  • SAUDI RAILWAY (SAR) PROJECT RIYADH SAUDI ARABIA

    GROUPING # 2- AL NARIYAH YARD SEGMENT 7

    SPECIFICATIONS FOR CIVIL, STRUCTURAL, ARCHITECTURAL WORKS

    TENDERER RH0522A

    December 2010

    RIYADH

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/1

    SPECIFICATIONS

    CONTENTS

    SPECIFICATIONS FOR CIVIL, STRUCTURAL AND ARCHITECTURAL

    VOLUME 2 PART 1

    DIVISION 1 GENERAL REQUIREMENTS

    Section 01010 General Instructions 01010/1 01010/6 Section 01012 Summary of Work 01012/1 01012/2 Section 01025 Measurement and Payment 01025/1 01025/3 Section 01041 Coordination 01041/1 01041/5 Section 01045 Cutting and Patching 01045/1 01045/5 Section 01050 Field Engineering 01050/1 01050/3 Section 01060 Regulatory Requirements 01060/1 01060/2 Section 01200 Project Meetings 01200/1 01200/6 Section 01300 Submittals 01300/1 01300/21 Section 01310 Construction Schedule 01310/1 01310/4 Section 01400 Quality Control 01400/1 01400/12 Section 01421 Reference Standards and Definitions 01421/1 01421/5 Section 01500 Temporary Facilities 01500/1 01500/13 Section 01600 General Materials Plant and Equipment 01600/1 01600/10 Section 01630 Substitutions 01630/1 01630/4 Section 01700 Project Closeout 01700/1 01700/6 Section 01710 Cleaning 01710/1 01710/3

    Section 01720 Project Record Documents 01720/1 01720/11 Section 01740 Warranties 01740/1 01740/3

    Section 01750 Spare Parts and Maintenance Materials 01750/1 01750/4 Section 01770 Take-Over Procedures 01770/1 01770/3

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/2

    DIVISION 2 - SITE WORK

    Section 02200 Earthwork 02200/1 02200/12

    Section 02500 Road Work 02500/1 02500/1 Section 02600 Environmental Works 02600/1 02600/25 Section 02780 Unit Pavers 02780/1 02780/8 Section 02900 Landscaping 02900/1 02900/10

    DIVISION 3 - CONCRETE WORK

    Section 03100 Concrete Formwork 03/1 03/5 Section 03300 Cast-In Place Concrete 03/6 03/72 Section 03500 Beds and Screed 03/73 03/78

    DIVISION 4 - MASONRY

    Section 04100 Mortar 04100/1 04100/3

    Section 04200 Unit Masonry 04200/1 04200/13

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/3

    VOLUME 2 PART 2

    DIVISION 5 - METALS

    Section 05500 Metal Fabrications 05500/1 05500/12

    DIVISION 6 - WOOD AND PLASTICS

    Section 06100 Rough Carpentry 06100/1 06100/6 Section 06200 Finish Carpentry 06200/1 06200/8

    DIVISION 7 - THERMAL AND MOISTURE PROTECTION

    Section 07100 Waterproofing and Roofing 07100/1 07100/13 Section 07210 Thermal Insulation 07210/1 07210/5 Section 07841 Fire Stopping and Smoke Seals 07841/1 07841/6 Section 07920 Joint Sealants 07920/1 07920/11

    DIVISION 8 - DOORS AND WINDOWS

    Section 08110 Steel Doors and Frames 08110/1 08110/9 Section 08520 Aluminium Windows 08520/1 08520/12 Section 08540 Aluminium Doors 08540/1 08540/11 Section 08710 Finish Hardware 08710/1 08710/13 Section 08800 Glass and Glazing 08800/1 08800/12

    DIVISION 9 - FINISHES

    Section 09220 Plastering 09220/1 09220/10 Section 09310 Ceramic Tiles 09310/1 09310/8 Section 09350 Cement Tiles and Terrazzo 09350/1 09350/7 Section 09800 Special Coatings 09800/1 09800/14 Section 09900 Painting 09900/1 09900/13

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/1

    SPECIFICATIONS

    CONTENTS

    SPECIFICATIONS FOR CIVIL, STRUCTURAL AND ARCHITECTURAL

    VOLUME 2 PART 1

    DIVISION 1 GENERAL REQUIREMENTS

    Section 01010 General Instructions 01010/1 01010/6 Section 01012 Summary of Work 01012/1 01012/2 Section 01025 Measurement and Payment 01025/1 01025/3 Section 01041 Coordination 01041/1 01041/5 Section 01045 Cutting and Patching 01045/1 01045/5 Section 01050 Field Engineering 01050/1 01050/3 Section 01060 Regulatory Requirements 01060/1 01060/2 Section 01200 Project Meetings 01200/1 01200/6 Section 01300 Submittals 01300/1 01300/21 Section 01310 Construction Schedule 01310/1 01310/4 Section 01400 Quality Control 01400/1 01400/12 Section 01421 Reference Standards and Definitions 01421/1 01421/5 Section 01500 Temporary Facilities 01500/1 01500/13 Section 01600 General Materials Plant and Equipment 01600/1 01600/10 Section 01630 Substitutions 01630/1 01630/4 Section 01700 Project Closeout 01700/1 01700/6 Section 01710 Cleaning 01710/1 01710/3

    Section 01720 Project Record Documents 01720/1 01720/11 Section 01740 Warranties 01740/1 01740/3

    Section 01750 Spare Parts and Maintenance Materials 01750/1 01750/4 Section 01770 Take-Over Procedures 01770/1 01770/3

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/2

    DIVISION 2 - SITE WORK

    Section 02200 Earthwork 02200/1 02200/12

    Section 02500 Road Work 02500/1 02500/1 Section 02600 Environmental Works 02600/1 02600/25 Section 02780 Unit Pavers 02780/1 02780/8 Section 02900 Landscaping 02900/1 02900/10

    DIVISION 3 - CONCRETE WORK

    Section 03100 Concrete Formwork 03/1 03/5 Section 03300 Cast-In Place Concrete 03/6 03/72 Section 03500 Beds and Screed 03/73 03/78

    DIVISION 4 - MASONRY

    Section 04100 Mortar 04100/1 04100/3

    Section 04200 Unit Masonry 04200/1 04200/13

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    _____________________________________________________________________________________

    Khatib and Alami Contents C/3

    VOLUME 2 PART 2

    DIVISION 5 - METALS

    Section 05500 Metal Fabrications 05500/1 05500/12

    DIVISION 6 - WOOD AND PLASTICS

    Section 06100 Rough Carpentry 06100/1 06100/6 Section 06200 Finish Carpentry 06200/1 06200/8

    DIVISION 7 - THERMAL AND MOISTURE PROTECTION

    Section 07100 Waterproofing and Roofing 07100/1 07100/13 Section 07210 Thermal Insulation 07210/1 07210/5 Section 07841 Fire Stopping and Smoke Seals 07841/1 07841/6 Section 07920 Joint Sealants 07920/1 07920/11

    DIVISION 8 - DOORS AND WINDOWS

    Section 08110 Steel Doors and Frames 08110/1 08110/9 Section 08520 Aluminium Windows 08520/1 08520/12 Section 08540 Aluminium Doors 08540/1 08540/11 Section 08710 Finish Hardware 08710/1 08710/13 Section 08800 Glass and Glazing 08800/1 08800/12

    DIVISION 9 - FINISHES

    Section 09220 Plastering 09220/1 09220/10 Section 09310 Ceramic Tiles 09310/1 09310/8 Section 09350 Cement Tiles and Terrazzo 09350/1 09350/7 Section 09800 Special Coatings 09800/1 09800/14 Section 09900 Painting 09900/1 09900/13

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/1

    SECTION 01010

    GENERAL INSTRUCTIONS

    PART 1 GENERAL

    1.1 Summary

    .1 Conform to the General Conditions of the Contract as amended herein and articles contained in Division 1.

