21.2121.0220.0019.6025.3820.1920.070.440.44 19.80 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:07:17 21.2921.1420.0320.3426.6020.2320.130.560.57 19.82 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:08:17 21.5221.3420.0321.1228.3120.2720.200.690.69 19.83 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:09:17 21.7921.5220.0321.9944.6720.3820.260.830.83 19.84 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:10:17 22.1021.7920.0723.0571.5920.5420.340.970.97 19.85 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:11:17 22.4522.0720.1024.3892.7220.7120.381.121.12 19.88 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:12:17 22.8222.3120.1626.15102.6720.9220.471.281.28 19.89 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:13:17 23.1622.5920.1828.45108.5521.1220.571.441.44 19.91 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:14:17 23.5422.9420.2031.97113.5921.3320.671.611.61 19.92 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:15:17 23.9523.2720.2036.71115.1221.4920.781.771.77 19.95 STEAM PURGING STEAM PURGING

ON

Page No. 6 Of 24

Page 7: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 12:16:17 24.3923.6420.2344.08117.9721.7020.881.921.92 19.98 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:17:17 24.8023.9920.2755.27121.1021.8420.972.052.04 20.00 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:18:17 25.2524.3620.3473.03123.4022.0421.082.132.12 20.02 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:19:17 25.6324.7420.3492.27125.4222.2821.152.192.18 20.04 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:20:17 62.8268.6631.57106.59127.1326.6325.862.112.09 22.22 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:21:17 122.21122.70115.84117.24124.65122.10121.061.591.58 118.82 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:22:17 118.01118.35115.17115.57120.94117.48116.481.271.26 115.06 STEAM PURGING STEAM PURGING

ON

18/07/2017 12:23:17 114.71115.06113.69113.79117.99114.03112.871.051.04 112.33 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:24:17 112.12112.28111.99111.69115.63111.28110.190.870.86 110.59 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:25:17 109.56109.75109.60109.41113.76108.45107.340.720.71 108.39 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:26:17 107.32107.68107.57107.25112.89106.24104.860.590.58 106.37 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:27:17 105.34105.49105.39105.11112.49104.07102.570.480.47 104.30 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:28:17 106.77107.95106.34104.20111.89107.28107.190.460.45 107.44 INITIAL STEAM

PULSING

INITIAL HEATING

TEMPERATURE

18/07/2017 12:29:17 106.29106.27105.49106.86109.07105.52104.570.520.51 104.27 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

Page No. 7 Of 24

Page 8: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 12:30:17 104.60104.7696.34103.45108.08102.88102.070.430.42 102.57 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:31:17 102.84103.00102.13101.98107.14101.09100.180.340.33 101.26 INITIAL STEAM

PULSING

INITIAL HEATING

PRESSURE

RELEASE

18/07/2017 12:32:17 109.37109.82109.70110.16106.17109.60109.430.500.49 110.16 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:33:17 114.72114.91114.19115.14109.96114.87114.560.750.74 115.33 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:34:17 117.04117.26115.85117.74113.09117.35116.860.890.87 117.71 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:35:17 118.61118.85116.44119.27115.28118.82118.430.980.97 119.20 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:36:17 120.70120.97117.90121.26117.31121.00120.581.111.09 121.29 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:37:17 122.85123.10120.55123.09119.55123.18122.691.261.25 123.54 STERILIZATION

CYCLE

WAITING FOR

TEMPERATURE

18/07/2017 12:38:17 124.93125.19123.13124.47121.76125.18124.851.411.40 125.59 STERILIZATION

CYCLE

SIP STABILIZATION

18/07/2017 12:39:17 124.27123.62124.45125.21123.50124.96125.051.431.42 124.64 STERILIZATION

CYCLE

SIP STABILIZATION

18/07/2017 12:40:17 127.36127.56127.52123.04124.58127.69127.191.591.57 127.98 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:41:17 126.29125.55123.83127.56125.84126.59125.011.591.58 126.30 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:42:17 125.57125.19124.56123.28125.69125.70124.481.571.55 125.52 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:43:17 125.17125.10123.77124.98125.87124.25123.421.571.56 123.86 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:44:17 124.98125.02124.62123.71125.85124.15123.211.571.55 123.63 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:45:17 128.19127.53128.75126.39126.59128.83128.061.661.64 128.98 STERILIZATION

