GRAPHIC SCALE 0’ 100’ 100’ DENOTES FILL IN WETLAND F F S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED * * * * * * * * * * * SITE 8 ~ ~ SITE 8A SITE 5A SITE 5B SITE 6A SITE 7 SITE 6 SITE 5 TS S $$$$$$SYSTI ME$$$$$ $$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$ $$$$USERNAME$$$$ LOCATION: DESIGNED BY: CHECKED BY: COUNTY: TIP NO.: DATE: PLANS 0 25 50 50 100 GRAPHIC SCALE REVISIONS HYDRAULICS ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO. PROJECT REFERENCE NO. 7 U-2525B 6/2/99 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS S EES H E E T24 - Y 4 - S T A . 1 6 +00 . 00 M A T C H L I N E S T A. 11 + 00 - Y 5 - MAT CHL I NE - L - S T A. 66 + 0 0 . 0 0 S EE S HEET 6 MAT CHL I NE - L - S T A. 9 4 + 00 . 0 0 S EE S HEET 8 SEE SHEET 42 FOR -L- PROFILE SEE SHEET 54 & 55 FOR -Y4- PROFILE SEE SHEET 56 & 57 FOR -Y4RPA- PROFILE SEE SHEET 57 & 58 FOR -Y4RPB- PROFILE SEE SHEET 58 & 59 FOR -Y4RPC- PROFILE SEE SHEET 59 & 60 FOR -Y4RPD- PROFILE S E ES H E E T25 MA T C H L I N E- Y 4 -S T A . 31 +50 . 0 0 SEE SHEET 60 FOR -Y5- PROFILE SEE SHEET 2-J FOR BRIDGE SKETCH 2GI FS 2GI FS 2GI FS 2GI 2GI 2GI 2 GI 15"CSP 1 5 " C S P 2GI 0.08 Acp DA REMOVE REMOVE GRADE TO DRAIN C Proposed Ditch L S etc. GI Outside Ditch 1 0 : 1 20 : 1 Traffic Flow 0. 5Mi n. ( Not to Scale) FALSE SUMP 1 . 0Max. 2.0’ S = Ditch Slope @ STA. 14+98 -Y4RPB- (LT) @ STA. 72+48 -L- (LT) @ STA. 15+48 -Y4RPA- (RT) @ STA. 18+98 -Y4RPC- (LT) @ STA. 74+98 -L- (RT) 20 : 1 10 : 1 Traffic Flow Outside Ditch 0. 5Mi n. GI etc. C Proposed Ditch L S=Ditch Slope S ( Not to Scale) FALSE SUMP 2’ 1 . 0Max. Median Ditch ( Not to Scale) FALSE SUMP S S=Ditch Slope etc. GI C Proposed Ditch L 2’ D D Ditch Grade L L Ditch Grade 0.0% To 2.0% Over 2.0% To 4.0% 20’ 30’ Over 4.0% To 6.0% Over 6.0% 40’ 50’ 9" D D D D D 20’ L (See Chart Below) @ STA. 72+48 -L- (MED) Natural Natural Ground Ground 3 : 1 3 : 1 D ( Not to Scale) STANDARD ’V’ DITCH DETAIL L Min. D= 0.5 Ft. FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT) FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT) SEE DETAIL "L" STANDARD "V" DITCH STANDARD "V" DITCH SEE DETAIL "L" B Natural Natural Ground Ground 3 : 1 3 : 1 D ( Not to Scale) DETAIL H FROM STA. 74+28 TO STA. 79+12 -L- (LT) STANDARD 2’ BASE DITCH B= 2.0 Ft. Min. D= 2.5 Ft. SEE DETAIL "H" STANDARD 2’ BASE DITCH SEE DETAIL "L" FROM STA. 25+72 TO STA. 27+00 -Y4- (LT) DETAIL P DETAIL R DETAIL Q 2 GI 2GI FS FS 2GI FS 2 GI 2GI FS 2GI 2GI FS 2GI 2 GI FS W/ E L B OWS R OD AND L UG STA. 23+05 -Y4- (RT.) BEGIN SBG @ W/ ELBOWS ROD AND LUG STA. 23+05 -Y4- (RT.) BEGIN SBG @ W/ ELBOWS ROD AND LUG STA. 26+50 -Y4- (RT.) END SBG @ 2GI 2 GI 2GI W/ ELBOWS ROD AND LUG EST. 37 SY FABRIC EST. 15 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 28 SY FABRIC EST. 11 TONS W/ FILTER FABRIC CLASS "B" RIP RAP STANDARD "V" DITCH 5’x10’ RIPRAP PAD EST. 14 SY FABRIC EST. 5 TONS W/ FILTER FABRIC CLASS "B" RIP RAP REMOVE REMOVE 5’x10’ RIPRAP PAD REMOVE REMOVE REMOVE REMOVE REMOVE 5’x10’ RIPRAP PAD EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 5 SY FABRIC EST. 1 TON W/ FILTER FABRIC CLASS "B" RIP RAP EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 14 SY FABRIC EST. 5 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP STA. 27+35 -Y4- (RT.) END SBG @ 1 5 "C SP 15 "C SP Natural Natural Ground Ground D ( Not to Scale) E XI STI NG BANK EXI STI NG BANK PIPE OUTLET CHANNEL (Variable) CHANNEL BED d= 1.0 Ft. Est.= 4 Tons of Class "B" Rip-Rap D=4.0 Ft. Length= 10 Ft. DETAIL VV SEE DETAIL "VV" CLASS "B" RIP RAP STA. 21+00 -Y4RPB- (LT) PSH SEE DETAIL SHEET 2-L PSH SEE DETAIL SHEET 2-L PSH SEE DETAIL SHEET 2-L @ STA. 81+98 -L- (MED) @ STA. 92+02 -L- (MED) @ STA. 14+98 -Y4RPC- (RT) SHEETS 6 - 7 SEE ON-SITE MITIGATION PLANS BEG. APP. SLAB END SBG BEG. APP. SLAB END SBG END APP. SLAB BEGIN SBG END APP. SLAB BEGIN SBG 2 GI REMOVE REMOVE 1 8"RCP-III 15"RCP-III 24"RCP-III 18 " R C P - I II 18 " R C P -II I 24 "RC P -I V 24 "R C P - I V 18"RCP- I V 18"RCP-I V 1 5 " RC P -I V 36"RCP-I II 36"RCP-II I 42 "R C P - I V 4 2 "R C P - I V 15" RCP-IV 18"RCP- V 18"RCP- V 15 " R C P - I V 15"RCP- I V 15"RCP- II I 1 5"RCP-III 15 " 15 " 15" 15" 2 4 " 2 4 " 24" 24" 1 5 " HW HW 48"RCP-I V HW DI DI S T A . 20 +1 5- Y 4 R P B -( LT . ) E ND S B G @ STA. 16+95 -Y4- (RT.) BEGIN SBG @ P E R MANE NTI NS T A LL A T I ON R OC KP I P EI NL ETS E D I ME NTT R A PT Y P EA SEE DETAIL "C" 24"RCP- I V CLASS"B" RIPRAP TOE PROTECTION 42 SQYDS FILTER FAB. EST. 97 TONS Fill Slope ( Not to Scale) TOE PROTECTION d Fabric Filter FLATTER 2 : 1 OR Ground Natural DETAIL C d= 1.0 Ft. Type of Liner= CLASS "B" Rip-Rap FROM STA. 21+08 TO STA. 24+33 -L- (RT) b b b b c b b b c O F b b O I NF ORMATI ON E ND OF 6"STEEL 6"STEEL 6"STEEL N AD 83 -Y4- -Y4RPC- -Y4RPD- SE = .07 SE = .07 -Y4RPB- -Y4RPA- -L- L = 4,420.01’ PI Sta 79+71.67 D T = 2,326.53’ R = 5,730.00’ SE = .04 PI Sta 17+37.59 = 13 59’ 43.4" (LT) D D = 1 30’ 28.0" L = 928.21’ T = 466.43’ R = 3,800.00’ SE = 02 -Y4- POT STA. 24+56.70 -L- POC STA. 80+74.41= -Y4- PTSta. 21+99.38 70 + 00 75 + 00 80+00 85 + 00 9 0 + 0 0 20+00 25+00 30+00 - Y 4 RP C - - Y 4 RPD- SE = .08 SE = .08 SE = .06 SE = .06 SE = .06 SE = .06 LT = 133.35’ PIs Sta 11+33.35 F Ls = 200.00’ ST = 66.69’ R = 1,800.00’ PI Sta 14+41.55 D L = 480.22’ T = 241.55’ LT = 133.35’ PIs Sta 17+46.91 F Ls = 200.00’ ST = 66.69’ LT = 133.51’ PIs Sta 20+13.73 F Ls = 200.00’ ST = 66.83’ PI Sta 22+15.97 D L = 267.37’ T = 135.74’ R = 628.00’ LT = 133.35’ PIs Sta 11+33.35 F Ls = 200.00’ ST = 66.69’ R = 1,800.00’ PI Sta 14+50.19 D L = 497.20’ T = 250.19’ ST = 66.69’ PIs Sta 17+63.88 F Ls = 200.00’ LT = 133.35’ LT = 133.51’ PIs Sta 20+30.71 F Ls = 200.00’ ST = 66.83’ PI Sta 22+62.79 D L = 323.82’ T = 165.60’ R = 628.00’ - Y 4 R P B - -L- POCSta. 66+96.59 47.00’ RT. -Y4RPC- ST Sta. 10+00.00 = -Y4RPC- SC Sta. 12+00.00 -Y4RPD- PT Sta. 23+47.60 -Y4RPD- SC Sta. 20+80.22 -Y4RPC- PT Sta. 24+21.02 -Y4RPC- SC Sta. 20+97.20 -Y4RPC- SRS Sta. 18+97.20 -Y4RPC- CS Sta. 16+97.20 -Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22 -Y4RPD- CS Sta. 16+80.22 1 5 + 00 2 0 + 0 0 2 5 + 00 25 + 0 0 20 +0 0 15 + 0 0 -Y4- POT Sta. 28+90.33 = -Y4- POT Sta. 28+90.37 = -Y4RPC- POT Sta. 26+11.02 -Y4RPA- SC Sta. 23+28.89 -Y4RPA- SRS Sta. 21+28.89 -Y4RPA- CS Sta. 19+18.89 -Y4RPA- PT Sta. 25+35.26 -Y4RPB- CS Sta. 19+04.16 -Y4RPB- SRS Sta. 21+14.16 -Y4RPB- SC Sta. 23+14.16 -Y4RPB- PT Sta. 24+62.76 PIs Sta 11+26.24 F F Ls = 210.00’ LT = 126.24’ ST = 83.90’ PI Sta 15+64.37 D L = 694.16’ T = 354.37’ R = 1,400.00’ PIs Sta 19+74.20 F Ls = 210.00’ LT = 140.04’ ST = 70.04’ PIs Sta 22+47.60 F Ls = 200.00’ LT = 133.44’ ST = 66.77’ PI Sta 23+88.67 D L = 148.60’ T = 74.51’ R = 800.00’ PI Sta 15+72.22 D L = 708.89’ T = 362.22’ R = 1,400.00’ PIs Sta 19+88.92 F Ls = 210.00’ LT = 140.04’ ST = 70.04’ PIs Sta 22+62.33 F Ls = 200.00’ LT = 133.44’ ST = 66.77’ D PI Sta 24+32.65 L = 206.38’ T = 103.76’ R = 800.00’ 15+00 -Y4RPA- POT Sta. 27+25.26 -Y4- POC Sta. 20+04.60 = -Y4- POC Sta. 20+04.80 = -Y4RPB- POT Sta. 26+52.76 2 5 + 0 0 2 0 + 00 15+00 20 + 00 25+00 -Y4- - Y 4 R P A - -Y4RPD- SC Sta. 12+00.00 PI Sta 14+43.47 D L = 185.06’ T = 92.60’ R = 2,000.00’ PI Sta 16+25.44 D L = 29.83’ T = 14.91’ R = 2,000.00’ -Y5- PC Sta. 13+50.87 -Y5- PT Sta. 15+35.93 -Y5- PC Sta. 16+10.52 -Y5- PT Sta. 16+40.35 -Y5- POT Sta. 16+95.82 -Y5- C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C F F F F F F F F F F C F C C C C C C C C C C C C C C C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F C C C C C C C F C C C C C C C F C F C F F F F F F F F F F F F F F F F F F F F F F F C C C C C C C C C C C C C F F F F F F F F F C C C C C C F F F F F F F F C C C C C C C F F F F F F F F F F F C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F C C C C F F F F F F C C C C C C C C C C C C C C C C C C C C F F F F F F CHOR D C HOR D +80.00 -Y4- 105.00’ 50.00’ +20.00 -Y4- 105.00’ 50.00’ C HOR D R ET AI N E XI S T . R / W 1 0 0 P R OP . R / W - Y 5 - R ET A I N E X I S T . R / W R ET A I N E X I S T . R / W C HOR D +00.00 -Y4- 105.00’ +18.00 -Y4RPB- 90.00’ @ PROP. R/W 50.00’ +90.00 -Y5- 55.00’ @ EXIST. R/W CHOR D C HOR D +96.59 -L- +00.00 -Y4RPC- +97.20 -Y4RPC- +97.20 -Y4RPC- +21.02 -Y4RPC- +14.16 -Y4RPB- +62.76 -Y4RPB- +47.60 -Y4RPD- +80.22 -Y4RPD- +80.22 -Y4RPD- +00.00 -Y4RPD- +35.26 -Y4RPA- +28.89 -Y4RPA- +18.89 -Y4RPA- 150.00’ 90.00’ +30.00 -Y4- +15.00 -Y4- 50.00’ 90.00’ 90.00’ 90.00’ 90.00’ 90.00’ 50.00’ 90.00’ 90.00’ 90.00’ 90.00’ 90.00’ 90.00’ 90.00’ +50.00 -Y4RPB- 90.00’ 90.00’ 50.00’ +75.00 -Y4- +80.00 -Y4- 105.00’ 50.00’ +20.00 -Y4- 105.00’ 50.00’ 90.00’ C HOR D +25.00 -Y4RPA- 90.00’ 90.00’ 135.00’ +70.00 -Y4RPA- @ EXIST. R/W 90.00’ END C/A FENCE +25.00 -Y4RPD- +40.00 -Y4- +10.00 -Y4RPC- +40.00 -Y4- 50.00’ @ EXIST. R/W @ EXIST. R/W R ET AI N E XI S T . R / W @ PL +25.00 -EY4- 80.00’ 1 0 0 P R OP . R / W +15.00 -Y4RPB- 292.00’ +14.16-Y4RPB- +90.00 -Y4RPB- 139.00’ 90.00’ BEGIN C/A FENCE R ET A I N E X I S T . R / W R ET A I N E X I S T . R / W +28.89-Y4RPA- 90.00’ +97.20 -Y4RPC- 90.00’ +80.22 -Y4RPD- 90.00’ 80.00’ C HOR D +00.00 -Y5- @ EXIST. R/W +00.00 -Y4- 105.00’ +18.00 -Y4RPB- 90.00’ @ PROP. R/W 50.00’ +90.00 -Y5- 55.00’ @ EXIST. R/W @ EXIST. R/W +36.65 -EY4- 4 4 7 7 13 24 23 22 21 20 18 18 13 19 17 10 16 15 15 14 10 12 +98.00 -EY4- @ PROP. R/W 80.00’ 19A -Y4- -Y4RPC- -Y4RPD- SE = .07 SE = .07 -Y4RPB- -Y4RPA- -L- L = 4,420.01’ PI Sta 79+71.67 D T = 2,326.53’ R = 5,730.00’ SE = .04 PI Sta 17+37.59 = 13 59’ 43.4" (LT) D D = 1 30’ 28.0" L = 928.21’ T = 466.43’ R = 3,800.00’ SE = 02 -Y4- POT STA. 24+56.70 -L- POC STA. 80+74.41= -Y4- PTSta. 21+99.38 70 + 00 75 + 00 80+00 85 + 00 9 0 + 0 0 20+00 25+00 30+00 - Y 4 RP C - - Y 4 RPD- SE = .08 SE = .08 SE = .06 SE = .06 SE = .06 SE = .06 LT = 133.35’ PIs Sta 11+33.35 F Ls = 200.00’ ST = 66.69’ R = 1,800.00’ PI Sta 14+41.55 D L = 480.22’ T = 241.55’ LT = 133.35’ PIs Sta 17+46.91 F Ls = 200.00’ ST = 66.69’ LT = 133.51’ PIs Sta 20+13.73 F Ls = 200.00’ ST = 66.83’ PI Sta 22+15.97 D L = 267.37’ T = 135.74’ R = 628.00’ LT = 133.35’ PIs Sta 11+33.35 F Ls = 200.00’ ST = 66.69’ R = 1,800.00’ PI Sta 14+50.19 D L = 497.20’ T = 250.19’ ST = 66.69’ PIs Sta 17+63.88 F Ls = 200.00’ LT = 133.35’ LT = 133.51’ PIs Sta 20+30.71 F Ls = 200.00’ ST = 66.83’ PI Sta 22+62.79 D L = 323.82’ T = 165.60’ R = 628.00’ - Y 4 R P B - -L- POCSta. 66+96.59 47.00’ RT. -Y4RPC- ST Sta. 10+00.00 = -Y4RPC- SC Sta. 12+00.00 -Y4RPD- PT Sta. 23+47.60 -Y4RPD- SC Sta. 20+80.22 -Y4RPC- PT Sta. 24+21.02 -Y4RPC- SC Sta. 20+97.20 -Y4RPC- SRS Sta. 18+97.20 -Y4RPC- CS Sta. 16+97.20 -Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22 -Y4RPD- CS Sta. 16+80.22 1 5 + 00 2 0 + 0 0 2 5 + 00 25 + 0 0 20 +0 0 15 + 0 0 -Y4- POT Sta. 28+90.33 = -Y4- POT Sta. 28+90.37 = -Y4RPC- POT Sta. 26+11.02 -Y4RPA- SC Sta. 23+28.89 -Y4RPA- SRS Sta. 21+28.89 -Y4RPA- CS Sta. 19+18.89 -Y4RPA- PT Sta. 25+35.26 -Y4RPB- CS Sta. 19+04.16 -Y4RPB- SRS Sta. 21+14.16 -Y4RPB- SC Sta. 23+14.16 -Y4RPB- PT Sta. 24+62.76 PIs Sta 11+26.24 F F Ls = 210.00’ LT = 126.24’ ST = 83.90’ PI Sta 15+64.37 D L = 694.16’ T = 354.37’ R = 1,400.00’ PIs Sta 19+74.20 F Ls = 210.00’ LT = 140.04’ ST = 70.04’ PIs Sta 22+47.60 F Ls = 200.00’ LT = 133.44’ ST = 66.77’ PI Sta 23+88.67 D L = 148.60’ T = 74.51’ R = 800.00’ PI Sta 15+72.22 D L = 708.89’ T = 362.22’ R = 1,400.00’ PIs Sta 19+88.92 F Ls = 210.00’ LT = 140.04’ ST = 70.04’ PIs Sta 22+62.33 F Ls = 200.00’ LT = 133.44’ ST = 66.77’ D PI Sta 24+32.65 L = 206.38’ T = 103.76’ R = 800.00’ 15+00 -Y4RPA- POT Sta. 27+25.26 -Y4- POC Sta. 20+04.60 = -Y4- POC Sta. 20+04.80 = -Y4RPB- POT Sta. 26+52.76 2 5 + 0 0 2 0 + 00 15+00 20 + 00 25+00 -Y4- - Y 4 R P A - -Y4RPD- SC Sta. 12+00.00 PI Sta 14+43.47 D L = 185.06’ T = 92.60’ R = 2,000.00’ PI Sta 16+25.44 D L = 29.83’ T = 14.91’ R = 2,000.00’ -Y5- PC Sta. 13+50.87 -Y5- PT Sta. 15+35.93 -Y5- PC Sta. 16+10.52 -Y5- PT Sta. 16+40.35 -Y5- POT Sta. 16+95.82 -Y5- N AD 8 3 / 95 - Y 5 - C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C F F F F F F F F F F C F C C C C C C C C C C C C C C C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F C C C C C C C F C C C C C C C F C F C F F F F F F F F F F F F F F F F F F F F F F F C C C C C C C C C C C C C F F F F F F F F F C C C C C C F F F F F F F F C C C C C C C F F F F F F F F F F F C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F C C C C F F F F F F C C C C C C C C C C C C C C C C C C C C F F F F F F F F 2GI FS 2GI FS 2GI FS 2GI 2GI 2GI 2 GI 15"CSP 1 5 " C S P 2GI 0.08 Acp DA REMOVE REMOVE GRADE TO DRAIN C Proposed Ditch L S etc. GI Outside Ditch 1 0 : 1 20 : 1 Traffic Flow 0. 5Mi n. ( Not to Scale) FALSE SUMP 1 . 0Max. 2.0’ S = Ditch Slope @ STA. 14+98 -Y4RPB- (LT) @ STA. 72+48 -L- (LT) @ STA. 15+48 -Y4RPA- (RT) @ STA. 18+98 -Y4RPC- (LT) @ STA. 74+98 -L- (RT) 20 : 1 10 : 1 Traffic Flow Outside Ditch 0. 5Mi n. GI etc. C Proposed Ditch L S=Ditch Slope S ( Not to Scale) FALSE SUMP 2’ 1 . 0Max. Median Ditch ( Not to Scale) FALSE SUMP S S=Ditch Slope etc. GI C Proposed Ditch L 2’ D D Ditch Grade L L Ditch Grade 0.0% To 2.0% Over 2.0% To 4.0% 20’ 30’ Over 4.0% To 6.0% Over 6.0% 40’ 50’ 9" D D D D D 20’ L (See Chart Below) @ STA. 72+48 -L- (MED) Natural Natural Ground Ground 3 : 1 3 : 1 D ( Not to Scale) STANDARD ’V’ DITCH DETAIL L Min. D= 0.5 Ft. FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT) FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT) SEE DETAIL "L" STANDARD "V" DITCH STANDARD "V" DITCH SEE DETAIL "L" B Natural Natural Ground Ground 3 : 1 3 : 1 D ( Not to Scale) DETAIL H FROM STA. 74+28 TO STA. 79+12 -L- (LT) STANDARD 2’ BASE DITCH B= 2.0 Ft. Min. D= 2.5 Ft. SEE DETAIL "H" STANDARD 2’ BASE DITCH SEE DETAIL "L" FROM STA. 25+72 TO STA. 27+00 -Y4- (LT) DETAIL P DETAIL R DETAIL Q 2 GI 2GI FS FS 2GI FS 2 GI 2GI FS 2GI 2GI FS 2GI 2 GI FS W/ E L B OWS R OD AND L UG STA. 23+05 -Y4- (RT.) BEGIN SBG @ W/ ELBOWS ROD AND LUG STA. 23+05 -Y4- (RT.) BEGIN SBG @ W/ ELBOWS ROD AND LUG STA. 26+50 -Y4- (RT.) END SBG @ 2GI 2 GI 2GI W/ ELBOWS ROD AND LUG EST. 37 SY FABRIC EST. 15 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 28 SY FABRIC EST. 11 TONS W/ FILTER FABRIC CLASS "B" RIP RAP STANDARD "V" DITCH 5’x10’ RIPRAP PAD EST. 14 SY FABRIC EST. 5 TONS W/ FILTER FABRIC CLASS "B" RIP RAP REMOVE REMOVE 5’x10’ RIPRAP PAD REMOVE REMOVE REMOVE REMOVE REMOVE 5’x10’ RIPRAP PAD EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 5 SY FABRIC EST. 1 TON W/ FILTER FABRIC CLASS "B" RIP RAP EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 14 SY FABRIC EST. 5 TONS W/ FILTER FABRIC CLASS "B" RIP RAP EST. 7 SY FABRIC EST. 2 TONS W/ FILTER FABRIC CLASS "B" RIP RAP STA. 27+35 -Y4- (RT.) END SBG @ 1 5 "C SP 15 "C SP Natural Natural Ground Ground D ( Not to Scale) E XI STI NG BANK EXI STI NG BANK PIPE OUTLET CHANNEL (Variable) CHANNEL BED d= 1.0 Ft. Est.= 4 Tons of Class "B" Rip-Rap D=4.0 Ft. Length= 10 Ft. DETAIL VV SEE DETAIL "VV" CLASS "B" RIP RAP STA. 21+00 -Y4RPB- (LT) PSH SEE DETAIL SHEET 2-L PSH SEE DETAIL SHEET 2-L PSH SEE DETAIL SHEET 2-L @ STA. 81+98 -L- (MED) @ STA. 92+02 -L- (MED) @ STA. 14+98 -Y4RPC- (RT) SHEETS 6 - 7 SEE ON-SITE MITIGATION PLANS BEG. APP. SLAB END SBG BEG. APP. SLAB END SBG END APP. SLAB BEGIN SBG END APP. SLAB BEGIN SBG 2 GI REMOVE REMOVE 1 8"RCP-III 15"RCP-III 24"RCP-III 18 " R C P - I II 18 " R C P -II I 24 "RC P -I V 24 "R C P - I V 18"RCP- I V 18"RCP-I V 1 5 " RC P -I V 36"RCP-I II 36"RCP-II I 42 "R C P - I V 4 2 "R C P - I V 15" RCP-IV 18"RCP- V 18"RCP- V 15 " R C P - I V 15"RCP- I V 15"RCP- II I 1 5"RCP-III 15 " 15 " 15" 15" 2 4 " 2 4 " 24" 24" 1 5 " HW HW 48"RCP-I V HW DI DI S T A . 20 +1 5- Y 4 R P B -( LT . ) E ND S B G @ STA. 16+95 -Y4- (RT.) BEGIN SBG @ P E R MANE NTI NS T A LL A T I ON R OC KP I P EI NL ETS E D I ME NTT R A PT Y P EA SEE DETAIL "C" 24"RCP- I V CLASS"B" RIPRAP TOE PROTECTION 42 SQYDS FILTER FAB. EST. 97 TONS Fill Slope ( Not to Scale) TOE PROTECTION d Fabric Filter FLATTER 2 : 1 OR Ground Natural DETAIL C d= 1.0 Ft. Type of Liner= CLASS "B" Rip-Rap FROM STA. 21+08 TO STA. 24+33 -L- (RT) 1 5 " CONC 3 6" CMP 36"CMP 24"CLAY DEREK L. HARRIS DARRELL DWAYNE LEVAN NCDOT DIANE R. WILSON NCDOT Albert L. Rhew Jr. CYNTHIA S. RUSSEL LELAND R. RUSSEL & & MARTHA ANDERSON STEPHEN J. ANDERSON EXI STI NG R/W EXI STI NG R/W EXI STI NGR/ W EXI STI NGR/ W EXI STI NGR/ W 60R/W 60R/W GARY W. NEAL CITY OF GREENSBORO Loyd A. Whitesell & ANNIE L. RICH JERRY N. RICH CITY OF GREENSBORO EXI STI NG R/W Loyd A. Whitesell Robert L. Mefford EI P EI P ALBERT L. RHEW LIVING TRUST ALBERT L. RHEW LIVING TRUST DEBORAH ANN PAYNE COBLE LIVING TRUST COBLE LIVING TRUST ANNIE L. RICH JERRY N. RICH & DAVID A. CRABTREE CHARLOTTE V. STEWART KATHY L. GREENE MICHAEL L. GREENE & GARY W. NEAL 0504018900397W005 DARRELL D. LEVAN Charles C. Drye Sr. EIP NCDOT ALBERT L. RHEW JR. 1 5 " CONC 24"CLAY 36" CMP 36"CMP 347 73 GR 72"WD PLASTI C 48" 72 " CHL 72"CHL 72 " CHL 72 " WD 1 2 " CONC 26 27 29 337 338 339 340 341 342 1 2 " CONC 15 " CONC 1 2 " CONC S R 2 8 2 9 O AK L EI GH RD 1 7 BS T GR GR 18"CONC 48"CHL 50"WD 50"WD 48"WW 60"CHL 28 1 5"CONC 15"CONC 63 65 12"CONC 1 2"CONC 15"CONC 72"WD 66 69 68 71 72 60"CHL 12"CONC 336 48"CONC S GR CONC 1 8" 345 18"CONC 1 8"CONC 343 14 13 4 8 " CHL 4 8 " P L AS TI C RAI L LT HTR W/LT 1SBKD W/LT FLAGPOLE CONC G G G CONC 1SFD S S G S S S 1SFD CONC S S 1SFBUS 1SFD 1SFD W/LT GR GR S CONC S S POOL DK WD 1SFD GR FOUND 1SFD S B W/LT S S G 1SFD S 16’ BST BST 1SFD G CONC 1SFD W/LT W/LT 1SFD GR GR GR GR S 1SFBUS 1SFD G S LT GR GR GR S (ABAND) 1SFD GR 1SFD LT GR S 2SFD 1 SFMTL MARKERS CEMETERY POSSIBLE GRAVE GR LT CONC 1SFD GR GR GR BST GR GR GR z z X X X X X X X X X X X O X X X X X X X X X X X X X X X X O X X X X X X X X X X X S 15 " CONC GR P X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X B G G S S S