    1.2 Project Documents

    .1 The Project Documents comprises the written Tender/Bid Documents, Contract Documents, Technical Specifications, Finish/Detail Schedules. The Project Documents will consist of several volumes, and accompanies the larger Drawings, the combination of which provides the details to tender and complete the construction of the Project Work under this Contract.

    .2 Ensure that Subcontractors and suppliers carefully read and study the General Conditions of the Contract and Division 1, before commencing their respective work. Claims for delay and/or extra expense will not be accepted as a reason for non-compliance with this requirement.

    .3 The Project Documents has been divided into Divisions and Sections for reference, but a Section may consist of the work of more than one Subcontractor or supplier. The responsibility for determining which Subcontractor or supplier shall provide labour, material, products, equipment and services to complete the work rests solely with the Contractor.

    .4 This Project Documents is not intended as a detailed description of installation methods, but serves to indicate particular requirements in the completed work.

    .5 Mention in the Project Documents or indication on the Drawings of materials, products, operations, or methods, requires that the Contractor provide each item mentioned or indicated of the quality or subject to the qualifications noted; perform according to the conditions stated each operation prescribed; and provide labour, materials, products, equipment and services to complete the Work.

    1.3 Discrepancies/Conflicts/Omissions

    .1 If discrepancies or conflicts in, or omissions from Drawings, Specifications or other Contract Documents are suspected, or if there is doubt as to the meaning or intent thereof, notify the Engineer at once.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/2

    .2 Drawings, Specifications and other Contract Documents are intended to be in compliance with local laws, by-laws, regulations and other requirements of local jurisdictional authorities. Perform work in conformity with such requirements. If discrepancies, conflicts or omissions are suspected, notify the Engineer at once.

    .3 Comply with Engineer's written instructions or explanations.

    .4 In the event that a discrepancy has not been reported to the Engineer or clarified by Addendum (prior to submission of Bids), Bidders shall include in their Bid Price, the more stringent requirements.

    .5 Failure to notify the Engineer of any discrepancies, shall result in the Contractor incurring the responsibility for resulting costs and conditions.

    1.4 Examination

    .1 Make a careful examination of the site of the Work, and investigate and be satisfied as to all matters relating to the nature of the Work to be undertaken, as to the means of access and egress thereto and therefrom, as to the obstacles to be met with, as to the rights and interests which may be interfered with during the construction of the Work, as to the extent of the Work to be performed and any and all matters which are referred to in the Drawings, Specifications and other Contract Documents, or which are necessary for the full and proper understanding of the Work and the conditions under which it will be performed. No allowances shall be made subsequently by the Employer or Engineer for error or negligence in connection with this requirement.

    .2 Before commencing any of the work, carefully examine the work of other Sections upon which it may depend. Report in writing to the Engineer, defects which might affect new work. Commencement of new work implies acceptance of all work by other Sections and Other Contractors upon which the new work depends.

    1.5 Dimensions

    .1 Check all dimensions at the site before fabrication and installation commences and report all discrepancies to the Engineer.

    .2 Where dimensions are not available before fabrication commences, ensure that the dimensions required are agreed upon between the parties concerned.

    .3 Wall thicknesses shown on the Drawings are nominal only; ascertain the actual sizes at the building.

    .4 Verify dimensions of shop fabricated portions of the building on the site before shop drawings and fabrications are commenced. The Employer will not accept claims for extra expense by reason of non-compliance with this requirement.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/3

    .5 In areas where equipment is to be installed, check dimensional data on equipment to ensure that area and equipment dimensions are compatible with necessary access and clearance provided. Ensure that equipment supplied is dimensionally suitable for space provided.

    .6 The Mechanical and Electrical Drawings are intended to show approximate locations of mechanical and electrical apparatus, mechanical fixtures, mechanical equipment, piping and duct runs, electrical fixtures, electrical outlets, electrical equipment, electrical units, and conduit in diagrammatic form. In locations where spatial characteristics or job conditions make it difficult to determine or comply with the intended location of these items obtain direction from the Engineer. If relocation of such item(s) is necessary it shall be done without change to the Contract Price.

    .7 Leave areas clear where space is indicated to be reserved for future equipment, including access to such future equipment.

    .8 Leave adequate space and provision for servicing of equipment and removal and reinstallation of replaceable items including, but not limited to such items as motors, coils and tubes.

    .9 Furr in exposed pipes and conduit located not more than 300 mm from the wall (exception - storage rooms, janitor, service, mechanical and electrical, telephone, garage), and/or ceiling surfaces, and finish similar to the respective wall and/or ceiling surfaces.

    .10 Ensure that pipes, conduit, service lines and ducts are concealed in chases, behind furring or above ceiling except where such items are noted as being exposed and except where no ceiling is provided.

    .11 Install equipment, materials and products to present a neat appearance. Run piping, ducts and conduit parallel to or perpendicular to the building planes. Install piping, ducts, and conduit as close to underside of structure as possible, unless shown otherwise.

    .12 Install ceiling mounted components, including but not limited to air registers, sprinkler heads and lighting fixtures, in accordance with final reflected ceiling plans.

    1.6 Overloading

    .1 Do not load the structure during construction with a load greater than it is calculated to bear safely. Be solely responsible and liable for damages resulting from violation of this requirement. Provide temporary bracing and supports equivalent in strength to the permanent support. Do not place loads on concrete floors until they have obtained their design strength.

    .2 Do not cut, bore or sleeve load bearing members unless shown on structural Drawings or otherwise accepted by the Engineer in writing.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/4

    1.7 Relocation of Doors and/or Partitions

    .1 The Employer and the Engineer reserve the right to relocate doors and frames and/or partitions at any time prior to installation, without additional cost to the Employer, assuming that there will be no increase in the number of doors and/or frames, nor greater lengths or heights of partition incurred.

    .2 Should there be an increase or decrease in doors, frames or lengths of partition after such relocation, the Contract Price will be adjusted in accordance with the provisions for changes in the Contract Documents.

    1.8 Relocation of Mechanical/Electrical Items

    .1 The Employer and the Engineer reserve the right to relocate electrical outlets at any time prior to installation, without additional cost to the Employer, assuming that the relocation per outlet does not exceed 3000 mm from the original location. No credits will be anticipated where relocation per outlet of up to and including 3000 mm reduces materials, products and labour.

    .2 Should relocations per outlet exceed 3000 mm from the original location the Contract Price will be adjusted in accordance with the provisions for changes in the Contract Documents.

    .3 Alter the location of pipes and other equipment, without additional cost to the Employer, if approved, provided the change is made before installation.

    1.9 Codes and Standards

    .1 Consider contract forms, codes, specifications, standards, manuals, and installation and application instructions referred to in these Specifications to be the latest published editions at the date of submission of the bid unless otherwise stated in the applicable building code, Specifications or otherwise required by the jurisdictional authorities.

    .2 The purpose of referring to standards in the Specifications is to establish minimum acceptable standards of materials, products and workmanship. Ensure that materials, products and workmanship meet or exceed requirements of the reference standards specified. Obtain from the manufacturer an independent test report stating that product meets specified requirements.

    .3 Where a material or product is specified in conjunction with a referenced standard, do not supply the material or product if it does not meet the requirements of the standard. Supply another specified material or product, or an acceptable material or product of other accepted alternative which does meet the requirements of the standard, at no additional cost to the Employer. Testing may be required by the Engineer to ensure that the alternative material or equipment meets the requirements of the Contract Documents.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/5

    .4 Where no standard is referred to, provide materials, products and workmanship which meet requirements of the applicable standards of the Place of Work.