CYCLE

SIP TIMER

RUNNING

Page No. 8 Of 24

Page 9: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 12:46:17 127.97127.51123.38128.77126.50128.43127.731.641.62 128.75 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:47:17 126.66126.40126.38124.74126.93126.38125.321.661.64 126.06 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:48:17 127.33128.15122.21125.32126.63125.68124.771.691.67 125.22 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:49:17 125.63125.80124.68124.60126.75122.78123.371.641.62 122.72 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:50:17 127.79127.09128.18128.41127.11127.97127.221.671.65 128.04 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:51:17 126.17126.34122.96123.69126.81127.45125.971.631.62 126.83 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:52:17 126.05126.16125.60126.26127.01124.50124.491.641.63 124.44 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:53:17 128.98129.17127.90129.42127.02124.00128.461.701.68 128.82 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:54:17 125.88127.47124.33124.92126.80124.13123.141.661.65 124.49 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:55:17 127.16126.75126.76127.67127.13127.24126.291.661.64 126.94 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:56:17 126.81127.95122.26125.36126.80126.68125.441.671.66 126.21 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:57:17 125.91126.16125.43125.66127.01123.63123.751.641.62 123.90 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:58:17 128.59127.80128.86128.98127.22127.85128.401.681.66 128.91 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 12:59:17 127.07127.35123.22124.34126.94128.40126.591.651.63 128.53 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:00:17 126.15126.33125.50126.28127.16124.79124.301.651.63 124.51 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:01:17 128.47128.87124.45128.63127.04125.58127.361.731.71 125.17 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:02:17 125.62127.04124.40125.17127.01123.68123.721.671.65 124.73 STERILIZATION

CYCLE

SIP TIMER

RUNNING

Page No. 9 Of 24

Page 10: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 13:03:17 127.07126.67126.68127.20127.20126.66125.911.651.63 126.21 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:04:17 127.57128.28122.32126.61126.86125.76125.381.681.66 124.56 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:05:17 125.59125.92124.26124.95126.83122.80123.601.611.59 122.82 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:06:17 126.54126.39127.06127.01126.90126.91125.851.621.60 126.52 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:07:17 128.23128.57121.96128.45126.72128.46128.001.671.65 128.91 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:08:17 125.62125.85124.18124.75126.67122.54123.281.611.59 122.85 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:09:17 127.00126.61127.27127.73126.83127.57126.411.631.61 127.36 STERILIZATION

CYCLE

SIP TIMER

RUNNING

18/07/2017 13:10:17 119.62119.73116.96113.73124.72119.09117.980.690.64 110.77 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:11:17 104.49104.57106.93106.78117.02103.18101.251.451.45 103.81 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:12:17 95.1695.14100.77101.64117.06102.25100.481.731.71 99.76 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:13:17 87.0687.1393.3094.17114.9398.3697.261.101.08 97.66 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:14:17 81.3881.2790.1489.75113.5194.4692.580.760.75 93.87 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:15:17 76.4976.1187.2086.27111.2990.4688.460.510.49 90.40 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:16:17 72.9272.5884.1981.08109.7188.0286.511.541.54 87.42 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:17:17 70.0169.6583.2984.75109.3183.7681.701.511.49 86.26 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:18:17 67.2766.7482.3180.56106.2881.3279.050.960.94 84.29 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:19:17 64.7464.2080.5076.54102.7279.0575.490.630.61 82.19 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:20:17 62.6962.1678.0971.4299.7776.8573.251.091.09 80.22 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:21:17 61.3860.7775.5771.2199.5674.7972.041.971.94 78.36 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:22:17 59.8359.2278.0674.1498.7473.2368.711.191.17 76.23 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:23:17 58.3957.6575.3469.9895.7972.1866.940.760.74 75.13 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:24:17 56.9856.3772.8466.9692.7670.4565.040.560.57 73.58 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:25:17 55.9255.4070.5763.0892.0068.4863.961.721.71 71.83 DRYING CYCLE HOT AIR DRYING