Upload: others

Post on 30-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

GRAPHIC SCALE

0’ 100’100’

DENOTES FILL INWETLANDF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

E E IN WETLANDDENOTES EXCAVATION

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

SITE 8

~ ~

SITE 8A

SITE 5A

SITE 5B

SITE 6A

SITE 7

SITE 6SITE 5

TS

S

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

LOCATION:

DESIGNED BY:

CHECKED BY:

COUNTY:TIP NO.:

DATE:

PLANS

02550 50 100

GRAPHIC SCALE

REVISIONS

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

7 U-2525B

6/2/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

SEE SHEET 24 -Y4- STA. 16+00.00MATCHLINE

STA. 11

+00

-Y5-

TO

PLO

T FU

LL SI Z

E 62"X34"

MA

TC

HLIN

E -L- STA. 66+

00.0

0 SEE S

HEET 6

MA

TC

HLIN

E -L- STA. 94+

00.0

0 SEE S

HEET 8

SEE SHEET 42 FOR -L- PROFILESEE SHEET 54 & 55 FOR -Y4- PROFILESEE SHEET 56 & 57 FOR -Y4RPA- PROFILESEE SHEET 57 & 58 FOR -Y4RPB- PROFILESEE SHEET 58 & 59 FOR -Y4RPC- PROFILESEE SHEET 59 & 60 FOR -Y4RPD- PROFILE

SEE SHEET

25

MATCHLINE -Y4- S

TA. 31+

50.00

SEE SHEET 60 FOR -Y5- PROFILE

SEE SHEET 2-J FOR BRIDGE SKETCH

2GIFS

2GIFS

2GI

FS

2GI

2GI2GI

2GI

15" C

SP

15" CSP 2GI

0.08 Acp

DA

REMOVE

REMOVE

GRADE TO DRAIN

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 14+98 -Y4RPB- (LT)

@ STA. 72+48 -L- (LT)

@ STA. 15+48 -Y4RPA- (RT)@ STA. 18+98 -Y4RPC- (LT)@ STA. 74+98 -L- (RT)

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

C Proposed DitchL

2’

D

D

Ditch Grade L LDitch Grade

0.0% To 2.0%

Over 2.0% To 4.0%

20’

30’

Over 4.0% To 6.0%

Over 6.0%

40’

50’

9"

DD

D D

D20’L (See Chart Below)

@ STA. 72+48 -L- (MED)

Natural Natural

Ground Ground3:1 3:1

D

( Not to Scale)

STANDARD ’V’ DITCH

DETAIL L

Min. D= 0.5 Ft.

FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT)FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT)

SEE DETAIL "L"STANDARD "V" DITCH

STANDARD "V" DITCHSEE DETAIL "L"

B

Natural Natural Ground Ground

3:13:1 D

( Not to Scale)

DETAIL H

FROM STA. 74+28 TO STA. 79+12 -L- (LT)

STANDARD 2’ BASE DITCH

B= 2.0 Ft.

Min. D= 2.5 Ft.

SEE DETAIL "H"STANDARD 2’ BASE DITCH

SEE DETAIL "L"

FROM STA. 25+72 TO STA. 27+00 -Y4- (LT)

DETAIL P

DETAIL R

DETAIL Q

2GI

2GIFS

FS

2GI

FS

2GI

2GI

FS 2GI

2GI

FS

2GI

2GI

FS

W/ ELB

OWSRO

D AND

LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 26+50 -Y4- (RT.)END SBG @

2GI

2GI

2GI

W/ ELBOWSROD AND LUG

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 28 SY FABRICEST. 11 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STANDARD "V" DITCH

5’x10’RIPRAP PAD

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

REMOVE

REMOVE

5’x10’RIPRAP PAD

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

5’x10’RIPRAP PAD

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STA. 27+35 -Y4- (RT.)END SBG @

15" CSP

15" CSP

Natural Natural

Ground Ground

D

( Not to Scale)

EXISTING BANKEXI

STING

BANK

PIPE OUTLET CHANNEL

(Variable)

CHANNEL BED

d= 1.0 Ft.

Est.= 4 Tons of Class "B" Rip-Rap

D=4.0 Ft.

Length= 10 Ft.

DETAIL VV

SEE DETAIL "VV"CLASS "B" RIP RAP

STA. 21+00 -Y4RPB- (LT)

PSH

SEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

@ STA. 81+98 -L- (MED)@ STA. 92+02 -L- (MED)

@ STA. 14+98 -Y4RPC- (RT)

SHEETS 6 - 7SEE ON-SITE MITIGATION PLANS

BEG. APP. SLABEND SBG

BEG. APP. SLABEND SBG

END APP. SLABBEGIN SBG

END APP. SLABBEGIN SBG

2GI

REMOVE

REMOVE

18"

RCP-III

15" RC

P-III

24" RC

P-III

18" RCP-III

18" RCP-III

24" RC

P-IV

24" RC

P-IV

18" R

CP-IV

18" R

CP-IV

15" RCP-IV

36" RC

P-III

36" RC

P-III

42" RC

P-IV

42" RC

P-IV

15" RCP-IV

18" R

CP-V

18" R

CP-V

15" RCP-IV

15" RC

P-IV

15" RC

P-III

15" RC

P-III

15"

15"

15"

15"

24"

24"

24"

24"

15"

HW

HW

48" R

CP-IV

HW

DI

DI

STA. 2

0+15

-Y4RPB

- (LT.)