    1.10 Existing Public Service Lines

    .1 Where existing public service lines are indicated to be removed and/or relocated, perform the work in compliance with the requirements of jurisdictional authorities.

    .2 Repair public roads, walkways and curbs soiled or damaged due to construction to the requirements of the local jurisdictional authorities.

    1.11 Public Utilities

    .1 Before commencement of the work, confirm that areas to be occupied by public utilities, including but not necessarily limited to electric, water, telephone, meet the correct requirements of the respective utility company.

    .2 If the requirements of the utility companies are not met, notify the Engineer in writing.

    1.12 Expansion and Contraction

    .1 Ensure building movements induced by temperature changes are absorbed without damage of any kind to building components and assemblies.

    .2 Make provisions for expansion and contraction due to temperature changes within components, products and assemblies, and between adjacent component products and assemblies, and due to building movements including but not limited to creep, column shortening, deflection, sway and twist. Ensure provisions for expansion, contraction, and building movements prevent damages from occurring to and within components, products, systems and assemblies.

    1.13 Air and Fluid Movements

    .1 Make provisions in pipes, plenums, ducts and vessels containing air and fluids as is necessary to prevent damages and generation of noise due to fluid and air induced pressure, surges and vibrations, to pipes, plenums, ducts and vessels and to adjacent components, assemblies and constructions to which pipes, ducts, plenums and vessels are attached or pass through.

    1.14 Building Voltages

    .1 Comply with available building voltages as indicated in Electrical Specifications and Drawings.

    1.15 Fossils

    Deem fossils, coins, articles of value or antiquity and structure and other remains or items of geological or archaeological interest discovered on or in the area of the site of the work to be the absolute property of the Employer. Take reasonable precautions to prevent workmen or

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami General Instructions Section 01010/6

    persons from removing or damaging such articles or items, and immediately upon discovery thereof and before removal, inform the Engineer of such discovery and carry out at the expense of the Employer, the Employer's instructions as to the specialized disposal of the same.

    1.16 Documents on Site

    Contractor shall keep on site an up-to-date copy of all standards quoted herein, all relevant building codes and regulations and a complete set of Drawings and Specifications.

    1.17 Powder Actuated Fasteners

    Do not use powder actuated fastening systems on site unless prior approval of Engineer has been obtained.

    1.18 Fire Rating

    Where a material, component or assembly is required to be fire rated, the fire rating shall be as determined or listed by one of the testing authorities acceptable to the jurisdictional authorities, or well known internationally and to acceptable by the Engineer.

    1.19 Existing Public Service Lines

    1 Where existing public service lines are indicated to be removed and/or relocated, perform the work in compliance with the requirements of jurisdictional authorities.

    2 Repair public roads, walkways and curbs soiled or damaged due to construction to the requirements of the local jurisdictional authorities.

    PART 2 - PRODUCTS (Not Used)

    PART 3 - EXECUTION (Not Used)

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Summary of Work Section 01012/1

    SECTION 01012

    SUMMARY OF WORK

    PART 1 GENERAL

    1.1 Related Documents

    Drawings and general provisions of the Contract, including General Conditions, Conditions of Particular Application and Division - 1 Specification Sections, apply to work of this Section.

    1.2 Project Description

    The work involves the Construction, Completion, Maintenance and Handing over Saudi Railway (SAR) Project Batch No. 3, Site GROUPING # 2 AL NARIYAH YARD SEGMENT 7 All complete as specified, detailed on drawings, and to the approval of the Engineer.

    1.2.1. Project Location: Kingdom of Saudi Arabia

    1.2.2. Work Covered by Contract Documents

    1.3.1. Contract Documents: 1- Drawings. 2- Specifications. 3- Conditions of Contract. 4- Tender Queries 5- Bills of Quantities

    1.3.2. Contract Work: Contract shall include but not limited to the following: Excavation where required, Backfilling, Site Work, Concrete Work, Block Work, Waterproofing , Wood work, Aluminium and Metal, all finishes, Mechanical systems, electrical systems and all related work for proper operation.

    1.4 Contract Method

    Construct the work under a Remeasured Contract.

    1.5 Contractor Use of Premises

    .1 The Contractor shall coordinate the Work to accommodate the work with other Contractors.

    .2 Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to the Employer, the Employer's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Summary of Work Section 01012/2

    1.6 Occupancy Requirements

    1.6.1 Partial Employer Occupancy: The Employer reserves the right to occupy and to place and install furniture in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placing of furniture and partial occupancy shall not constitute acceptance of the total Work.

    The Engineer shall prepare a Certificate of Substantial completion for each specific portion of the Work to be occupied prior to Employer occupancy.

    Prior to partial Employer occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy, the Employer will operate and maintain mechanical and electrical systems serving occupied portions of the building.

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Measurement and Payment Section 01025/1

    SECTION 01025

    MEASUREMENT AND PAYMENT

    PART 1 - GENERAL

    1.1 Section Include

    .1 Payments.

    .2 Payments Withheld.

    .3 Payments to Subcontractors.

    1.2 Related Sections

    .1 General Conditions.

    .2 Special Conditions.

    1.3 Payments

    .1 Payments to the Contractor will be made in accordance with the General Conditions and Special Conditions of the Contract.

    .2 Prior to submittal of monthly applications for payment the Contractor shall request his Mechanical and Electrical Subcontractors to submit their applications for payment to the Consulting Engineers of Record for evaluation and approval prior to being incorporated into the Contractor's application.

    1.4 Payment Withheld

    .1 The Engineer may withhold or nullify the whole or a part of any application for payment represented by the Contractor's estimate or any Certificate for Payment to such extent as may be necessary to protect the Employer from loss because of:

    .1 Defective work not remedied;

    .2 Claims filed or reasonable evidence indicating probable filing of claims;

    .3 Failure of the Contractor to make payments properly to Subcontractors or for material or labour;

    .4 A reasonable doubt that the Contract can be completed, and all unpaid claims, charges, liens and encumbrances satisfied, for the balance then unpaid;

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Measurement and Payment Section 01025/2

    .5 Damage to another Contractor;

    .6 Erroneous estimates by the Contractor of the value of the Work performed;

    .7 Unauthorized deviations by the Contractor from the Contract Documents;

    .8 Unsatisfactory progress of the Project Work by the Contractor;

    .9 Contractor not complying with instructions issued to him in accordance with the terms of the Contract.

    .2 When the above grounds are removed, payments will be made for amounts withheld because of them. No interest will be paid on payments withheld. The Engineer's determination as to the issuance or withholding of, or the amount of payment reflected by Certificates for Payments, shall be final and binding and shall subject the Engineer to no liability whatsoever to the Employer, Contractor, Surety or any other person.

    1.5 Payments to Subcontractors

    .1 Subcontractors shall notify the Engineer in writing if the Contractor fails to make payments when due to Subcontractors who have contracts with the Contractor. The Engineer will consider payments have been made if no such written notice is received.

    .2 Should the Engineer find that the Contractor is not paying Subcontractors then the Engineer will require the Contractor to provide a legal declaration. With the legal declaration the Contractor shall also provide the following information:

    .1 The Contract date with the Employer.

    .2 The name of the Contractor.

    .3 The Project name and legal description.

    .4 The name and address of the Subcontractor and/or Subcontractors.

    .5 The date the Subcontractor was complete on the Project.

    .6 The amount of money of the Contract with the Subcontractor(s).

    .7 The amount of money of any approved extras to the Subcontract(s).

    .8 The last day of work on the Project for the Subcontractor.

    .9 A statement that the Work is complete.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Measurement and Payment Section 01025/3

    .10 The amount of money paid to date to the Subcontractor(s).