18/07/2017 13:26:17 54.9554.6072.8369.0592.7167.1161.261.401.39 69.89 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:27:17 54.0353.7071.2367.4591.1766.6260.470.910.90 69.30 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:28:17 53.0952.8368.8467.4288.6465.5559.410.580.57 68.21 DRYING CYCLE COLD AIR DRYING

Page No. 10 Of 24

Page 11: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

18/07/2017 13:29:17 52.3652.1466.6865.9186.9463.9858.361.281.28 66.75 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:30:17 51.7451.5567.5668.1688.2762.2256.631.721.70 64.75 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:31:17 51.0550.9367.7468.7287.7862.2455.801.061.04 64.23 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:32:17 50.3950.2365.6766.2285.6361.6255.050.670.66 63.44 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:33:17 49.7349.6663.6663.7683.5660.4554.120.920.93 62.24 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:34:17 49.3849.3061.5561.8684.1758.7953.221.921.91 60.78 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:35:17 48.8848.8164.9066.5185.1258.8852.291.281.26 60.00 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:36:17 48.3348.3063.3864.6883.5858.6451.880.810.80 59.57 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:37:17 47.8447.7861.4762.3681.4857.9951.290.520.50 58.76 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:38:17 47.5047.4359.4259.9880.9256.4350.291.581.58 57.37 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:39:17 47.1647.0261.9263.8682.3956.1149.631.501.48 56.25 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:40:17 46.7646.6161.2363.1981.5556.2549.470.940.92 56.03 DRYING CYCLE COLD AIR DRYING

18/07/2017 13:41:17 46.4346.2759.4060.7679.7855.8149.050.780.78 55.42 POSITIVE

PRESSURE

CYCLE

POSITIVE PURGING

ON

18/07/2017 13:42:17 46.1245.9957.3858.2879.7354.1348.021.921.92 54.13 POSITIVE

PRESSURE

CYCLE

POSITIVE PURGING

ON

Page No. 11 Of 24

Page 12: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

STERILIZATION SUMMARY

STERILIZATION MINIMUM TEMPERATURE AT

STERILIZATION MAXIMUM TEMPERATURE AT

°C

°C 129.42

121.96

Page No. 12 Of 24

Page 13: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

EVENT LIST

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

7/18/2017 11:12:40AM11:12:40 19.5119.5019.4519.3026.6119.3218.872.002.01 19.29 PRESSURE LEAK

TEST

PRESSURIZE

DONE, STABILIZE

STARTED

7/18/2017 11:16:10AM11:16:10 19.6419.6919.5619.3827.2619.4418.971.801.79 19.38 PRESSURE LEAK

TEST

STABILIZE DONE,

HOLD TIME

STARTED

7/18/2017 11:46:10AM11:46:10 20.9920.8720.2019.9523.8420.2919.971.731.73 19.85 PRESSURE LEAK

TEST

HOLD TIME OVER,

PRESSURE

RELEASE

STARTED

7/18/2017 11:46:41AM11:46:41 16.1415.5419.1518.5023.6719.1719.280.460.44 19.37 STEAM PURGING PRESSURE REL.

DONE, STEAM

PURG.STARTED

7/18/2017 12:22:26PM12:22:26 117.33117.80115.00115.37120.42116.99115.821.231.22 114.60 INITIAL STEAM

PULSING

HEATING-1 OVER,

RELEASE-1

STARTED

7/18/2017 12:27:05PM12:27:05 105.73105.89105.92105.53112.55104.60102.970.500.49 104.72 INITIAL STEAM

PULSING

RELEASE-1 OVER,

HEATING-2

STARTED

7/18/2017 12:27:05PM12:27:05 105.73105.89105.92105.53112.55104.60102.970.500.49 104.72 INITIAL STEAM

PULSING

HEATING-2 OVER,

RELEASE-2

STARTED

7/18/2017 12:28:01PM12:28:01 103.73103.99103.75103.46112.09102.42101.070.400.39 102.69 INITIAL STEAM

PULSING

RELEASE-2 OVER,

HEATING-3

STARTED

7/18/2017 12:28:27PM12:28:27 109.77110.31109.86110.88111.39110.05109.790.530.52 110.64 INITIAL STEAM

PULSING

HEATING-3 OVER,

RELEASE-3

STARTED

7/18/2017 12:31:44PM12:31:44 101.92102.20101.52101.26106.67100.3299.380.300.29 100.59 STERILIZATION

CYCLE

STEAM PULSING

DONE, WAITING

FOR TEMP.