END

SBG @

STA. 16+95 -Y4- (RT.)BEGIN SBG @

PERMANENT INSTALLATION

ROCK PIPE INLET SEDIMENT TRAP TYPE ’A’

SEE DETAIL "C"

24"

RCP-IV

CLASS"B" RIPRAP

TOE PROTECTION

42 SQYDS FILTER FAB.EST. 97 TONS

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 21+08 TO STA. 24+33 -L- (RT)

b

b

b

b

c

b

b

b

c

O

F

b

b

O

INFORMATION

END OF

6" S

TEEL

6" S

TEEL

6" S

TEEL

NAD 83

-Y4-

-Y4RPC-

-Y4RPD-

SE = .07

SE = .07

-Y4RPB-

-Y4RPA--L-

L = 4,420.01’

PI Sta 79+71.67

D

T = 2,326.53’

R = 5,730.00’

SE = .04

PI Sta 17+37.59

= 13° 59’ 43.4" (LT)D

D = 1° 30’ 28.0"

L = 928.21’

T = 466.43’

R = 3,800.00’

SE = 02

-Y4- POT STA. 24+56.70

-L- POC STA. 80+74.41=

-Y4- PTSta. 21+99.38

70+00

75+00

80+00

85+00

90+00

20+00

25+00

30+00

-Y4RPC-

-Y4RPD-

SE = .08

SE = .08 SE = .06

SE = .06

SE = .06

SE = .06

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’R = 1,800.00’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

LT = 133.35’

PIs Sta 17+46.91

F

Ls = 200.00’

ST = 66.69’

LT = 133.51’

PIs Sta 20+13.73

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+15.97

D

L = 267.37’

T = 135.74’

R = 628.00’

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

R = 1,800.00’

PI Sta 14+50.19

D

L = 497.20’

T = 250.19’ ST = 66.69’

PIs Sta 17+63.88

F

Ls = 200.00’

LT = 133.35’ LT = 133.51’

PIs Sta 20+30.71

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+62.79

D

L = 323.82’

T = 165.60’

R = 628.00’

-Y4RPB-

-L- POCSta. 66+96.59 47.00’ RT.

-Y4RPC- ST Sta. 10+00.00 =

-Y4RPC- SC Sta. 12+00.00

-Y4RPD- PT Sta. 23+47.60

-Y4RPD- SC Sta. 20+80.22

-Y4RPC- PT Sta. 24+21.02

-Y4RPC- SC Sta. 20+97.20

-Y4RPC- SRS Sta. 18+97.20

-Y4RPC- CS Sta. 16+97.20

-Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22

-Y4RPD- CS Sta. 16+80.22

15+00

20+00

25+00

25+00

20+0

0

15+0

0

-Y4- POT Sta. 28+90.33 =-Y4- POT Sta. 28+90.37 =

-Y4RPC- POT Sta. 26+11.02

-Y4RPA- SC Sta. 23+28.89

-Y4RPA- SRS Sta. 21+28.89

-Y4RPA- CS Sta. 19+18.89

-Y4RPA- PT Sta. 25+35.26

-Y4RPB- CS Sta. 19+04.16

-Y4RPB- SRS Sta. 21+14.16

-Y4RPB- SC Sta. 23+14.16-Y4RPB- PT Sta. 24+62.76

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

PI Sta 15+64.37

D

L = 694.16’

T = 354.37’

R = 1,400.00’

PIs Sta 19+74.20

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+47.60

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

PI Sta 23+88.67

D

L = 148.60’

T = 74.51’

R = 800.00’

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 19+88.92

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+62.33

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

D

PI Sta 24+32.65

L = 206.38’

T = 103.76’

R = 800.00’

15+00

-Y4RPA- POT Sta. 27+25.26

-Y4- POC Sta. 20+04.60 =

-Y4- POC Sta. 20+04.80 =

-Y4RPB- POT Sta. 26+52.76

25+00

20+0

0

15+00

20+00

25+00

-Y4-

-Y4RPA-

-Y4RPD- SC Sta. 12+00.00

PI Sta 14+43.47

D

L = 185.06’

T = 92.60’

R = 2,000.00’

PI Sta 16+25.44

D

L = 29.83’

T = 14.91’

R = 2,000.00’

-Y5- PC Sta. 13+50.87

-Y5- PT Sta. 15+35.93

-Y5- PC Sta. 16+10.52

-Y5- PT Sta. 16+40.35

-Y5- POT Sta. 16+95.82

-Y5-

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

CC C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

F

CC

CC

CC

C F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

CC

C

C

C

C

C

C

C

C

C

CC

F

F

F

FF

FF

F

F

C

C

C

C

C

C

FF

F

F

FFF

F

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

C

C

C

C

F

F

F

F

F

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

FF

CHORD

CHORD

+80.00 -Y4-

105.00’50.00’

+20.00 -Y4-

105.00’50.00’

CHORD

RETAIN EXIST.

R/W

100’ PR

OP. R/W

-Y5-

RETAIN EXIST. R/W

RETAIN EXIST. R/W

CHORD

+00.00 -Y4-

105.00’

+18.00 -Y4RPB-

90.00’

@ PROP. R/W

50.00’

+90.00 -Y5-

55.00’@ EXIST. R/W

CHORD

CHORD

+96.59 -L-

+00.00 -Y4RPC-

+97.20 -Y4RPC-

+97.20 -Y4RPC-

+21.02 -Y4RPC-

+14.16 -Y4RPB-

+62.76 -Y4RPB-

+47.60 -Y4RPD-

+80.22 -Y4RPD-

+80.22 -Y4RPD-

+00.00 -Y4RPD-

+35.26 -Y4RPA-

+28.89 -Y4RPA-

+18.89 -Y4RPA-

150.00’

90.00’

+30.00 -Y4-

+15.00 -Y4-50.00’

90.00’

90.00’

90.00’

90.00’

90.00’

50.00’ 90.00’

90.00’

90.00’

90.00’

90.00’

90.00’

90.00’

+50.00 -Y4RPB-

90.00’

90.00’

50.00’

+75.00 -Y4-

+80.00 -Y4-

105.00’50.00’

+20.00 -Y4-

105.00’50.00’

90.00’

CHORD

+25.00 -Y4RPA-

90.00’

90.00’

135.00’

+70.00 -Y4RPA-

@ EXIST. R/W

90.00’

END C/A FENCE

+25.00 -Y4RPD-

+40.00 -Y4-

+10.00 -Y4RPC-

+40.00 -Y4-

50.00’

@ EXIST. R/W

@ EXIST. R/W

RETAIN EXIST.

R/W

@ PL

+25.00 -EY4-

80.00’

100’ PR

OP. R/W

+15.00 -Y4RPB-

292.00’

+14.16-Y4RPB-

+90.00 -Y4RPB-139.00’

90.00’

BEGIN C/A FENCE

RETAIN EXIST. R/W

RETAIN EXIST. R/W

+28.89-Y4RPA-

90.00’

+97.20 -Y4RPC-

90.00’

+80.22 -Y4RPD-90.00’

80.00’

CHORD

+00.00 -Y5-

@ EXIST. R/W

+00.00 -Y4-

105.00’

+18.00 -Y4RPB-

90.00’

@ PROP. R/W

50.00’

+90.00 -Y5-

55.00’@ EXIST. R/W

@ EXIST. R/W

+36.65 -EY4-

4

4

7

7

13

24

23

22

21

20

18

18

13

19

17

10

16

15

15

14

10

12

+98.00 -EY4-

@ PROP. R/W

80.00’

19A

-Y4-

-Y4RPC-

-Y4RPD-

SE = .07

SE = .07

-Y4RPB-

-Y4RPA--L-

L = 4,420.01’

PI Sta 79+71.67

D

T = 2,326.53’

R = 5,730.00’

SE = .04

PI Sta 17+37.59

= 13° 59’ 43.4" (LT)D

D = 1° 30’ 28.0"

L = 928.21’

T = 466.43’

R = 3,800.00’

SE = 02

-Y4- POT STA. 24+56.70

-L- POC STA. 80+74.41=

-Y4- PTSta. 21+99.38

70+00

75+00

80+00

85+00

90+00

20+00

25+00

30+00

-Y4RPC-

-Y4RPD-

SE = .08

SE = .08 SE = .06

SE = .06

SE = .06

SE = .06

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’R = 1,800.00’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

LT = 133.35’

PIs Sta 17+46.91

F

Ls = 200.00’

ST = 66.69’

LT = 133.51’

PIs Sta 20+13.73

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+15.97

D

L = 267.37’

T = 135.74’

R = 628.00’

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

R = 1,800.00’

PI Sta 14+50.19

D

L = 497.20’

T = 250.19’ ST = 66.69’

PIs Sta 17+63.88

F

Ls = 200.00’

LT = 133.35’ LT = 133.51’

PIs Sta 20+30.71

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+62.79

D

L = 323.82’

T = 165.60’

R = 628.00’

-Y4RPB-

-L- POCSta. 66+96.59 47.00’ RT.

-Y4RPC- ST Sta. 10+00.00 =

-Y4RPC- SC Sta. 12+00.00

-Y4RPD- PT Sta. 23+47.60

-Y4RPD- SC Sta. 20+80.22

-Y4RPC- PT Sta. 24+21.02

-Y4RPC- SC Sta. 20+97.20

-Y4RPC- SRS Sta. 18+97.20

-Y4RPC- CS Sta. 16+97.20

-Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22

-Y4RPD- CS Sta. 16+80.22

15+00

20+00

25+00

25+00

20+0

0

15+0

0

-Y4- POT Sta. 28+90.33 =-Y4- POT Sta. 28+90.37 =

-Y4RPC- POT Sta. 26+11.02

-Y4RPA- SC Sta. 23+28.89

-Y4RPA- SRS Sta. 21+28.89

-Y4RPA- CS Sta. 19+18.89

-Y4RPA- PT Sta. 25+35.26

-Y4RPB- CS Sta. 19+04.16

-Y4RPB- SRS Sta. 21+14.16

-Y4RPB- SC Sta. 23+14.16-Y4RPB- PT Sta. 24+62.76

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

PI Sta 15+64.37

D

L = 694.16’

T = 354.37’

R = 1,400.00’

PIs Sta 19+74.20

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+47.60

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

PI Sta 23+88.67

D

L = 148.60’

T = 74.51’

R = 800.00’

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 19+88.92

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+62.33

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

D

PI Sta 24+32.65

L = 206.38’

T = 103.76’

R = 800.00’

15+00

-Y4RPA- POT Sta. 27+25.26

-Y4- POC Sta. 20+04.60 =

-Y4- POC Sta. 20+04.80 =

-Y4RPB- POT Sta. 26+52.76

25+00

20+0

0

15+00

20+00

25+00

-Y4-

-Y4RPA-

-Y4RPD- SC Sta. 12+00.00

PI Sta 14+43.47

D

L = 185.06’

T = 92.60’

R = 2,000.00’

PI Sta 16+25.44

D

L = 29.83’

T = 14.91’

R = 2,000.00’

-Y5- PC Sta. 13+50.87

-Y5- PT Sta. 15+35.93

-Y5- PC Sta. 16+10.52

-Y5- PT Sta. 16+40.35

-Y5- POT Sta. 16+95.82

-Y5-

NAD 83/ 95-Y5-

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

CC C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

F

CC

CC

CC

C F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

CC

C

C

C

C

C

C

C

C

C

CC

F

F

F

FF

FF

F

F

C

C

C

C

C

C

FF

F

F

FFF

F

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

C

C

C

C

F

F

F

F

F

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

FF

F

F

2GIFS

2GIFS

2GI

FS

2GI

2GI2GI

2GI

15" C

SP

15" CSP 2GI

0.08 Acp

DA

REMOVE

REMOVE

GRADE TO DRAIN

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 14+98 -Y4RPB- (LT)

@ STA. 72+48 -L- (LT)

@ STA. 15+48 -Y4RPA- (RT)@ STA. 18+98 -Y4RPC- (LT)@ STA. 74+98 -L- (RT)

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

C Proposed DitchL

2’

D

D

Ditch Grade L LDitch Grade

0.0% To 2.0%

Over 2.0% To 4.0%

20’

30’

Over 4.0% To 6.0%

Over 6.0%

40’

50’

9"

DD

D D

D20’L (See Chart Below)

@ STA. 72+48 -L- (MED)

Natural Natural

Ground Ground3:1 3:1

D

( Not to Scale)

STANDARD ’V’ DITCH

DETAIL L

Min. D= 0.5 Ft.

FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT)FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT)

SEE DETAIL "L"STANDARD "V" DITCH

STANDARD "V" DITCHSEE DETAIL "L"

B

Natural Natural Ground Ground

3:13:1 D

( Not to Scale)

DETAIL H

FROM STA. 74+28 TO STA. 79+12 -L- (LT)

STANDARD 2’ BASE DITCH

B= 2.0 Ft.

Min. D= 2.5 Ft.

SEE DETAIL "H"STANDARD 2’ BASE DITCH

SEE DETAIL "L"

FROM STA. 25+72 TO STA. 27+00 -Y4- (LT)

DETAIL P

DETAIL R

DETAIL Q

2GI

2GIFS

FS

2GI

FS

2GI

2GI

FS 2GI

2GI

FS

2GI

2GI

FS

W/ ELB

OWSRO

D AND

LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 26+50 -Y4- (RT.)END SBG @

2GI

2GI

2GI

W/ ELBOWSROD AND LUG

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 28 SY FABRICEST. 11 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STANDARD "V" DITCH

5’x10’RIPRAP PAD

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

REMOVE

REMOVE

5’x10’RIPRAP PAD

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

5’x10’RIPRAP PAD

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STA. 27+35 -Y4- (RT.)END SBG @

15" CSP

15" CSP

Natural Natural

Ground Ground

D

( Not to Scale)

EXISTING BANKEXI

STING

BANK

PIPE OUTLET CHANNEL

(Variable)

CHANNEL BED

d= 1.0 Ft.

Est.= 4 Tons of Class "B" Rip-Rap

D=4.0 Ft.

Length= 10 Ft.

DETAIL VV

SEE DETAIL "VV"CLASS "B" RIP RAP

STA. 21+00 -Y4RPB- (LT)

PSH

SEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

@ STA. 81+98 -L- (MED)@ STA. 92+02 -L- (MED)

@ STA. 14+98 -Y4RPC- (RT)

SHEETS 6 - 7SEE ON-SITE MITIGATION PLANS

BEG. APP. SLABEND SBG

BEG. APP. SLABEND SBG

END APP. SLABBEGIN SBG

END APP. SLABBEGIN SBG

2GI

REMOVE

REMOVE

18"

RCP-III

15" RC

P-III

24" RC

P-III

18" RCP-III

18" RCP-III

24" RC

P-IV

24" RC

P-IV

18" R

CP-IV

18" R

CP-IV

15" RCP-IV

36" RC

P-III

36" RC

P-III

42" RC

P-IV

42" RC

P-IV

15" RCP-IV

18" R

CP-V

18" R

CP-V

15" RCP-IV

15" RC

P-IV

15" RC

P-III

15" RC

P-III

15"

15"

15"

15"

24"

24"

24"

24"

15"

HW

HW

48" R

CP-IV

HW

DI

DI

STA. 2

0+15

-Y4RPB

- (LT.)

END

SBG @

STA. 16+95 -Y4- (RT.)BEGIN SBG @

PERMANENT INSTALLATION

ROCK PIPE INLET SEDIMENT TRAP TYPE ’A’

SEE DETAIL "C"

24"

RCP-IV

CLASS"B" RIPRAP

TOE PROTECTION

42 SQYDS FILTER FAB.EST. 97 TONS

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 21+08 TO STA. 24+33 -L- (RT)

15" CONC

36" CMP

36" C

MP

24" C

LA

Y

DEREK L. HARRIS

DARRELL DWAYNE LEVAN

NCDOT

DIANE R. WILSON

NCDOT

Albert L. Rhew Jr.

CYNTHIA S. RUSSEL

LELAND R. RUSSEL &

& MARTHA ANDERSON

STEPHEN J. ANDERSON

EXIS

TIN

G R/

W

EXIS

TIN

G R/

W

EXISTING R/W

EXISTING R/W

EXISTING R/W

60’ R

/W

60’ R/

W

GARY W. NEAL

CITY OF GREENSBORO

Loyd A. Whitesell

& ANNIE L. RICH

JERRY N. RICH

CITY OF GREENSBORO

EXIS

TIN

G

R/

W

Loyd A. Whitesell

Robert L. Mefford

EIP

EIP

ALBERT L. RHEW LIVING TRUST

ALBERT L. RHEW LIVING TRUST

DEBORAH ANN PAYNE

COBLE LIVING TRUST

COBLE LIVING TRUST

ANNIE L. RICH

JERRY N. RICH &

DAVID A. CRABTREE

CHARLOTTE V. STEWART

KATHY L. GREENE

MICHAEL L. GREENE &GARY W. NEAL

0504018900397W005

DARRELL D. LEVAN

Charles C. Drye Sr.

