Site Information & Scope of Work Site Information Site Name : Site Code : Site Address : Coordinates :N :E * Coordinates are surveyed by handy type GPS and might be inaccurate. Site Type Control Center Master Telemetry Station Gas Field Operating Company Terminal (OCT) CGS (City Gas Station) Power station/Fertilizer Factory Compressor Station TBS (Town Bordering Station) Pig Station DRS (District Regulating Station) MS (Metering Station) GMS (Gas Manifold Station) VS (Valve Station) Site Status Operating Company : Remarks : Laksham 20-LAK-100M To be provided later. 23° 15’ 07’ 20.6 ” Upcoming site which will be covered by The New System after the completion of the Project. Originally covered by The Existing System and shall be covered by The New System. Currently not covered by The Existing System but shall be covered by The New System. BGSL 04.5 ” 91° LAK-100M - 1/6 Scope of Work Works checked off hereinafter shall be carried out for the Project 1. SCADA System : No SCADA System at this site. LAK-100M - 2/6

Upload: others

Post on 14-Dec-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Laksham20-LAK-100M

To be provided later.

23° 15’ 07’ 20.6 ”

Upcoming site which will be covered by The New System after thecompletion of the Project.

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.

BGSL

04.5 ” 91°

LAK-100M - 1/6

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : No SCADA System at this site.

LAK-100M - 2/6

Page 2: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Master Telemetry Station (Former Microwave Radio Station)

Removal of existing communication system

Radio equipment to connect Master Telemetry Station with Provider's Access Point

Master telemetry equipment

Radio equipment to connect Master Telemetry Station with OCT

Radio equipment to connect Provider's Access Point with Master Telemetry Station

Network equipment

Network cable to OCT

■ : IP PBX System

IP PBX main unit

Extension telephone set

Design, supply and install IP PBX main unit with necessary accessories and spare parts.

Design, supply and install IP radio equipment at nearest BTCL's access point to connectBTCL's AP with Master Telemetry Station, including all necessary cables, accessories andthe antenna with monopole.

Design, supply and install network cable between Master Telemetry Station and OCTwhich shall be installed within the same site.

Remove and dispose following existing items used for microwave transmission system:- Microwave equipment/facilities in the radio equipment room- Antenna mounted on the existing tower- Cables between radio equipment room and existing tower

Design, supply and install IP radio equipment at radio equipment room to connectMaster Telemetry Station with Operating Company Terminal (OCT) at another site,including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

Design, supply and install extension telephone set(s) with required cables. [ 2 ]

Design, supply and install all necessary Network equipment at radio equipment room ofMaster telemetry station as well as at nearest BTCL's access point.

Q'ty

Design, supply and install master telemetry equipment at existing radio equipmentroom to connect with slave telemetry equipment, including all necessary cables,accessories and the antenna to be mounted on the existing tower.

Design, supply and install IP radio equipment at existing radio equipment room toconnect Master Telemetry Station with nearest Provider's Access Point (BTCL's AP),including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

LAK-100M - 3/6

3. Electrical Works

■ : Backup Batteries for Radio Equipment at Master Station

■ : Replacement of Emergency Generator

■ : Replacement of Air conditioner at Radio room of Master Station

4. Civil Works

■ : Refurbishment of Existing Radio Building/Radio Equipment Room

Remove and dispose existing backup batteries for radio equipment.Supply & install new backup batteries with charger suitable to backup new radioequipment for 48 hours.

Cleaning of Radio Equipment RoomClean and tidy up the existing rooms where radio equipment and backup batteries areinstalled.

Examin the condition of the whole existing radio building and repair the defects if any.Clean and touch-up the external and internal finish of the whole existing radio building.

Refurbishment of Radio Equipment RoomExamine the condition of existing rooms where radio equipment and backup batteriesare installed and repair the defects if any.Clean and touch-up the internal finish of the said rooms.

Refurbishment of Radio Building

Remove and dispose existing emergency generator.Supply & install new emergency generator suitable for power supply to relatedequipment and facilities.

Remove and dispose existing window type air conditioner at raido room, and Supply &install new air conditioner suitably selected to maintain the specified temperature andhumidity of radio room.