Page No. 13 Of 24

Page 14: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE CYCLE STATUS STEP STATUSPICR10

(N2SLP)

PICR11

(TP)

TICR14

(N2FCOT)

TICR15

(VFCOT)

TICR16

(TT)

TICR17

(VDCOT)

TICR18

(PCDT)

TICR41

(VFT)

TICR40

(N2FT)

˚C˚Cbarbar ˚C ˚C ˚C ˚C ˚C

HH:MM:SS

˚C

TICR44

(PTLT)

7/18/2017 12:37:58PM12:37:58 124.22124.44122.25123.87121.03124.58124.171.361.35 124.88 STERILIZATION

CYCLE

STERILIZATION

STABILISATION

STARTED

7/18/2017 12:39:58PM12:39:58 126.55126.81122.24123.43123.78126.43119.921.541.53 127.21 STERILIZATION

CYCLE

STERILIZATION

TIMER RUNNING

7/18/2017 1:09:59PM13:09:59 125.02126.75122.77124.26126.49123.57123.001.581.56 122.83 DRYING CYCLE STERILIZATION

DONE, HOT

DRYING STARTED

7/18/2017 1:25:26PM13:25:26 55.8555.3670.3262.9992.0968.2663.871.811.81 71.71 DRYING CYCLE HOT DRYING

DONE, COLD

DRYING STARTED

7/18/2017 1:41:11PM13:41:11 46.4346.3059.6661.2379.9755.9449.170.660.68 55.58 POSITIVE

PURGING CYCLE

POSITIVE

PURGING

STARTED

7/18/2017 1:42:23PM13:42:23 46.0845.9857.2758.1179.8754.0447.952.012.01 54.01 CYCLE

COMPLETED

STERILIZATION

CYCLE

COMPLETED

SUCCESSFULLY

Page No. 14 Of 24

Page 15: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

FO VALUE

SIP HOLD START TIME

SIP HOLD END TIME

18/07/2017 12:39:58

18/07/2017 13:09:59

DATE

TICR14

(N2FCOT) FOTICR15

(VFCOT) FOTICR16

(TT) FOTICR17

(VDCOT)

FOTICR18

(PCDT)

°C mins °C mins °C mins °C mins

°C mins mins

FO

FOFOTICR41

(VFT)FO

mins°Cmins

HH:MM:SS

°C

TICR44

(PTLT)

°C

TICR40

(N2FT)

127.19 127.69 124.58 123.04

127.52 127.56 127.36 127.9818/07/2017 12:40:17

4.07 4.57 2.24 1.55

4.37 4.47 4.27 4.90

125.01 126.59 125.84 127.56

123.83 125.55 126.29 126.3018/07/2017 12:41:17

6.52 8.12 5.19 6.02

6.23 7.29 7.58 8.21

124.48 125.70 125.69 123.28

124.56 125.19 125.57 125.5218/07/2017 12:42:17

8.71 11.00 8.07 7.68

8.47 9.86 10.40 10.96

123.42 124.25 125.87 124.98

123.77 125.10 125.17 123.8618/07/2017 12:43:17

10.41 13.09 11.09 10.13

10.33 12.37 12.97 12.87

123.21 124.15 125.85 123.71

124.62 125.02 124.98 123.6318/07/2017 12:44:17

12.03 15.13 14.11 11.95

12.57 14.82 15.42 14.65

128.06 128.83 126.59 126.39

128.75 127.53 128.19 128.9818/07/2017 12:45:17

17.04 21.02 17.66 15.34

18.46 19.19 20.55 20.82

127.73 128.43 126.50 128.77

123.38 127.51 127.97 128.7518/07/2017 12:46:17

21.61 26.39 21.13 21.23

20.16 23.56 25.45 26.71

125.32 126.38 126.93 124.74

126.38 126.40 126.66 126.0618/07/2017 12:47:17

24.24 29.78 24.93 23.52

23.55 26.95 29.08 29.87

Page No. 15 Of 24

Page 16: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE

TICR14

(N2FCOT) FOTICR15

(VFCOT) FOTICR16

(TT) FOTICR17

(VDCOT)