EIP

NCDOT

ALBERT L. RHEW JR.

15" CONC

24" C

LA

Y

36" CMP

36" C

MP

347

73

GR

72" W

D

PL

AS

TIC

48"

72" C

HL

72" C

HL 72

" CHL

72" W

D

12" CONC

26

27

29

337

338

339

340

341

342

12" CONC

15" CONC

12" CONC

SR 2829 OAKLEIGH RD 17’ BST

GR

GR

18" C

ONC

48" C

HL

50" W

D

50" W

D

48" W

W

60" CHL

28

15" C

ONC

15" C

ONC

63

65

12" C

ONC

12" C

ONC

15" C

ONC

72"

WD

66

69

68

71

72

60" CHL

12" C

ONC

336

48" CONC

S

GR

CO

NC

18"

345

18" C

ONC

18" C

ONC

343

14

13

48" CHL

48" PLASTIC

RAIL

LT

vv

v v

v

v

v v

v

v

v

v

v

v

v

v

HTR

W/LT

1SBKD

W/LT

FLAGPOLE

CONC

G

G

G

CONC

1SFD

S

S

G

SS

S

1SFD

CONC

S

S

1SFBUS

1SFD

1SFD

W/LT

GR

GR

S

CONC

S

S

POOL

DK

WD

1SFD

GR

FOUND

1SFD

S

B

W/LT

S

S

G

1SFD

S

16’ BST

BST

1SFD

G

CONC

1SFD

W/LTW/LT

1SFD

GR

GR

GR

GR

S

1SFBUS

1SFD

G

S

LT

GR

GR

GR

S

(ABAND)

1SFD

GR

1SFD

LT

GR

S

2SFD

1SF

MT

L

MARKERS

CEMETERY

POSSIBLE GRAVE

GR

LT

CONC

1SFD

GR

GR

GR

BST

GR

GR

GR

z

z

X

X

X

X

X

X

X

X

XXX O

X

X

X X X

X

X

X

X X

X

X XX

X

X

OX

X

XX

X

X

X X

X

X

X

S

15" CONC

GR

P

XX

XX

XX

X XX

X X X X X

XX X X

XX XX

XX X X

XXXX

XX

XX

XXX X

X

X XX

XX

B

G

G

S

S

S

shawnharris
Text Box
PERMIT DRAWINGS SHEET 20 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 2: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

GRAPHIC SCALE

0’ 100’100’

DENOTES FILL INWETLANDF F

S SSURFACE WATER

DENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATER

DENOTES TEMPORARY

E E IN WETLANDDENOTES EXCAVATION

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

SITE 8

~ ~

SITE 8A

SITE 5A

SITE 5B

SITE 6A

SITE 7

SITE 6SITE 5

TS

S

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

LOCATION:

DESIGNED BY:

CHECKED BY:

COUNTY:TIP NO.:

DATE:

PLANS

02550 50 100

GRAPHIC SCALE

REVISIONS

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

7 U-2525B

6/2/99

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

SEE SHEET 24 -Y4- STA. 16+00.00MATCHLINE

STA. 11

+00

-Y5-

TO

PLO

T FU

LL SI Z

E 62"X34"

MA

TC

HLIN

E -L- STA. 66+

00.0

0 SEE S

HEET 6

MA

TC

HLIN

E -L- STA. 94+

00.0

0 SEE S

HEET 8

SEE SHEET 42 FOR -L- PROFILESEE SHEET 54 & 55 FOR -Y4- PROFILESEE SHEET 56 & 57 FOR -Y4RPA- PROFILESEE SHEET 57 & 58 FOR -Y4RPB- PROFILESEE SHEET 58 & 59 FOR -Y4RPC- PROFILESEE SHEET 59 & 60 FOR -Y4RPD- PROFILE

SEE SHEET

25

MATCHLINE -Y4- S

TA. 31+

50.00

SEE SHEET 60 FOR -Y5- PROFILE

SEE SHEET 2-J FOR BRIDGE SKETCH

2GIFS

2GIFS

2GI

FS

2GI

2GI2GI

2GI

15" C

SP

15" CSP 2GI

0.08 Acp

DA

REMOVE

REMOVE

GRADE TO DRAIN

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 14+98 -Y4RPB- (LT)

@ STA. 72+48 -L- (LT)

@ STA. 15+48 -Y4RPA- (RT)@ STA. 18+98 -Y4RPC- (LT)@ STA. 74+98 -L- (RT)

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

C Proposed DitchL

2’

D

D

Ditch Grade L LDitch Grade

0.0% To 2.0%

Over 2.0% To 4.0%

20’

30’

Over 4.0% To 6.0%

Over 6.0%

40’

50’

9"

DD

D D

D20’L (See Chart Below)

@ STA. 72+48 -L- (MED)

Natural Natural

Ground Ground3:1 3:1

D

( Not to Scale)

STANDARD ’V’ DITCH

DETAIL L

Min. D= 0.5 Ft.

FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT)FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT)

SEE DETAIL "L"STANDARD "V" DITCH

STANDARD "V" DITCHSEE DETAIL "L"

B

Natural Natural Ground Ground

3:13:1 D

( Not to Scale)

DETAIL H

FROM STA. 74+28 TO STA. 79+12 -L- (LT)

STANDARD 2’ BASE DITCH

B= 2.0 Ft.

Min. D= 2.5 Ft.

SEE DETAIL "H"STANDARD 2’ BASE DITCH

SEE DETAIL "L"

FROM STA. 25+72 TO STA. 27+00 -Y4- (LT)

DETAIL P

DETAIL R

DETAIL Q

2GI

2GIFS

FS

2GI

FS

2GI

2GI

FS 2GI

2GI

FS

2GI

2GI

FS

W/ ELB

OWSRO

D AND

LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 26+50 -Y4- (RT.)END SBG @

2GI

2GI

2GI

W/ ELBOWSROD AND LUG

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 28 SY FABRICEST. 11 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STANDARD "V" DITCH

5’x10’RIPRAP PAD

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

REMOVE

REMOVE

5’x10’RIPRAP PAD

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

5’x10’RIPRAP PAD

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STA. 27+35 -Y4- (RT.)END SBG @

15" CSP

15" CSP

Natural Natural

Ground Ground

D

( Not to Scale)

EXISTING BANKEXI

STING

BANK

PIPE OUTLET CHANNEL

(Variable)

CHANNEL BED

d= 1.0 Ft.

Est.= 4 Tons of Class "B" Rip-Rap

D=4.0 Ft.

Length= 10 Ft.

DETAIL VV

SEE DETAIL "VV"CLASS "B" RIP RAP

STA. 21+00 -Y4RPB- (LT)

PSH

SEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

@ STA. 81+98 -L- (MED)@ STA. 92+02 -L- (MED)

@ STA. 14+98 -Y4RPC- (RT)

SHEETS 6 - 7SEE ON-SITE MITIGATION PLANS

BEG. APP. SLABEND SBG

BEG. APP. SLABEND SBG

END APP. SLABBEGIN SBG

END APP. SLABBEGIN SBG

2GI

REMOVE

REMOVE

18"

RCP-III

15" RC

P-III

24" RC

P-III

18" RCP-III

18" RCP-III

24" RC

P-IV

24" RC

P-IV

18" R

CP-IV

18" R

CP-IV

15" RCP-IV

36" RC

P-III

36" RC

P-III

42" RC

P-IV

42" RC

P-IV

15" RCP-IV

18" R

CP-V

18" R

CP-V

15" RCP-IV

15" RC

P-IV

15" RC

P-III

15" RC

P-III

15"

15"

15"

15"

24"

24"

24"

24"

15"

HW

HW

48" R

CP-IV

HW

DI

DI

STA. 2

0+15

-Y4RPB

- (LT.)

END

SBG @

STA. 16+95 -Y4- (RT.)BEGIN SBG @

PERMANENT INSTALLATION

ROCK PIPE INLET SEDIMENT TRAP TYPE ’A’

SEE DETAIL "C"

24"

RCP-IV

CLASS"B" RIPRAP

TOE PROTECTION

42 SQYDS FILTER FAB.EST. 97 TONS

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 21+08 TO STA. 24+33 -L- (RT)

b

b

b

b

c

b

b

b

c

O

F

b

b

O

INFORMATION

END OF

6" S

TEEL

6" S

TEEL

6" S

TEEL

NAD 83

-Y4-

-Y4RPC-

-Y4RPD-

SE = .07

SE = .07

-Y4RPB-

-Y4RPA--L-

L = 4,420.01’

PI Sta 79+71.67

D

T = 2,326.53’

R = 5,730.00’

SE = .04

PI Sta 17+37.59

= 13° 59’ 43.4" (LT)D

D = 1° 30’ 28.0"

L = 928.21’

T = 466.43’

R = 3,800.00’

SE = 02

-Y4- POT STA. 24+56.70

-L- POC STA. 80+74.41=

-Y4- PTSta. 21+99.38

70+00

75+00

80+00

85+00

90+00

20+00

25+00

30+00

-Y4RPC-

-Y4RPD-

SE = .08

SE = .08 SE = .06

SE = .06

SE = .06

SE = .06

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’R = 1,800.00’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

LT = 133.35’

PIs Sta 17+46.91

F

Ls = 200.00’

ST = 66.69’

LT = 133.51’

PIs Sta 20+13.73

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+15.97

D

L = 267.37’

T = 135.74’

R = 628.00’

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

R = 1,800.00’

PI Sta 14+50.19

D

L = 497.20’

T = 250.19’ ST = 66.69’

PIs Sta 17+63.88

F

Ls = 200.00’

LT = 133.35’ LT = 133.51’

PIs Sta 20+30.71

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+62.79

D

L = 323.82’

T = 165.60’

R = 628.00’

-Y4RPB-

-L- POCSta. 66+96.59 47.00’ RT.

-Y4RPC- ST Sta. 10+00.00 =

-Y4RPC- SC Sta. 12+00.00

-Y4RPD- PT Sta. 23+47.60

-Y4RPD- SC Sta. 20+80.22

-Y4RPC- PT Sta. 24+21.02

-Y4RPC- SC Sta. 20+97.20

-Y4RPC- SRS Sta. 18+97.20

-Y4RPC- CS Sta. 16+97.20

-Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22

-Y4RPD- CS Sta. 16+80.22

15+00

20+00

25+00

25+00

20+0

0

15+0

0

-Y4- POT Sta. 28+90.33 =-Y4- POT Sta. 28+90.37 =

-Y4RPC- POT Sta. 26+11.02

-Y4RPA- SC Sta. 23+28.89

-Y4RPA- SRS Sta. 21+28.89

-Y4RPA- CS Sta. 19+18.89

-Y4RPA- PT Sta. 25+35.26

-Y4RPB- CS Sta. 19+04.16

-Y4RPB- SRS Sta. 21+14.16

-Y4RPB- SC Sta. 23+14.16-Y4RPB- PT Sta. 24+62.76

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

PI Sta 15+64.37

D

L = 694.16’

T = 354.37’

R = 1,400.00’

PIs Sta 19+74.20

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+47.60

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

PI Sta 23+88.67

D

L = 148.60’

T = 74.51’

R = 800.00’

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 19+88.92

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+62.33

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

D

PI Sta 24+32.65

L = 206.38’

T = 103.76’

R = 800.00’

15+00

-Y4RPA- POT Sta. 27+25.26

-Y4- POC Sta. 20+04.60 =

-Y4- POC Sta. 20+04.80 =

-Y4RPB- POT Sta. 26+52.76

25+00

20+0

0

15+00

20+00

25+00

-Y4-

-Y4RPA-

-Y4RPD- SC Sta. 12+00.00

PI Sta 14+43.47

D

L = 185.06’

T = 92.60’

R = 2,000.00’

PI Sta 16+25.44

D

L = 29.83’

T = 14.91’

R = 2,000.00’

-Y5- PC Sta. 13+50.87

-Y5- PT Sta. 15+35.93

-Y5- PC Sta. 16+10.52

-Y5- PT Sta. 16+40.35

-Y5- POT Sta. 16+95.82

-Y5-

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

CC C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

F

CC

CC

CC

C F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

CC

C

C

C

C

C

C

C

C

C

CC

F

F

F

FF

FF

F

F

C

C

C

C

C

C

FF

F

F

FFF

F

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

C

C

C

C

F

F

F

F

F

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

FF

CHORD

CHORD

+80.00 -Y4-

105.00’50.00’

+20.00 -Y4-

105.00’50.00’

CHORD

RETAIN EXIST.

R/W

100’ PR

OP. R/W

-Y5-

RETAIN EXIST. R/W

RETAIN EXIST. R/W

CHORD

+00.00 -Y4-

105.00’

+18.00 -Y4RPB-

90.00’

@ PROP. R/W

50.00’

+90.00 -Y5-

55.00’@ EXIST. R/W

CHORD

CHORD

+96.59 -L-

+00.00 -Y4RPC-

+97.20 -Y4RPC-

+97.20 -Y4RPC-

+21.02 -Y4RPC-

+14.16 -Y4RPB-

+62.76 -Y4RPB-

+47.60 -Y4RPD-

+80.22 -Y4RPD-

+80.22 -Y4RPD-

+00.00 -Y4RPD-

+35.26 -Y4RPA-

+28.89 -Y4RPA-

+18.89 -Y4RPA-

150.00’

90.00’

+30.00 -Y4-

+15.00 -Y4-50.00’

90.00’

90.00’

90.00’

90.00’

90.00’

50.00’ 90.00’

90.00’

90.00’

90.00’

90.00’

90.00’

90.00’

+50.00 -Y4RPB-

90.00’

90.00’

50.00’

+75.00 -Y4-

+80.00 -Y4-

105.00’50.00’

+20.00 -Y4-

105.00’50.00’

90.00’

CHORD

+25.00 -Y4RPA-

90.00’

90.00’

135.00’

+70.00 -Y4RPA-

@ EXIST. R/W

90.00’

END C/A FENCE

+25.00 -Y4RPD-

+40.00 -Y4-

+10.00 -Y4RPC-

+40.00 -Y4-

50.00’

@ EXIST. R/W

@ EXIST. R/W

RETAIN EXIST.

R/W

@ PL

+25.00 -EY4-

80.00’

100’ PR

OP. R/W

+15.00 -Y4RPB-

292.00’

+14.16-Y4RPB-

+90.00 -Y4RPB-139.00’

90.00’

BEGIN C/A FENCE

RETAIN EXIST. R/W

RETAIN EXIST. R/W

+28.89-Y4RPA-

90.00’

+97.20 -Y4RPC-

90.00’

+80.22 -Y4RPD-90.00’

80.00’

CHORD

+00.00 -Y5-

@ EXIST. R/W

+00.00 -Y4-

105.00’

+18.00 -Y4RPB-

90.00’

@ PROP. R/W

50.00’

+90.00 -Y5-

55.00’@ EXIST. R/W

@ EXIST. R/W

+36.65 -EY4-

4

4

7

7

13

24

23

22

21

20

18

18

13

19

17

10

16

15

15

14

10

12

+98.00 -EY4-

@ PROP. R/W

80.00’

19A

-Y4-

-Y4RPC-

-Y4RPD-

SE = .07

SE = .07

-Y4RPB-

-Y4RPA--L-

L = 4,420.01’

PI Sta 79+71.67

D

T = 2,326.53’

R = 5,730.00’

SE = .04

PI Sta 17+37.59

= 13° 59’ 43.4" (LT)D

D = 1° 30’ 28.0"

L = 928.21’

T = 466.43’

R = 3,800.00’

SE = 02

-Y4- POT STA. 24+56.70

-L- POC STA. 80+74.41=

-Y4- PTSta. 21+99.38

70+00

75+00

80+00

85+00

90+00

20+00

25+00

30+00

-Y4RPC-

-Y4RPD-

SE = .08

SE = .08 SE = .06

SE = .06

SE = .06

SE = .06

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’R = 1,800.00’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

LT = 133.35’

PIs Sta 17+46.91

F

Ls = 200.00’

ST = 66.69’

LT = 133.51’

PIs Sta 20+13.73

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+15.97

D

L = 267.37’

T = 135.74’

R = 628.00’

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

R = 1,800.00’

PI Sta 14+50.19

D

L = 497.20’

T = 250.19’ ST = 66.69’

PIs Sta 17+63.88

F

Ls = 200.00’

LT = 133.35’ LT = 133.51’

PIs Sta 20+30.71

F

Ls = 200.00’

ST = 66.83’

PI Sta 22+62.79

D

L = 323.82’

T = 165.60’

R = 628.00’

-Y4RPB-

-L- POCSta. 66+96.59 47.00’ RT.