    .11 The amount of money owing to the Subcontractor(s).

    .12 The date the holdback money is due to be released to the Contractor and Subcontractor (this date is as stipulated in the Contract).

    .13 The name of the person swearing the declaration and the name of the jurisdictional authority certifying the legal declaration.

    .14 Person swearing the legal declaration must be an officer of the Contractor.

    PART 2 - PRODUCTS (Not Used)

    PART 3 - EXECUTION (Not Used)

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Coordination Section 01041/1

    SECTION 01041

    COORDINATION

    PART 1 GENERAL

    1.1 Related Documents

    Drawings and general provisions of the Contract, including General Conditions, Conditions of Particular Application and Division - 1 Specification Sections, apply to work of this Section.

    1.2 Summary

    This section includes administrative and supervisory requirements necessary for coordinating construction operations on the Project to be collectively fulfilled by the prime Contractor including, but not limited to, the following:

    General project coordination procedures Coordination drawings Administrative and supervisory personnel Cleaning and protection

    Certain areas bf responsibility may be assigned to a specific contractor, and the Prime Contractor shall be assigned responsibility for overall coordination.

    1.3 Related Sections

    The following Sections contain requirements that relate to this Section:

    Division 1 Section 01200"Project Meetings" for progress meetings, coordination meetings, 'and preinstallation conferences.

    Division 1 Section 01300 "Submittals" for preparing and submitting the Contractor's Construction Schedule.

    Division 1 Section 01600" General Plant Materials and Equipment" for coordinating general installation

    Division 1 Section 01700"Contract Closeout" for coordinating contract closeout.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Coordination Section 01041/2

    1.4 Coordination

    1.4.1 Coordination: Contractor shall coordinate its construction activities included in various sections of these specifications with those of other contractors and other entities involved to assure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its operations with operations included under different Sections of the Specifications that depend on each other for proper installation, connection, and operation.

    Contractor shall schedule its construction operations in the sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

    Where availability of space is limited, Contractor shall coordinate installation of different components with other contractors to assure maximum accessibility for required maintenance, service, and repair.

    Contractor shall make adequate provisions to accommodate items scheduled for later installation.

    Where necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.

    Prepare similar memoranda for the Engineer.

    1.4.2 Administrative Procedures: Contractor shall coordinate scheduling and timing of its required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and assure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

    Preparation of schedules Installation and removal of temporary facilities Delivery and processing of submittals Progress meetings Project closeout activities

    1.4.3 Conservation: Contractor shall coordinate construction activities to assure that operations are carried out with consideration of energy, water, and materials.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Coordination Section 01041/3

    1.5 Submittals

    1.5.1 Coordination Drawings: Prepare coordination drawings where careful coordination is needed for installation of products and materials fabricated by separate entities. Prepare coordination drawings where limited space availability necessitates maximum utilization of space for efficient installation of different components.

    Show the relationship of components shown on separate shop drawings.

    Indicate required installation sequences.

    Comply with requirements contained in Section "Submittals".

    1.5.2 Preparation Responsibility: Preparation of coordination drawings is the responsibility of the Contractor principally involved, where involvement by other contractors is minor.

    Where the Drawings reflect substantial participation by more than one contractor, the Contractor shall coordinate preparing of coordination drawings.

    1.5.3 Staff Names: Within 15 days of commencement of construction operations, each contractor shall submit a list of its principal staff assignments, including the superintendent and other personnel in attendance at the Project Site. Identify individuals and their duties and responsibilities. List their addresses and telephone numbers.

    Post copies of the list in the Project meeting room, the temporary field office, and each temporary telephone.

    1.6 Administrative and Supervisory Personnel

    1.6.1 General: in addition to its Project superintendent, Contractor shall provide other administrative and supervisory personnel, as required for proper performance of the Work. Include special personnel required for coordination of operations with other contractors.

    1.6.2 Project - Coordinator: The Contractor shall provide a full-time project coordinator, experienced in administration and supervision of building construction, including mechanical and electrical work. The Project Coordinator shall be authorized to act as the coordinator of construction activities between the separate Contracts.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Coordination Section 01041/4

    Construction activities requiring coordination by the Project Coordinator include, but are not limited to, the following:

    Scheduling and sequencing the Work Sharing access to work spaces Installations Protection of each other's Work Cutting and patching Preparation of coordination drawings Inspections and tests Temporary services and facilities

    PART 2 PRODUCTS

    (Not Applicable)

    PART 3 EXECUTION

    3.1 General Coordination Provisions

    3.1.1 Inspection of Coordination: The Prime Contractor shall require the installer of each major component to inspect both the substrate and conditions under which work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.

    3.1.2 Coordinate Temporary Enclosures: With required inspections and tests to minimize the necessity of uncovering completed construction for that purpose.

    3.2 Cleaning and Protection

    3.2.1 Clean and protect construction in progress and adjoining materials in place during handling and installation. Apply protective covering where required to assure protection from damage or deterioration at Substantial Completion.

    Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to assure operability without damaging effects.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Coordination Section 01041/5

    3.2.2 Limiting Exposures: Contractor shall supervise the construction operations of other Contractors, to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. Where applicable, such exposures include, but are not limited to, the following:

    Excessive static or dynamic loading Excessive internal or external pressures Excessively high or low temperatures Thermal shock Excessively high or low humidity Air contamination or pollution Water Solvents Chemicals Light Radiation Puncture Abrasion Heavy traffic Soiling, staining, and corrosion Combustion Electrical current High-speed operation Improper lubrication Unusual wear or other misuse Contact between incompatible materials Destructive testing Misalignment Excessive weathering Unprotected storage Improper shipping or handling Theft

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Cutting and Patching Section 01045/1

    SECTION 01045

    CUTTING AND PATCHING

    PART 1 GENERAL

    1.1 Related Documents

    Drawings and general provisions of the Contract, including General Conditions, Conditions of Particular Application and Division - 1 Specification Sections, apply to work of this Section.

    1.2 Summary

    This section includes procedural requirements for cutting and patching to install or attach something to or in an existing surface, or to cut an existing surface to gain access to concealed supports or other services.

    Cutting, is the removal of existing construction to permit the installation or performance of the Work.

    Patching is the fitting and repair required to restore surfaces to original conditions following the installation or performance of the Work.

    1.3 Related Sections

    The following Sections contain requirements that relate to this Section:

    Division I: Section 01041 "Coordination" for coordination cutting and patching with other construction activities.

    Requirements of this Section apply specially to mechanical and electrical installations.

    1.4 Submittals

    1.4.1 Cutting and Patching Proposal: Submit a proposal describing procedures well in advance of the time cutting and patching will be performed. Request approval to proceed. Include the following information, as applicable, in the proposal:

    Describe the extent of cutting and patching required. Show how it will be performed and indicate why it cannot be avoided.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Cutting and Patching Section 01045/2

    Describe anticipated results in terms of changes to existing construction. Include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.

    List products to be used.

    Where cutting and patching involves adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with the original structure.

    Approval by the Engineer to proceed with cutting and patching does not waive the Engineer's right to later require complete removal and replacement of unsatisfactory work.

    1.4.2 Utilities: List utilities that cutting and patching shall disturb or affect. List utilities that shall be relocated and those that shall be temporarily out-of-service. Indicate how long services shall be disrupted.

    1.5 Quality Assurance

    1.5.1 Requirements for Structural Work: Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio.

    Obtain approval of the cutting and patching proposal before cutting and patching the following structural elements:

    Foundation construction Bearing and retaining walls Structural concrete Structural steel Lintels Structural decking Stair systems Miscellaneous structural materials Equipment supports Piping, ductwork, vessels, and equipment

    1.5.2 Operational Limitations: Do not cut and patch operating elements or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut and patch operating elements or related components in a manner that would result in increased maintenance or decreased operational life or safety.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Cutting and Patching Section 01045/3

    1.5.3 Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in the Engineers opinion, reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching. Remove and replace construction cut and patched in a visually unsatisfactory manner.