FOTICR18

(PCDT)

°C mins °C mins °C mins °C mins

°C mins mins

FO

FOFOTICR41

(VFT)FO

mins°Cmins

HH:MM:SS

°C

TICR44

(PTLT)

°C

TICR40

(N2FT)

124.77 125.68 126.63 125.32

122.21 128.15 127.33 125.2218/07/2017 12:48:17

26.58 32.66 28.48 26.15

24.84 32.08 33.25 32.44

123.37 122.78 126.75 124.60

124.68 125.80 125.63 122.7218/07/2017 12:49:17

28.28 34.14 32.20 28.39

27.13 35.03 36.07 33.89

127.22 127.97 127.11 128.41

128.18 127.09 127.79 128.0418/07/2017 12:50:17

32.35 39.04 36.18 33.76

32.26 39.01 40.75 38.79

125.97 127.45 126.81 123.69

122.96 126.34 126.17 126.8318/07/2017 12:51:17

35.44 43.41 39.90 35.58

33.81 42.32 43.99 42.51

124.49 124.50 127.01 126.26

125.60 126.16 126.05 124.4418/07/2017 12:52:17

37.63 45.60 43.79 38.89

36.63 45.56 47.15 44.65

128.46 124.00 127.02 129.42

127.90 129.17 128.98 128.8218/07/2017 12:53:17

43.13 47.55 47.68 45.65

41.42 52.02 53.32 50.54

123.14 124.13 126.80 124.92

124.33 127.47 125.88 124.4918/07/2017 12:54:17

44.71 49.55 51.40 48.05

43.51 56.39 56.34 52.73

126.29 127.24 127.13 127.67

126.76 126.75 127.16 126.9418/07/2017 12:55:17

48.02 53.62 55.38 52.62

47.23 60.11 60.41 56.53

125.44 126.68 126.80 125.36

122.26 127.95 126.81 126.2118/07/2017 12:56:17

50.71 57.25 59.10 55.31

48.55 65.01 64.13 59.77

123.75 123.63 127.01 125.66

125.43 126.16 125.91 123.9018/07/2017 12:57:17

52.57 59.03 62.99 58.19

51.24 68.25 67.15 61.68

Page No. 16 Of 24

Page 17: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE

TICR14

(N2FCOT) FOTICR15

(VFCOT) FOTICR16

(TT) FOTICR17

(VDCOT)

FOTICR18

(PCDT)

°C mins °C mins °C mins °C mins

°C mins mins

FO

FOFOTICR41

(VFT)FO

mins°Cmins

HH:MM:SS

°C

TICR44

(PTLT)

°C

TICR40

(N2FT)