-Y4RPC- ST Sta. 10+00.00 =

-Y4RPC- SC Sta. 12+00.00

-Y4RPD- PT Sta. 23+47.60

-Y4RPD- SC Sta. 20+80.22

-Y4RPC- PT Sta. 24+21.02

-Y4RPC- SC Sta. 20+97.20

-Y4RPC- SRS Sta. 18+97.20

-Y4RPC- CS Sta. 16+97.20

-Y4RPD- POT Sta. 25+37.60 -Y4RPD- SRS Sta. 18+80.22

-Y4RPD- CS Sta. 16+80.22

15+00

20+00

25+00

25+00

20+0

0

15+0

0

-Y4- POT Sta. 28+90.33 =-Y4- POT Sta. 28+90.37 =

-Y4RPC- POT Sta. 26+11.02

-Y4RPA- SC Sta. 23+28.89

-Y4RPA- SRS Sta. 21+28.89

-Y4RPA- CS Sta. 19+18.89

-Y4RPA- PT Sta. 25+35.26

-Y4RPB- CS Sta. 19+04.16

-Y4RPB- SRS Sta. 21+14.16

-Y4RPB- SC Sta. 23+14.16-Y4RPB- PT Sta. 24+62.76

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

PI Sta 15+64.37

D

L = 694.16’

T = 354.37’

R = 1,400.00’

PIs Sta 19+74.20

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+47.60

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

PI Sta 23+88.67

D

L = 148.60’

T = 74.51’

R = 800.00’

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 19+88.92

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+62.33

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

D

PI Sta 24+32.65

L = 206.38’

T = 103.76’

R = 800.00’

15+00

-Y4RPA- POT Sta. 27+25.26

-Y4- POC Sta. 20+04.60 =

-Y4- POC Sta. 20+04.80 =

-Y4RPB- POT Sta. 26+52.76

25+00

20+0

0

15+00

20+00

25+00

-Y4-

-Y4RPA-

-Y4RPD- SC Sta. 12+00.00

PI Sta 14+43.47

D

L = 185.06’

T = 92.60’

R = 2,000.00’

PI Sta 16+25.44

D

L = 29.83’

T = 14.91’

R = 2,000.00’

-Y5- PC Sta. 13+50.87

-Y5- PT Sta. 15+35.93

-Y5- PC Sta. 16+10.52

-Y5- PT Sta. 16+40.35

-Y5- POT Sta. 16+95.82

-Y5-

NAD 83/ 95-Y5-

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

CC C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

F

CC

CC

CC

C F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

CC

C

C

C

C

C

C

C

C

C

CC

F

F

F

FF

FF

F

F

C

C

C

C

C

C

FF

F

F

FFF

F

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

C

C

C

C

F

F

F

F

F

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

FF

F

F

2GIFS

2GIFS

2GI

FS

2GI

2GI2GI

2GI

15" C

SP

15" CSP 2GI

0.08 Acp

DA

REMOVE

REMOVE

GRADE TO DRAIN

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 14+98 -Y4RPB- (LT)

@ STA. 72+48 -L- (LT)

@ STA. 15+48 -Y4RPA- (RT)@ STA. 18+98 -Y4RPC- (LT)@ STA. 74+98 -L- (RT)

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

C Proposed DitchL

2’

D

D

Ditch Grade L LDitch Grade

0.0% To 2.0%

Over 2.0% To 4.0%

20’

30’

Over 4.0% To 6.0%

Over 6.0%

40’

50’

9"

DD

D D

D20’L (See Chart Below)

@ STA. 72+48 -L- (MED)

Natural Natural

Ground Ground3:1 3:1

D

( Not to Scale)

STANDARD ’V’ DITCH

DETAIL L

Min. D= 0.5 Ft.

FROM STA. 12+77 TO STA. 14+16 -Y4RPD- (LT)FROM STA. 13+36 TO STA. 14+45 -Y4RPA- (RT)

SEE DETAIL "L"STANDARD "V" DITCH

STANDARD "V" DITCHSEE DETAIL "L"

B

Natural Natural Ground Ground

3:13:1 D

( Not to Scale)

DETAIL H

FROM STA. 74+28 TO STA. 79+12 -L- (LT)

STANDARD 2’ BASE DITCH

B= 2.0 Ft.

Min. D= 2.5 Ft.

SEE DETAIL "H"STANDARD 2’ BASE DITCH

SEE DETAIL "L"

FROM STA. 25+72 TO STA. 27+00 -Y4- (LT)

DETAIL P

DETAIL R

DETAIL Q

2GI

2GIFS

FS

2GI

FS

2GI

2GI

FS 2GI

2GI

FS

2GI

2GI

FS

W/ ELB

OWSRO

D AND

LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 26+50 -Y4- (RT.)END SBG @

2GI

2GI

2GI

W/ ELBOWSROD AND LUG

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 28 SY FABRICEST. 11 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STANDARD "V" DITCH

5’x10’RIPRAP PAD

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

REMOVE

REMOVE

5’x10’RIPRAP PAD

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

5’x10’RIPRAP PAD

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 14 SY FABRICEST. 5 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

STA. 27+35 -Y4- (RT.)END SBG @

15" CSP

15" CSP

Natural Natural

Ground Ground

D

( Not to Scale)

EXISTING BANKEXI

STING

BANK

PIPE OUTLET CHANNEL

(Variable)

CHANNEL BED

d= 1.0 Ft.

Est.= 4 Tons of Class "B" Rip-Rap

D=4.0 Ft.

Length= 10 Ft.

DETAIL VV

SEE DETAIL "VV"CLASS "B" RIP RAP

STA. 21+00 -Y4RPB- (LT)

PSH

SEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

PSHSEE DETAIL SHEET 2-L

@ STA. 81+98 -L- (MED)@ STA. 92+02 -L- (MED)

@ STA. 14+98 -Y4RPC- (RT)

SHEETS 6 - 7SEE ON-SITE MITIGATION PLANS

BEG. APP. SLABEND SBG

BEG. APP. SLABEND SBG

END APP. SLABBEGIN SBG

END APP. SLABBEGIN SBG

2GI

REMOVE

REMOVE

18"

RCP-III

15" RC

P-III

24" RC

P-III

18" RCP-III

18" RCP-III

24" RC

P-IV

24" RC

P-IV

18" R

CP-IV

18" R

CP-IV

15" RCP-IV

36" RC

P-III

36" RC

P-III

42" RC

P-IV

42" RC

P-IV

15" RCP-IV

18" R

CP-V

18" R

CP-V

15" RCP-IV

15" RC

P-IV

15" RC

P-III

15" RC

P-III

15"

15"

15"

15"

24"

24"

24"

24"

15"

HW

HW

48" R

CP-IV

HW

DI

DI

STA. 2

0+15

-Y4RPB

- (LT.)

END

SBG @

STA. 16+95 -Y4- (RT.)BEGIN SBG @

PERMANENT INSTALLATION

ROCK PIPE INLET SEDIMENT TRAP TYPE ’A’

SEE DETAIL "C"

24"

RCP-IV

CLASS"B" RIPRAP

TOE PROTECTION

42 SQYDS FILTER FAB.EST. 97 TONS

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 21+08 TO STA. 24+33 -L- (RT)

15" CONC

36" CMP

36" C

MP

24" C

LA

Y

DEREK L. HARRIS

DARRELL DWAYNE LEVAN

NCDOT

DIANE R. WILSON

NCDOT

Albert L. Rhew Jr.

CYNTHIA S. RUSSEL

LELAND R. RUSSEL &

& MARTHA ANDERSON

STEPHEN J. ANDERSON

EXIS

TIN

G R/

W

EXIS

TIN

G R/

W

EXISTING R/W

EXISTING R/W

EXISTING R/W

60’ R

/W

60’ R/

W

GARY W. NEAL

CITY OF GREENSBORO

Loyd A. Whitesell

& ANNIE L. RICH

JERRY N. RICH

CITY OF GREENSBORO

EXIS

TIN

G

R/

W

Loyd A. Whitesell

Robert L. Mefford

EIP

EIP

ALBERT L. RHEW LIVING TRUST

ALBERT L. RHEW LIVING TRUST

DEBORAH ANN PAYNE

COBLE LIVING TRUST

COBLE LIVING TRUST

ANNIE L. RICH

JERRY N. RICH &

DAVID A. CRABTREE

CHARLOTTE V. STEWART

KATHY L. GREENE

MICHAEL L. GREENE &GARY W. NEAL

0504018900397W005

DARRELL D. LEVAN

Charles C. Drye Sr.

EIP

NCDOT

ALBERT L. RHEW JR.

727

728

728

728

729

729

729

729

730

730

730

730

730

730

730

730

730

731

731

731

731731

731 731

731

732

732

732

732

732

732

732

732

732

733

733

733

733

733

733

733

734

734

734

734 734

734

734

735

735

735

735

735

735

735

735

735

735735

735

735

735

735

735

736

736

736

736

736

736

73673

6736

736

737

737

737

737

737

737

737

737737

737

737

737

738

738

738

738

738

738

738

738

738

738

738

739

739

739

739

739

739

739

739

739

739

740

740

740

740

740

740

740

740

740

740

740 740

740

740

740

740

740

740740

740

740

740

741

741

741

741

741

741

741

741

741

741

741

741

742

742

742

742

742

742

742 742

742

742

742

742

743

743

743

743

743

743 743

743

743

743

743

743

743

743

743

744

744

744

744

744

744 744

744

744

744

744

744744

744

744

745

745

745

745

745

745

745

745

745

745

745745

745

745

745

745745

745

745745

745

745

745

745

745

745

745

745

745

745

745

746

746

746

746

746

746

746

746

746 746

746

746

746

746

746

746

746

747

747

747

747

747

747

747 747

747

747

747

747

747

747

747

747

747

748

748

748748

748

748

748

748748

748

748

748

748

748

748

748

748

748

749

749

749

749

749

749

749 749749

749

749

749

749

749

749

749

749

749

749

750

750

750

750

750

750

750750

750

750

750

750

750

750750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

751

751

751

751

751

751

751 751

751

751

751

751

751751

751

751

751

751

751

751

751

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

752

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

753

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

754

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

755

756

756

756

756

756

756

756

756

756

756

756

756

756

756

756

756

756

7567

56

756

756

756

756

756

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757757

757

757

757

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

758

759

759

759

759

759

759

759

759

759

759

759

759

759

759

759

759

759

75975

9

759

759

759

759

759

759

759

759

759

759

760

760

760

760

760

760

760

760

760

760

760

760

760 7

60

760

760

760

760 760

760

760

760 760

760

760

760 7

60

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760760

760

760

760

760

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

761

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

762

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

763

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

764

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765765

765

76576

5

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765

765 765

765

765

765

765

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

766

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

767

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

768

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

769

7697

69

769

769

769

769

769

769

769

769

769

769

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770770

770770

770

770

770

770

770

770

771

771

771

771

771

771

771

771

771

771

771

771

771

771771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

771

772

772

772

772

772

772

772

772772

772

772

772

772

772772 7

72

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

773

773

773

773

773

773

773

773

773

773

773

773

773

773773

773

773

773

773

773

773

773 7

73

773

773

773

773

773

773

773

773

773

773

773

773773

773

773

773

773

774

774

774

774

774

774

774

774

774

774

774

774774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

775

775

775

775

775

775

775 775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

775

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

776

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

778

778

778

778

778

778

778

778

778

7787

78

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

779

779

779

779

779

779 7

79

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

7807

80

780

781

781

781

781

781

781

781

781

781781

781

781

781

781

781

781

782

782

782

782

782

782

782

782

782

783

783

783

784

15" CONC

24" C

LA

Y

36" CMP

36" C

MP

347

73

GR

72" W

D

PL

AS

TIC

48"

72" C

HL

72" C

HL 72

" CHL

72" W

D

12" CONC

26

27

29

337

338

339

340

341

342

12" CONC

15" CONC

12" CONC

SR 2829 OAKLEIGH RD 17’ BST

GR

GR

18" C

ONC

48" C

HL

50" W

D

50" W

D

48" W

W

60" CHL

28

15" C

ONC

15" C

ONC

63

65

12" C

ONC

12" C

ONC

15" C

ONC

72"

WD

66

69

68

71

72

60" CHL

12" C

ONC

336

48" CONC

S

GR

CO

NC

18"

345

18" C

ONC

18" C

ONC

343

14

13

48" CHL

48" PLASTIC

RAIL

LT

vv

v v

v

v

v v

v

v

v

v

v

v

v

v

HTR

W/LT

1SBKD

W/LT

FLAGPOLE

CONC

G

G

G

CONC

1SFD

S

S

G

SS

S

1SFD

CONC

S

S

1SFBUS

1SFD

1SFD

W/LT

GR

GR

S

CONC

S

S

POOL

DK

WD

1SFD

GR

FOUND

1SFD

S

B

W/LT

S

S

G

1SFD

S

16’ BST

BST

1SFD

G

CONC

1SFD

W/LTW/LT

1SFD

GR

GR

GR

GR

S

1SFBUS

1SFD

G

S

LT

GR

GR

GR

S

(ABAND)

1SFD

GR

1SFD

LT

GR

S

2SFD

1SF

MT

L

MARKERS

CEMETERY

POSSIBLE GRAVE

GR

LT

CONC

1SFD

GR

GR

GR

BST

GR

GR

GR

z

z

X

X

X

X

X

X

X

X

XXX O

X

X

X X X

X

X

X

X X

X

X XX

X

X

OX

X

XX

X

X

X X

X

X

X

S

15" CONC

GR

P

XX

XX

XX

X XX

X X X X X

XX X X

XX XX

XX X X

XXXX

XX

XX

XXX X

X

X XX

XX

B

G

G

S

S

S

shawnharris
Text Box
PERMIT DRAWINGS SHEET 21 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 3: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

GRAPHIC SCALE

0’ 100’100’

DENOTES FILL INWETLANDF F

S SSURFACE WATERDENOTES IMPACTS IN

TS TSIMPACTS IN SURFACE WATERDENOTES TEMPORARY

E E IN WETLANDDENOTES EXCAVATION

CLEARINGDENOTES MECHANIZED*

**

*

***

***

*

SITE 5A

SITE 5B

SITE 6A

SITE 7

SITE 6

SITE 5

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

7U-2525B

TS

S

SEE SHEET 24 -Y4- STA. 16+

00.00MATCHLINE

+96.59 -L-

+00.00 -Y4RPC-

+14.16 -Y4RPB-

+62.76 -Y4RPB-

150.00’

90.00’

+15.00 -Y4-

50.00’

90.00’

+50.00 -Y4RPB-

90.00’

90.00’

50.00’+75.00 -Y4-

+80.00 -Y4-

105.00’50.00’

+20.00 -Y4-

105.00’50.00’

90.00’

CHORD

END C/A FENCE

@ EXIST. R/W

RETAIN EXIST. R/W

+15.00 -Y4RPB-

292.00’

+14.16-Y4RPB-

+90.00 -Y4RPB-139.00’

90.00’

CHORD

+00.00 -Y4-

105.00’

+18.00 -Y4RPB-

90.00’

4

4

7

13

12

-Y4RPB-

L = 4,420.01’

T = 2,326.53’

R = 5,730.00’

SE = .04

L = 928.21’

T = 466.43’

R = 3,800.00’

SE = 02

-Y4- PTSta. 21+99.38

70+00

75+0080+00

20+00

25+00

-Y4RPC-

SE = .08

SE = .08 SE = .06

SE = .06

-Y4RPB-

-L- POCSta. 66+96.59 47.00’ RT.

-Y4RPC- ST Sta. 10+00.00 =

-Y4RPC- SC Sta. 12+00.00

15+00

-Y4RPA- PT Sta. 25+35.26

-Y4RPB- CS Sta. 19+04.16

-Y4RPB- SRS Sta. 21+14.16

-Y4RPB- SC Sta. 23+14.16-Y4RPB- PT Sta. 24+62.76

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

PI Sta 15+64.37

D

L = 694.16’

T = 354.37’

R = 1,400.00’

PIs Sta 19+74.20

F

Ls = 210.00’

LT = 140.04’

ST = 70.04’

PIs Sta 22+47.60

F

Ls = 200.00’

LT = 133.44’

ST = 66.77’

PI Sta 23+88.67

D

L = 148.60’

T = 74.51’

R = 800.00’

T = 362.22’

R = 1,400.00’

ST = 70.04’ ST = 66.77’ T = 103.76’

R = 800.00’

-Y4RPA- POT Sta. 27+25.26

-Y4- POC Sta. 20+04.60 =

-Y4- POC Sta. 20+04.80 =

-Y4RPB- POT Sta. 26+52.76

25+00

20+0

0

15+00

-Y4-

C C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

CC C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

CC

CC

CC

C F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

C

F

2GIFS

2GI2GI

2GI

15" C

SP

15" CSP 2GI

0.08 Acp

DA

REMOVE

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1

20:1Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 14+98 -Y4RPB- (LT)

@ STA. 72+48 -L- (LT)

B

Natural Natural

Ground Ground3:13:1 D

( Not to Scale)

DETAIL H

FROM STA. 74+28 TO STA. 79+12 -L- (LT)

STANDARD 2’ BASE DITCH

B= 2.0 Ft.

