site report
DESCRIPTION
SinamicsTRANSCRIPT
-
500000 * Date: 24/04/2015* Notification No.:* Service Engineer:* Product MLFB / System:Product Sr. No.:Machine No. / Details:
* Address:
* City: Koppal
Mr. Baskar6SL3310-1TH37-4AB3T-B30367000145
Hospet Steels Limited* Customer Name:Ginegera
Date 22/04/2015 Time 15:00
Date 23/04/2015 Time 11:00 Date 24/04/2015 Time 17:00
Machine No. / Details:
TIN No.:Payment Type: Paid
Breakdown
ID Fan* Email ID: Supplied by / OEM / Country:
PAN No.:
Mr. Girish* City: Koppal
Nature of Call:
*** 2nd Commissioning Date:Application:
** RSV / SIROT / Equipment No.:* Contact Person:* Telephone No.:* Mobile No.: +919448397217
0
Malfunction end
*Mandatory/ **Mandatory for SIROT & AMC services/ ***Mandatory for MCMTCall Received
Deputation scheduledDate 22/04/2015 Time 21:00 Date 4/24/2015 Time 19:34Date 23/04/2015 Time 11:00 Date 25/04/2015 Time 8:30
Engineer left siteEngineer reached site
* Problem Reported:
Engineer arrived office
* Observation at Site:
Sinamics G130 Drive Mobile Repair
Engr start from office
Drive cleaning Cold test of complete drive, Simulation test, drive commissioning
* Site Analysis:
Power & Control cable tightness, dust level, earthing, received material inspection
(iii) Installed the new rectifier power block (MLFB: 6SL3351-1AG37-4DA1) in drive panel and changed the damaged fiber optic cable(A5E00106346). Capacitor forming done for all power blocks and verified the DC link voltage built up status.
(v) Drive stationary & turning measurement done. Started the drive and ran upto full speed (1450 rpm) and verified the motor operation. Foundok. Drive complete operation verified through LCI and found ok. Values recorded through trace function.
(i) Received new rectifier power block and drive internal spares material inspection done
(ii) Visual & physical inspection done on faulty drive. Cold test done for all power blocks and found ok
* Work Done at Site:
(iv) Simulation test done for the complete drive and found ok.
Failed drive details taken for further analysis.
* Conclusion:
If No, Further Actions Required:
Yes* Job Completed:
-- Please Select--
earthing continuity upto the earth pit.
Product the drive from dust & moisture, Provide proper cooling system to drive panel, provide double earthing to drive and ensure the
If No, Further Actions Required:
Recommendations to Customer:
Details:
-- Please Select--
earthing continuity upto the earth pit.
-
Sl No.Consumed /Required /Returned
Qty From Good /Defective BillableFaulty to
beReturned
1 -Select -Select -Select -Select -Select
2 -Select -Select -Select -Select -Select
3 -Select -Select -Select -Select -Select
4 -Select -Select -Select -Select -Select
5 -Select -Select -Select -Select -Select
Material Consumed / Required / Returned / Inspected :
Material DescriptionMLFB Serial No.
5 -Select -Select -Select -Select -Select
Sl No.
1
2
3
4
5 Excellent
Excellent
Analysis / explanation by Service Engineer
Response to Service Request
Engineer was equipped for solving the problem Excellent
Excellent
ExcellentOverall satisfaction about Siemens products & Service
Call Registration / Co-ordination Process with SIEMENS
Customer Feedback:
Feedback On
5 Excellent
Dear Sir, we request you to update the below information for better service support.
Customer Remarks:
Overall satisfaction about Siemens products & Service
Note: You can also give your feedback on [email protected] along with Notification No.
3 Nos2 Nos2 Nos
NoNoNo
1. Electrical team:
Dear Sir, we request you to update the below information for better service support.
2. Name of service provider:
In House facility
4. Repair facility:
1. Existing maintenance contract for the products:
3. Mechanical maint. team:2. Instrumentation team:
Maintenance Contract
4. Extended warranty support required:5. Condition monitoring Dept:
Yes
No
Siemens Ltd-
Siemens Training Center
3. Interested in AMC with Siemens & the products:
5. If Yes, then what are the Products: No6. Training on Siemens products:
Yes7. Spares requirement:No6. Energy management study:
7. Asset management:
Date:
Place: Mr. Baskar
.----------------------------------------------------------------------------------------------------------------------------------------.
74212731
Signature :
Roll No. :Customer Service Engineer
Signature :
Name :GinegeraTelephone/Mobile No.:Name : Mr. Girish
24/04/2015
+919448397217
Work end Work end Work start19:3020:00
Time Sheet: For internal purpose only
Work end23/04/2015 11:00
Date in dd/mm/yyyy & Time in 24 hrs format only.DateDate Work start Date Work start
24/04/2015 10:00