LAK-100M - 4/6

Page 3: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

5. Site Photo

Existing Radio Building

paste site photo

LAK-100M - 5/6

6. Site Layout

See attached Layout Plan.

LAK-100M - 6/6

Page 4: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave
Page 5: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Laksham TBS10-LAK-101

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.

To be provided later.

BGSL

07’ 21.8 ”23° 16’ 18.6 ” 91°

Upcoming site which will be covered by The New System after thecompletion of the Project.

LAK-101 - 1/8

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

RTU without display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning p

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthi

Interface with flow computer

RTU with display monitor

Interface with receiver for turbine meter

RTU (design & supply only)Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection-

Make provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Install the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

LAK-101 - 2/8

Page 6: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

■ : Instruments

■ : Pressure transmitters

■ : Differential pressure transmitters

■ : Temprature transmitters

Re-use the existing instruments and cables.

Note:Existing instruments and cables shall be serviced by the Employer.

Provide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Interface with other system

New InstrumentsDesign, supply and install the following instruments.Output signals from instruments are to be cabled via field junction box to the RTU.

Prepare the tapping point for the pressure transmitter,and design, supply and install:- Pressure transmitter on the prepared tapping point- Tubing between tapping point and transmitter

Cable between RTU and Master Telemetry StationDesign, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

Design, supply and intall:- Pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Q'ty

Prepare the tapping point for the differential pressure transmitter,and design, supply and install:- Differential pressure transmitter on the tapping point- Tubing between tapping point and transmitter

Existing instruments

Q'ty

Design, supply and install:- Differential pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Design, supply and install:- Thermowell in the spare boss on the pipe- Resistance temperature detector complete with a head mounted transmitter into the thermowell

Q'ty

LAK-101 - 3/8

■ : Limit switch

Q'tyDesign, supply and install an Intrinsic safety junction box. The junction boxto be suitable for glanding appropriate cables.

Instrument Cables

Supply and install a dual pulse output pickup head in place of the singlepulse output pickup in the existing turbine flowmeter sensor head. Theoutput signal from the existing turbine flowmeter to be cabled via junctionbox to RTU.

Design, supply, install the instrument cables from the field instruments to RTU viajunction box including each cable termination with gland.

Local Field Instrument Junction Box

Design, supply and install the limit switch on the existing shutdownvalve for valve position monitoring.

Q'ty

Q'ty

Pick up Signal from the Existing Turbine Meter

LAK-101 - 4/8

Page 7: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Slave Telemetry System

Removal of existing slave telemetry equipment

Slave Telemetry Equipment

Slave Telemetry Equipment (design & supply only)

Existing monopole

New monopole

New monopole (design & supply only)Design and supply new monopole to mount new antenna.

Design, supply and install new slave telemetry equipment in the RTU enclosure,including cables and antenna.

Re-use existing monople to mount new antenna.

Design and supply new slave telemetry equipment in the RTU enclosure, includingcables and antenna.

Remove and dispose the existing slave telemetry system including antenna and cable.

Design, supply and install new monopole with foundation to mount new antenna.

LAK-101 - 5/8

3. Electrical Works

■ : Power Supply to RTU

4. Civil Works

■ : Foundation & Sunshade for RTU

■ : Instrument Stand with Foundation & Sunshade

Design and construct the foundation and sunshade for new RTU at suitable location. Thefoundation and sunshade should be designed to suitably accommodate new RTU.

Re-use existing Instrument stand(s) with foundation & sunshade

Design, supply and install MCB box for the power supply to RTU including all cables fromexisting PDB to MCB box and from MCB box to RTU.

Design and construct the Instrument stand(s) with foundation & sunshade at suitablelocation. It should be designed to suitably accommodate the required number ofinstruments and explosion proof instrument field junction box.

Examine the condition of existing Instrument stand(s) with foundation & sunshade andrepair the defects, if any.

Provide new foundation & sunshade for RTU

Re-use existing foundation & sunshade for RTU

Provide new Instrument stand(s) with foundation & sunshade

Design, supply and install new solar panel, power controller and power cable to RTU.