Min. D= 2.5 Ft.

SEE DETAIL "H"STANDARD 2’ BASE DITCH

DETAIL Q

2GI

2GIFS

FS

2GI

FS

2GI

2GI

FS 2GI

W/ ELB

OWSRO

D AND

LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 23+05 -Y4- (RT.)BEGIN SBG @

STA. 26+50 -Y4- (RT.)END SBG @

W/ ELBOWSROD AND LUG

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

REMOVE

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

15" CSP

SEE DETAIL "VV"CLASS "B" RIP RAP

PSH

SEE DETAIL SHEET 2-L

PSH

SEE DETAIL SHEET 2-L

SHEETS 6 - 7SEE ON-SITE MITIGATION PLANS

BEG. APP. SLABEND SBG

BEG. APP. SLABEND SBG

END APP. SLABBEGIN SBG

END APP. SLABBEGIN SBG

18"

RCP-III

15" RC

P-III

24" RC

P-III

18" RCP-III

18" RCP-III

42" RC

P-IV

42" RC

P-IV

15" RCP-IV

18" R

CP-V

18" R

CP-V

15" RCP-IV

15" RC

P-IV

15"

15"

24"

24"

24"

HW

HW

48" R

CP-IV

DI

DI

STA. 2

0+15

-Y4RPB

- (LT.)

END

SBG @

STA. 16+95 -Y4- (RT.)BEGIN SBG @

PERMANENT INSTALLATION

ROCK PIPE INLET SEDIMENT TRAP TYPE ’A’

SEE DETAIL "C"CLASS"B" RIPRAPTOE PROTECTION

42 SQYDS FILTER FAB.EST. 97 TONS

Fill

Slope

( Not to Scale)TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 21+08 TO STA. 24+33 -L- (RT)

S

36" CMP

36" C

MP

INV= 749.87

INV= 749.88

INV= 755.72

INV= 754.76

& MARTHA ANDERSON

STEPHEN J. ANDERSON

CITY OF GREENSBORO

Loyd A. Whitesell

CITY OF GREENSBORO

COBLE LIVING TRUST

36" CMP

36" C

MP

26

27

GR

GR

18" C

ONC

60" CHL

28

336

48" CONC

14

13

HTR

W/LT

1SBKD

W/LT

FLAGPOLE

CONC

G

G

G

CONC

1SFD

S

S

G

B

W/LT

16’ BST

W/LT

S

GR

z

shawnharris
Text Box
PERMIT DRAWINGS SHEET 22 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 4: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

750 750

760 760

770 770

780 780

790 790

740 740

20+50.00

750 750

760 760

770 770

780 780

790 790

740 740

21+00.00

X-223U-2525B

-Y4-

5 10

E 1793913.9

788

N 857556.8

010

755.63

0.020 0.020

4:1

4:1

752.95

0.020 0.020

4:1

4:1

WLB

WLB

SITE 6

shawnharris
Text Box
PERMIT DRAWINGS SHEET 23 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 5: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

750 750

760 760

770 770

780 780

790 790

740 740

21+50.00

760 760

770 770

780 780

790 790

750 75022+00.00

760 760

770 770

780 780

790 790

750 75022+50.00

X-224U-2525B

-Y4-

5 10

E 1794005.7

757

N 857596.4

590

21+50.0000 / 1

752.74

0.020 0.020

4:1 4:1

WLB

WLB

SITE 6

E 1794051.2

748

N 857617.1

904

Y422+00.0000 / 1

754.80

0.020 0.013

4:14:1

WLB

WLB

SITE 6

E 1794096.6

403

N 857638.2

135

Y422+50.0000 / 1

759.04

0.020 0.005

4:13:1

WLB

WLB

SITE 6

shawnharris
Text Box
PERMIT DRAWINGS SHEET 24 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 6: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

760 760

770 770

780 780

790 790

800 800

750 750

26+00.00

770 770

780 780

790 790

800 800

760 76026+50.00

770 770

780 780

790 790

800 800

760 76027+00.00

X-227U-2525B

-Y4-

5 10

E 1794414.1

991

N 857785.3

748

26+00.0000 / 1

765.733:1

EL.=762.78’

0.020 0.020

2:1

4:1

3:1

764.94

3:1

EL.=763.80’

0.020 0.020

3:1

4:1

3:1

WLB

WLB

SITE 7

765.53

3:1

EL.=764.83’

0.020 0.020

4:1 4:1

3:1

WLB

WLB

SITE 7

shawnharris
Text Box
PERMIT DRAWINGS SHEET 25 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 7: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

770 770

780 780

790 790

800 800

760 76027+50.00

770 770

780 780

790 790

800 800

760 76028+00.00

770 770

780 780

790 790

800 800

760 760

28+50.00

X-228U-2525B

-Y4-

5 10

766.51

0.020 0.020

4:14:1

WLB

WLB

SITE 7

766.90

0.020 0.020

4:1 4:1

WLB

SITE 7 WLB

769.45

0.020 0.020

4:14:1

WLB

WLB

shawnharris
Text Box
PERMIT DRAWINGS SHEET 26 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 8: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

770 770

780 780

790 790

800 800

760 760

29+00.00

780 780

790 790

800 800

770 77029+50.00

780 780

790 790

800 800

770 77030+00.00

X-229U-2525B

-Y4-

5 10

771.13

0.020 0.020SP -Y4RPC-SP -Y4RPD-

773.36

0.020 0.020SP -Y4RPD-

4:1

WLB

WLB

SITE 7

775.69

0.020 0.020

4:14:1

shawnharris
Text Box
PERMIT DRAWINGS SHEET 27 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 9: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

WETLANDDENOTES FILL IN

F F

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

S S SURFACE WATER

DENOTES IMPACTS IN

TS TS IMPACTS IN SURFACE WATER

DENOTES TEMPORARY

GRAPHIC SCALE

0’ 100’100’

SITE 8

SITE 9

SITE 9A

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 94+

00.0

0 SEE S

HEET 7

MA

TC

HLIN

E -L- STA. 10

7+

00.0

0 SEE S

HEET 9

SEE SHEET 43 FOR -L- PROFILESEE SHEET 56 FOR -Y4RPA- PROFILESEE SHEET 59 FOR -Y4RPD- PROFILE

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99 SHEET NO.PROJECT REFERENCE NO.

8U-2525B

CHORD

CHORDCHORD

CHORD

300’ PR

OP.

R/W

300’ PR

OP.

R/W

25

18

26

26

26

25

SE = .04

-L- -Y4RPA-

PI Sta 79+71.67

D

L = 4,420.01’

T = 2,326.53’

R = 5,730.00’

LT = 133.34’

PIs Sta 101+31.82

F

Ls = 200.00’

ST = 66.67’

-Y4RPD-

SE = 07

95+00

100+00

-L- CS STA. 100+65.15 -L- ST STA. 102+65.15

105+00

-L-

SE = .08

-L- POC Sta. 95+78.58 47.00’ RT.

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

R = 1,800.00’

-Y4RPD- CS Sta. 10+00.00 =

-Y4RPA-

-Y4RPD-

-Y4RPA- CS Sta. 10+00.00 =

-Y4RPA- SC Sta. 12+10.00

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

-L- POC Sta. 96+88.35 47.00’ LT.

NAD 83/ 95

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

2GI FS 2GI FS

2GI

2GI

2GI

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

@ STA. 95+52 -L- (MED)

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 99+02 -L- (MED)@ STA. 102+02 -L- (MED)

DETAIL P

2GIFS

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

42" RC

P-III

42" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

15" 15" 15"

15"

15"

HW

NC PRISON DEPT.

68’

DU

KE P

OW

ER

EAS

EM

EN

T

Charles C. Drye Sr.

NC PRISON DEPT.

NC PRISON DEPT.NC PRISON DEPT.

N03°36’12"E2110.89’

OF TRANSPORTATION

NORTH CAROLINA DEPARTMENT

STONE

MON.CONC.

EIP

583.7

3’

188.5

4’

640.4

4’

381.83’

115.4

6’

358.02’

210.75’

167.7

4’

ALBERT L. RHEW LIVING TRUST

OF TRANSPORTATION

NORTH CAROLINA DEPARTMENT

z

z

WE 746.7’

POND

X X

X

X

XX

X

X

X X

X

X

SSS

S

XX

X

X

XXX

XX

X

X

T

XX

X

Revised 10/15/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 28 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 10: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

WETLANDDENOTES FILL IN

F F

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

S S SURFACE WATER

DENOTES IMPACTS IN

TS TS IMPACTS IN SURFACE WATER

DENOTES TEMPORARY

GRAPHIC SCALE

0’ 100’100’

SITE 8

SITE 9

SITE 9A

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 94+

00.0

0 SEE S

HEET 7

MA

TC

HLIN

E -L- STA. 10

7+

00.0

0 SEE S

HEET 9

SEE SHEET 43 FOR -L- PROFILESEE SHEET 56 FOR -Y4RPA- PROFILESEE SHEET 59 FOR -Y4RPD- PROFILE

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99 SHEET NO.PROJECT REFERENCE NO.

8U-2525B

CHORD

CHORDCHORD

CHORD

300’ PR

OP.

R/W

300’ PR

OP.

R/W

25

18

26

26

26

25

SE = .04

-L- -Y4RPA-

PI Sta 79+71.67

D

L = 4,420.01’

T = 2,326.53’

R = 5,730.00’

LT = 133.34’

PIs Sta 101+31.82

F

Ls = 200.00’

ST = 66.67’

-Y4RPD-

SE = 07

95+00

100+00

-L- CS STA. 100+65.15 -L- ST STA. 102+65.15

105+00

-L-

SE = .08

-L- POC Sta. 95+78.58 47.00’ RT.

LT = 133.35’

PIs Sta 11+33.35

F

Ls = 200.00’

ST = 66.69’

PI Sta 14+41.55

D

L = 480.22’

T = 241.55’

R = 1,800.00’

-Y4RPD- CS Sta. 10+00.00 =

-Y4RPA-

-Y4RPD-

-Y4RPA- CS Sta. 10+00.00 =

-Y4RPA- SC Sta. 12+10.00

PI Sta 15+72.22

D

L = 708.89’

T = 362.22’

R = 1,400.00’

PIs Sta 11+26.24

F

F

Ls = 210.00’

LT = 126.24’

ST = 83.90’

-L- POC Sta. 96+88.35 47.00’ LT.

NAD 83/ 95

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

2GI FS 2GI FS

2GI

2GI

2GI

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

@ STA. 95+52 -L- (MED)

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 99+02 -L- (MED)@ STA. 102+02 -L- (MED)

DETAIL P

2GIFS

EST. 37 SY FABRICEST. 15 TONSW/ FILTER FABRICCLASS "B" RIP RAP

42" RC

P-III

42" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

15" 15" 15"

15"

15"

HW

NC PRISON DEPT.

68’

DU

KE P

OW

ER

EAS

EM

EN

T

Charles C. Drye Sr.

NC PRISON DEPT.

NC PRISON DEPT.NC PRISON DEPT.

N03°36’12"E2110.89’

OF TRANSPORTATION

NORTH CAROLINA DEPARTMENT

STONE

MON.CONC.

EIP

583.7

3’

188.5

4’

640.4

4’

381.83’

115.4

6’

358.02’

210.75’

167.7

4’

ALBERT L. RHEW LIVING TRUST

OF TRANSPORTATION

NORTH CAROLINA DEPARTMENT

z

z

WE 746.7’

POND

X X

X

X

XX

X

X

X X

X

X

SSS

S

XX

X

X

XXX

XX

X

X

T

XX

X

723

724 725725

725

726

726

727

727

728

728

729

729

729

730

730

730

730

730

730

730

730

731

731

731

731

731

731

731

732

732

732

732

732

732

733

733

733

733

733

733

733

733

733

734

734

734

734

734

734

734

734

734

735

735

735

735

735

735

735

735

735

735

735

735

735

736

736

736

736

736

736

736

737

737

737

737

737

737

737

737

737

738

738

738

738

738

738

738

738

738

739

739

739

739

739

739

739

739

740740

740

740

740

740

740

740

740

740

740

740

740

740

741

741

741

741

741

741

741

741

742

742

742

742

742

742

742

743

743

743

743

743

743

743

743

744

744

744

744

744

744

744

744

745

745

745

745

745

745

745745

745

745

745

745

745

745

745

746

746

746

746746

746

746

746

746

747

747

747

747747

747

747

747

747

747747

747

748

748

748

748

748

748

748

748

748

748

748

748

748

748

749749

749

749

749

749

749

749

749

749

749

749

749

749

750750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

751

751

751

751

751

751

751

751

751

751

751

752

752

752

752

752

752

752

752

752

752

752

753

753

753

753

753

753753

753

753

753

753

753

754

754

754

754

754

754

754

754

754

754

754

754

754

755755

755

755

755

755

75575

5

755

755

755755755755

755

755

755

755

755

755

755

755

755

756

756

756

756

756

756

756

756

756

756

756

756

756

757

757

757

757

757

757

757

757

757

757

757

757

757

757

757

758

758

758

758

758

758

758

758

758

758

758

758

758

759

759

759

759

759

759

759

759

759

759

759

760

760

760

760

760760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

761

761

761

761

761

761

761

761

761

7617

62

762

762

762

762

762

762

762

762

762

763

763

763

763

763

763

763

763

763

763

764764

764

764

764

764

764

765

765

765

765

765

765

765

765

765

765

7657

66

766

766

766

767

767

767

768

768

769

7697

69

770

770

770

770

770

771

771

772

77277

3

Revised10/15/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 29 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 11: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

760 760

770 770

780 780

93+50.00

760 760

770 770

780 780

94+00.00

760 760

770 770

94+50.00

760 760

770 770

95+00.00

760 760

770 770

95+50.00

X-72U-2525B

-L-

5 10

761.91

0.0400.040

D.P. 766.001

5.835:1 6:10.078 0.078

0.009 0.010

- Y4RPD -

OFF 57.29STA 12+30.93- Y4RPA -

OFF -62.33STA 13+35.95

4:1

4:1WLB

SITE 8WLB

760.47

0.0400.040

D.P. 765.129

5.835:1 6:10.078 0.078

0.008 0.008

- Y4RPD -

OFF 52.52STA 11+80.22- Y4RPA -

OFF -56.82STA 12+86.16

4:1

4:1WLB

SITE 8WLB

758.99

0.0400.040

D.P. 764.176

5.835:1 6:10.079 0.079

0.025

- Y4RPD -

OFF 49.46STA 11+29.68- Y4RPA -

OFF -52.64STA 12+36.46

4:1

4:1

757.47

0.0400.040

D.P. 763.140

5.835:1 6:10.071 0.0700.041

- Y4RPD -

OFF 47.77STA 10+79.23- Y4RPA -

OFF -49.79STA 11+86.82

4:1

4:1

757.72

0.0400.040

D.P. 762.022

5.835:1 6:10.052

0.040

- Y4RPD -

OFF 47.08STA 10+28.81

- Y4RPA -STA 11+37.2159

OFF -48.10

4:1

4:1

Revised 10/15/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 30 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 12: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

750 750

99+00.00

750 750

99+50.00

740 740

750 750

100+00.00

740 740

750 750

100+50.00

740 740

750 750

101+00.00

740 740

750 750

101+50.00

740 740

102+00.00

X-74U-2525B

-L-

5 10

746.65

0.040 0.040 3.19:1

S.S. 747.061

0.040 0.040

D.P. 752.549

5.835:1 6:1

4:1

744.98

0.040 0.040 3.89:1

S.S. 747.144

0.040 0.040

D.P. 751.142

5.835:1 6:1

4:1

742.77

0.040 0.0400.040 0.040

D.P. 749.736

5.835:1 6:14:1

4:1

DWLB SITE 9

741.04

0.040 0.0400.040 0.040

D.P. 748.330

5.835:1 6:14:1

4:1

741.48

0.033 0.033 0.033 0.033

D.P. 746.952

5.892:1 6:1 4:1

4:1

740.38

0.023 0.023

3.38:1

0.023 0.023

D.P. 745.585

5.974:1 6:1 4:1

739.83

0.020 0.020

2.96:1

0.013 0.013

D.P. 744.191

6:1 6:1 4:1

Revised 10/15/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 31 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 13: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

WETLANDDENOTES FILL IN

F F

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

S S SURFACE WATER

DENOTES IMPACTS IN

E E IN WETLANDDENOTES EXCAVATION

TS TS IMPACTS IN SURFACE WATER

DENOTES TEMPORARY

GRAPHIC SCALE

0’ 100’100’

SITE 10

SITE 10A

SITE 10BSITE 10C

SITE 9A F

EXCAVATION

F

EXCAVATION

+95.00 -L-150.00’170.00’

300’ PR

OP.

R/W

300’ PR

OP.

