Site Remediation and the Licensed Site Remediation
Professional Program
NJDEP/Air & Waste Management Association Regulatory Update Conference
October 12, 2012
Ken Kloo, DirectorSite Remediation Program
SITE REMEDIATION PROGRAMAssistant
Commissioner
Division of Remediation Management
Remediation Review
Inspection and Review
Field Operations North
Field Operations South
UHOT
Remediation Oversight
Case Management
Remedial ActionPermitting
Brownfield Reuse
Publicly Funded Response
Site Management
Environmental Measurements and Site Assessment
Division of Enforcement, Technical, and
Financial Support
Enforcement and Information Support
CaseAssignment and Initial
Notice
Enforcement and Investigations
Information Systems
Hazardous Site Science
Ground Water Pollution Abatement
Environmental Evaluation and Risk
Assessment
Data Quality
Dredging and Sediment Technology
CommunityRelations
Financial Services
Fiscal Support and Contract
Administration
Fund Management
Direct Billing and Cost Recovery
2
Site Remediation Reform Act
• May 7, 2012• Full implementation of LSRP program• Final rules adopted
3
Reflect complete conversion to LSRP program
“Final” rule included:• Amendments to ARRCS, ISRA, UST rules to
make consistent with LSRP process
• Complete overhaul of Technical Requirements
Completed with upfront stakeholder input
Coincides with conversion of all cases within SRP to LSRP process
Final Rules
4
Technical Guidance: Round 1
Technical Guidance topics• Attainment
(Compliance)
• Clean Fill/Alternative Fill
• Conceptual Site Model
• Ecological Investigation
• Historic Fill
• Immediate Environmental Concern
• Linear Construction
• LNAPL
• Monitored Natural Attenuation
• PA/SI/RI Groundwater
• PA/SI/RI Soils
• Presumptive Remedies
• Receptor Evaluation
• Vapor Intrusion
• Analytical Methods *
• Technical Impracticability *
* = Not completed
5
Technical Guidance: Round 2
Kick-off meeting held September 19 Six (6) topics chosen through stakeholder
process for document development Committee members chosen
• Offsite source investigation
• Co-mingled ground water plumes
• Historic pesticide use
• Capping
• Performance monitoring of in-situ ground water remedial actions
• Evaluation of contaminated ground water discharge to surface water
6
Unregulated Heating Oil Tanks
Aiming to propose Fall 2012
LSRP not required
DEP issues NFA, LSRP does not issue RAO
Significant changes:• Do not need to analyze for TICs
• De minimis volume can remain without need for Deed Notice in limited circumstances
• Deed notice “lite”
UHOT Rules
7
Stakeholder Input
DEP recognizes the importance of continued stakeholder input to help ensure the success of the LSRP program• Regulations
• Technical Guidances
• Training
8
Compliance Assistance
Current emphasis on compliance assistance
Identify responsible entity(ies)• Someone needs to step up
• No one steps up, all go to Enforcement
Someone steps up: discuss issues - attempt to bring into compliance
Not permanent – offered during transition to LSRP program
9
Enforcement
Will pursue enforcement actions against responsible entity(ies) for failure to:• Retain LSRP
• Meet regulatory/mandatory time frames
• Meet requirements imposed by Direct Oversight
AONOCAPAs already sent to responsible entity(ies)
LSRPs may be referred to SRPL Board for disciplinary proceedings
10
LSRP Statistics: (as of October 1, 2012)
Total number SRP cases = 14,365
Total number active LSRP cases = 9,491
Total number closed LSRP cases = 1,174
Total number cases that still needto hire LSRP = 2,344
Total number active UHOT cases = 2,116
Total number closed UHOT cases = 33,074
Total number active “other” SRP cases = 2,758
11
Number RAOs filed = 1,812 Number RAOs inspection/review
completed = 1,464 Number RAOs invalidated = 0
Average total days DEP processing time =45.20
LSRP Statistics: (as of October 1, 2012)
12
LSRP Licensing Examinations
1st exam = May 14, 2012• 278 took exam
• 218 passed (78 percent)
• List of permanent/temporary available through DEP and SRPL websites
▪ (datamine2.state.nj.us/DEP_OPRA/OpraMain/categories?category=SRRA/)
▪ (www.nj.gov/lsrpboard/)
2nd exam = September 24, 2012• 235 took exam
• Results available soon13
Two more exams scheduled• November 15, 2012• January 17, 2013 (tentative)
November Exam• Full Credential Review applicants must submit
applications by October 12, 2012• Limited Credential Review applicants must
submit applications by October 19, 2012• Limited Credential Reviews are available only
for individuals who possess a temporary LSRP license and/or individuals who are repeating the exam
LSRP Licensing Examinations
14
LSRP Licensing Examinations
January 2013 Exam• Tentatively scheduled for January 17, 2013
• Application schedule for January 2013 exam will be announced when January examination date finalized
SRPL Board anticipates additional examinations will be given May and November 2013
ALL TEMPORARY LICENSES EXPIRE ON FEBRUARY 28, 2013
15
HDSRF• Current balance = approximately
$30M• A2395/S1246 revised HDSRF priorities• Conditionally vetoed by Governor
Accepts revised priorities Reduces awards to municipalities Eliminates grants for innovative
technology and unrestricted/limited restricted remedies
Funds remedial action workplan (RAW) preparation at 100%
Brownfield Issues
16
Brownfield Development Areas• No plans to designate new BDAs due
to limited HDSRF funding
Brownfield Issues
17
Department has amended all contracts to allow use of LSRPs on publicly funded remediations• Implementation ongoing
Immediate Environmental Concerns• Case manager assigned for all IEC cases
Publicly Funded Remediations
18
Contact Information
Names and phone numbers of SRP staff by topic area are available at
http://www.state.nj.us/dep/srp/srra/srra_contacts.htm
19
Questions?