128.40 127.85 127.22 128.98

128.86 127.80 128.59 128.9118/07/2017 12:58:17

57.94 63.82 67.06 64.36

57.27 72.93 72.77 67.71

126.59 128.40 126.94 124.34

123.22 127.35 127.07 128.5318/07/2017 12:59:17

61.49 69.19 70.86 66.45

58.89 77.20 76.75 73.21

124.30 124.79 127.16 126.28

125.50 126.33 126.15 124.5118/07/2017 13:00:17

63.58 71.53 74.93 69.76

61.64 80.51 79.99 75.40

127.36 125.58 127.04 128.63

124.45 128.87 128.47 125.1718/07/2017 13:01:17

67.85 74.35 78.82 75.38

63.83 86.54 85.49 77.97

123.72 123.68 127.01 125.17

124.40 127.04 125.62 124.7318/07/2017 13:02:17

69.67 76.17 82.71 77.95

65.97 90.43 88.31 80.26

125.91 126.66 127.20 127.20

126.68 126.67 127.07 126.2118/07/2017 13:03:17

72.69 79.80 86.78 82.02

69.60 94.06 92.29 83.50

125.38 125.76 126.86 126.61

122.32 128.28 127.57 124.5618/07/2017 13:04:17

75.38 82.75 90.58 85.57

70.92 99.31 96.76 85.74

123.60 122.80 126.83 124.95

124.26 125.92 125.59 122.8218/07/2017 13:05:17

77.16 84.23 94.30 88.02

73.01 102.33 99.58 87.22

125.85 126.91 126.90 127.01

127.06 126.39 126.54 126.5218/07/2017 13:06:17

80.18 88.03 98.10 91.91

76.99 105.72 103.05 90.69

128.00 128.46 126.72 128.45

121.96 128.57 128.23 128.9118/07/2017 13:07:17

85.08 93.53 101.73 97.41

78.22 111.34 108.18 96.72

Page No. 17 Of 24

Page 18: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

DATE

TICR14

(N2FCOT) FOTICR15

(VFCOT) FOTICR16

(TT) FOTICR17

(VDCOT)

FOTICR18

(PCDT)

°C mins °C mins °C mins °C mins

°C mins mins

FO

FOFOTICR41

(VFT)FO

mins°Cmins

HH:MM:SS

°C

TICR44

(PTLT)

°C

TICR40

(N2FT)

123.28 122.54 126.67 124.75

124.18 125.85 125.62 122.8518/07/2017 13:08:17

86.74 94.91 105.36 99.75

80.26 114.36 111.00 98.23

126.41 127.57 126.83 127.73

127.27 126.61 127.00 127.3618/07/2017 13:09:17

90.13 99.38 109.08 104.32

84.43 117.91 114.89 102.50

FO SUMMARY :

FO TOTAL

(mins)

TICR14(N2FCOT) TICR15 (VFCOT) TICR16 (TT) TICR17 (VDCOT)

TICR18 (PCDT) TICR40 (N2FT) TICR41 (VFT) TICR44 (PTLT)

90.13 99.38 109.08 104.32

102.50114.89117.9184.43

Page No. 18 Of 24

Page 19: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

TIME VS TEMPERATURE

0

14

27

41

55

68

82

95

109

123

136

150

7/1

8/2

01

7

11

:08

AM

7/1

8/2

01

7

11

:18

AM

7/1

8/2

01

7

11

:28

AM

7/1

8/2

01

7

11

:38

AM

7/1

8/2

01

7

11

:48

AM

7/1

8/2

01

7

11

:58

AM

7/1

8/2

01

7

12

:08

PM

7/1

8/2

01

7

12

:18

PM

7/1

8/2

01

7

12

:28

PM

7/1

8/2

01

7

12

:38

PM

7/1

8/2

01

7

12

:48

PM

7/1

8/2

01

7

12

:58

PM

7/1

8/2

01

7

1:0

8P

M

7/1

8/2

01

7

1:1

8P

M

7/1

8/2

01

7

1:2

8P

M

7/1

8/2

01

7

1:3

8P

M

TICR14 TICR15 TICR16 TICR17 TICR18 TICR40 TICR41 TICR44

Date & Time

Tem

p(°

C)

Page No. 19 Of 24

Page 20: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

TIME VS PRESSURE

-1

0

1

2

3

4

5

7/1

8/2

01

7

11

:08

AM

7/1

8/2

01

7

11

:18

AM

7/1

8/2

01

7

11

:28

AM

7/1

8/2

01

7

11

:38

AM

7/1

8/2

01

7

11

:48

AM

7/1

8/2

01

7

11

:58

AM

7/1

8/2

01

7

12

:08

PM

7/1

8/2

01

7

12

:18

PM

7/1

8/2

01

7

12

:28

PM

7/1

8/2

01

7

12

:38

PM

7/1

8/2

01

7

12

:48

PM

7/1

8/2

01

7

12

:58

PM

7/1

8/2

01

7

1:0

8P

M

7/1

8/2

01

7

1:1

8P

M

7/1

8/2

01

7

1:2

8P

M

7/1

8/2

01

7

1:3

8P

M

PICR10 PICR11

Date & Time

Pre

ssure

( bar)