R/W

26

+10.00 -L-

170.00’150.00’

+60.00 -L-

170.00’150.00’

+25.00 -L-

150.00’170.00’

27

27

150.00’

170.00’

170.00’

150.00’

150.00’

150.00’170.00’

170.00’

+69.00 -L-

+58.00 -L-

+82.00 -L-

+93.00 -L-

+39.00 -L-

+51.00 -L- +63.00 -L-

+74.00 -L-

110+00115+00

-L-

NAD 83/ 95

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

C

F

C

F

C

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

FS2GI FS

2GI

2GI

2GI

( Not to Scale)

RIP RAP AT EMBANKMENT

GradeDitch

DETAIL D

Est. ? Tons

1’5’

1.5’

Type of Liner= CLASS "B" Rip-Rap

AT STA. 113+70 -L- (LT)

FS

FS2GI

FS

2GIFS

AT STA. 113+95 -L- (LT)

Natural

Ground3:1 3:

1

b

Fill Slope

dD

B

( Not to Scale)

Fabric

Filter

Std. No. 876.01

*When B is > 6.0’-

Type of Liner= CLASS "B" Rip-Rap

b= VAR. Ft.

B= 5.0 Ft.

Max. d= 1.0 Ft.

Min. D= 1.5 Ft.

FROM STA. 112+50 TO STA. 113+65 -L- (LT)

LATERAL 5’ BASE DITCH

LATERAL 5’ BASE DITCH

SlopeFill

b

1"/Ft.3:1 3:

1D

B

( Not to Scale)

Std. No. 876.01

*When B is > 6.0’

Natural

Ground

Type of Liner= GRASS

DETAIL EE

DETAIL E

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 107+02 -L- (MED)

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 112+02 -L- (LT)

@ STA. 113+52 -L- (RT)

@ STA. 112+02 -L- (MED)

b= 5.0 Ft.

B= 5.0 Ft.

Min. D= 1.0 Ft.

Est. 11 TonsEst. 11 Tons

LATERAL 5’ BASE DITCH

DETAIL P DETAIL Q

STA. 113+50 -L- (LT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 116+27 -L- (RT.)END SBG @

STA. 116+27 -L- (LT.)END SBG @

EST. 10 SY FABRIC

EST. 3 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

SEE DETAIL "EE"

SEE DETAIL "D"

CLASS "B" CLASS "B"SEE DETAIL "D"

STA. 114+00 -L- (RT.)BEGIN SBG @

EST. 7 SY FABRIC

EST. 2 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

DETAIL R

@ STA. 107+02 -L- (LT)

@ STA. 107+02 -L- (RT)

.02"/Ft.

2GI

EST. 10 SY FABRIC

EST. 3 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

LATERAL ’V’ DITCHSEE DETAIL BC

LATERAL ’V’ DITCH( Not to Scale)

Natural

GroundD

2:1 2:1

bFill

Slope0.02 Ft./Ft.

b= 5.0 Ft.

Min. D= 1.5 Ft.

DETAIL BC

FROM STA. 115+39 TO STA. 116+50 -L- (RT)

15" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

15" C

SP

15" RC

P-III

15" RC

P-III

18"

18" 18"

15" 15"

FROM STA. 115+50 TO STA. 116+23 -L- (LT)

159 SQYDS FILTER FAB.Est. 96 Tons

FROM STA. 113+95 TO STA. 115+50 -L- (LT)

24"

EST. 12 SY FABRIC

EST. 4 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

LATERAL 5’ BASE DITCH

SEE DETAIL EE

LATERAL 5’ BASE DITCH

SEE DETAIL E

CROSS VANE

CLASS "I" RIPRAP

CLASS "I" RIPRAP

N03°36’12"E

2110.89’

City Of Greensboro

S07°43’30"

E

2414.

00’

NC PRISON DEPT.

City Of Greensboro

MA

TC

HLIN

E -L- STA. 11

9+

00.0

0 SEE S

HEET 10

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 10

7+

00.0

0 SEE S

HEET 8

SEE SHEET 43 FOR -L- PROFILESEE SHEETS C-1 THRU C-?? FOR CULVERT PLANS

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99 SHEET NO.PROJECT REFERENCE NO.

9U-2525B

RE

VISIO

NS

6-24-13

R/

W

RE

VISIO

N (D

WG) -

AD

DE

D

PU

E

AT -

L-

ST

A. 114

+75.0

0

LT. A

ND -

L-

ST

A. 116

+57.0

0

RT. O

N P

AR

CE

L 27 (CIT

Y

OF

GR

EE

NS

BO

RO).

{

{

XXX

XX

XX X X XX

XX

XX

X

XX

TRevised 9/24/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 32 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 14: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

WETLANDDENOTES FILL IN

F F

CLEARINGDENOTES MECHANIZED*

**

*

**

*

**

*

*

S S SURFACE WATER

DENOTES IMPACTS IN

E E IN WETLANDDENOTES EXCAVATION

TS TS IMPACTS IN SURFACE WATER

DENOTES TEMPORARY

GRAPHIC SCALE

0’ 100’100’

SITE 10

SITE 10A

SITE 10BSITE 10C

SITE 9A F

EXCAVATION

F

EXCAVATION

+95.00 -L-150.00’170.00’

300’ PR

OP.

R/W

300’ PR

OP.

R/W

26

+10.00 -L-

170.00’150.00’

+60.00 -L-

170.00’150.00’

+25.00 -L-

150.00’170.00’

27

27

150.00’

170.00’

170.00’

150.00’

150.00’

150.00’170.00’

170.00’

+69.00 -L-

+58.00 -L-

+82.00 -L-

+93.00 -L-

+39.00 -L-

+51.00 -L- +63.00 -L-

+74.00 -L-

110+00115+00

-L-

NAD 83/ 95

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

C

F

C

F

C

F

F

F

F

F

F

F

F

F

C

F

C

C

C

C

C

C

C

C

C

C

FS2GI FS

2GI

2GI

2GI

( Not to Scale)

RIP RAP AT EMBANKMENT

GradeDitch

DETAIL D

Est. ? Tons

1’5’

1.5’

Type of Liner= CLASS "B" Rip-Rap

AT STA. 113+70 -L- (LT)

FS

FS2GI

FS

2GIFS

AT STA. 113+95 -L- (LT)

Natural

Ground3:1 3:

1

b

Fill Slope

dD

B

( Not to Scale)

Fabric

Filter

Std. No. 876.01

*When B is > 6.0’-

Type of Liner= CLASS "B" Rip-Rap

b= VAR. Ft.

B= 5.0 Ft.

Max. d= 1.0 Ft.

Min. D= 1.5 Ft.

FROM STA. 112+50 TO STA. 113+65 -L- (LT)

LATERAL 5’ BASE DITCH

LATERAL 5’ BASE DITCH

SlopeFill

b

1"/Ft.3:1 3:

1D

B

( Not to Scale)

Std. No. 876.01

*When B is > 6.0’

Natural

Ground

Type of Liner= GRASS

DETAIL EE

DETAIL E

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 107+02 -L- (MED)

C Proposed DitchL

S etc.

GI

Outside Ditch

10:1 20:1

Traffic Flow

0.5’

Min.

( Not to Scale)

FALSE SUMP

1.0’

Max.

2.0’

S = Ditch Slope

@ STA. 112+02 -L- (LT)

@ STA. 113+52 -L- (RT)

@ STA. 112+02 -L- (MED)

b= 5.0 Ft.

B= 5.0 Ft.

Min. D= 1.0 Ft.

Est. 11 TonsEst. 11 Tons

LATERAL 5’ BASE DITCH

DETAIL P DETAIL Q

STA. 113+50 -L- (LT.)BEGIN SBG @

W/ ELBOWSROD AND LUG

STA. 116+27 -L- (RT.)END SBG @

STA. 116+27 -L- (LT.)END SBG @

EST. 10 SY FABRIC

EST. 3 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

SEE DETAIL "EE"

SEE DETAIL "D"

CLASS "B" CLASS "B"SEE DETAIL "D"

STA. 114+00 -L- (RT.)BEGIN SBG @

EST. 7 SY FABRIC

EST. 2 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

20:1

10:1Traffic Flow

Outside Ditch

0.5’

Min.

GI

etc.

C Proposed DitchLS=Ditch Slope

S

( Not to Scale)

FALSE SUMP

2’

1.0’

Max.

DETAIL R

@ STA. 107+02 -L- (LT)

@ STA. 107+02 -L- (RT)

.02"/Ft.

2GI

EST. 10 SY FABRIC

EST. 3 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

LATERAL ’V’ DITCHSEE DETAIL BC

LATERAL ’V’ DITCH( Not to Scale)

Natural

GroundD

2:1 2:1

bFill

Slope0.02 Ft./Ft.

b= 5.0 Ft.

Min. D= 1.5 Ft.

DETAIL BC

FROM STA. 115+39 TO STA. 116+50 -L- (RT)

15" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

15" C

SP

15" RC

P-III

15" RC

P-III

18"

18" 18"

15" 15"

FROM STA. 115+50 TO STA. 116+23 -L- (LT)

159 SQYDS FILTER FAB.Est. 96 Tons

FROM STA. 113+95 TO STA. 115+50 -L- (LT)

24"

EST. 12 SY FABRIC

EST. 4 TONS

W/ FILTER FABRIC

CLASS "B" RIP RAP

LATERAL 5’ BASE DITCH

SEE DETAIL EE

LATERAL 5’ BASE DITCH

SEE DETAIL E

CROSS VANE

CLASS "I" RIPRAP

CLASS "I" RIPRAP

N03°36’12"E

2110.89’

City Of Greensboro

S07°43’30"

E

2414.

00’

NC PRISON DEPT.

City Of Greensboro

MA

TC

HLIN

E -L- STA. 11

9+

00.0

0 SEE S

HEET 10

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 10

7+

00.0

0 SEE S

HEET 8

SEE SHEET 43 FOR -L- PROFILESEE SHEETS C-1 THRU C-?? FOR CULVERT PLANS

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99 SHEET NO.PROJECT REFERENCE NO.

9U-2525B

RE

VISIO

NS

6-24-13

R/

W

RE

VISIO

N (D

WG) -

AD

DE

D

PU

E

AT -

L-

ST

A. 114

+75.0

0

LT. A

ND -

L-

ST

A. 116

+57.0

0

RT. O

N P

AR

CE

L 27 (CIT

Y

OF

GR

EE

NS

BO

RO).

696

697

697

698

698

698

698

698

699

699

699

699

699

699

699

699

699

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

700

701

701

701

701

701

701

701

701

701

701

701

702

702

702

702

702

702

702

702

702

702

702

702

702

702

702

702

703

703

703

703

703

703

703

703

703

703

703

703

703

703

703

703

704

704

704

704

704

704

704

704

704

704

704

704

704

704

704

704

704

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

706

706

706

706

706

706

706

706

706

706

706

706

706

706

706

706

707

707

707

707

707

707

707

707

707

707

707

707

708

708

708

708

708

708

708

708

708

708

708

708

708

708

708

709

709

709

709

709

709

709

709

709

709

709

709

709

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

711

711

711

711

711

711

711

711

711

711

711

711

711

712

712

712

712

712

712

712

712

712

712

712

712

712

713

713

713

713

713

713

713

713

713

713

713

71371

3

714

714

714

714

714

714

714

714

714

714

714

714

714

714

714

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

716

716

716

716

716

716

716

716

716

716

716

716

716

716

717

717

717

717

717

717

717

717

717

717

717

717

717

718

718

718

718

718

718

718

718

718

718

718

718

719

719

719

719

719

719

719

719

719

719

719

719

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720720

720

720

720

720

720

721

721

721

721

721

721

721

721

721

721721

721

721

722

722

722

722

722

722

722

722

722

722

722

722

722

722

723

723

723

723

723

723

723

723

723

723

723

723

723

724

724

724

724

724

724

724

724

724

724

724

724

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

725

726

726

726

726

726

726

726

726

726

726

726

727

727

727

727

727

727

727

727

727

727

727

727

728

728

728

728

728

728

728

728

728

728

728

729

729

729

729

729

729

729

729

729

729

729

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

731

731

731

731

731

731

731

731

731

731

731

732

732

732

732

732

732

732

732

732

732

732

733

733

733

733

733

733

733

733

733

733

734

734

734

734

734

734

734

734

735

735

735

735

735

735

735

735

735

735

735

735

735

735

736

736

736

736

736

736

736

737

737

737

737

737

737

737

738

738

738

738

738

738

739

739

739

739

739

739

739

740

740

740

740

740

740

740

740

740

740

740

741

741

741

741

741

741

742

742

742

742

742

742

742

743

743

743

743

743

743

744

744

744

744

744

745

745

745

745

745

745

745

746

746

746

746

747

747

747

747

748

748

748

748

749

749

749

749

750

750

750

750

750

750

750

750

750

751

751

751

751

751

751

752

752

752

752

753

753

753

754

754

754

755

755

755

755

755

756

756

757

757

758

758

759

759

760

760

760

760

761

761

762

762

763

764

765

765

766

767

7687

69

770

{

{

XXX

XX

XX X X XX

XX

XX

X

XX

TRevised 9/24/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 33 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 15: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

720

710

700

690

720

710

700

690

2 @ 7’ x 8’ RCBC (1’ BURY)

C STA. 114+55.00 -L-L

SKEW = 55 DEGREES

100-YR. WSE50-YR. WSE

GRADE POINT ELEV. = 715.20

(N

OR

MAL)

2.0

4:1 (N

OR

MAL)

2.76:1

GRADE POINT

GRADE POINT

CHANNEL BED

NWS

TOP OF BANK

TOP SLAB

CHANNEL BED

0.8%

C ELEV. = 698.0L

TOP OF BANK

0’50’ LT.150’ LT. 50’ RT. 150’ RT.

PROFILEDIVISION OF HIGHWAYS

SHEET OF

GUILFORD COUNTY

PROJECT: 34821.1.1 (U-2525B)

OF GREENSBORO RELOCATION TO US 29 NORTH

FROM NORTH OF US 70GREENSBORO EASTERN LOOP

NCDOT

03/08/13

shawnharris
Text Box
PERMIT DRAWINGS SHEET 34 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 16: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150150

150150

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

680 680

690 690

700 700

710 710

720 720

730 730

740 740

750 750

116+50.00

710 710

117+00.00

710 710

720 720

117+50.00

X-83U-2525B

-L-

5 10

707.35

0.0206:1

2.12:1

S.S. 713.00

5.95:1

S.S. 705.36

0.0206:1 6:1

EL.=703.70

2:12:1

WLB

WLB

SITE 10

713.840.0206:1 6:1

S.S. 709.760.0206:1 6:1

6:1

2:1

718.06

0.0206:1

2:1

S.S. 722.59

6:1

2:1

S.S. 714.83

0.0206:1 6:1

shawnharris
Text Box
PERMIT DRAWINGS SHEET 35 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 17: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

SITE 11

WETLANDDENOTES FILL IN

F F

S S SURFACE WATER

DENOTES IMPACTS IN

GRAPHIC SCALE

0’ 100’100’

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 11

9+

00.0

0 SEE S

HEET 9

MA

TC

HLIN

E -L- STA. 13

2+

00.0

0 SEE S

HEET 11

SEE SHEET 44 FOR -L- PROFILESEE SHEET 61 FOR -Y7- PROFILE

SEE SHEET 2-M FOR BRIDGE SKETCH

NOTE: SEE CROSS-SECTIONS AND ROADWAY STANDARD DRAWINGS,STD. NO. 865.01, SHEET 2 FOR SPECIAL MEDIAN GRADING.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99

SHEET NO.PROJECT REFERENCE NO.

10U-2525B

SEE SHEETS S-1 THRU S-?? FOR STRUCTURE PLANS

RE

VISIO

NS

WE

ST

ER

N P

ROP

ER

TY LIN

E

ON P

AR

CE

L 29

B (N

CD

OT).

(NC P

RIS

ON

DE

PT.), 2

9 (J

AM

ES

L. G

OO

DWIN), A

ND 29

A (N

CD

OT

FO

RM

ER

LY B

ET

TY JE

AN

GO

OD

WIN). R

EVIS

ED

TH

E

LO

CA

TIO

N

OF

TH

E

R/

W

AN

D

C/

A

TO

TH

E

RE

VIS

ED

TH

E

NO

RT

HE

RN P

ROP

ER

TY LIN

E

ON P

AR

CE

L 27 (CIT

Y

OF

GR

EE

NS

BO

RO)

AN

D

TH

E

ADJ

OININ

G S

OU

TH

ER

N P

ROP

ER

TY LIN

ES

ON P

AR

CE

LS 26

PA

RC

EL 29

B

TO

R/

W.

DE

LE

TE

D

PA

RC

EL 28 (D

UK

E

PO

WE

R

CO

MP

AN

Y)

DU

E

TO P

ROP

ER

TY LIN

E

DE

LIN

EA

TIO

N

CH

AN

GIN

G

TO

EAS

EM

EN

T.

