Site Instruction Sheet PROJECT : MAWINGS RESIDENCES FORMAT NO : F / 001 DATE : SEPT. 17, 2015 CONTRACTOR : JONNEL TAN ITEM EARTHWORKS DESCRIPTION OVER-CUTTING OF COLUMN FOOTING EXCAVATION DUE TO OVERSIZED BOULDERS. PROPOSED CORRECTIVE ACTION DUE TO OVERCUTTING, THE CONTRACTOR IS ADVISED TO INCREASE THE AMOUNT OF GRAVEL TO BE FILLED. INSTRUCTED BY CHECKED BY D RECEIVED BY

Upload: kristine-joyce-agustin

Post on 10-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Site Instruction Sheet

Site Instruction SheetPROJECT : MAWINGS RESIDENCES FORMAT NO : F / 001  DATE : SEPT. 17, 2015  CONTRACTOR : JONNEL TAN      

 ITEM

 

 EARTHWORKS

     

 DESCRIPTION

 

  OVER-CUTTING OF COLUMN FOOTING EXCAVATION DUE TO OVERSIZED BOULDERS.  

         

         

         

 PROPOSED CORRECTIVE ACTION

   

  DUE TO OVERCUTTING, THE CONTRACTOR IS ADVISED TO INCREASE THE AMOUNT  

 OF GRAVEL TO BE FILLED.

     

         

         

 INSTRUCTED BY CHECKED BY

 

   

       D  

 RECEIVED BY

     

        (CONTRACTOR)   DATE :