Examine the condition of existing foundation and sunshade for RTU and repair thedefects, if any.

Electrical power shall be supplied to RTU from existing PDB, and existing power cableshall be re-used.

Design, supply and intall power controller and power cable to RTU at remote site whereelectrical power is supplied from existing solar panel.

LAK-101 - 6/8

Page 8: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

5. Site Photo

Existing Instrument Stand

paste site photo

Existing RTU

paste site photo

LAK-101 - 7/8

6. Site Layout

See attached Layout Plan.

LAK-101 - 8/8

Page 9: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave
Page 10: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Chandpur20-CHA-100M

To be provided later.

23° 14’ 41’ 00.6 ”

Upcoming site which will be covered by The New System after thecompletion of the Project.

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.

BGSL

02.8 ” 90°

CHA-100M - 1/6

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : No SCADA System at this site.

CHA-100M - 2/6

Page 11: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Master Telemetry Station (Former Microwave Radio Station)

Removal of existing communication system

Radio equipment to connect Master Telemetry Station with Provider's Access Point

Master telemetry equipment

Radio equipment to connect Master Telemetry Station with OCT

Radio equipment to connect Provider's Access Point with Master Telemetry Station

Network equipment

Network cable to OCT

■ : IP PBX System

IP PBX main unit

Extension telephone set

Design, supply and install IP PBX main unit with necessary accessories and spare parts.

Design, supply and install IP radio equipment at nearest BTCL's access point to connectBTCL's AP with Master Telemetry Station, including all necessary cables, accessories andthe antenna with monopole.

Design, supply and install network cable between Master Telemetry Station and OCTwhich shall be installed within the same site.

Remove and dispose following existing items used for microwave transmission system:- Microwave equipment/facilities in the radio equipment room- Antenna mounted on the existing tower- Cables between radio equipment room and existing tower

Design, supply and install IP radio equipment at radio equipment room to connectMaster Telemetry Station with Operating Company Terminal (OCT) at another site,including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

Design, supply and install extension telephone set(s) with required cables. [ 2 ]

Design, supply and install all necessary Network equipment at radio equipment room ofMaster telemetry station as well as at nearest BTCL's access point.

Q'ty

Design, supply and install master telemetry equipment at existing radio equipmentroom to connect with slave telemetry equipment, including all necessary cables,accessories and the antenna to be mounted on the existing tower.

Design, supply and install IP radio equipment at existing radio equipment room toconnect Master Telemetry Station with nearest Provider's Access Point (BTCL's AP),including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

CHA-100M - 3/6

3. Electrical Works

■ : Backup Batteries for Radio Equipment at Master Station

■ : Replacement of Emergency Generator

■ : Replacement of Air conditioner at Radio room of Master Station

4. Civil Works

■ : Refurbishment of Existing Radio Building/Radio Equipment Room

Remove and dispose existing backup batteries for radio equipment.Supply & install new backup batteries with charger suitable to backup new radioequipment for 48 hours.

Cleaning of Radio Equipment RoomClean and tidy up the existing rooms where radio equipment and backup batteries areinstalled.

Examin the condition of the whole existing radio building and repair the defects if any.Clean and touch-up the external and internal finish of the whole existing radio building.

Refurbishment of Radio Equipment RoomExamine the condition of existing rooms where radio equipment and backup batteriesare installed and repair the defects if any.Clean and touch-up the internal finish of the said rooms.

Refurbishment of Radio Building

Remove and dispose existing emergency generator.Supply & install new emergency generator suitable for power supply to relatedequipment and facilities.

Remove and dispose existing window type air conditioner at raido room, and Supply &install new air conditioner suitably selected to maintain the specified temperature andhumidity of radio room.

CHA-100M - 4/6

Page 12: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

5. Site Photo

Existing Radio Building

paste site photo

CHA-100M - 5/6

6. Site Layout

See attached Layout Plan.

CHA-100M - 6/6

Page 13: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave
Page 14: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Chandpur TBS20-CHA-101

40’

To be provided later.

Upcoming site which will be covered by The New System after thecompletion of the Project.

