Site Operations and Maintenance Plan For the Proposed: Meadow Commons Located at: 3333 Berlin Turnpike Newington, Connecticut Prepared for Submission to: Town of Newington, Connecticut Conservation Commission Planning and Zoning Commission April 13, 2021 Revised April 29, 2021 Applicant: HJG-PC Newington Investor, LLC 405 Cochituate Road, Suite 302 Framingham, MA 01701 Prepared by: BL Companies 355 Research Parkway Meriden, Connecticut 06450 Phone: (203) 630-1406 Fax: (203) 630-2615 BL Project Number: 2100116

Upload: others

Post on 18-Dec-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Site Operations and Maintenance Plan

Site Operations and Maintenance Plan

For the Proposed:

Meadow Commons

Located at:

3333 Berlin Turnpike Newington, Connecticut

Prepared for Submission to:

Town of Newington, Connecticut Conservation Commission

Planning and Zoning Commission

April 13, 2021 Revised April 29, 2021

Applicant:

HJG-PC Newington Investor, LLC 405 Cochituate Road, Suite 302

Framingham, MA 01701

Prepared by:

BL Companies 355 Research Parkway

Meriden, Connecticut 06450 Phone: (203) 630-1406

Fax: (203) 630-2615

BL Project Number: 2100116

Page 2: Site Operations and Maintenance Plan

An Employee-Owned Company

Contents

GENERAL OVERVIEW ............................................................................................................................................. 2

PURPOSE & GOALS .................................................................................................................................................. 2

RESPONSIBLE PARTIES ............................................................................................................................................ 3

LIST OF PERMITS & SPECIAL CONDITIONS .............................................................................................................. 3

MAINTENANCE LOGS AND CHECKLISTS ................................................................................................................... 3

FORMS ...................................................................................................................................................................... 4

EMPLOYEE TRAINING ................................................................................................................................................ 4

SPILL PREVENTION, RESPONSE AND CLEAN-UP PROCEDURES .............................................................................. 4

STORMWATER WASHOUTS ....................................................................................................................................... 5

STORMWATER MANAGEMENT MAINTENANCE .............................................................................................. 6

SYSTEM COMPONENTS ............................................................................................................................................ 6

A - CATCH BASINS AND MANHOLES ......................................................................................................................... 6

B - HYDRODYNAMIC SEPARATORS ........................................................................................................................... 6

C - UNDERGROUND DETENTION SYSTEMS AND PIPING .......................................................................................... 7

D- STORMWATER PONDS/ BASINS ........................................................................................................................... 7

E- RAIN GARDENS .................................................................................................................................................... 7

F- GREASE TRAPS .................................................................................................................................................... 8

PARKING LOTS .......................................................................................................................................................... 9

LANDSCAPING ........................................................................................................................................................... 9

SNOW REMOVAL & STORAGE .................................................................................................................................. 9

OUTDOOR STORAGE ................................................................................................................................................ 9

REFUSE AREAS ....................................................................................................................................................... 10

UTILITIES .................................................................................................................................................................. 10

INSPECTION LOG – FORM MAINTENANCE SCHEDULE FORM OPERATION & MAINTENANCE PLAN (SHEET OM-1)

Page 3: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

2

GENERAL OVERVIEW

This report has been prepared in support of Planning and Zoning and Conservation

Commission applications for the proposed “Meadow Commons” mixed use development by

HJG-PC Newington Investor, LLC. The proposed site development consists of the

construction of three residential buildings with garages and five commercial buildings,

including associated driveways, parking and loading areas, sidewalks, landscaping, utilities,

and detention systems. The proposed development proposes impact to regulated wetland

areas as indicated on the development plans.

The site stormwater system provides stormwater detention and water quality improvements

through hydrodynamic separators, an above ground detention basin, underground

stormwater management systems (detention chambers), rain gardens, deep sump catch

basins with hoods, and a street sweeping program to treat the impervious surfaces. These

measures have been designed in accordance with the Newington Zoning Regulations, the

2002 Connecticut Guidelines for Soil Erosion and Sediment Control, and the 2004

Connecticut Stormwater Quality Manual.