    PART 2 PRODUCTS

    2.1 Materials

    Use materials identical to existing materials, for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible if identical materials are unavailable or cannot be used. Use materials whose installed performance will equal or surpass that of existing materials.

    PART 3 EXECUTION

    3.1 Inspection

    Examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed before cutting. If unsafe or unsatisfactory conditions are encountered, take corrective action before proceeding.

    Before proceeding, meet parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict, resolve potential conflicts before proceeding.

    3.2 Preparation

    Provide temporary support of work to be cut.

    Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations.

    Avoid cutting existing pipe, conduit, or ductwork serving the building but scheduled to be removed or relocated until provisions have been made to bypass them.

    3.3 Performance

    Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Cutting and Patching Section 01045/4

    Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.

    3.3.1 Cutting: Cut existing construction using methods least likely to damage elements retained or adjoining construction.

    In general, where cutting, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

    To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.

    Cut through concrete and masonry using a cutting machine, such as a Carborundum saw or a diamond-core drill.

    Comply with requirements of applicable Division - 2 Sections where cutting and patching requires excavating and backfilling.

    Where services are required to be removed, relocated, or abandoned, by-pass utility services, such as pipe or conduit, before cutting. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.

    3.3.2 Patching: Promptly patch and repair holes and damaged surfaces caused to adjacent construction by selective demolition operations.

    Patch to produce surfaces suitable to new materials.

    Patch with durable seams that are as invisible as possible. Comply with specified tolerances.

    Completely fill holes and depression in existing concrete or masonry walls to remain with an approved concrete or masonry patching material.

    Where feasible, inspect and test patched areas to demonstrate integrity of the installation.

    Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that shall eliminate evidence of patching and refinishing.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Cutting and Patching Section 01045/5

    Where removing walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform colour, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform colour and appearance.

    Patch, repair, or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.

    3.3.3 Plaster Installation: Comply with specifications and install thickness and coats as indicated.

    Unless otherwise indicated, provide 3-coat work.

    Finish plaster to match existing adjacent surfaces. Sand lightly to remove trowel marks and arises.

    Cut, patch, point-up, and repair plaster to accommodate other construction.

    3.4 Cleaning

    Clean areas and spaces where cutting and patching are performed. Completely remove pint, mortar, oils, putty, and similar items. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. Restore damaged pipe covering to its original conditions.

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Field Engineering Section 01050/1

    SECTION 01050

    FIELD ENGINEERING

    PART 1 - GENERAL

    1.1 Section Includes

    .1 Field engineering survey services to measure and stake the site and building works.

    .2 Survey services to establish and confirm invert measurements for the Work.

    .3 Subsurface conditions.

    .4 The related sections article contained herein is included for reference only. All items contained therein are an assessment of the work, which should not be presumed to be complete.

    1.2 Related Sections

    .1 Section 01300 - Submittals: Record Drawings.

    .2 Section 01720 - Project Record Documents.

    .3 Employer's identification of existing survey control points and property limits.

    1.3 Qualifications of Surveyor

    .1 Qualified land surveyor, registered to practice in Kingdom of Saudi Arabia, acceptable to Employer.

    1.4 Survey Reference Points

    .1 Existing base horizontal and vertical control points are designated on drawings.

    .2 Locate, confirm and protect control points prior to starting site work. Preserve permanent reference points during construction.

    .3 Make no changes or relocations without prior written notice to Engineer.

    .4 Report to Engineer when a reference point is lost or destroyed, or requires relocation because of necessary changes in grades or location.

    .5 Require surveyor to replace control points in accordance with original survey control.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Field Engineering Section 01050/2

    1.5 Survey Requirements

    .1 Establish two (2) permanent bench marks on site in widely separate places, referenced to established bench marks by survey control points. Record locations, with horizontal and vertical data in Project Record Documents. As the work progresses, establish bench marks at each floor.

    .2 Establish lines and levels, locate and lay out, by instrumentation.

    .3 Verify grades, lines, levels and dimensions indicated and report any errors or inconsistencies to the Engineer before commencing work. Confirm job dimensions at once to allow prompt checking of shop and other Drawings. Be responsible for work done prior to the receipt of the Engineer's decision regarding reported discrepancies.

    .4 Stake for grading, fill and topsoil placement and landscaping features.

    .5 Stake slopes and berms.

    .6 Establish pipe invert elevations.

    .7 Stake batter boards at corners for foundations.

    .8 Establish foundation column locations and floor elevations.

    .9 Locate and fix location of walls, partitions, shafts and all parts of construction, as work proceeds, as a guide to the various Sections. Check the layout of other Sections.

    1.6 Building Dimensions

    .1 Ensure that necessary job dimensions are taken and Subcontractors are coordinated for the proper execution of the Work. Assume complete responsibility for the accuracy and completeness of such dimensions, and for coordination.

    .2 Verify that work as it proceeds, is executed in accordance with dimensions and positions indicated which maintain levels and clearances to adjacent work, as set out by requirements of the Drawings, and ensure that work installed in error is rectified before construction continues.

    .3 Check and verify dimensions referring to work and interfacing of services. Verify dimensions, when pertaining to the Work of other Subcontractors, with the Subcontractor concerned. Ensure that various Subcontractors cooperate for the proper performance of the Work.

    .4 Do not scale directly from the Drawings. If there is ambiguity or lack of information, immediately inform the Engineer. Any change resulting from the disregard of this clause will be the responsibility of the Contractor.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Field Engineering Section 01050/3

    .5 All details and measurements of any work which is to fit or to conform with work installed shall be taken at the site.

    1.7 Records

    .1 Maintain a complete, accurate log of control and survey work as it progresses.

    1.8 Subsurface Conditions

    .1 Promptly notify the Engineer in writing if subsurface conditions at the Place of the Work differ materially from those indicated in the Contract Documents, or a reasonable assumption of probable conditions based thereon.

    .2 After prompt investigation, should Engineer determine that the conditions do differ materially, instructions will be issued for changes in the Work as provided in the Contract.

    PART 2 - PRODUCTS (Not Used)

    PART 3 - EXECUTION (Not Used)

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Regulatory Requirements Section 01060/1

    SECTION 01060

    REGULATORY REQUIREMENTS

    PART 1 - GENERAL

    1.1 Section Includes

    .1 Regulatory documents.

    .2 Fire safety features.

    1.2 Related Sections

    .1 Section 01010 - General Instructions.

    1.3 Regulatory Documents

    .1 Conform to the local Building Code and requirements of the jurisdictional authorities, hereinafter referred to as Codes.

    .2 Engage a registered Professional Engineer, registered in Kingdom of Saudi Arabia, to design formwork and falsework for concrete.

    .3 Requirements of jurisdictional authorities shall apply to Work in precedence to the requirements of the Contract, except that more stringent requirements of the Contract shall take precedence over requirements of jurisdictional authorities.

    .4 Nothing contained in the Drawings or Specifications is to be so construed as to be in conflict with any law, bylaw or regulation of the jurisdictional authorities. In case of discrepancy between regulatory requirements and Contract Documents, regulatory requirements take precedence over Contract Documents, except under no circumstances, reduce the standards established by the Contract Documents.

    .5 Contract forms, codes, specifications, standards, manuals, and installation, application and maintenance instructions, referred to in these Specifications are to be of the latest published editions at the date of signing the Contract.

    .6 Provide copies of Standards referred to in the Specification for joint use of Contractor and Engineer on site, when so requested by the Engineer.

