Big Picture
• Design Phase – April 13– Conceptual Design, Final Design Draft
• Design Phase – May 30– Configuration Documentation & Testing
• Preparatory Projects Phase – April 17 – May 30– Reconfigure K12/HAN/Library, Replace current HECN
routers, Video testing, local projets
• Implementation – June 12 – August 18– Details to be determined
![Page 3: SIS 2006 Update](https://reader036.vdocuments.net/reader036/viewer/2022082611/56812c26550346895d909713/html5/thumbnails/3.jpg)
Design
• Conceptual Design is due March 24
• Physical Designs due April 13
• Start equipment orders following week– Includes order lag time and setup time
• Document Configuration
• Perform Testing
![Page 4: SIS 2006 Update](https://reader036.vdocuments.net/reader036/viewer/2022082611/56812c26550346895d909713/html5/thumbnails/4.jpg)
Preparatory Projects Phase
• Things we can do before the actual implementation
• Planning the details now – Draft Due April 13
![Page 5: SIS 2006 Update](https://reader036.vdocuments.net/reader036/viewer/2022082611/56812c26550346895d909713/html5/thumbnails/5.jpg)
Implementation Phase
• Can’t be determined until many of the design tasks completed
• Planning for it will occur through the month of May
• Intend to have at least K12 & HE completed by August deadline
![Page 6: SIS 2006 Update](https://reader036.vdocuments.net/reader036/viewer/2022082611/56812c26550346895d909713/html5/thumbnails/6.jpg)
Current Risks
• Weather in the Red River Valley– Several fiber runs to be completed
• Compressed timeline may impact “burn-in” time
• New Technology
![Page 7: SIS 2006 Update](https://reader036.vdocuments.net/reader036/viewer/2022082611/56812c26550346895d909713/html5/thumbnails/7.jpg)
More Information
• Next IVN Session = April 26• www.stagenet.nd.gov/projects/infrastructure/index.html
– Biweekly status reports– Project Plans– RFPs– Lots More