The operations and maintenance of the site shall be performed as detailed in this manual

and as identified on the Operation & Maintenance Plan (sheet OM-1) referenced as an

appendix. To provide a clean environment for both the residential and commercial

development, there shall be monthly inspections and litter removal on all surfaces

throughout the property, especially in areas of refuse and the wetlands.

The following Operations and Maintenance Plan, herby referred to as Plan, was prepared

specifically for the development located in the Town of Newington, Connecticut. The Plan

was developed to satisfy the requirements of the Connecticut Department of Energy and

Environmental Protection’s 2002 Connecticut Guidelines for Soil Erosion and Sediment

Control.

Purpose & Goals

The purpose of this Plan is to ensure that the stormwater management components are

operated in accordance with all approvals and permits. The primary goal is to inform all

property managers on how the system operates and what maintenance items are

necessary to protect downstream wetlands and watercourses. The secondary goal is to

provide a practical, efficient means of maintenance, planning, and record keeping, verifying

permit compliance. This plan is on file at the Town of Newington Planner’s Office.

Page 4: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

3

Responsible Parties

The Property Owner, and other parties as listed below, will be responsible for implementing

the Plan for the subject property.

Company: HJG-PC Newington Investor, LLC

Business Address: 405 Cochituate Road, Suite 302 Framingham, MA 01701

Maintenance inspections shall be performed by a qualified professional. The property owner may retain a management company to oversee the maintenance of the site. A contact name and phone number for the Facility Manager responsible to follow and adhere to this plan will kept on file with this plan and provided to the Town of Newington Planner’s office. Some utilities located on the site will be owned and maintained by various utility companies

in accordance with their standards. The property owner may maintain the service

connections and shall coordinate with the corresponding utility provider for additional

information.

List of Permits & Special Conditions

The project will receive several permits, which may contain special conditions that require

compliance by the property owner and maintenance contractors. Permits may include the

following:

• Town of Newington Permits –

o Conservation Commission: Map Amendment, Subdivision, Regulated Activity

o Planning and Zoning Commission

o Building Department: Building Permit

• State of Connecticut Permits –

o Stormwater Discharge from Construction Activities – Registration

Maintenance Logs and Checklists

The property owner will keep a record of all maintenance procedures performed, date of

inspection/ cleanings, etc. Copies of inspection reports and maintenance records shall be

kept on-site and be readily available if requested by local municipality or state authorities.

Page 5: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

4

Forms

The following forms will be developed for annual maintenance. Copies of the forms will be

kept on-site as part of the Stormwater System Operation and Maintenance Plan.

• Annual Checklist

• Quarterly Checklist

• Monthly Checklist

Employee Training

The property owner will have an employee-training program, with annual updates, to ensure

that the qualified employees charged with maintaining the buildings and grounds do so in

accordance with the approved permit conditions. All sub-contractors (Vactor, landscaping,

snowplowing, etc.) will be informed of requirements and responsibilities

Spill Prevention, Response and Clean-up Procedures

These procedures provide guidance for the prevention of spills of hazardous materials, and the notification, clean-up, and reporting of releases should they occur at the site. A formal plan shall be prepared and kept on site in the Facility Manager’s office.

Hazardous Materials Storage

All hazardous materials shall be stored high and dry in secure locked areas. A list of hazardous materials on-site should be maintained and updated as required. All hazardous products, shall be transported, stored, and used in compliance with applicable labels, regulations, and permit conditions. No incompatible materials shall be mixed or stored together. Compliance with all applicable regulations, including those relating to proper labeling, retention of MSDS sheets, compatibility requirements, containers, and housekeeping shall be the responsibility of the contractor. Drums and containers will be clearly labeled and stored with all labels visible. All flammable products will be stored away from heat and/or ignition sources. All transportation of hazardous materials shall occur in compliance with all applicable federal, state, and local regulations and permit conditions.