    .7 Unless otherwise indicated, obtain and pay for all permits, licences and certificates of inspection required by the jurisdictional authorities.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    Khatib and Alami Regulatory Requirements Section 01060/2

    .8 Be responsible for making arrangement with and obtaining necessary permits from jurisdictional authorities to ensure access to the site for construction equipment, and performance of the Work. The Employer will not be responsible for obtaining permissions for access or for any payments required by the jurisdictional authorities for provision of access.

    .9 Except where special permission is obtained, maintain clear access for roads and sidewalks on public property.

    1.4 Fire Safety Features

    .1 The safety features called for in the Contract Documents are supplied and installed to meet fire safety standards established by the jurisdictional authorities.

    .2 Ensure that the work of Subcontractor is properly coordinated to achieve the intent of these Contract Documents.

    PART 2 - PRODUCTS (Not Used)

    PART 3 - EXECUTION (Not Used)

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/1

    SECTION 01200

    PROJECT MEETINGS

    PART 1 GENERAL

    1.1 Related Documents

    General provisions of the Contract, including General Conditions, Conditions of Particular Application and other Division - 1 Specification Sections, apply to work of this section.

    1.2 Description

    Project meetings provide the Employer, Engineer and Contractor an opportunity to communicate directly with each other and with other parties involved in the Project.

    This Section covers the administrative and procedural requirements for project meetings, including but not limited to

    Preconstruction conference Progress meetings Coordination meetings

    1.3 Related Sections

    The following sections contain requirements that relate to this section:

    Section 01014: Coordination Section 01300: Submittals

    1.4 Attendees

    Unless other-wise specified or required by the Engineer, the meetings shall be attended by the Employer, the Engineer and the Contractor and his Superintendent. Contractor of special packages, subcontractors and suppliers may attend when involved in the matters to be discussed or resolved, but only when requested by the Employer, Engineer or Contractor.

    All participants shall be authorized to conclude matters relating to the Work.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/2

    1.5 Meeting Records

    The Engineer shall record minutes of each meeting and shall furnish copies to the Employer and the Contractor within 7 working days thereafter. If either of the Employer or Contractor does not submit written objection to the contents of such minutes within 7 days after presentation to them it shall be understood and agreed that the Employer and the Contractor accept the minutes as a true record of the meeting.

    1.6 Meeting Schedule

    The Engineer is responsible for scheduling and conducting the meetings, insofar as possible, the dates, times and locations for the various meetings shall be agreed upon and recorded at the preconstruction conference. Then after, changes to the schedule shall be by agreement between the Engineer and Contractor, with appropriate written notice to all parties involved.

    PART 2 PRODUCTS

    (Not Applicable)

    PART 3 EXECUTION

    3.1 Preconstruction Conference

    A preconstruction conference and organizational meeting shall be held before starting construction at the Project Site or another convenient location, date and time designated by the Engineer, not later than 21 days after the Letter of Acceptance. In addition to the attendees listed in Clause 1.3 the meeting may be attended by the representatives of regulatory agencies having jurisdiction of the project if required, employers of affected utilities and such other persons the Employer may designate.

    Conduct the meeting to review responsibilities and personnel assignments.

    All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

    3.1.1 Execution and Submittal of Documents At the preconstruction conference: unless otherwise specified or agreed by the Employer and Contractor, the Contract Agreement shall be executed by the parties thereto and the Contractor shall present to the Employer the Performance Security, certificates of insurance, construction schedule, submittals schedule, schedule of values and all other preconstruction documents required of him by the Contract Documents.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/3

    3.1.2 Agenda: In general, items of significance that could affect progress shall be discussed. The matters to be resolved and the instructions and information to be furnished to or given by the Contractor - at the preconstruction conference include; but shall not be limited to the following:

    a. Project meeting schedule.

    b. Contractor's Construction, schedule and submittals schedule as submitted by the Contractor.

    c. Communication procedures between the parties.

    d. The names and titles of all persons authorized by the Contractor to represent and execute documents for him, with samples of all authorized signatures.

    e. The names, addresses, and telephone numbers of all those authorized by the Contractor to act for him in emergencies.

    f Construction permit requirements, procedures and posting.

    g. Public notice of starting work.

    h. Procedures concerning the installation of Work on public property not owned by the Employer.

    i. Access and rights-of-way furnished by the Employer.

    j. Forms and procedures for Contractor's submittals.

    k. Change order forms and procedures.

    a. Payment application forms and procedures and progress reports to accompany the applications.

    b. Contractor's safety and training program and designation of the Contractor's safety officer and his qualifications

    c. First aid and medical facilities to be furnished by the Contractor.

    d. Contractor's provisions for barricades, traffic control, utilities, sanitary facilities and other temporary facilities and controls.

    e. Project signs for the Employer.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/4

    f. The Engineer and his duties.

    g. Contractor's surveyor and initiation of surveying and monitoring services.

    h. Testing laboratory or agency and testing procedures.

    i. Construction equipment and methods proposed by the Contractor.

    j. Issuance of the order to commence.

    k. Matters concerning salvage items.

    l. Contractor's policy, rules restrictions and protection measures to provide protection of the environment in the project site.

    m. Other administrative and general matters as needed.

    3.2 Preinstallation Conference

    Conduct a preinstallation conference at the Project Site before each construction activity or work package that requires coordination with other construction works.

    3.2.1 Attendees: The separate specialized contractor, installer, or fabricator involved in or affected by the work or installation and its coordination or integration with other works, materials and installations that have proceeded or shall follow, shall attend the meeting.

    Review the progress of other construction activities and relations for the particular activity under consideration at each preinstallation conference including the following:

    Contract Documents Possible Conflicts Time Schedule Compatibility of Materials Temporary Facilities Space and Access Limitation Safety

    3.3 Progress Meetings

    The meetings shall be field at the Project site on a monthly basis in accordance with the agreed schedule. Coordinate dates of meeting with preparation of the payment request. All matters bearing on the progress and performance of the Works since the preceding last progress meeting shall be discussed and resolved including without limitation any previously unresolved matters, deficiencies in the Works or the methods being employed for the Works, and problems, difficulties or delays which may be encountered.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/5

    Determine where each activity is in relation to the Contractor's Schedule is on time or ahead or behind schedule.

    Discuss whether schedule revisions are required to ensure that activities shall be complete within Contract time.

    Review the present and future needs of each entity present.

    3.3.1 Schedule Updating: Revise the construction schedule after each progress meeting where revisions to the schedule have been made. Issue the revised schedule concurrently with the report of each meeting.

    3.4 Special Meetings

    Upon appropriate notice to the other parties, special meetings may be called by the Employer, Engineer or Contractor. Special meetings will be held where and when designated by the Employer for the following purposes unless the matters are resolved at the preconstruction conference.

    3.5 Separate Contracts

    Within 15 days after award of a separate contract by the Employer, a meeting attended by those specified hereinbefore in Clause 1.4 and the separate contractor shall be held to discuss and resolve the portions of the project, time constraints and the procedures to coordinate the operations of the Contractor and the separate contractor. If required by the Employer, the Contractor shall revise and resubmit his construction schedule to conform to the decisions agreed upon at this meeting.

    3.5.1 Coordination Meeting: Conduct project coordination meeting at regular intervals. Coordinate meetings are in addition to other purposes meetings such as progress meetings.

    Request representation of each party currently involved in coordination or planning the construction activities involved.

    3.6 Regulatory Agencies

    When requested, the Contractor shall attend meetings held or required by the governmental regulatory agencies or authorities having jurisdiction of the project.