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.

BGSL

55.6 ”23° 14’ 22.9 ” 90°

Additional instruments are required at this site.

CHA-101 - 1/8

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection-

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthi

Install the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

RTU with display monitor

RTU (design & supply only)

RTU without display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning p

Interface with flow computerMake provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Interface with receiver for turbine meter

CHA-101 - 2/8

Page 15: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

■ : Instruments

■ : Pressure transmitters

■ : Differential pressure transmitters

■ : Temprature transmitters

Cable between RTU and Master Telemetry Station

[ 2 ]

Existing instruments

Design, supply and install:- Thermowell in the spare boss on the pipe- Resistance temperature detector complete with a head mounted transmitter into the thermowell

Q'ty

[ 4 ]

Provide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Design, supply and install the following instruments.Output signals from instruments are to be cabled via field junction box to the RTU.

New Instruments

Q'ty

Design, supply and intall:- Pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Interface with other system

Design, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

Re-use the existing instruments and cables.

Note:Existing instruments and cables shall be serviced by the Employer.

Prepare the tapping point for the pressure transmitter,and design, supply and install:- Pressure transmitter on the prepared tapping point- Tubing between tapping point and transmitter

Design, supply and install:- Differential pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Prepare the tapping point for the differential pressure transmitter,and design, supply and install:- Differential pressure transmitter on the tapping point- Tubing between tapping point and transmitter

Q'ty

[ 2 ]

CHA-101 - 3/8

■ : Limit switch

Pick up Signal from the Existing Turbine Meter

Design, supply, install the instrument cables from the field instruments to RTU viajunction box including each cable termination with gland.

Local Field Instrument Junction Box

Design, supply and install the limit switch on the existing shutdownvalve for valve position monitoring.

Q'ty

Q'ty

Supply and install a dual pulse output pickup head in place of the singlepulse output pickup in the existing turbine flowmeter sensor head. Theoutput signal from the existing turbine flowmeter to be cabled via junctionbox to RTU.

Q'ty

Instrument Cables

[ 1 ]Design, supply and install an Intrinsic safety junction box. The junction boxto be suitable for glanding appropriate cables.

CHA-101 - 4/8

Page 16: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Slave Telemetry System

Removal of existing slave telemetry equipment

Slave Telemetry Equipment

Slave Telemetry Equipment (design & supply only)

Existing monopole

New monopole

New monopole (design & supply only)

Design and supply new slave telemetry equipment in the RTU enclosure, includingcables and antenna.

Design, supply and install new monopole with foundation to mount new antenna.

Design and supply new monopole to mount new antenna.

Remove and dispose the existing slave telemetry system including antenna and cable.

Design, supply and install new slave telemetry equipment in the RTU enclosure,including cables and antenna.

Re-use existing monople to mount new antenna.

CHA-101 - 5/8

3. Electrical Works

■ : Power Supply to RTU

4. Civil Works

■ : Foundation & Sunshade for RTU

■ : Instrument Stand with Foundation & Sunshade

Electrical power shall be supplied to RTU from existing PDB, and existing power cableshall be re-used.

Provide new Instrument stand(s) with foundation & sunshade

Design, supply and intall power controller and power cable to RTU at remote site whereelectrical power is supplied from existing solar panel.

Re-use existing Instrument stand(s) with foundation & sunshade

Provide new foundation & sunshade for RTUDesign and construct the foundation and sunshade for new RTU at suitable location. Thefoundation and sunshade should be designed to suitably accommodate new RTU.

Design, supply and install MCB box for the power supply to RTU including all cables fromexisting PDB to MCB box and from MCB box to RTU.

Examine the condition of existing Instrument stand(s) with foundation & sunshade andrepair the defects, if any.

Design, supply and install new solar panel, power controller and power cable to RTU.

Design and construct the Instrument stand(s) with foundation & sunshade at suitablelocation. It should be designed to suitably accommodate the required number ofinstruments and explosion proof instrument field junction box.

Examine the condition of existing foundation and sunshade for RTU and repair thedefects, if any.