Equipment and Materials

The Facility Manager shall keep on-hand appropriate equipment, supplies, and materials for containment and clean-up of chemicals, in the event of a spill. These materials may include but are not limited to:

• Spill Kits for Equipment.

• Sorbents for containment and quick pickup of spilled liquids.

• Drums, barrels, temporary storage bags for containment and transportation.

Page 6: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

5

• Absorbent pads, oil booms, mats, or equivalent.

• Washable, reusable rags for cleaning up small leaks.

• Sheet plastic.

• The above listed materials and dry powder and any other material for use in oil spill clean-up will be stored onsite in a secure area. All personnel will be notified of the location of materials used to contain spills.

Site Management and Spill Prevention

The following measures should be implemented to ensure the proper storage and disposal of wastes:

• Designate waste collection areas.

• Cover waste containers.

• Schedule waste collection at appropriate intervals to prevent overfilling of containers;

• Clean up any spills immediately and dispose of in accordance with applicable state and local laws.

• Maintain adequate spill prevention materials (e.g., absorbent pads, booms) on-site.

• No petroleum products other than those used for small equipment shall be stored on-site. Fuel trucks or fuel storage tanks to fuel equipment/trucks shall not be stored on site.

• Storage areas and waste containers should be included in the regular inspection program of the site.

Inspection and Leak Detection

Facility Manager and/or designated staff shall conduct routine inspections of equipment and facilities, and any other potential sources of hazardous releases. Equipment and facilities will be inspected on a routine basis for leaks of potential hazardous materials and for integrity of containment should where applicable.

Stormwater Washouts

If any unanticipated stormwater washouts occur on site that are not covered under general maintenance of any of the Stormwater Management Facilities listed below the facility manager shall contact the engineer of record for recommendations on corrective actions to be performed. A log of washouts and corrective actions taken, including dates, shall be included with the general maintenance logs.

Page 7: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

6

STORMWATER MANAGEMENT MAINTENANCE

System Components

The stormwater management system has several components that are shown on the

Drainage Plans (DR-1, 2, 3) and perform various functions in capturing, routing, and treating

stormwater runoff. See sheet OM-1 for featured components and their respective

maintenance requirements.

A - Catch Basins and Manholes

Catch Basins and trench drains are inlets which trap road sand and floatable debris prior to draining through the storm sewer system. The proposed catch basins (CBs) are equipped with sumps with sump depths 4’ below the outlet pipe, and hoods over the outlet pipes. The property owner is responsible for cleaning the catch basins and manholes on the site. A Connecticut Licensed hauler shall clean the sumps and dispose of removed sand legally. The road sand may be reused for winter sanding but may not be stored on-site. As part of the hauling contract, the hauler shall notify the property owner in writing where the material is being disposed. Each catch basin and trench drain shall be inspected every four months, with one inspection occurring during the month of April. Any debris occurring within one foot from the bottom of each sump shall be removed by Vacuum "Vactor" type of maintenance equipment. During the inspection of each of the catch basin sumps, the hoods (where provided) on each of the outlet pipes shall also be observed. In the event that a hood is damaged or off the hanger, it shall be reset or repaired.

B - Hydrodynamic Separators

Hydrodynamic separators are underground concrete manholes which trap road sand, fine sediment, metals, oils, grease, and floatable debris that wash off the parking lots via storm sewers prior to discharge into the Underground Detention System and Surface Detention Pond. The hydrodynamic separator manholes will be cleaned periodically during construction, and at the end of construction once the landscaped areas are fully stabilized.