    Record meeting results and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Project Meetings Section 01200/6

    3.7 Post construction Conference

    A post construction conference shall be held prior to final inspection of the Work to discuss and resolve all unsettled matters. The Performance Security and insurance shall remain in force and other documents required to be submitted by the Contractor will be reviewed and deficiencies determined. Schedules and procedures for the final inspection process and for the correction of defects and deficiencies shall be discussed and agreed.

    END OF SECTION

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/1

    SECTION 01300

    SUBMITTALS

    PART 1 GENERAL

    1.1 Related Documents

    Drawings and general provisions of Contract, including General Conditions, Conditions of Particular Application and other Division 1 Specification Sections, apply to this section.

    1.2 Description

    1.2.1 This section covers general procedures and administrative requirements for handling submittals specified, or required for the performance of the work.

    Submittals comprise:

    Submittals that require action by the Engineer as shop drawings etc.

    Submittals that do not require action by the Engineer as: construction photograph, operation and maintenance manuals, as installed drawings, etc.

    Unless otherwise specified the Contractor shall submit to the Engineer for his review and approval the following: the Contractor's construction schedule, list of subcontractors, all samples, materials lists, shop drawings, equipment data, test procedures, installation instructions, test results and other submittals required by the Contract Documents, or subsequently covered by modifications.

    Submittals and their contents shall be properly prepared, identified and transmitted as provided or as the Engineer may otherwise direct. Except for record documents, installation instructions and manuals for operation and maintenance, submittals shall be approved before the material or equipment covered by the submittal is delivered to the Site.

    1.2.2 Coordination Drawings: show the relationship and integration of different construction elements that require careful coordination during fabrication or installation to fit in the space provided or function intended Preparation of coordination Drawing shall comply with Section "Coordination".

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/2

    1.3 Administrative

    .1 Submit to the Engineer submittals listed for review. Submit with reasonable promptness and in orderly sequence so as to not cause delay in the Work. Failure to submit in ample time is not considered sufficient reason for an extension of Contract Time and no claim for extension by reason of such default will be allowed.

    .2 Work affected by the submittal shall not proceed until review is complete.

    .3 Review submittals prior to submission to the Engineer. This review represents that necessary requirements have been determined and verified and that each submittal has been checked and coordinated with the requirements of the Work and the Contract Documents. Submittals not stamped, signed, dated and identified as to the specific Project, and Specification Section where applicable, will be rejected and returned without being examined.

    .4 In making any submittal, the Contractor shall notify the Engineer of any changes made from the Contract Documents. Contractor's responsibility for errors and omissions in submission is not relieved by Engineer's review of submittals.

    .5 Contractor's responsibility for deviations in submission from requirements of Contract Documents is not relieved by Engineer's review.

    1.4 Prior to Commencement of Work

    .1 Submit the following documents to the Engineer within time stipulated within the General Conditions, Special Conditions, or individual Specification Sections, or if not stipulated, before issue of the first certificate of payment or as otherwise arranged.

    .1 Insurance policies.

    .2 Shop drawing schedule and submittal schedule.

    .3 Permits required for Work of Division 15 - Mechanical and Division 16 - Electrical.

    .4 Permits for temporary structures, hoists, access, etc.

    .5 Estimate of monthly progress cash flow (Cash Flow Schedule).

    .6 Construction Schedule.

    .7 Procurement Schedule.

    1.5 Submittal Schedule

    .1 Within thirty (30) days after the start date specified in the Notice to Proceed or at Award of Contract, submit a Schedule of Submittals required by the Contract Documents. List items in chronological order, identifying proposed submission date and proposed return date to Contractor.

    .2 Allow at least thirty five (35) calendar days for review by the Engineer.

    .3 Submit Schedule of Submittals in bar chart format, plotted with time scale in calendar days. Show submittal dates, review time and second submission. Identify latest fabrication date and delivery date of each key component.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/3

    1.6 Deviations

    At the time of the submission, the Contractor shall give notice in writing in the submittal of any deviation from the requirements of the Contract Documents.

    The deviations shall be clearly indicated or described including all other changes required to correlate the work. If the Contractor fails to describe such deviations, he shall not be relieved of the responsibility for executing the work in accordance with the Contract Documents, even though such Submittals may have been approved.

    The Contractor shall give, before tendering, written notice of any materials or plant believed inadequate or unsuitable, in violation of laws, ordinances, rules and any necessary items or work omitted. In the absence of such written notice, it is mutually agreed that the Contractor has included the cost of all required items in his Tender and that he shall be responsible for the approved satisfactory functioning of the entire system without extra compensation.

    1.7 Submittal Transmittal

    Transmit each submittal from the Contractor to the Engineer using transmittal form. The Engineer shall not accept submittals received from sources other than the Contractor.

    Record on the form or separate sheet, the relevant information, the request for data and the deviations from Contract Document requirements or contractor's certification that information complies with Contract Document requirements.

    Coordinate preparation and processing of submittals with performance of the construction activities. Transmit submittals sufficiently in advance to avoid construction delay.

    1.8 Mock-Ups

    Are full size assemblies for review of construction, coordination, testing or operating. (They are not samples).

    1.9 Field Samples

    Samples are full-sized physical examples to illustrate finish, materials, and coating.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/4

    PART 2 PRODUCTS

    2.1 Contractor's Construction Schedule

    Within 30 days after the date of the Letter of Acceptance, the Contractor shall submit to the Engineer for approval, a detailed fabrication and Contractors construction schedule as per section 1310.

    2.1 Schedule of Submittals

    2.1.1 Within 10 days after the development and acceptance of the Contractor's construction schedule, the Contractor shall in accordance with the above schedule Submit to the Engineer for approval, in both media; hard copies and computer diskettes, a detailed submittals schedule listing in chronological order all items that will be furnished for review and approval. The schedule shall include, but shall not be limited to, shop drawings and related data; standard specifications, layout drawings, materials, equipment and fixture lists, certificates of compliance, spare parts data, samples, operation and maintenance manuals, "As-Installed" drawings; test procedures and test results.

    The schedule shall indicate the type of item, Contract requirement reference, the Contractor's schedule dates for submitting the above items and projected needs for approval answers and procurement dates. In preparing the schedule, adequate time (15 days exclusive of time in the mails) shall be allowed for the Engineer to review and approve the submittals and re-submittals or if an intermediate submittal is necessary, the schedule shall allow 15 days (exclusive time in the mail) for reprocessing each submittal as specified in Part 3.

    2.1.2 Schedule updating: The Contractor shall review and/or update the schedule after any meeting or activity where revision has been made as required and submit such revised schedules to the Engineer for monitoring. No extension of Contract time shall be authorized because of failure to transmit submittals to the Engineer 'sufficiently in advance of the work to permit processing.

    2.2 Progress Reports

    During the performance of the Works, the Contractor shall submit to the Engineer, in both media; hard copies and computer diskettes, a weekly and monthly progress reports on or before the fifth day of every month covering the activities of the previous month. Such progress reports shall include the following:

    A copy of the construction schedule outlining progress to date for the various major items of the works.

    List of subcontractors at the site. Approximate count of personnel at the site. Accidents, and unusual events. Meetings and significant decisions. Change orders received, implemented.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/5

    A narrative summation indicating the status of the Work performed and other pertinent activities including the actual percentage of work completed and an estimate of the percentage of work completion in the succeeding week or month. If the work has fallen behind the schedule the Contractor shall state how the time is to be made up to remain on schedule.

    2.3 Materials Lists of Plant and Equipment Specifications

    Prior to ordering and fabrication of materials and equipment, the Contractor shall submit for Engineer's approval, in both media; hard copies and computer diskettes, information and data completely describing all materials and equipment to be supplied as part of the works. Two sets of lists of materials, plant and equipment data shall be submitted as soon as possible. One copy will be returned to the Contractor marked to show the required corrections or approval. When applicable, the approved data shall be incorporated into, and submitted as a part of the materials, plant and equipment manuals. Approval of materials lists and equipment data will be tentative subject to submittal, plant and approval of shop drawings.