Page No. 20 Of 24

Page 21: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

ALARM LIST

Alarm TextStatusDate & Time

18/07/2017 11:14:04 IN COMPRESSED AIR FOR VALVE LOW

18/07/2017 11:15:05 ACK COMPRESSED AIR FOR VALVE LOW

18/07/2017 11:15:06 OUT COMPRESSED AIR FOR VALVE LOW

18/07/2017 11:46:10 IN HV5000L - 1 PRESSURE LEAK TEST PASSED

18/07/2017 11:46:46 ACK HV5000L - 1 PRESSURE LEAK TEST PASSED

18/07/2017 11:46:47 OUT HV5000L - 1 PRESSURE LEAK TEST PASSED

18/07/2017 13:09:59 IN HV5000L-1 SIP HOLD TIME OVER

18/07/2017 13:10:04 ACK HV5000L-1 SIP HOLD TIME OVER

18/07/2017 13:10:04 OUT HV5000L-1 SIP HOLD TIME OVER

18/07/2017 13:42:22 IN HV5000L -1-SIP CYCLE COMPLETED SUCCESSFULLY

Page No. 21 Of 24

Page 22: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

AUDIT TRAIL REPORT

commentDescriptionUser NameDate & Time Activity

admin USERT:CLIENTHV:Manual login18/07/2017 11:25:46

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 11:27:06

admin USERT:CLIENTHV:Invalid login name/password admin18/07/2017 11:28:01

admin USERT:CLIENTHV:Manual login18/07/2017 11:28:12

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 11:28:14

admin admin new=1 old=0 SCADA_ADAMSERVER::Maintenance_button_I

PC2

18/07/2017 11:28:16

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 11:29:37

admin USERT:CLIENTHV:Manual login18/07/2017 11:35:14

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 11:35:17

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 11:36:19

admin USERT:CLIENTHV:Manual login18/07/2017 12:30:02

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 12:30:04

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 12:31:27

admin USERT:CLIENTHV:Manual login18/07/2017 12:41:09

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 12:41:13

admin admin new=1 old=0 SCADA_ADAMSERVER::Maintenance_button_I

PC2

18/07/2017 12:41:15

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 12:43:29

admin USERT:CLIENTHV:Invalid login name/password admin18/07/2017 12:44:08

admin USERT:CLIENTHV:Manual login18/07/2017 12:44:18

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 12:45:17

admin USERT:CLIENTHV:Manual login18/07/2017 12:46:46

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 12:47:51

admin USERT:CLIENTHV:Manual login18/07/2017 12:55:13

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 12:56:48

Page No. 22 Of 24

Page 23: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

commentDescriptionUser NameDate & Time Activity

admin USERT:CLIENTHV:Manual login18/07/2017 12:59:12

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 12:59:15

admin admin new=1 old=0 SCADA_ADAMSERVER::MASTER_RESET18/07/2017 12:59:19

admin admin new=30 old=15 SCADA_ADAMSERVER::SIP_HV5000L-2_PRE

SSURIZATION_HOLD_TIME

18/07/2017 12:59:32

admin admin new=120 old=30 SCADA_ADAMSERVER::SIP_HV5000L-2_STAB

ILIZATION_TIME

18/07/2017 12:59:51

admin USERT:CLIENTHV:Automatic logout by timeout18/07/2017 13:01:07

Page No. 23 Of 24

Page 24: SIP REPORT - DreamSoft IT Solutions Pvt. Ltd · SIP REPORT SKID DESCRIPTION Manufacturing Skid For Solution Products VESSEL NAME HV5000L-1 CYCLE NAME Sterilization In Place (SIP)

Vessel SelectedSterilization In Place (SIP)

Progressive No

HV5000L-1Skid Description

Batch NoProduct Name

Manufacturing Skid For Solution Products00021

Lyposuction lypo007

Electronic Signatures

Operator

Name :

Date & Time :

Comments :

Reviewer

Name :

Date & Time :

Comments :

Approver

Name :

Date & Time :

Comments :

Print Date : 18/07/2017

Print Time : 19:07:08

Print By : Admin

Print Count : 3