Page 8: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

7

For the first year of operation following construction, inspect each manhole once each month for the months of January, February, March and April, and once every four months thereafter. A graduated measuring device (stadia rod) shall be inserted into each grit chamber and measurements of any accumulations shall be recorded. Any debris, which has accumulated to within one foot of the water surface inside the grit chamber portion of each tank, shall be removed by vacuum "Vactor" type of equipment. Oils scum and floatables shall also be removed from the unit on the same schedule as the grit removal. After the first year of operation, each manhole shall be inspected at a minimum, three times yearly with one inspection occurring in the month of April in the same manner as described above for the first season of operation. Any accumulations found to be occurring within one foot of the water surface shall be removed from the manhole and properly disposed off-site. Also, any floating material discovered during inspections shall be removed from the separator. A detailed maintenance logbook shall be kept for each unit. Information is to include, but not be limited to, the date of inspection, record of grit depth, condition of baffles, observation of any floatable, and date of cleaning performed.

C - Underground Detention Systems and Piping

The underground detention systems are designed to collect flows from property paved parking areas and shall be inspected every six months in the months of April and October. Each of the inspection manholes and observation provided shall be opened and visually checked from the surface. Observation of grit inside of the detention system shall be noted and any deposits found to be 2 inches or more, as measured from the invert of pipe, shall be cleaned and removed. The underground detention systems qualify as a Confined Space under OSHA regulations, and any maintenance involving entry into the pipes should comply with OSHA Confined Space Entry Regulations. The system will be visually inspected through the manholes. If deemed necessary, the system can be TV inspected.

D- Stormwater Ponds/ Basins

All stormwater ponds, scour holes, underdrains, and stone drainage discharge outlet

areas shall be inspected and maintained as noted below. This routine is common for all

stormwater ponds and stormwater basins onsite.

E- Rain Gardens

Rain gardens shall be inspected and cleaned (free from trash) once per month

minimum. Grass in these areas shall be mowed 2 to 12 times per year. Mulching,

fertilizing, and pruning shall occur annually.

Page 9: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

8

Maintenance Activities for Stormwater Ponds/Basins

Activity Frequency

Inspect for Invasive Vegetation Semi-Annual Inspections (Contact Town Wetland Agent for proper procedure/permitting to remove invasive specifies within wet pond)

Inspect for Damage (Outlet Structures/Pipe and Riprap)

Annual Inspection

Monitor for sediment accumulation in the facility and forebay and discharge outlet

Annual Inspection

Examine to ensure that inlet and outlet devices are free of debris and free flowing

Annual Inspection

Repair eroded areas as necessary As needed maintenance

Clean and remove debris/sediment from inlet and outlet control structures and discharges.

Monthly Maintenance

Mow side slopes. Vegetation within bottom of basin and along aquatic shelf shall not be mowed. The vegetation located within the aquatic shelf will serve to filter pollutants and enhance the overall water quality of the basin.

Monthly Maintenance

Removal of sediment from the forebay (scour holes)

Annual Maintenance

Remove sediment when the pool volume has become reduced significantly

Every 5 years; Increase frequency if tributary watersheds experience higher sediment loading than expected

Clean Outlet Control Structure Semi-Annual

F- Grease Traps

All grease traps shall be inspected monthly and cleaned out twice per year per CT DPH

standards.

Page 10: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

9

Parking Lots

Parking lots, driveways and sidewalks shall be swept regularly by the property owner to

clean trash and other debris. The property owner will sweep parking lots on its property in

the spring to remove winter accumulations of road sand.

Landscaping

The property owner will maintain landscaped areas. Normally the landscaping maintenance will consist of pruning, mulching, planting, mowing lawns, raking leaves, etc. It expected that all landscaping is to remain in healthy condition that is consistent with approved plans. Trees/landscaping that die must be replaced. Use of fertilizers and pesticides will be controlled and limited to minimal amounts necessary for healthy landscape maintenance. The lawn areas, once established, will be maintained at a typical height of 2½”-3”. This will allow the grass to be maintained with minimal impact from weeds and/or pests. Pesticides will only be used as a control method when a problem has been clearly identified and other natural control methods are not successful. All pesticide applications shall be by licensed applicators, where necessary. Invasive vegetation is to be removed. Topsoil, brush, leaves, clippings, woodchips, mulch, and other material shall be stored off site. Snow Removal & Storage

Snow shall be shoveled and plowed from sidewalks, driveways and parking areas as soon

as practical during and after winter storms and stored in snow storage areas on site where

practical. No snow shall be pushed behind the snow storage areas towards downgradient

areas. No sodium chloride shall be used for ice or snow control on the site. Areas

downgradient of the snow removal deposition areas will be checked and maintained after

the winter season by removal of any debris and sand and restored to original condition after

seasonal winter conditions. Vegetation will be raked and if needed, pruned or reseeded.

