Site Instruction SheetPROJECT : MAWINGS RESIDENCES FORMAT NO : F / 001 DATE : SEPT. 17, 2015 CONTRACTOR : JONNEL TAN
ITEM
EARTHWORKS
DESCRIPTION
OVER-CUTTING OF COLUMN FOOTING EXCAVATION DUE TO OVERSIZED BOULDERS.
PROPOSED CORRECTIVE ACTION
DUE TO OVERCUTTING, THE CONTRACTOR IS ADVISED TO INCREASE THE AMOUNT
OF GRAVEL TO BE FILLED.
INSTRUCTED BY CHECKED BY
D
RECEIVED BY
(CONTRACTOR) DATE :