Re-use existing foundation & sunshade for RTU

CHA-101 - 6/8

Page 17: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

5. Site Photo

paste site photo

paste site photo

Existing Instrument Stand

Existing RTU

CHA-101 - 7/8

6. Site Layout

See attached Layout Plan.

CHA-101 - 8/8

Page 18: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave
Page 19: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Feni20-FEN-100/100M

To be provided later.

91° 22’ 10.5 ”23° 01’ 02.0 ”

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.Upcoming site which will be covered by The New System after thecompletion of the Project.

BGSL

FEN-100(M) - 1/9

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

Make provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Interface with receiver for turbine meter

RTU without display monitor

Interface with flow computer

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU with display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU (design & supply only)Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Install the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

FEN-100(M) - 2/9

Page 20: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

■ : Instruments

■ : Pressure transmitters

■ : Differential pressure transmitters

■ : Temprature transmitters

Prepare the tapping point for the pressure transmitter,and design, supply and install:- Pressure transmitter on the prepared tapping point- Tubing between tapping point and transmitter

Q'ty

Prepare the tapping point for the differential pressure transmitter,and design, supply and install:- Differential pressure transmitter on the tapping point- Tubing between tapping point and transmitter

Q'ty

Q'ty

Re-use the existing instruments and cables.

Note:Existing instruments and cables shall be serviced by the Employer.

Design, supply and install:- Differential pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

New InstrumentsDesign, supply and install the following instruments.Output signals from instruments are to be cabled via field junction box to the RTU.

Design, supply and intall:- Pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Design, supply and install:- Thermowell in the spare boss on the pipe- Resistance temperature detector complete with a head mounted transmitter into the thermowell

Interface with other systemProvide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Existing instruments

Cable between RTU and Master Telemetry StationDesign, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

FEN-100(M) - 3/9

■ : Limit switch

Design, supply, install the instrument cables from the field instruments to RTU viajunction box including each cable termination with gland.

Q'ty

Design, supply and install the limit switch on the existing shutdownvalve for valve position monitoring.

Q'ty

Supply and install a dual pulse output pickup head in place of the singlepulse output pickup in the existing turbine flowmeter sensor head. Theoutput signal from the existing turbine flowmeter to be cabled via junctionbox to RTU.

Local Field Instrument Junction BoxDesign, supply and install an Intrinsic safety junction box. The junction boxto be suitable for glanding appropriate cables.

Q'ty

Instrument Cables

Pick up Signal from the Existing Turbine Meter

FEN-100(M) - 4/9

Page 21: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Master Telemetry Station (Former Microwave Radio Station)

Removal of existing communication system

Radio equipment to connect Master Telemetry Station with Provider's Access Point

Master telemetry equipment

Radio equipment to connect Master Telemetry Station with OCT

Radio equipment to connect Provider's Access Point with Master Telemetry Station

Network equipment

Network cable to OCT

■ : IP PBX System

IP PBX main unit

Extension telephone setDesign, supply and install extension telephone set(s) with required cables.

Design, supply and install IP radio equipment at radio equipment room to connectMaster Telemetry Station with Operating Company Terminal (OCT) at another site,including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

Remove and dispose following existing items used for microwave transmission system:- Microwave equipment/facilities in the radio equipment room- Antenna mounted on the existing tower- Cables between radio equipment room and existing tower

Q'ty

Design, supply and install IP radio equipment at nearest BTCL's access point to connectBTCL's AP with Master Telemetry Station, including all necessary cables, accessories andthe antenna with monopole.

Design, supply and install IP radio equipment at existing radio equipment room toconnect Master Telemetry Station with nearest Provider's Access Point (BTCL's AP),including all necessary cables, accessories and the antenna to be mounted on theexisting tower.

Design, supply and install all necessary Network equipment at radio equipment room ofMaster telemetry station as well as at nearest BTCL's access point.

Design, supply and install IP PBX main unit with necessary accessories and spare parts.

Design, supply and install network cable between Master Telemetry Station and OCTwhich shall be installed within the same site.

[ 2 ]

Design, supply and install master telemetry equipment at existing radio equipmentroom to connect with slave telemetry equipment, including all necessary cables,accessories and the antenna to be mounted on the existing tower.