Outdoor Storage

There will be no outdoor storage of hazardous chemicals, fertilizer, pesticides, or herbicides

anywhere in the site.

Clean wooden pallets and baled cardboard may be stored outside periodically. These items

will be removed from the site on a regular schedule.

Page 11: Site Operations and Maintenance Plan

Operations & Maintenance Plan Meadow Commons, 3333 Berlin Turnpike, Newington, CT

355 Research Parkway ▪ Meriden, CT 06450 ▪ T (203) 630-1406 ▪ F (203) 630-2615 ▪ www.blcompanies.com

10

Refuse Areas

Designated refuse areas and any trash receptacles will be inspected monthly to ensure they

provide adequate capacity between empty cycles and overall cleanliness in the surrounding

area of the receptacles and refuse areas. Generally, any trash around the site will be

disposed of appropriately immediately and the owner will be notified of repeat occurrences.

UTILITIES

Sanitary Sewer System

All of the on-site sanitary sewer collection system will be owned and maintained by the property owner.

On-Site Collection Sewer: The property owner will annually inspect the manholes within the on-site sewer system on the property and check for debris and blockages. Any low-flow lines with accumulations will be cleaned with water-jetting.

Water System

The on-site mains and fire hydrants will be owned and maintained by the property owner. The off-site mains are owned and maintained by The Metropolitan District. The property owner will be responsible for maintaining the domestic and fire service lines to the buildings.

Gas\Electric\Telephone\Cable TV System

The electric system will be owned and maintained up to the transformer by United Illuminating. The gas system on site will be owned and maintained by the property owner and gas will be provided by Eversource. The property owner will maintain the secondary electric lines from the transformers to the buildings. The telephone system will be owned and maintained by Frontier up to the buildings.

Site Lighting

The property owner is responsible for maintaining the parking lot, driveway and building-mounted lights on the property.

Page 12: Site Operations and Maintenance Plan

CA

TC

H B

AS

IN /

CA

TC

H B

AS

IN I

NS

ER

T I

NS

PE

CT

ION

LO

G

Nam

e of

Insp

ecto

r:

Dat

e:

Cat

ch

Bas

in

ID

Condit

ion (

circ

le

one)

Deb

ris

above

1’

wit

hin

sum

p?

(If

yes

then

cat

ch b

asin

is

to b

e

clea

ned

)

Dat

e of

Cat

ch B

asin

Cle

anin

g (

if d

ebri

s is

gre

ater

than

1’)

Condit

ion o

f

Hood (

if

appli

cable

) C

om

men

ts:

Exce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

E

xce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

E

xce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

E

xce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

E

xce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

E

xce

llen

t

F

air

Poor

Yes

N

o

Yes

N

o

On-s

ite

Pro

cedure

s fo

r In

spec

tion a

nd M

ainte

nan

ce o

f C

atch

Bas

in I

nse

rts

• S

ecure

tra

ffic

and p

edes

tria

n t

raff

ic w

ith c

ones

, bar

rels

, et

c.

• C

lean

surf

ace

area

aro

und e

ach c

atch

bas

in

• R

emove

gra

tes

and s

et a

side

• C

lean

gra

tes,

rem

ove

litt

er a

nd d

ebri

s th

at m

ay b

e tr

apped

wit

hin

the

gra

te

• R

emove

by v

acto

r hose

the

deb

ris

that

has

bee

n t

rapped

in t

he

trough a

rea.