29

B (N

CD

OT), A

ND

PA

RC

EL 29

C (MIC

HA

EL

A. F

OW

LE

R). C

HA

NG

ED

TH

E

NO

RT

HE

RN P

ROP

ER

TY LIN

E

ON P

AR

CE

L 29

A

AN

D

TH

E

SO

UT

HE

RN P

ROP

ER

TY LIN

E

ON

03-19-13

R/

W

RE

VISIO

N (D

WG) -

PA

RC

EL 29 (J

AM

ES

L. G

OO

DWIN)

WAS

SU

BDIVID

ED, A

DDIN

G P

AR

CE

L 29

A (N

CD

OT

FO

RM

ER

LY B

ET

TY JE

AN

GO

OD

WIN), P

AR

CE

L

2GIFS

FS

2GI

2GI

15" C

SP

2GI

2GI

2GI

FS

2GI

15" C

SP

15" C

SP

2GI

2GI

( Not to Scale)

RIP RAP AT EMBANKMENT

GradeDitch

DETAIL D

1’5’

1.5’

Type of Liner= CLASS "B" Rip-Rap

SEE DETAIL "C"

SEE DETAIL "F"LATERAL 2’ BASE DITCH

LATERAL 2’ BASE DITCH

3:1

( Not to Scale)

DETAIL F

SlopeFill

b

1"/Ft.3:1 D

B

Std. No. 876.01

*When B is > 6.0’

Natural

Ground

Type of Liner= GRASS

FROM STA. 127+50 TO STA. 128+97 -L- (LT)

b= 5.0 Ft.

B= 2.0 Ft.

Min. D= 1.0 Ft.

SEE DETAIL "FF"

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 119+98 -L- (RT)

LATERAL 2’ BASE DITCH

Natural

Ground3:1 3:

1

b

Fill Slope

dD

B

( Not to Scale)

Fabric

Filter

1"/Ft.

Std. No. 876.01

*When B is > 6.0’-

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 129+78 TO STA. 130+65 -L- (RT)

LATERAL 2’ BASE DITCH

DETAIL FF

b= 5.0 Ft.

B= 2.0 Ft.

Max. d= 1.0 Ft.

Min. D= 1.5 Ft.

AT STA. 128+97 -L- (LT) Est. Qty. 11 TonsAT STA. 129+78 -L- (RT) Est. Qty. 11 Tons

DETAIL P

20:1

Traffic Flow

Outside Ditch

S=Ditch Slope

S

C Proposed Ditch

10:1

0.5’

Min.

GI

etc.

L

2’

1.0’

Max.

( Not to Scale)

FALSE SUMP

DETAIL R

CLASS "B" RIPRAPTOE PROTECTION

W/ ELBOWSROD AND LUG

W/ ELBOWS

ROD AND LUG

127+95 -L- (LT.)BEGIN SBG @

CLASS "B"SEE DETAIL "D"

W/ ELBOWSROD AND LUG

STA. 125+45 -L- (RT.)BEGIN SBG @

SEE DETAIL "D"CLASS "B"

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

42 SQYDS FILTER FAB.EST. 97 TONS

72 SQYDS FILTER FAB.EST. 34 TONS

@ STA. 119+98 -L- (MED)@ STA. 130+48 -L- (MED)

BEGIN APP. SLAB -L- (LT.)END SBG @

BEGIN APP. SLAB -L- (RT.)END SBG @

END APP. SLAB -L- (LT.)BEGIN SBG @

END APP. SLAB -L- (RT.)BEGIN SBG @

15" RC

P-III

15" R

CP-IV

15" RC

P-IV

15" R

CP-IV

15" RC

P-IV

15"

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 125+00 TO STA. 128+25 -L- (RT)

60" CMP

300’ PR

OP.

R/W

27

27 29

27

26

29A

29B

29C

29A

T

T

X

XX

60" CMP

108"

CHL

& 1S

RW

108" C

HL

&

1SR

W

P

356

P

357

108" CHL

z

z

z

SR 2825

CA

MP

BU

RT

ON

RD 21’ B

ST

MTL

MTL

O

T

O

O

O

X

OOOO

O

YY

YYY

YYY

YYYYYYY

YYYY

YYYYYYYY

O

v

v

Y

YYY

Y YY

YYYYY

X

X

X

X

X

X

X

XX

X

X

X

XX

X

XX

XXX

XXXX

XX

X

X

XXX

XX

XX

XX

XX

XX

X

XX

XX

X

X

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

SE = NC

-L-

PI Sta 130+34.85

D

L = 964.43’

T = 482.29’

R = 23,000.00’

-Y7- POTSta. 10+00.00

-Y7- POTSta. 13+75.58

120+00125+00 130+00

-Y7- POT STA. 11+73.23

-L- POC STA. 129+37.56=

N 75° 31’ 3

5.1" E

-L-

-L- PC Sta. 125+52.57

-Y7-

NAD 83/ 95

DUKE POWER COMPANY

JAMES L. GOODWIN

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

60’ R/W

City Of Greensboro

NC PRISON DEPT.

City Of Greensboro

150’ DUKE POWER EASEMENT

EIP

EIP

City Of Greensboro

EIP

150’ DUKE POWER EASEMENT

N 88°3

7’0

7" W

612.9

8’

S 11°0

7’37"

E 488.4

1’

S 88°3

0’4

7" W

363.6

4’

S 88°3

0’4

7" W

581.3

4’

S 11°0

7’37"

E 720.6

9’

N 32°11’3

8" W

6.7

3’

S 31°41’16" E

R 23175’L 409.31’

CH 409.30’

NCDOTFORMERLY BETTY JEAN GOODWIN

NCDOT

FORMERLY BETTY JEAN GOODWIN

NCDOT

MICHAEL A. FOWLER

S

SS

shawnharris
Text Box
PERMIT DRAWINGS SHEET 36 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
Page 18: SITE 8 - saw.usace.army.mil...ro d o w s and lug sta. 23+05 -y4- (rt.) w/ elbows rod and lug sta. 23+05 -y4- (rt.) ... r = 3,800.00’ se = 02-y4- pot sta. 24+56.70-l- poc sta. 80+74.41=-y4-

SITE 11

WETLANDDENOTES FILL IN

F F

S S SURFACE WATER

DENOTES IMPACTS IN

GRAPHIC SCALE

0’ 100’100’

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

MA

TC

HLIN

E -L- STA. 11

9+

00.0

0 SEE S

HEET 9

MA

TC

HLIN

E -L- STA. 13

2+

00.0

0 SEE S

HEET 11

SEE SHEET 44 FOR -L- PROFILESEE SHEET 61 FOR -Y7- PROFILE

SEE SHEET 2-M FOR BRIDGE SKETCH

NOTE: SEE CROSS-SECTIONS AND ROADWAY STANDARD DRAWINGS,STD. NO. 865.01, SHEET 2 FOR SPECIAL MEDIAN GRADING.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.5/14/99

SHEET NO.PROJECT REFERENCE NO.

10U-2525B

SEE SHEETS S-1 THRU S-?? FOR STRUCTURE PLANS

RE

VISIO

NS

WE

ST

ER

N P

ROP

ER

TY LIN

E

ON P

AR

CE

L 29

B (N

CD

OT).

(NC P

RIS

ON

DE

PT.), 2

9 (J

AM

ES

L. G

OO

DWIN), A

ND 29

A (N

CD

OT

FO

RM

ER

LY B

ET

TY JE

AN

GO

OD

WIN). R

EVIS

ED

TH

E

LO

CA

TIO

N

OF

TH

E

R/

W

AN

D

C/

A

TO

TH

E

RE

VIS

ED

TH

E

NO

RT

HE

RN P

ROP

ER

TY LIN

E

ON P

AR

CE

L 27 (CIT

Y

OF

GR

EE

NS

BO

RO)

AN

D

TH

E

ADJ

OININ

G S

OU

TH

ER

N P

ROP

ER

TY LIN

ES

ON P

AR

CE

LS 26

PA

RC

EL 29

B

TO

R/

W.

DE

LE

TE

D

PA

RC

EL 28 (D

UK

E

PO

WE

R

CO

MP

AN

Y)

DU

E

TO P

ROP

ER

TY LIN

E

DE

LIN

EA

TIO

N

CH

AN

GIN

G

TO

EAS

EM

EN

T.

29

B (N

CD

OT), A

ND

PA

RC

EL 29

C (MIC

HA

EL

A. F

OW

LE

R). C

HA

NG

ED

TH

E

NO

RT

HE

RN P

ROP

ER

TY LIN

E

ON P

AR

CE

L 29

A

AN

D

TH

E

SO

UT

HE

RN P

ROP

ER

TY LIN

E

ON

03-19-13

R/

W

RE

VISIO

N (D

WG) -

PA

RC

EL 29 (J

AM

ES

L. G

OO

DWIN)

WAS

SU

BDIVID

ED, A

DDIN

G P

AR

CE

L 29

A (N

CD

OT

FO

RM

ER

LY B

ET

TY JE

AN

GO

OD

WIN), P

AR

CE

L

2GIFS

FS

2GI

2GI

15" C

SP

2GI

2GI

2GI

FS

2GI

15" C

SP

15" C

SP

2GI

2GI

( Not to Scale)

RIP RAP AT EMBANKMENT

GradeDitch

DETAIL D

1’5’

1.5’

Type of Liner= CLASS "B" Rip-Rap

SEE DETAIL "C"

SEE DETAIL "F"LATERAL 2’ BASE DITCH

LATERAL 2’ BASE DITCH

3:1

( Not to Scale)

DETAIL F

SlopeFill

b

1"/Ft.3:1 D

B

Std. No. 876.01

*When B is > 6.0’

Natural

Ground

Type of Liner= GRASS

FROM STA. 127+50 TO STA. 128+97 -L- (LT)

b= 5.0 Ft.

B= 2.0 Ft.

Min. D= 1.0 Ft.

SEE DETAIL "FF"

Median Ditch

( Not to Scale)

FALSE SUMP

S

S=Ditch Slope

etc.

GI

L

2’

D

D

Ditch Grade L Ditch Grade

20’

30’

9"

DD

D D

D20’L (See Chart Below)

L

40’

50’

0.0% To 2.0%

Over 2.0% To 4.0%

Over 4.0% To 6.0%

Over 6.0%

C Proposed Ditch

@ STA. 119+98 -L- (RT)

LATERAL 2’ BASE DITCH

Natural

Ground3:1 3:

1

b

Fill Slope

dD

B

( Not to Scale)

Fabric

Filter

1"/Ft.

Std. No. 876.01

*When B is > 6.0’-

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 129+78 TO STA. 130+65 -L- (RT)

LATERAL 2’ BASE DITCH

DETAIL FF

b= 5.0 Ft.

B= 2.0 Ft.

Max. d= 1.0 Ft.

Min. D= 1.5 Ft.

AT STA. 128+97 -L- (LT) Est. Qty. 11 TonsAT STA. 129+78 -L- (RT) Est. Qty. 11 Tons

DETAIL P

20:1

Traffic Flow

Outside Ditch

S=Ditch Slope

S

C Proposed Ditch

10:1

0.5’

Min.

GI

etc.

L

2’

1.0’

Max.

( Not to Scale)

FALSE SUMP

DETAIL R

CLASS "B" RIPRAPTOE PROTECTION

W/ ELBOWSROD AND LUG

W/ ELBOWS

ROD AND LUG

127+95 -L- (LT.)BEGIN SBG @

CLASS "B"SEE DETAIL "D"

W/ ELBOWSROD AND LUG

STA. 125+45 -L- (RT.)BEGIN SBG @

SEE DETAIL "D"CLASS "B"

EST. 5 SY FABRICEST. 1 TONW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

EST. 7 SY FABRICEST. 2 TONSW/ FILTER FABRICCLASS "B" RIP RAP

42 SQYDS FILTER FAB.EST. 97 TONS

72 SQYDS FILTER FAB.EST. 34 TONS

@ STA. 119+98 -L- (MED)@ STA. 130+48 -L- (MED)

BEGIN APP. SLAB -L- (LT.)END SBG @

BEGIN APP. SLAB -L- (RT.)END SBG @

END APP. SLAB -L- (LT.)BEGIN SBG @

END APP. SLAB -L- (RT.)BEGIN SBG @

15" RC

P-III

15" R

CP-IV

15" RC

P-IV

15" R

CP-IV

15" RC

P-IV

15"

Fill

Slope

( Not to Scale)

TOE PROTECTION

d

Fabric

Filter

FLATTER2:1 O

R

Ground

Natural

DETAIL C

d= 1.0 Ft.

Type of Liner= CLASS "B" Rip-Rap

FROM STA. 125+00 TO STA. 128+25 -L- (RT)

60" CMP

300’ PR

OP.

R/W

27

27 29

27

26

29A

29B

29C

29A

T

T

X

XX

60" CMP

108"

CHL

& 1S

RW

108" C

HL

&

1SR

W

P

356

P

357

108" CHL

z

z

z

SR 2825

CA

MP

BU

RT

ON

RD 21’ B

ST

MTL

MTL

O

T

O

O

O

X

OOOO

O

YY

YYY

YYY

YYYYYYY

YYYY

YYYYYYYY

O

v

v

Y

YYY

Y YY

YYYYY

X

X

X

X

X

X

X

XX

X

X

X

XX

X

XX

XXX

XXXX

XX

X

X

XXX

XX

XX

XX

XX

XX

X

XX

XX

X

X

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

SE = NC

-L-

PI Sta 130+34.85

D

L = 964.43’

T = 482.29’

R = 23,000.00’

-Y7- POTSta. 10+00.00

-Y7- POTSta. 13+75.58

120+00125+00 130+00

-Y7- POT STA. 11+73.23

-L- POC STA. 129+37.56=

N 75° 31’ 3

5.1" E

-L-

-L- PC Sta. 125+52.57

-Y7-

NAD 83/ 95

DUKE POWER COMPANY

JAMES L. GOODWIN

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

60’ R/W

City Of Greensboro

NC PRISON DEPT.

City Of Greensboro

150’ DUKE POWER EASEMENT

EIP

EIP

City Of Greensboro

EIP

150’ DUKE POWER EASEMENT

N 88°3

7’0

7" W

612.9

8’

S 11°0

7’37"

E 488.4

1’

S 88°3

0’4

7" W

363.6

4’

S 88°3

0’4

7" W

581.3

4’

S 11°0

7’37"

E 720.6

9’

N 32°11’3

8" W

6.7

3’

S 31°41’16" E

R 23175’L 409.31’

CH 409.30’

NCDOTFORMERLY BETTY JEAN GOODWIN

NCDOT

FORMERLY BETTY JEAN GOODWIN

NCDOT

MICHAEL A. FOWLER

S

688

689

689

690

690

690

690

691

691

691

691 692

692

693

693

693

694

694

694

695

695

695

695

695

695

695

696

696

696

696

697

697

697

697

698

698

698

699

699

699

699

700

700

700

700

700

700

700

700

700

700

701

701

701

701

701

701

702

702

702

702

702

702

703

703

703

703

703

703

703

703

704

704

704

704

704

704

704

704

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

705

706

706

706

706

706

706

706

706

706

706

706

706

707

707

707

707

707

707

707

707

707

707

707

707

707

708

708

708

708

708

708

708

708

708

708

708

708

708

708

708

709

709

709

709

709

709

709

709

709

709

709

709

709

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

710

711

711

711

711

711

711

711

711

711

711

711

711

711

712

712

712

712

712

712

712

712

712

712

712

713

713

713

713

713

713

713

713

713

713

713

713

714

714

714

714

714

714

714

714

714

714

714

714

714

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

715

716

716

716

716

716

716

716

716

716

716

716

716

716

716

717

717

717

717

717

717

717

717

717

717

717

717

717

718

718

718

718

718

718

718

718

718

718

718

718

718

718

719

719

719

719

719

719

719

719

719

719

719

719

719

720

720

720

720

720

720

720

720

720

720

720

720

720

720

720 720

720

720

720

720

720

720

720

720

720

720

720

721

721

721

721

721

721

721

721

721

721

721

721

721

721

722

722

722

722

722

722

722

722

722

722

722

722

722

723

723

723

723

723

723

723

723

723

723

723

723

723

724

724

724

724

724

724

724

724

724

724

724

724

724

725

725

725

725

725

725

725

725

725

725

725

725

725 725

725

725

725

725

725

725

725

725

725

725

725

726

726

726

726

726

726

726

726

726

726

726

726

726

727

727

727

727

727

727

727

727

727

727

727

727

727

727

728

728

728

728

728

728

728

728

728

728

728

728

728

728

728

729

729

729

729

729

729

729

729

729

729

729

729

729

729

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730 730

730

730

731

731

731

731

731

731

731

731

731

731

731

731

731

731

732

732

732 7

32

732

732

732

732

732

732

732

732

733

733

733

733

733

733

733

733

733

733

733

734

734

734

734

734

734

734

734

734

734

734

734

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

735

736

736

736

736

736

736

736

736

736

736

736

737

737

737

737

737

737

737

737

738

738

738

738

738

738

738

739

739

739

740

740

740

740

740

740

740

740

741

741

741

742

742

742

742

743

743

743

744

744

744

744

744

745

745

745

745

745

745

745

745

746

746

746

746

747

747

747

747

748

748

749

750

751

SS

shawnharris
Text Box
PERMIT DRAWINGS SHEET 37 OF 93
shawnharris
Sticky Note
Accepted set by shawnharris
shawnharris
Sticky Note
Accepted set by shawnharris