FEN-100(M) - 5/9

3. Electrical Works

■ : Power Supply to RTU

■ : Backup Batteries for Radio Equipment at Master Station

■ : Replacement of Emergency Generator

■ : Replacement of Air conditioner at Radio room of Master Station

Design, supply and intall power controller and power cable to RTU at remote site whereelectrical power is supplied from existing solar panel.

Remove and dispose existing emergency generator.Supply & install new emergency generator suitable for power supply to relatedequipment and facilities.

Design, supply and install new solar panel, power controller and power cable to RTU.

Remove and dispose existing window type air conditioner at raido room, and Supply &install new air conditioner suitably selected to maintain the specified temperature andhumidity of radio room.

Design, supply and install MCB box for the power supply to RTU including all cables fromexisting PDB to MCB box and from MCB box to RTU.

Remove and dispose existing backup batteries for radio equipment.Supply & install new backup batteries with charger suitable to backup new radioequipment for 48 hours.

Electrical power shall be supplied to RTU from existing PDB, and existing power cableshall be re-used.

FEN-100(M) - 6/9

Page 22: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

4. Civil Works

■ : Foundation & Sunshade for RTU

■ : Instrument Stand with Foundation & Sunshade

■ : Refurbishment of Existing Radio Building/Radio Equipment Room

Cleaning of Radio Equipment RoomClean and tidy up the existing rooms where radio equipment and backup batteries areinstalled.

Refurbishment of Radio Equipment RoomExamine the condition of existing rooms where radio equipment and backup batteriesare installed and repair the defects if any.Clean and touch-up the internal finish of the said rooms.

Design and construct the Instrument stand(s) with foundation & sunshade at suitablelocation. It should be designed to suitably accommodate the required number ofinstruments and explosion proof instrument field junction box.

Re-use existing foundation & sunshade for RTUExamine the condition of existing foundation and sunshade for RTU and repair thedefects, if any.

Provide new foundation & sunshade for RTU

Examine the condition of existing Instrument stand(s) with foundation & sunshade andrepair the defects, if any.

Re-use existing Instrument stand(s) with foundation & sunshade

Refurbishment of Radio BuildingExamin the condition of the whole existing radio building and repair the defects if any.Clean and touch-up the external and internal finish of the whole existing radio building.

Provide new Instrument stand(s) with foundation & sunshade

Design and construct the foundation and sunshade for new RTU at suitable location. Thefoundation and sunshade should be designed to suitably accommodate new RTU.

FEN-100(M) - 7/9

5. Site Photo

paste site photo

Existing RTU (cable link)

Existing Radio Building & Generator Room

paste site photo

FEN-100(M) - 8/9

Page 23: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

6. Site Layout

See attached Layout Plan.

FEN-100(M) - 9/9

Page 24: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave
Page 25: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Feni Gas Field20-FEN-701

To be provided later.

24’ 08.0 ”91°

Currently not covered by The Existing System but shall be covered byThe New System.

22° 56’ 29.3 ”

NIKO

Originally covered by The Existing System and shall be covered by TheNew System.

Upcoming site which will be covered by The New System after thecompletion of the Project.

FEN-701 - 1/8

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Make provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Interface with receiver for turbine meter

Interface with flow computer

Install the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

RTU without display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU with display monitor

RTU (design & supply only)

FEN-701 - 2/8

Page 26: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

■ : Instruments

■ : Pressure transmitters

■ : Differential pressure transmitters

■ : Temprature transmitters

Prepare the tapping point for the differential pressure transmitter,and design, supply and install:- Differential pressure transmitter on the tapping point- Tubing between tapping point and transmitter

Design, supply and install:- Thermowell in the spare boss on the pipe- Resistance temperature detector complete with a head mounted transmitter into the thermowell

Prepare the tapping point for the pressure transmitter,and design, supply and install:- Pressure transmitter on the prepared tapping point- Tubing between tapping point and transmitter

Q'ty

Interface with other system

Re-use the existing instruments and cables.

Note:Existing instruments and cables shall be serviced by the Employer.