Dis

pose

of

in a

ccord

ance

wit

h l

oca

l, s

tate

and f

eder

al r

egula

tory

agen

cy r

equir

emen

ts. M

ost

deb

ris

that

is

captu

red i

n t

he

trough o

r su

mp a

rea

wil

l fa

ll i

nto

the

non-h

azar

dous

was

te c

ateg

ory

.

• V

isual

ly i

nsp

ect

and c

hec

k t

he

condit

ion o

f th

e tr

ough a

rea.

• R

epla

ce g

rate

and l

ock

dow

n a

s nee

ded

.

• U

n-s

ecure

tra

ffic

contr

ol

area

.

• C

om

ple

te s

ervic

e re

port

and s

ubm

it t

o f

acil

ity o

wner

.

Page 13: Site Operations and Maintenance Plan

MAINTENANCE SCHEDULE

During the First Year of Operation:

Task: Completion Date: Manager’s Initials:

JANUARY:

Employee Training Program with Spill Program

*Stormwater Management Basins

(Underground & Surface)

FEBRUARY:

* Stormwater Management Basins

(Underground & Surface)

MARCH:

* Stormwater Management Basins

(Underground & Surface)

APRIL:

*Catch Basin

* Stormwater Management Basins

(Underground & Surface)

*Sanitary Inspection

Shrub Fertilization

AUGUST:

*Catch Basin

* Stormwater Management Basins

(Underground & Surface)

OCTOBER:

* Stormwater Management Basins

(Underground & Surface)

Tree and Lawn Fertilization

DECEMBER:

*Catch Basin

* Stormwater Management Basins

(Underground & Surface)

*NOTE: Use appropriate worksheet found in this plan to conduct the inspection.

Page 14: Site Operations and Maintenance Plan

After the First Year of Operation:

FOR YEAR___________________________

Task: Completion Date: Manager’s Initials:

JANUARY:

Employee Training Program with Spill Program

APRIL:

*Catch Basin

* Stormwater Management Basins

(Underground & Surface)

*Sanitary Inspection

Shrub Fertilization

AUGUST:

*Catch Basin

OCTOBER:

* Stormwater Management Basins

(Underground & Surface)

Tree and Lawn Fertilization

DECEMBER:

*Catch Basin

*NOTE: Use appropriate worksheet found in this plan to conduct the inspection.

Page 15: Site Operations and Maintenance Plan

B

e

r

l

i

n

T

u

r

n

p

i

k

e

-

C

T

R

o

u

t

e

1

5

-

U

S

R

o

u

t

e

5

P

a

n

e

R

o

a

d

1"=80'

OPERATION &MAINTENANCEPLAN

A.J.S.

A.J.S.

OM-1

Designed

Reviewed

Project No.Scale

Drawn

Date2100116

Des

c.RE

VIS

ION

SD

ate

No.

Title

NEW

ING

TON

, HA

RTFO

RD C

OUN

TY, C

ON

NEC

TICUT

3333

BER

LIN

TUR

NPI

KE

Sheet No.

Xref

(s):

; BD

2100

1160

0 ; X

C21

0011

602

; XC

2100

1160

0 ; X

C21

0011

603

; XY2

1001

1601

; XC

2100

1160

1 ; X

C21

0011

604

CAD File:OM210011601

4/28

/202

1, H

LIN

DER

, G:\

JOBS

21\0

0\21

0011

6\D

WG

\OM

2100

1160

1.D

WG

.OM

-1 2

4X36

80S

C.

2021 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.C

Land

Sur

veyi

ngEn

viro

nmen

tal

Engi

neer

ing

Arc

hite

ctur

eM

EADO

W C

OM

MO

NS

355 Research Parkway

(203) 630-1406Meriden, CT 06450

(203) 630-2615 Fax

4/13/2021

J.A.B.

REV

ISED

PER

TO

WN

CO

MM

ENTS

4/29

/202

11.

···