    2.3.1 Materials Lists: Submittal copies shall be indexed and neatly bound with sturdy labelled covers complying with the requirements for manuals. Loose submittals will be returned un-reviewed. For each item listed, the Contractor shall include the manufacturer's name and address, trade or brand name, local supplier's name and address, catalog numbers, brochures, terms and conditions of manufacturer's guarantee and warranty, other information to fully describe the item and to demonstrate conformance to the specific requirements and supplementary information as may be required for approval. Brochures and data shall be marked to indicate the items proposed and the intended use.

    Revise the schedule after each meeting or activity where revisions have been required or made. Issue the updated schedule concurrently with the report of each meeting.

    2.3.2 Plant Equipment Data: Copies of submittal shall be bound, indexed and contain information as required for submittal of equipment lists and shall further include specific information on performance and operating curves and data, ratings, capacities, characteristics, efficiencies and other data to fully illustrate and describe the items as may be specified or required for approval.

    Data shall be submitted in sets covering complete systems or functioning units.

    2.4 Standard Specifications

    The Contractor shall submit to the Engineer three copies of referenced or alternative applicable standard publications, standard specifications, regulations and codes of practice for review and/or approval of applicability and compliance with materials, plant and equipment delivered. One approved copy shall be returned to the Contractor to keep permanently on Site.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/6

    2.5 Shop Drawings

    2.5.1 General: After receiving tentative approval of lists of materials and equipment data, the Contractor shall submit shop drawings drawn accurately to scale and related data covering all materials, plant, equipment and accessories to be provided. Shop drawings include fabrication and installation drawings. Information prepared without specific reference to the project are not acceptable shop drawings. Each shop drawings submittal shall be complete and shall be accompanied by technical and performance data as necessary to fully Illustrate the information in the shop drawings or cross referenced to such data contained in the materials lists, plant and equipment data submittals.

    Highlight, encircle or otherwise indicate deviations from the Contract Documents standard. Unless otherwise specified, six blue-print copies of each shop drawing shall be submitted. Two copies will be returned to the Contractor marked to show the required corrections or approval.

    Shop drawings not stamped, project identified, Specification Section identified (where applicable), or signed and dated will be rejected and returned without being examined.

    Submit shop drawings to the Engineer for his review with reasonable promptness and in orderly sequence so as to cause no delay in the Work or in the Work of other contractors. Contractor shall be responsible for delays and costs, and shall make up lost time due to not making submittals.

    At the time of submission the Contractor shall notify the Engineer in writing of any deviations in the shop drawings from the requirements of the Contract Documents.

    Catalogue cuts showing all aspects, design, sizes, components and rough-in information for equipment may be submitted as shop drawings. four(4) copies of each catalogue cut are required.

    Make changes in shop drawings as the Engineer may require, consistent with Contract Documents. When resubmitting, notify the Engineer in writing of any revisions other than those requested.

    The Contractor is responsible for dimensions to be confirmed and correlated at the job site, for information that pertains solely to fabrication processes or to techniques of construction and installation, for coordination of the work of subtrades, and for coordination of the Work of this Contract with the work of Other Contractors.

    Submit sleeving shop drawings for review.

    Where shop drawings involve the structural, mechanical, electrical and vertical transportation Engineers, submit per each submission, five (5) white prints. Provide additional copies when required by the Engineer.

    2.5.2 Title Block and Identification: On each submittal or, drawing, place a permanent label or title block for identification and provide a 40 by 80 mm space for the Engineer's review stamp and a title block showing:

    a. Name and address of the Employer, name and address of the Engineer.

    b. Name and address of the Contractor, name and address of the project.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/7

    c. Name and address of subcontractor, manufacturer or supplier as applicable.

    d. Date, scale, identification number of appropriate specification section or drawing number and revision number.

    e. Contractor's review and approval stamp.

    f. Notation of coordination requirement.

    g. Notation of dimensions established by field measurement.

    2.5.3 Preparation and Size: Details, fabrication and installation information setting, diagrams templates and similar drawings shall be clearly drawn, to accurate scale, dimensioned, noted and cross referenced. Unless otherwise approved, prepare shop drawings of the same size as the Contract Drawings or on 210 mm. by 297 mm sheets as applicable.

    2.5.4 Information Required: Shop drawings with cross-reference to applicable portions of the Contract Document requirements and such other information as may be specified or required for approval, shall include but shall not be limited to the following:

    a. Plant, equipment and material drawings showing all major dimensions, fabrication methods and materials.

    b. Related work with cross-references to applicable portions of the Contract Documents.

    c. Physical configurations with critical dimensions for clearance, access and servicing.

    d. Description of materials including thickness, weights, strengths, etc.

    e. Structural construction and assemblies, welds shown by international standards, symbols and each fastener and connector shown by type and class.

    f. Grouting work, including grouting space and material.

    g. Concrete foundations and bases for machinery and equipment including joints, joint filler and reinforcing.

    h. Anchor bolt details showing type and class, sizes, embedments, projections and locations measured with respect to permanent structural features, anchor bolt location templates of non-shrinking paper or plastic shall be provided.

    i. Protective coatings and factory finishes fully described as to materials, number of coats, colours, plated and metallic coating finishes, treatments and similar information all based on specified requirements. The term "as specified" is not acceptable for this purpose.

    j. Auxiliary parts of materials, plant and equipment including pet-cocks, gauges, gaskets, drillings, etc.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/8

    k. Dimensional drawings of the parts and final assembly for equipment to be site erected.

    l. Piping systems including layout, fittings, valves, hangers, sleeves, identifications and other appurtenances.

    m. Electrical conduit, cable tray and duct systems including layout, fittings, hanger, sleeves and other appurtenances.

    n. Fully detailed wiring drawings showing all wires and conduits and indicating the fittings socket outlets, switches etc.. All general wiring drawings shall be drawn to 1/50 scale.

    o. Name-plate titles for plant and equipment.

    Fixtures and other components should be approved by the Engineer before implementing their data in the coordination drawings.

    Do not use shop-drawings without an appropriate final stamp indicating action taken.

    2.6 Product Data

    .1 Manufacturer's standard schematic drawings:

    .1 Modify drawings to delete information which is not applicable to the project.

    .2 Supplement standard information to provide additional information applicable to the project.

    .2 Manufacturer's catalogue sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data.

    .1 Clearly mark each copy to identify pertinent materials, products or models.

    .2 Show dimensions and clearances required.

    .3 Show performance characteristics and capabilities.

    .4 Show wiring diagrams and controls.

    .5 Supplement standard information to provide details applicable to project.

    .6 Cross-reference product data information to applicable portions of Contract Documents.

    .7 Submit four (4) copies of product data sheets or brochures for requirements requested in specification Sections and as the Engineer may reasonably request where shop drawings will not be prepared due to standardized manufacture of product.

  • December 2010 North South Railway Project Grouping # 2 - Al Nariyah Yard Segment 7

    Specifications

    ______________________________________________________________________________________

    Khatib & Alami Submittals Section 01300/9

    2.7 Layout Drawings

    The Contractor shall prepare and submit layout drawings as required by the technical provisions and additionally for areas where equipment proposed for use could present interface or space difficulties. Submittal of layout drawings shall conform to the requirements specified for shop drawings. Submittals describing the various equipment items which are to be installed in the areas represented in the layout drawings shall be assembled and submitted concurrently and accompanied by the layout drawings. Layout drawings shall be consolidated for all trades, shall be to scale and shall show all pertinent structural and fenestration features and other items required for installation and which affec