[ 1 ]

Provide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Cable between RTU and Master Telemetry Station

[ 1 ]

Design, supply and install:- Differential pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

New InstrumentsDesign, supply and install the following instruments.Output signals from instruments are to be cabled via field junction box to the RTU.

Design, supply and intall:- Pressure transmitter on the existing spare tapping point- Tubing between tapping point and transmitter

Q'ty

[ 2 ]

Design, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

Existing instruments

Q'ty

FEN-701 - 3/8

■ : Limit switch

[ 1 ]

Pick up Signal from the Existing Turbine Meter

Local Field Instrument Junction Box

Design, supply and install the limit switch on the existing shutdownvalve for valve position monitoring.

Design, supply, install the instrument cables from the field instruments to RTU viajunction box including each cable termination with gland.

Design, supply and install an Intrinsic safety junction box. The junction boxto be suitable for glanding appropriate cables.

Q'ty

Q'ty

Q'ty

Instrument Cables

Supply and install a dual pulse output pickup head in place of the singlepulse output pickup in the existing turbine flowmeter sensor head. Theoutput signal from the existing turbine flowmeter to be cabled via junctionbox to RTU.

FEN-701 - 4/8

Page 27: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

2. Communication System

■ : Slave Telemetry System

Removal of existing slave telemetry equipment

Slave Telemetry Equipment

Slave Telemetry Equipment (design & supply only)

Existing monopole

New monopole

New monopole (design & supply only)Design and supply new monopole to mount new antenna.

Design, supply and install new monopole with foundation to mount new antenna.

Design and supply new slave telemetry equipment in the RTU enclosure, includingcables and antenna.

Remove and dispose the existing slave telemetry system including antenna and cable.

Design, supply and install new slave telemetry equipment in the RTU enclosure,including cables and antenna.

Re-use existing monople to mount new antenna.

FEN-701 - 5/8

3. Electrical Works

■ : Power Supply to RTU

4. Civil Works

■ : Foundation & Sunshade for RTU

■ : Instrument Stand with Foundation & Sunshade

Design and construct the Instrument stand(s) with foundation & sunshade at suitablelocation. It should be designed to suitably accommodate the required number ofinstruments and explosion proof instrument field junction box.

Design, supply and install MCB box for the power supply to RTU including all cables fromexisting PDB to MCB box and from MCB box to RTU.

Examine the condition of existing Instrument stand(s) with foundation & sunshade andrepair the defects, if any.

Provide new Instrument stand(s) with foundation & sunshade

Re-use existing foundation & sunshade for RTUExamine the condition of existing foundation and sunshade for RTU and repair thedefects, if any.

Electrical power shall be supplied to RTU from existing PDB, and existing power cableshall be re-used.

Re-use existing Instrument stand(s) with foundation & sunshade

Provide new foundation & sunshade for RTUDesign and construct the foundation and sunshade for new RTU at suitable location. Thefoundation and sunshade should be designed to suitably accommodate new RTU.

Design, supply and intall power controller and power cable to RTU at remote site whereelectrical power is supplied from existing solar panel.

Design, supply and install new solar panel, power controller and power cable to RTU.

FEN-701 - 6/8

Page 28: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

5. Site Photo

paste site photo

Site view

FEN-701 - 7/8

6. Site Layout

Site layout shall be provided later.

FEN-701 - 8/8

Page 29: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

Sundalpur Gas Field20-FEN-702

To be provided later.

14’ 39.0 ”91°

Currently not covered by The Existing System but shall be covered byThe New System.

22° 51’ 28.4 ”

BAPEX

Originally covered by The Existing System and shall be covered by TheNew System.

Upcoming site which will be covered by The New System after thecompletion of the Project.

FEN-702 - 1/7

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Make provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Interface with receiver for turbine meter

Interface with flow computer

Install the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

RTU without display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU with display monitor

RTU (design & supply only)

FEN-702 - 2/7

Page 30: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Interface with other systemProvide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Cable between RTU and Master Telemetry StationDesign, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

FEN-702 - 3/7

2. Communication System

■ : Slave Telemetry System

Removal of existing slave telemetry equipment

Slave Telemetry Equipment

Slave Telemetry Equipment (design & supply only)

Existing monopole

New monopole

New monopole (design & supply only)Design and supply new monopole to mount new antenna.

Design, supply and install new monopole with foundation to mount new antenna.

Design and supply new slave telemetry equipment in the RTU enclosure, includingcables and antenna.

Remove and dispose the existing slave telemetry system including antenna and cable.

Design, supply and install new slave telemetry equipment in the RTU enclosure,including cables and antenna.

Re-use existing monople to mount new antenna.

FEN-702 - 4/7

Page 31: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

3. Electrical Works

■ : No electrical works at this site.

4. Civil Works

■ : No civil works at this site.

FEN-702 - 5/7

5. Site Photo

Not Available

FEN-702 - 6/7

Page 32: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

6. Site Layout

Not Available

FEN-702 - 7/7

Page 33: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Site Information & Scope of Work

Site Information

Site Name :Site Code :

Site Address :

Coordinates : N : E* Coordinates are surveyed by handy type GPS and might be inaccurate.

Site Type Control Center Master Telemetry StationGas Field Operating Company Terminal (OCT)CGS (City Gas Station) Power station/Fertilizer FactoryCompressor Station TBS (Town Bordering Station)Pig Station DRS (District Regulating Station)MS (Metering Station) GMS (Gas Manifold Station)VS (Valve Station)

Site Status

Operating Company :

Remarks :

To be provided later.

BAPEX

Originally covered by The Existing System and shall be covered by TheNew System.Currently not covered by The Existing System but shall be covered byThe New System.Upcoming site which will be covered by The New System after thecompletion of the Project.

91° 03.0 ”22° 59’ 17.0 ” 10’

Begumgonj Gas Field20-FEN-703

FEN-703 - 1/7

Scope of Work

Works checked off hereinafter shall be carried out for the Project

1. SCADA System

■ : RTU

Design, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Display monitor- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU (design & supply only)

RTU without display monitorDesign, supply and install a self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

RTU with display monitor

Design and supply self-standing IP65 enclosure equipped with following items:- RTU- Instrumentation and communication equipment- Backup battery system with charger for 24 hours- Lighting- Anti-condensation heater- Earthing and lightning protection- All internal wiring- Other equipment to satisfy the functional requirements

Interface with flow computerMake provision for:- Installation of the flow computer which shall be prepared by GTCL in the enclosure- Interface between RTU and the said flow computer

Interface with receiver for turbine meterInstall the existing receiver for turbine meter(s) in the RTU enclosure and interface it(them) via communication (MODBUS) cable.

FEN-703 - 2/7

Page 34: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

Interface with other systemProvide the interface between RTU and other system such as PLC or PC operated by theoperating company including all communication cables between RTU and other system.

Cable between RTU and Master Telemetry StationDesign, supply and install the cable between RTU and Master Telemetry Station in caseRTU and Master Telemetry Station are located in the same site.

FEN-703 - 3/7

2. Communication System

■ : Slave Telemetry System

Removal of existing slave telemetry equipment

Slave Telemetry Equipment

Slave Telemetry Equipment (design & supply only)

Existing monopole

New monopole

New monopole (design & supply only)

Re-use existing monople to mount new antenna.

Design, supply and install new monopole with foundation to mount new antenna.

Design and supply new slave telemetry equipment in the RTU enclosure, includingcables and antenna.

Design and supply new monopole to mount new antenna.

Remove and dispose the existing slave telemetry system including antenna and cable.

Design, supply and install new slave telemetry equipment in the RTU enclosure,including cables and antenna.

FEN-703 - 4/7

Page 35: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

3. Electrical Works

■ : No electrical works at this site.

4. Civil Works

■ : No civil works at this site.

FEN-703 - 5/7

5. Site Photo

Not Available

FEN-703 - 6/7

Page 36: Site Information & Scope of Work Scope of Work Site ...SCADA System : No SCADA System at this site. LAK-100M - 2/6 2. Communication System : Master Telemetry Station (Former Microwave

6. Site Layout

Not Available

FEN-703 - 7/7